Work Procedure & Check List

Gubbi Civil Engineers provides work procedures and checklists for strengthening structures using carbon laminate and fiber wrapping. The document outlines the organization chart, work methodology for polymetric mortar work, epoxy grouting, carbon laminate application, carbon fiber wrapping, and glass fiber wrapping. It also includes checklists for scaffolding, polymetric mortar work, carbon fiber wrapping, glass fiber wrapping, carbon laminate work, and epoxy grouting work.

Uploaded by

HARSHAD
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
278 views

Work Procedure & Check List

Gubbi Civil Engineers provides work procedures and checklists for strengthening structures using carbon laminate and fiber wrapping. The document outlines the organization chart, work methodology for polymetric mortar work, epoxy grouting, carbon laminate application, carbon fiber wrapping, and glass fiber wrapping. It also includes checklists for scaffolding, polymetric mortar work, carbon fiber wrapping, glass fiber wrapping, carbon laminate work, and epoxy grouting work.

Uploaded by

HARSHAD
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 14

Gubbi Civil Engineers

Structural Strengthening work by


carbon laminate & Fiber

Work Methodology and Checklist

Strengthening of structure by using


carbon laminate and fiber wrapping
work

Gubbi Civil Engineers

Prepared by Approved by Checked by


GUBBI
Name

Date

Signature
Gubbi Civil Engineers

Structural Strengthening work by


carbon laminate & Fiber

Content:-

Sr. No. Description Page No


A Organization Chart 3
B Work Procedure 3
1 Work Procedure for PMM Work 4
2 Work procedure for Monopol Grouting Work 5
3 Work procedure for Carbon Laminate Work 6
4 Work procedure for Carbon Fiber Work 7
5 Work procedure for Glass Fiber Work 8

C Checklist 9
1 Checklist for Scaffolding Work 9
2 Checklist for PMM Work 10
3 Checklist for Carbon Fiber Wrapping Work 11
4 Checklist for Glass Fiber Wrapping Work 12
5 Checklist for Carbon laminate work 13
6 Checklist For Epoxy Grouting Work 14

2
Gubbi Civil Engineers

Structural Strengthening work by


carbon laminate & Fiber

Organization Chart
Managing Director
Siddheshwar Jamma

Director
Mehul Shroff

Project Manager
Shambhu Jalkote

Site Incharge Site Supervisor Safety Officer


Sagar Ganji Yogesh Lahim Machindra Mahtre

Site Engineer
Sachin Pednekar

3
Gubbi Civil Engineers

Structural Strengthening work by


carbon laminate & Fiber

1. PMM Work :-

Objective: - These work procedure is established to make Level and Smoothness sections of
the structure.

Applicability:-This procedure is applicable to all RCC members for providing sufficient


cover to the confinement of existing concrete structure.

Reference document: - Technical specification & BOQ

Equipment: - Tray, Hand Gloves, Brush , Bucket/ Mortar Pan tools etc.

Procedure:-

1. After hacking of existing surface, surface grinding is done to the edges of RCC

members for rounding it to receive further treatment of Carbon wrapping.

2. Apply suitable bonding agent to the concrete surface before application of mortar to

ensure proper bonding of old and new concrete surface.

3. Mix Molith PMM powder with water in the proportion of 170 to 190 ml of water to 1
kg of PMM powder to get a cohesive mortar.

4. Apply it to the repaired surface with trowel to achieve required finished surface.

Cure the surface for 48 hrs to achieve required strength.

4
Gubbi Civil Engineers

Structural Strengthening work by


carbon laminate & Fiber

2. Monopol Grouting Work :-

Objective :- These work procedure is established to achieve homogeneous, high strength rcc
structure by grouting with low viscosity high molecular weight thermoset polymer.

Applicability:-This procedure is applicable to honeycombed concrete, cracks in RCC,


rehabilitation of fire and explosion damaged structure, sealer for concrete bridge decks etc.

Reference document: - Technical specification & BOQ

Equipment: - Epoxy grouting pump, PVC Nipple, Drill machine, blower machine, Chessel ,
Hammer tools etc.

