Safe Work Method Statement: Lower Roof Walkway
Safe Work Method Statement: Lower Roof Walkway
1
Safe Work Method Statement Queensland
Activity: Construction of Lower Roof Walkway
Company: RoofSafe Solutions Pty Ltd
Project Location: Queensland
The SWMS were made after risk assessments were undertaken and the hierarchy of control was used.
Step 1 Task | Activity: In the correct sequence, identify the High Risk Construction Work for the construction activity to be undertaken
Step 2 Potential Hazards: For each of the High Risk Construction Works to be undertaken, list the things that have the potential to cause harm
to people
Step 3 Inherent Risk: Calculate the current risk (1 – 5) of the hazard prior the introduction of the control measures using the attached Risk
Rating Table
Step 4 Control Measures: Using the Hierarchy of Controls, list the control measures required to eliminate or minimise the risk of injury from the
identified hazard and the manner in which the control measures will be implemented, monitored and reviewed.
Step 5 Calculate the new risk (1 – 5) of the hazard after the introduction of the control measures using the attached Risk
Residual Risk:
Rating Table
2
Safe Work Method Statement Queensland
Activity: Construction of Lower Roof Walkway
Company: RoofSafe Solutions Pty Ltd
Project Location: Queensland
The SWMS were made after risk assessments were undertaken and the hierarchy of control was used.
Monitoring will be
carried out visually by
Wear appropriate When weather is Hot; drink water
Weather
Hot & cold
illnesses 3 clothing for climate
conditions
frequently. In cold climate wear
appropriate clothing
the operator and
reviewed, discussed
and documented if
4
circumstances change
Monitoring will be
carried out visually by
Trees/shrubs: In conjunction with
Environment Environmental
damage 3 PC’s Environmental
Plan
We will ensure for shrubs/trees
protection we consult Site Supervisor
the operator and
reviewed, discussed
and documented if
4
circumstances change
3
Safe Work Method Statement Queensland
Activity: Construction of Lower Roof Walkway
Company: RoofSafe Solutions Pty Ltd
Project Location: Queensland
The SWMS were made after risk assessments were undertaken and the hierarchy of control was used.
4
Safe Work Method Statement Queensland
Activity: Construction of Lower Roof Walkway
Company: RoofSafe Solutions Pty Ltd
Project Location: Queensland
The SWMS were made after risk assessments were undertaken and the hierarchy of control was used.
5
Safe Work Method Statement Queensland
Activity: Construction of Lower Roof Walkway
Company: RoofSafe Solutions Pty Ltd
Project Location: Queensland
The SWMS were made after risk assessments were undertaken and the hierarchy of control was used.
6
Safe Work Method Statement Queensland
Activity: Construction of Lower Roof Walkway
Company: RoofSafe Solutions Pty Ltd
Project Location: Queensland
The SWMS were made after risk assessments were undertaken and the hierarchy of control was used.
7
Safe Work Method Statement Queensland
Activity: Construction of Lower Roof Walkway
Company: RoofSafe Solutions Pty Ltd
Project Location: Queensland
The SWMS were made after risk assessments were undertaken and the hierarchy of control was used.
8
Safe Work Method Statement Queensland
Activity: Construction of Lower Roof Walkway
Company: RoofSafe Solutions Pty Ltd
Project Location: Queensland
The SWMS were made after risk assessments were undertaken and the hierarchy of control was used.
I …………………………………… have read, understand and will comply with the requirements of this work method statement. I confirm that I
have the skills and training including relevant certification to conduct the tasks as described.
I …………………………………… have read, understand and will comply with the requirements of this work method statement. I confirm that I
have the skills and training including relevant certification to conduct the tasks as described.
I …………………………………… have read, understand and will comply with the requirements of this work method statement. I confirm that I
have the skills and training including relevant certification to conduct the tasks as described.
I …………………………………… have read, understand and will comply with the requirements of this work method statement. I confirm that I
have the skills and training including relevant certification to conduct the tasks as described.
9
Safe Work Method Statement Queensland
Activity: Construction of Lower Roof Walkway
Company: RoofSafe Solutions Pty Ltd
Project Location: Queensland
The SWMS were made after risk assessments were undertaken and the hierarchy of control was used.
I …………………………………… have read, understand and will comply with the requirements of this work method statement. I confirm that I
have the skills and training including relevant certification to conduct the tasks as described.
I …………………………………… have read, understand and will comply with the requirements of this work method statement. I confirm that I
have the skills and training including relevant certification to conduct the tasks as described.
I …………………………………… have read, understand and will comply with the requirements of this work method statement. I confirm that I
have the skills and training including relevant certification to conduct the tasks as described.
I …………………………………… have read, understand and will comply with the requirements of this work method statement. I confirm that I
have the skills and training including relevant certification to conduct the tasks as described.
10
Safe Work Method Statement Queensland
Activity: Construction of Lower Roof Walkway
Company: RoofSafe Solutions Pty Ltd
Project Location: Queensland
The SWMS were made after risk assessments were undertaken and the hierarchy of control was used.
Period of Time Work Method Statement operates: Current from: 11/09/2018 Review date: 11/09/2019