100% found this document useful (1 vote)
563 views1 page

MV Cable Hi-Pot Test Shet

This document records the results of a high potential (hi-pot) test on MV/HV cable. It documents the cable type, rated voltage, length, test voltages applied, leakage currents measured, insulation test results before and after the hi-pot test, and approval signatures from the contractor, consultant, and employer as required. The purpose is to ensure the cable insulation meets specifications for voltage withstand and leakage current.

Uploaded by

Ahmad Dagamseh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
563 views1 page

MV Cable Hi-Pot Test Shet

This document records the results of a high potential (hi-pot) test on MV/HV cable. It documents the cable type, rated voltage, length, test voltages applied, leakage currents measured, insulation test results before and after the hi-pot test, and approval signatures from the contractor, consultant, and employer as required. The purpose is to ensure the cable insulation meets specifications for voltage withstand and leakage current.

Uploaded by

Ahmad Dagamseh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

MV/HV CABLE TEST RECORD (HI-POT)

DOCUMENT NUMBERING:
CO-TECH-EL-HP-NNNN

Project: Aqaba Screening Project task 5 of APC storing

Employer: ARAB POTASH COMPANY

EQUIPMENT NO: TAG No:

DESCRIPTION:

REPORT No:

CABLE TYPE: CABLE RATED VOLTAGE: LENGTH (m): FROM: TO:

Insulation Test (Before Hi Pot Test) EQUIPMENT NAME: SERIAL NUMBER: CALIBRATION CERTIFICATION No: CALIBRATION DATE (FROM-TO):

Required Value Test Voltage Connections Measurement Value

˃1 KΏ/Vn min. 1000V Phase-Earth

Duration of the Test: Applied Tension: Phase-Phase

Voltage to be applied to phases according to project specifications: V Maximum current leakage allowed as per project specifications: mA

CURRENT LEAKAGE (mA)


CONNECTION VOLTAGE APPLIED
15" 30" 45" 1' 2' 3' 4' 5' 6' 7' 8' 9' 10' INITIAL AND DATE

Ph1/Ph2-Ph3-Ar-G

Ph2/Ph1-Ph3-Ar-G

Ph3/Ph1-Ph2-Ar-G

Armour-Earth

EQUIPMENT NAME: SERIAL NUMBER: CALIBRATION CERTIFICATION No: CALIBRATION DATE (FROM-TO):

Insulation Test (After Hi Pot Test) EQUIPMENT NAME: SERIAL NUMBER: CALIBRATION CERTIFICATION No: CALIBRATION DATE (FROM-TO):

Required Value Test Voltage Connections Measurement Value

˃1 KΏ/Vn min. 1000V Phase-Earth

Duration of the Test: Applied Tension: Phase-Phase

FINAL TEST RESULT

REMARKS:

WITNESSED/REVIEWED BY: CONTRACTOR QUALITY CONTROL (NEGEMCO) CONSTULTANT (DAR) Employer APC (IF REQUIRED)

SIGNATURE:

PRINT NAME:

DATE: