Kaizen (Idea) Work-Up Form
Kaizen (Idea) Work-Up Form
Kaizen # _________
Date_________
Submitted By:______________ Evaluated By ________________
Resources Required:
Cooperation Required:
Legal/Ethical Concerns:
Education/Training Required:
Other problems:
Implications:
Plan Steps:
________________________________________________________________
Estimated Savings:
Time/Week__________ Money/Week___________
Implementation:
Date:_________ By Whom:__________________
Plan
Department___________ Kaizen Celebration Date Implemented: 12/XX/01
Before Improvement: (what was happening) After Improvement: (how it was fixed) Depending on the draws done at the
Each workstation varied as far as it stocking, some items were stocked in workstation a par level for each of the items was set and agreed upon. Team
drawers which hid their stock level, stock could easily get ‘messy looking. agreement was you never leave a station unstocked for the person behind you.
New plexi-glass holders were designed by the staff, built and are now dressing
up the work areas while minimizing stockout. Cost per station $75. Value of
not running out…priceless.
Change Sustainer:
Measurement:
Courtesy of Duke Rohe ([email protected])
HIMSS Management Engineering & Process Improvement (ME-PI) Community
http://www.himss.org/ASP/MEPI_Home.aspCourtesy