Procedure:-

1. Clean and dry concrete surface prior to use.

2. Mark the location for PVC nipple fixing.

3. Drill the marked location with 12 mm dia, 50 to 75 mm deep holes in structural


members at the interval of 350mm in staggered manner or as directed by engineer in
charge.

4. Clean the holes by air blower prior to fixing nozzle.Fix nozzle in holes by applying
thixotropic epoxy putty to ensure complete setting. Cure it for 12 hrs.

5. Grouting injecting low viscosity high molecular weight thermoset polymer by


pressure and using injector with accessories till nozzles refuse to accept grout.

6. Cut the nozzle by chisel after completion of grouting without damaging structural
elements.

5
Gubbi Civil Engineers

Structural Strengthening work by


carbon laminate & Fiber

3. Carbon Laminate Work :-

Objective: - This work procedure is established to provide high stiffness and strength to
RCC member, with application Carbon laminate over the surface.

Applicability:-This procedure will be applicable to Beam, Slabs for Structural Strengthening


work by carbon laminate.

Reference document: - Technical specification & BOQ

Equipment: - Mixing jar, Drill Machine, Roller, Stirrer Rod, Tools & tackles.

Procedure:

1. The beam needs to be apply carbon laminate is marked as per design.

2. The laminate strips is cut out with required length by means of mechanical cutter.

3. The Carbon laminate adhesive will be added with proportion as per TDS and

mixed by means of mechanical stirrer to become smooth in consistency.

4. The mixed Adhesive is applied on marked portion on beams and also applied on

Laminate strips.

5. The strips is fixed on marked portion on beams and roller is applied on the

Laminate strips for smoothen surface and to avoid air void in between.

6. Clean the laminate strip .

6
Gubbi Civil Engineers

Structural Strengthening work by


carbon laminate & Fiber

4. Carbon Fiber Wrapping Work :-

Objective: - This work procedure is established to achieve a high stiffness, high tensile
strength structure with application of carbon fiber.

Applicability:-This procedure will be applicable to beam, column for Structural


Strengthening work by carbon fiber wrapping.

Reference document: - Technical specification & BOQ

Equipment: - Measuring jar, Roller, Stirrer Rod, PVC Hand gloves , Tools & tackles.

Procedure:-

1. After marking the location where wrap is going to come must be smoothen by
applying PMM mortar.

2. Apply base coat /Primer to prepared RCC structure and simultaneously wrap
unidirectional carbon fiber and it should be rolled with hard roller to air voids.

3. Over the fiber surface epoxy adhesive applied and quartz Sand sprinkled over it to
receive further finishes.

7
Gubbi Civil Engineers

Structural Strengthening work by


carbon laminate & Fiber

5. Glass Fiber Wrapping Work :-

Objective: - This work procedure is established to achieve a high stiffness, high tensile
strength structure with application of carbon fiber.

Applicability:-This procedure will be applicable to beam, column for Structural


Strengthening work by carbon fiber wrapping.

Reference document: - Technical specification & BOQ

Equipment: - Measuring jar, Drill Machine, Roller, Stirrer Rod, Tools & tackles.

Procedure:-

1. After marking the location where wrap is going to come must be smoothen by
applying PMM mortar.

2. Apply base coat /Primer to prepared RCC structure and simultaneously wrap
unidirectional carbon fiber and it should be rolled with hard roller to air voids.

3. Over the fiber surface epoxy adhesive applied and quartz Sand sprinkled over it to
receive further finishes.

8
Checklist for Scaffolding Work
Name of Structure: - Structural strengthening work by carbon laminate & Fiber at Johnson
& Johnson Pvt. Ltd.
Date:-

Location: - Time :-

Yes / No /
Sr. No. Description Remarks
NA
Work location inspection i.e. falling tripping, uneven
1
surface etc.
2 All scaffold components in place and no defects
Scaffold components, planking/decking in good
3
condition
4 Proper access to get on and off the scaffold
5 The scaffold is not overloaded.
6 Planks are capable of sustaining the load.
7 PP net are provided to avoid dust coming out.
8 Checking of sufficient no. of props provided
7 Checking of equipment & required man power

Conclusion – Activities are Satisfactory / Not satisfactory

Prepared By Checked By

9
Gubbi Civil Engineers

Structural Strengthening work by


carbon laminate & Fiber

Checklist for PMM Work

Name of Structure: - Structural strengthening work by carbon laminate & Fiber at Johnson
& Johnson Pvt. Ltd.

Date:-

Location: - Time :-

Yes / No /
Sr. No. Description Remarks
NA
To take approval from site engineer on the location of
1
application.
Checking the stability of vertical scaffolding provided
2
for the working platform.
Checking barricading & also safety requirements for
3
the work.
Checking the hacking, Surface preparation before
4
application of PMM.
5 Checking mix proportion of bond coat
6 Checking curing period of polymer surface.
Checking of equipment & required material, man
7
power

Conclusion – Activities are Satisfactory / Not satisfactory

Prepared By Checked By

10
Gubbi Civil Engineers

Structural Strengthening work by


carbon laminate & Fiber

Checklist for Carbon Fiber Wrap


Name of Structure: - Structural strengthening work by carbon laminate & Fiber at Johnson
& Johnson Pvt. Ltd.
Date:-
Location: - Time:-

Yes / No /
Sr. No. Description Remarks
NA
To take approval from site engineer on the location of
1
application.
Checking the stability of vertical scaffolding provided
2
for the working platform.
3 Checking mix proportion of Saturant.
4 Checking of epoxy mortar surface is fully finished.
Checking dimension of fiber required before
5
application
6 Checking lapping of fiber strips.
Checking of equipment & required material, man
7
power

Conclusion – Activities are Satisfactory / Not satisfactory

Prepared By Checked By

Checklist for Glass Fiber Wrap


11
Gubbi Civil Engineers

Structural Strengthening work by


carbon laminate & Fiber

Name of Structure: - Structural strengthening work by carbon laminate & Fiber at Johnson
& Johnson Pvt. Ltd.
Date:-
Location: - Time:-

Yes / No /
Sr. No. Description Remarks
NA
To take approval from site engineer on the location of
1
application.
Checking the stability of vertical scaffolding provided
2
for the working platform.
4 Checking application of Base coat surface
3 Checking mix proportion of Saturant.
4 Checking of epoxy mortar surface is fully finished.
Checking dimension of fiber required before
5
application
6 Checking lapping of fiber strips.
Checking of equipment & required material, man
7
power

Conclusion – Activities are Satisfactory / Not satisfactory

Prepared By Checked By

Checklist for Carbon Laminate work


12
Gubbi Civil Engineers

Structural Strengthening work by


carbon laminate & Fiber

Name of Structure: - Structural strengthening work by carbon laminate & Fiber at Johnson
Yes / No /
Sr. No. Description Remarks
NA
To take approval from site engineer on the location of
1
application.
Checking the stability of vertical scaffolding provided
2
for the working platform.
Checking of equipment & required material, man
3
power
4 Checking of required length of laminate strip.
5 Checking mix proportion of adhesive.
Checking of air voids present in between structure and
6
strip.

& Johnson Pvt. Ltd.


Date:-

Location: - Time :-

Conclusion – Activities are Satisfactory / Not satisfactory

Checklist for Monopol Grouting Work


13
Name of Structure: - Structural strengthening work by carbon laminate & Fiber at Johnson
& Johnson Pvt. Ltd.

Date:-

Location: - Time :-

Yes / No /
Sr. No. Description Remarks
NA
To take approval from site engineer on the location of
1
grouting.
Checking the stability of vertical scaffolding provided
2
for the working platform.
Checking of equipment & required material, man
3
power
4 Checking dia. and depth of drilling
5 Checking staggered pattern of drilling nozzles.
6 Checking curing of thixotrophic putty.

Conclusion – Activities are Satisfactory / Not satisfactory

Prepared By Checked By

14