Bpi Family Savings Bank Construction Checklist Form: Client Instructions

This 3-sentence summary provides an overview of the construction checklist form: The form outlines the activities and percentage completions needed at 30%, 60%, and 90% stages of construction for loan disbursement purposes, including items like foundations, walls, electrical work, doors and windows. The client is instructed to check off completed activities at each stage and inform the bank of any plan changes. An on-site materials list and estimated costs are also included for reporting.

Uploaded by

Louie Enriquez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
254 views

Bpi Family Savings Bank Construction Checklist Form: Client Instructions

This 3-sentence summary provides an overview of the construction checklist form: The form outlines the activities and percentage completions needed at 30%, 60%, and 90% stages of construction for loan disbursement purposes, including items like foundations, walls, electrical work, doors and windows. The client is instructed to check off completed activities at each stage and inform the bank of any plan changes. An on-site materials list and estimated costs are also included for reporting.

Uploaded by

Louie Enriquez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

BPI FAMILY SAVINGS BANK

CONSTRUCTION CHECKLIST FORM

ACCOUNT'S NAME: __________________________________ PROJECT DATE: __________________


( ) One Storey Request No. 1. _________
LOCATION: _________________________________________ ( ) Two Storey 2. _________
( ) Others 3. _________
ACCOUNT OFFICER: _________________________________
Tel Nos: ______________________
Fax No. 754-6333

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------
-----------
CLIENT INSTRUCTIONS:

1. Prior to every release of loan proceeds, this form should be accomplished by you, your project engineer or any authorized
representative who is familiar with the construction project. Accomplished form should be submitted or faxed tou your account
officer for approval and loan release.
2. Indicated are building compositions for each required percentage completion. These are premised on standard construction
procedures and construction materials installed. Simply check an activity if it is fully completed, partially completed or not yet
started.
3. Any revisions from submitted building plans and bills of materials may alter suggested compositions. Kindly inform your account
officer of these revisions.
4. Partial, Partially installed / completed is equivalent to at least 50% accomplishment.

PARTIALLY
FULLY COMPLETED NOT YET
ACTIVITIES COMPLETED (at least 50% STARTED
done)

I. 30% COMPLETION COMPRISES OF THE FF. ITEMS: (Min. of 1 mo. and


max of 3 mos. to complete)

 STAKINGS – wood sticks planted on ground to guide excavation phase


 EXCAVATION – ground pit which houses foundation

 FILLING MATERIALS – materials used to fill excavation


 FOUNDATION – base or foot of column or wall below the ground

 REINFORCED CONCRETE COLUMNS (For 1 storey-full, for 2 storey-full


on ground, partial on 2nd floor)
 REINFORCED CONCRETE BEAMS (For 1 storey-full, for 2 storey-full on
ground, partial on 2nd floor)
 SLAB ON FILL(Full-Ground Floor)
 SUSPENDED SLAB / 1 & G Floor (Partial if two-storey) **

 PERIMETER WALL (6th CHB)


(For 1 storey-full, for 2 storey-full on ground, partial on 2nd floor)
 INTERIOR WALL (4th CHB)
(For 1 storey-full, for 2 storey-full on ground, partial on 2nd floor)
 PLASTER CEMENT FOR WALLS (6th CHB)
(For 1 storey-full, for 2 storey-full on ground, partial on 2nd floor)

II. 60% COMPLETION COMPRISES OF THE FF. ITEMS: (Min. of 1 mo. and
max of 3 mos. to complete)

 ROOFING MATERIALS – (Partially installed – with trusses/purlins)


PARTIALLY
FULLY COMPLETED NOT YET
ACTIVITIES COMPLETED (at least 50% STARTED
done)

 REINFORCED CONCRETE COLUMNS – (Full , if two-storey)***

 REINFORCED CONCRETE BEAMS – (Full , if two-storey)***


 SUSPENDED SLAB / 1 & G Floor – (Full , if two-storey)***

 PERIMETER WALL (6th CHB) - (Full , if two-storey)***


 INTERIOR WALL (4th CHB) - (Full , if two-storey)***

 PLASTER CEMENT FOR WALLS - (Full , if two-storey)***


 DOORS AND WINDOWS - (Partially installed)

 ELECTRICAL AND PLUMBING - (Partially installed)


 CEILING - (Partially installed)

 PLYWOOD PARTITIONS - (Partially installed)

III. 90% COMPLETION COMPRISES OF THE FF. ITEMS: (Min. of 1 mo. and
max of 3 mos. to complete)

 ROOFING MATERIALS – (Fully installed)

 DOORS AND WINDOWS - (Fully installed)


 ELECTRICAL AND PLUMBING– (Fully installed)

 FLOOR FINISHES - (Fully installed)


 WALL FINISHES - (Fully installed)
(e.g. Ashlar marble, wallpaper, anay finish etc.)
 CEILING - (Fully installed)

 PLYWOOD PARTITIONS - (Fully installed)


 PAINTINGS - (Fully or Partially Completed)

( ** ) - not applicable for one-storey


( *** ) - For 3-storey, Full on 1st & 2nd Floors,
Partial on 3rd Floor

CONSTRUCTION MATERIALS ON SITE BUT NOT INSTALLED:

1.

2.

3.

APPROXIMATE COST OF MATERAILS (ON-SITE): Php __________________________

ACCOMPLISHED BY:

_______________________________