Inspected by QCP Approval 1-APC 1-Employer (APC) 2 - DAR 2 - Engineer (DAR) 3 - Contractor (NEGEMCO) 4 - Vendor 5 - Third Party

4 Pole Digital —Ground resistivty tester Range: Serial No: Voltage: Calibrated Date: RESISTIVITY RESULTS GROUND ROD / GROUND WELD No CONNECTED TO GRID DISCONNECTED TO GRID ACCEPTED REJECTED REMARKS: WITNESSED / REVIEWED BY: CONTRACTOR QUALITY CONTROL (NEGEMCO) CONSULTANT (DAR) EMPLOYER (IF REQUIRED) SIGNATURE: PRINT NAME: DATE:

Uploaded by

Ahmad Dagamseh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
137 views6 pages

Inspected by QCP Approval 1-APC 1-Employer (APC) 2 - DAR 2 - Engineer (DAR) 3 - Contractor (NEGEMCO) 4 - Vendor 5 - Third Party

4 Pole Digital —Ground resistivty tester Range: Serial No: Voltage: Calibrated Date: RESISTIVITY RESULTS GROUND ROD / GROUND WELD No CONNECTED TO GRID DISCONNECTED TO GRID ACCEPTED REJECTED REMARKS: WITNESSED / REVIEWED BY: CONTRACTOR QUALITY CONTROL (NEGEMCO) CONSULTANT (DAR) EMPLOYER (IF REQUIRED) SIGNATURE: PRINT NAME: DATE:

Uploaded by

Ahmad Dagamseh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Project: J17082 Employer: ITP Ref No.

ITP-I-09

Engineer: Contractor: Date: August / 2 /2020

PO# 201902600 NEGEMCO Job No.: JV19-016 Rev: 00


Project: Aqaba Screening Project task 5 of APC storing
Inspection test Plan Earthing System
Inspected By 1- APC Amin Mohammad/Eyad N. Abu Adi
1-Employer (APC) QCP Approval
2- DAR
Earthing System 2- Engineer (DAR)
3- Contractor (NEGEMCO) ( )- Approved without Comment
4- Vendor ( )- Approved With Comment- Proceed
5- Third party ( )- Not Approved-Resubmitted
Control Activity
W: Witness
H: Hold
I: Inspection
Item Activity Description Inspection/Test method Referance standard R: Review Verification Documentation
T: Testing
N/A : Not Applicable
1 Documentation ENG CONT VEN TH.P
1_1 HSE Plan Document review HSE Policy R H N/A N/A Project requirment
1_2 Related Installation insturuction Document review Vendor Procedure R H N/A N/A Vendor Procedure

1_3 Installation Method of Statement Document review Contractor Procedure R H N/A N/A Method of Statement

1_4 Shop Drawing Document review Contractor Drawing R H N/A N/A Shop Drawing
2 Execution
Material Receipt Inspection to be Project Requirement and
2_1 done on delivery visual inspection Specifications R+I I N/A N/A Material Receiving Report

Grounding cable installed and


Approved Shop Drawings
2_2 routed according to the lastest visual inspection I I N/A N/A Visual Inspection + RFI
and Specification
drawing and specifications

Approved shop drawing


2_3 Grounding Cable correct size visual inspection and approved submittal I I N/A N/A Visual Inspection + RFI

Grounding Cables and Electrode are


Approved Shop Drawings
2_4 buried the depth as per drawing visual inspection and Specification I I N/A N/A Visual Inspection + RFI
and Specifications

Grounding joints visual check Specification and


2_5 visual inspection I I N/A N/A Visual Inspection + RFI
(cadwelds, clamps, etc) approved submittal

Ensure Structural Steel, Supports,


Equipments, Frames, Steel Column,
2_6 visual inspection Specification and Drawings I I N/A N/A Visual Inspection + RFI
Flexible Ducts, Cable Tray, conduit &
Piping Grounding installation

Ensure the installation of ground


Approved shop drawing
2_7 bus bar is the same as approved visual inspection I I N/A N/A Visual Inspection + RFI
and approved submittal
drawing

2_8 GROUNDING SOIL RESISTIVITY TEST 4 Pole Digital —Ground project requirement and I+W T N/A N/A Test Report
resistivty tester specification

project requirement and


2_9 GROUNDING CONTINUITY TEST Ohmmeter I+W T N/A N/A Test Report
specification

project requirement and


2_10 GROUNDING RESISTANCE TEST Ground Resistance Tester specification I+W T N/A N/A Test Report
GROUNDING RESISTANCE INSPECTION REPORT DOCUMENT NUMBERING:

Project: Aqaba Screening Project task 5 of APC storing

Employer: Arab Potash Company Contractor: NEGEMCO

EQUIPMENT NO:

DESCRIPTION:
SYSTEM/SUBSYSTEM No:
REPORT No:

LOCATION: REFERENCE DRAWING:

MINIMUM GROUND RESISTANCE VALUE:

TEST EQUIPMENT

Type: Manufacturer: Due Date:

Range: Serial Nº:

Voltage: Calibration Date:

GROUND RESISTANCE RESULT


GROUND ROD / GROUND WELD Nº
CONNECTED TO GRID DISCONNECTED TO GRID ACCEPTED REJECTED

REMARKS:

WITNESSED / REVIEWED BY: CONTRACTOR QUALITY CONTROL (NEGEMCO) CONSULTANT (DAR) EMPLOYER (IF REQUIRED)

SIGNATURE:

PRINT NAME:

DATE:
GROUNDING CONTINUITY INSPECTION REPORT DOCUMENT NUMBERING:

Project: Aqaba Screening Project task 5 of APC storing


Employer: Arab Potash Company Contractor: NEGEMCO
EQUIPMENT NO:
DESCRIPTION:
SYSTEM/SUBSYSTEM No:
REPORT No:

LOCATION: REFERENCE DRAWING:

TEST EQUIPMENT

Type: Manufacturer: Due Date:

Range: Serial Nº

Voltage: Calibrated Date:

CONTINUITY RESULT
AREA / ITEM / EQUIPMENT
ACCEPTED REJECTED

REMARKS:

WITNESSED /
CONTRACTOR QUALITY CONTROL (NEGEMCO) CONSULTANT (DAR) EMPLOYER APC (IF REQUIRED)
REVIEWED BY:

SIGNATURE:

PRINT NAME:

DATE:
DOCUMENT NUMBERING:
GROUNDING RESISTIVITY TEST REPORT

Project: Aqaba Screening Project task 5 of APC storing

Employer: Arab Potash Company Contractor: NEGEMCO

EQUIPMENT NO:

DESCRIPTION:
SYSTEM/SUBSYSTEM No:
REPORT No:

AREA : REFERENCE DRAWING:

MINIMUM GROUND RESISTIVITY VALUE:

TEST EQUIPMENT

Type: Manufacturer: Due Date:

Range: Serial Nº:

Voltage: Calibration Date:

RESULT
LINE NO. LINE ORIENTATION DEPTH
READING R (Ω) Earth resistivity, ρ (Ω.m)

1 NORTH-SOUTH

6 EAST-WEST

10

11

12

RESULT :

REMARKS:

WITNESSED / REVIEWED BY: CONTRACTOR QUALITY CONTROL (NEGEMCO) ENGINEER (DAR) EMPLOYER (IF REQUIRED)

SIGNATURE:

PRINT NAME:

DATE:
GROUNDING INSTALLATION DOCUMENT NUMBERING:
INSPECTION

Project: Aqaba Screening Project task 5 of APC storing


Contractor: NEGEMCO
Employer: ARAB POTASH COMPANY (APC)

EQUIPMENT NO:

DESCRIPTION: SYSTEM/SUBSYSTEM No:

REPORT No:

SL Nº ITEM DESCRIPTION ACCEPTED REJECTED N//A

1 Grounding cable installed and routed according to the lastest drawing and specifications

2 Grounding Cable correct size

3 Grounding Cables and Electrode are buried the depth as per drawing and Specifications

4 Grounding Electrode according to drawings and specifications

Distance between each Grounding Electrode and location shall be according to drawings and
5
specifications

Ensure Earth Test Pit is not disturbed any other activities (traffic, passage ways) and it's correctly
6
installed.

7 Underground conduits stub up are properly installed according to drawings and specifications

8 Ensure the installation of ground bus bar is the same as approved drawing

9 Grounding joints visual check (cadwelds, clamps, etc)

Ensure Structural Steel, Supports, Equipments, Frames, Steel Column, Flexible Ducts, Cable Tray,
10
conduit & Piping Grounding installation

REMARKS:

WITNESSED /
CONTRACTOR (NEGEMCO) ENGINEER (DAR) EMPLOYER (IF REQUIRED)
REVIEWED BY:

SIGNATURE:

PRINT NAME:

DATE: