Chandmari Format A B C

The document provides a condition survey format for the Chandmari Bridge located on the Grand Trunk Road in Howrah, West Bengal. Some key details: 1) The 119.9m long RCC bridge has 21 spans and was completed in 1933. 2) A visual inspection was conducted and notes the satisfactory condition of the approach slab and retaining walls. The type of foundation is not visible. 3) The substructure consists of octagonal shaped piers and RCC wall type abutments, though foundation details are unavailable. 4) No issues were found with the carriageway, footpaths, or protection works. As it is not a river bridge, waterway and scour were

Uploaded by

a khan
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
274 views

Chandmari Format A B C

The document provides a condition survey format for the Chandmari Bridge located on the Grand Trunk Road in Howrah, West Bengal. Some key details: 1) The 119.9m long RCC bridge has 21 spans and was completed in 1933. 2) A visual inspection was conducted and notes the satisfactory condition of the approach slab and retaining walls. The type of foundation is not visible. 3) The substructure consists of octagonal shaped piers and RCC wall type abutments, though foundation details are unavailable. 4) No issues were found with the carriageway, footpaths, or protection works. As it is not a river bridge, waterway and scour were

Uploaded by

a khan
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 37

Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and

assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

CHAPTER-5: APPENDIX OF FORMATS


--------------------------------------------------------------------------------------------------------------------------------------
Format A: Pro-forma for Condition Survey of Bridges

ANNEXURE A1: Format A- Pro-forma for Condition Survey of Bridges


FORMAT A: PROFARMA FOR CONDITION SURVEY OF BRIDGES

1. Road name Grand Trunk Road

2. location of bridge in Km

3. Name of River/Water Body/Bridge Chandmari Bridge

4. Year of completion of bridge 1933

5. Type of bridge RCC


(RCC/PSC,Slab,timer,steel)

6. Total length of bridge in 'm' with Span No. Length (m)


span Span 1 4.0
Span 2 5.7
Span 3 3.1
Span 4 3.5
Span 5 6.0
Span 6 6.0
Span 7 6.0
Span 8 6.0
Span 9 6.0
Span 10 6.0
Span 11 6.0
Span 12 3.2
Span 13 3.0
Span 14 6.0
Span 15 6.0
Span 16 6.0
Span 17 6.0
Span 18 6.4
Span 19 6.0
Span 20 13.0
Span 21 6.0
Total Length 119.9m
7. Width of carriageway and footpaths Carriageway – 7.30 m
Footpath – Right side 1.2m; Left Side 0.8m (in Span 12-20)
1.0m in A1 Side with kerb of 0.4m

Page 1
Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and
assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

ANNEXURE A1: Format A- Pro-forma for Condition Survey of Bridges


FORMAT A: PROFARMA FOR CONDITION SURVEY OF BRIDGES

1.0m in A2 Side with kerb of 0.6m

8. Whether located in back


No
waters/chemical zone?

Condition of the various bridge  


components

Name of components  

9. Approaches

9.1 Condition of pavement surface Good Condition

9.2 Side slopes Not present

9.3 Approach slab Satisfactory condition

9.4 Retaining walls RCC wall towards Punjab Lane Side


Brick Arch towards Phansi Tallah More

10. Protection Works:  

10.1 Slope Pitching ,apron ,floor


Not present
protection ,toe walls

10.2 Scour in river bed Not a River Bridge

11. Waterway:

11.1 Obstruction in waterways, island


Not a river bridge.
formation, Vegetation growth etc.

11.2 Flow pattern and banks Not a river bridge.

12. Foundation:

12.1 Type Not visible/ No records are available

12.2 Material Not visible/ No records are available

12.3 Condition of foundation Foundation is no visible.

12.4 Piers/Abutments Foundation is no visible.

13. Substructure  
Members Type Height
13.1 Type

Page 2
Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and
assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

ANNEXURE A1: Format A- Pro-forma for Condition Survey of Bridges


FORMAT A: PROFARMA FOR CONDITION SURVEY OF BRIDGES
Abutment A1 RCC wall type No records
Pier P1 Octagonal type No records
Pier P2 Octagonal type No records
Pier P3 Octagonal type No records
Pier P4 Octagonal type No records
Pier P5 Octagonal type No records
Pier P6 Octagonal type No records
Pier P7 Octagonal type No records
Pier P8 Octagonal type No records
Pier P9 Octagonal type No records
Pier P10 Octagonal type No records
Pier P11 Octagonal type No records
Pier P12 Octagonal type No records
Pier P13 Octagonal type No records
Pier P14 Octagonal type No records
Pier P15 Octagonal type No records
Pier P16 Octagonal type No records
Pier P17 Octagonal type No records
Pier P18 Octagonal type No records
Pier P19 Octagonal type No records
Pier P20 Octagonal type No records
Abutment A2 RCC wall type No records
13.2 Condition Members Condition
Abutment A1 Satisfactory condition
Pier P1 Satisfactory condition
Pier P2 Satisfactory condition
Pier P3 Crack observed
Pier P4 Hair crack observed
Pier P5 Good Condition
Pier P6 Good Condition
Pier P7 Good Condition
Pier P8 Good Condition
Pier P9 Satisfactory condition
Pier P10 Satisfactory condition
Pier P11 Satisfactory condition
Pier P12 Satisfactory condition
Pier P13 Satisfactory condition
Pier P14 Satisfactory condition
Pier P15 Satisfactory condition
Pier P16 Satisfactory condition
Pier P17 Satisfactory condition
Pier P18 Satisfactory condition
Pier P19 Satisfactory condition

Page 3
Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and
assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

ANNEXURE A1: Format A- Pro-forma for Condition Survey of Bridges


FORMAT A: PROFARMA FOR CONDITION SURVEY OF BRIDGES
Not accessible due to very low vertical
Pier P20
clearance
Not accessible due to very low vertical
Abutment A2
clearance
14. Bearing:  

14.1 Type Bearing not present

14.2 Condition Bearing not present

15. Superstructure:  
15.1 Structural system Span No. Structural System
Span 1 Continuous
Span 2 Continuous
Span 3 Continuous
Span 4 Continuous
Span 5 Continuous
Span 6 Continuous
Span 7 Continuous
Span 8 Continuous
Span 9 Continuous
Span 10 Continuous
Span 11 Continuous
Span 12 Continuous
Span 13 Continuous
Span 14 Continuous
Span 15 Continuous
Span 16 Continuous
Span 17 Continuous
Span 18 Continuous
Span 19 Continuous
Span 20 Continuous
Span 21 Continuous
15.2 Type Span No. Structural Type
RCC Solid Slab over Longitudinal and transverse
Span 1
beams
RCC Solid Slab over Longitudinal and transverse
Span 2
beams
RCC Solid Slab over Longitudinal and transverse
Span 3
beams
RCC Solid Slab over Longitudinal and transverse
Span 4
beams
RCC Solid Slab over Longitudinal and transverse
Span 5
beams
Span 6 RCC Solid Slab over Longitudinal and transverse

Page 4
Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and
assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

ANNEXURE A1: Format A- Pro-forma for Condition Survey of Bridges


FORMAT A: PROFARMA FOR CONDITION SURVEY OF BRIDGES
beams
RCC Solid Slab over Longitudinal and transverse
Span 7
beams
RCC Solid Slab over Longitudinal and transverse
Span 8
beams
RCC Solid Slab over Longitudinal and transverse
Span 9
beams
RCC Solid Slab over Longitudinal and transverse
Span 10
beams
RCC Solid Slab over Longitudinal and transverse
Span 11
beams
RCC Solid Slab over Longitudinal and transverse
Span 12
beams
RCC Solid Slab over Longitudinal and transverse
Span 13
beams
RCC Solid Slab over Longitudinal and transverse
Span 14
beams
RCC Solid Slab over Longitudinal and transverse
Span 15
beams
RCC Solid Slab over Longitudinal and transverse
Span 16
beams
RCC Solid Slab over Longitudinal and transverse
Span 17
beams
RCC Solid Slab over Longitudinal and transverse
Span 18
beams
RCC Solid Slab over Longitudinal and transverse
Span 19
beams
RCC Solid Slab over Longitudinal and transverse
Span 20
beams
RCC Solid Slab over Longitudinal and transverse
Span 21
beams
15.3 Span No. Length (m)
Arrangement
Span 1 4.0
Span 2 5.7
Span 3 3.1
Span 4 3.5
Span 5 6.0
Span 6 6.0
Span 7 6.0
Span 8 6.0
Span 9 6.0
Span 10 6.0
Span 11 6.0
Span 12 3.2
Span 13 3.0
Span 14 6.0

Page 5
Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and
assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

ANNEXURE A1: Format A- Pro-forma for Condition Survey of Bridges


FORMAT A: PROFARMA FOR CONDITION SURVEY OF BRIDGES
Span 15 6.0
Span 16 6.0
Span 17 6.0
Span 18 6.4
Span 19 6.0
Span 20 13.0
Span 21 6.0
Total Length 119.9m
Span No. Condition
15.4 Condition(Girder)
Span 1 Spalling and reinforcement exposed
Span 2 Spalling and reinforcement exposed
Span 3 Spalling and reinforcement exposed
Span 4 Spalling and reinforcement exposed
Span 5 Spalling and reinforcement exposed
Span 6 Spalling and reinforcement exposed
Span 7 Spalling and reinforcement exposed
Span 8 Gunitted surface
Span 9 Gunitted surface
Span 10 Gunitted surface
Span 11 Gunitted surface
Span 12 Gunitted surface
Span 13 Gunitted surface
Span 14 Gunitted surface
Span 15 Gunitted surface
Span 16 Gunitted surface
Span 17 Gunitted surface
Span 18 Gunitted surface
Span 19 Gunitted surface
Span 20 Not accessible due to low vertical clearance
Span 21 Not accessible due to low vertical clearance
Span No. Condition
15.5 Condition(Deck)
Span 1 Spalling and reinforcement exposed
Span 2 Spalling and reinforcement exposed
Span 3 Spalling and reinforcement exposed
Span 4 Spalling and reinforcement exposed
Span 5 Spalling and reinforcement exposed
Span 6 Spalling and reinforcement exposed
Span 7 Spalling and reinforcement exposed
Span 8 Gunitted surface
Span 9 Gunitted surface
Span 10 Gunitted surface
Span 11 Gunitted surface
Span 12 Gunitted surface
Page 6
Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and
assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

ANNEXURE A1: Format A- Pro-forma for Condition Survey of Bridges


FORMAT A: PROFARMA FOR CONDITION SURVEY OF BRIDGES
Span 13 Gunitted surface
Span 14 Gunitted surface
Span 15 Gunitted surface
Span 16 Gunitted surface
Span 17 Gunitted surface
Span 18 Gunitted surface
Span 19 Gunitted surface
Span 20 Not accessible due to low vertical clearance
Span 21 Not accessible due to low vertical clearance
15.6 In case of Steel Bridges Not a steel bridge

15.7 In case of Masonry bridges  Not a masonry bridge

16. Expansion joint:

16.1 Type Not Present

16.2 Condition Not Present

17. Wearing coat

17.1 Type Mastic Asphalt

17.2 Surface condition Good Condition

17.3 Drainage Spouts Not Present

18. Gabdrauks/Parapet:

18.1 Type RCC Wall type

18.2 Damage/missing parts if any Yes

19. Footpaths:

20. Type RCC pavement

21. Leakage/Damage if any Yes

22. Special Observation/Remarks if any Boundary wall of Bhawani Apartment is blocking access to the
bridge form A1 side from span 9 to span 18

Page 7
Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and
assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

Format B: Inventory of Bridges on Roads under State PWD, Govt. of West Bengal

ANNEXURE A2: Format B- Inventory of Bridges on Roads under State PWD, Govt. of West Bengal
FORMAT B: INVENTORY OF BRIDGES ON ROADS UNDER STATE PWD, GOVT OF WEST BENGAL

IDENTIFICATION
Nil
1. Link No.

2. State West Bengal

3. Road Name Grand Trunk Road

4. Section

5. Location

6. Structure No  Nil

Page 8
Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and
assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

ANNEXURE A2: Format B- Inventory of Bridges on Roads under State PWD, Govt. of West Bengal
FORMAT B: INVENTORY OF BRIDGES ON ROADS UNDER STATE PWD, GOVT OF WEST BENGAL

7. Latitude 22.587040

8. Longitude 88.335495

9. Feature Intersectioned Railway Line

10. Facility Carried by Structure Grand Trunk Road

11. Popular/Official Name Chandmari Bridge

12. Highway Circle & Division Circle –Nabanna


Division – Howrah

13. Administrative District Howrah

14. Nearest City/Town Howrah

15. Custodian PWD South Zone

16. Year of Construction 1933

17. Highway Level or Submersible Not applicable for this structure

18. Overall Length of Bridge 119.9m

19. No. of Lanes 2 lanes undivided

20. Load Rating Probably 2 lanes of IRC class A or Single lane of IRC
class AA loading

21. Average Daily Traffic(ADT) No records for Passenger Car Unit


No records for Commercial Vehicle

22. Year of ADT No records for ADT

23. Detour Length 0-2 Kms

24. Documentation

25. Year of Inventory 2020

STRUCTURE DATA

26. Design Discharge in Cumecs No data available with PWD

27. Design HFL No data available with PWD

Page 9
Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and
assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

ANNEXURE A2: Format B- Inventory of Bridges on Roads under State PWD, Govt. of West Bengal
FORMAT B: INVENTORY OF BRIDGES ON ROADS UNDER STATE PWD, GOVT OF WEST BENGAL

27(a) LWL/GL No data available with PWD

28. Design Scour Level at Pier No data available with PWD

29. Design scour level at Abutment No data available with PWD

30. Founding Strata Not visible/ No record

31. Whether the Bridge is in Grade Yes

32. Road Level No data available with PWD

33. Road Width 7.30m

34. Overall Deck Width From Span 1 to Span 11 -: 12.7m


From Span 12 to Span 21-: 10.5m

35. Approach Roadway Width Including Shoulder 10.9m

36. Height of Approach Embankment 5.0m at abutment A1; 2.8m at abutment A2 side

37. Average Skew 10 degree approx

38. Whether Navigable Not a river bridge/ Not applicable for this structure.

39. Vertical Clearance 6.50m

40. Horizontal Clearance Span No. Length (m)


Span 1 3.4
Span 2 5.1
Span 3 2.5
Span 4
2.9
Span 5 5.4
Span 6 5.4
Span 7 5.4
Span 8 5.4
Span 9 5.4
Span 10
5.4
Span 11
5.4

Page 10
Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and
assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

ANNEXURE A2: Format B- Inventory of Bridges on Roads under State PWD, Govt. of West Bengal
FORMAT B: INVENTORY OF BRIDGES ON ROADS UNDER STATE PWD, GOVT OF WEST BENGAL
Span 12
2.6
Span 13 2.4
Span 14 5.4
Span 15 5.4
Span 16 5.4
Span 17 5.4
Span 18 5.8
Span 19 5.4
Span 20 12.4
Span 21 5.4
Total Length 101.5m
(B)(1) MAIN SPANS

41. Total Number of Spans 21 Spans

42. Span Arrangement Span No. Length (m)


Span 1 4.0
Span 2 5.7
Span 3 3.1
Span 4 3.5
Span 5 6.0
Span 6 6.0
Span 7 6.0
Span 8 6.0
Span 9 6.0
Span 10 6.0
Span 11 6.0
Span 12 3.2
Span 13 3.0
Span 14 6.0
Span 15 6.0
Span 16 6.0
Span 17 6.0
Span 18 6.4
Span 19 6.0
Span 20 13.0

Page 11
Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and
assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

ANNEXURE A2: Format B- Inventory of Bridges on Roads under State PWD, Govt. of West Bengal
FORMAT B: INVENTORY OF BRIDGES ON ROADS UNDER STATE PWD, GOVT OF WEST BENGAL
Span 21 6.0
Total Length 119.9m
Span No. Structural Type
43. Superstructure Type
RCC Solid Slab over Longitudinal and
Span 1
transverse beams
RCC Solid Slab over Longitudinal and
Span 2
transverse beams
RCC Solid Slab over Longitudinal and
Span 3
transverse beams
RCC Solid Slab over Longitudinal and
Span 4
transverse beams
RCC Solid Slab over Longitudinal and
Span 5
transverse beams
RCC Solid Slab over Longitudinal and
Span 6
transverse beams
RCC Solid Slab over Longitudinal and
Span 7
transverse beams
RCC Solid Slab over Longitudinal and
Span 8
transverse beams
RCC Solid Slab over Longitudinal and
Span 9
transverse beams
RCC Solid Slab over Longitudinal and
Span 10
transverse beams
RCC Solid Slab over Longitudinal and
Span 11
transverse beams
RCC Solid Slab over Longitudinal and
Span 12
transverse beams
RCC Solid Slab over Longitudinal and
Span 13
transverse beams
RCC Solid Slab over Longitudinal and
Span 14
transverse beams
RCC Solid Slab over Longitudinal and
Span 15
transverse beams
RCC Solid Slab over Longitudinal and
Span 16
transverse beams
RCC Solid Slab over Longitudinal and
Span 17
transverse beams
RCC Solid Slab over Longitudinal and
Span 18
transverse beams
RCC Solid Slab over Longitudinal and
Span 19
transverse beams
RCC Solid Slab over Longitudinal and
Span 20
transverse beams
RCC Solid Slab over Longitudinal and
Span 21
transverse beams
Members Type Height
44. Pier Type
Pier P1 Octagonal type No records
Pier P2 Octagonal type No records
Pier P3 Octagonal type No records

Page 12
Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and
assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

ANNEXURE A2: Format B- Inventory of Bridges on Roads under State PWD, Govt. of West Bengal
FORMAT B: INVENTORY OF BRIDGES ON ROADS UNDER STATE PWD, GOVT OF WEST BENGAL
Pier P4 Octagonal type No records
Pier P5 Octagonal type No records
Pier P6 Octagonal type No records
Pier P7 Octagonal type No records
Pier P8 Octagonal type No records
Pier P9 Octagonal type No records
Pier P10 Octagonal type No records
Pier P11 Octagonal type No records
Pier P12 Octagonal type No records
Pier P13 Octagonal type No records
Pier P14 Octagonal type No records
Pier P15 Octagonal type No records
Pier P16 Octagonal type No records
Pier P17 Octagonal type No records
Pier P18 Octagonal type No records
Pier P19 Octagonal type No records
Pier P20 Octagonal type No records
Members Type Height
45. Abutment Type
Abutment A1 RCC wall type No record
Abutment A2 RCC wall type No records
46. Pier Foundation Type Not visible/No record

47. Maximum Depth of Pier Foundation Not visible/No record

48. Abutment Foundation Type Not visible/No record

49. Maximum Depth of Abutment Foundation Not visible/No record

50. Type of Bearings Bearing not present

51. Wearing Coat Type Mastic Asphalt

52. Expansion Joints Type Expansion joint not present

53. Railing Type RCC Wall type

(B)(2) APPROACH SPANS

54. Total Number of Spans 16 (Fansi Talah Mor side)

55. Span Arrangement 16 spans X 5.5 = 88.0m

56. Superstructure Type Arch Structure

Page 13
Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and
assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

ANNEXURE A2: Format B- Inventory of Bridges on Roads under State PWD, Govt. of West Bengal
FORMAT B: INVENTORY OF BRIDGES ON ROADS UNDER STATE PWD, GOVT OF WEST BENGAL

57. pier type Brick Wall

58. Abutment Type RCC Wall type

59. Pier Foundation Type Not visible

60. Depth of Pier Foundation Not visible

61. Abutment Foundation Type Not visible

62. Depth of abutment Foundation Not visible

63. Type of Bearings Bearing not present

64. Wearing Coat Type Mastic asphalt

65. Expansion Joints Type Expansion joint not present

66. Railing Type RCC Wall type

(B)(3) (GENERAL)

67. Corrosion Protection Measures Gunited surface

68. Bank Protection & Type Not a river bridge/ Not applicable for this structure

69. Floor Protection & Type Not visible

HISTORY

70. Suspension of Traffic No record

71. Erosion of Banks Not a river bridge/ Not applicable for this structure

72. Scour Around Guide Bunds Not a river bridge/ Not applicable for this structure

73. Abnormal Scour Level Around Piers Not a river bridge/ Not applicable for this structure
74. Abnormal Scour Level Around Abutments Not a river bridge/ Not applicable for this structure
75. Abnormal Flood Level Not a river bridge/ Not applicable for this structure
76.
Distress and Repair in Foundation Foundation not visible

77. Distress and Repair Guide Bunds Not a river bridge/ Not applicable for this structure

78. Distress and Repair in Substructure including


Bearings Guniting is done

79. Distress and Repair in Superstructure Guniting is done

Page 14
Consultancy Services for i) Collection of inventory data by MBIU ii) Analysis of Bridge condition and
assessment of distress condition, iii) preparing estimate for remedial measures wherever necessary
with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyover, Highway division
ROB in South zone in state of West Bengal Under Public Work Directorate.
Bridge: Chandmari ROB under Howrah DIvision of Nabanna Circle
Doc. No.: RITES/HW/KOL/RT330-00050/ Chandmari ROB /1 st Stage Report -R0

ANNEXURE A2: Format B- Inventory of Bridges on Roads under State PWD, Govt. of West Bengal
FORMAT B: INVENTORY OF BRIDGES ON ROADS UNDER STATE PWD, GOVT OF WEST BENGAL

80. Any other Observations Boundary wall of Bhawani Apartment is blocking access
to the bridge form A1 side from span 9 to span 18

Page 15
Format C: Standard Pro-forma for Inspection Report (for Passage of ODC/OWC)

ANNEXURE A3: Format C- Standard Pro-forma for Inspection Report (for Passage of ODC/OWC)
FORMAT C: STANDARD PROFORMA FOR INSPECTION REPORT (FOR PASSAGE OF ODC/OWC)

Ite Description Observations/Measurements Remarks


m
No.

1. GENERAL    

1.1 Name of the bridge/No. of  


Chandmari Bridge
the Bridge/Name of the river

1.2 Name/No. of highway/  


Grand Trunk Road
Bridge location

1.3 Year of construction  


(if available or through 1933
local inquiry)
Span No. Structural Type
1.4 Bridge superstructure Type  
RCC Solid Slab over Longitudinal and transverse
(Solid slab, voided slab, Span 1
beams
RCC/PSC, T Girder, Box RCC Solid Slab over Longitudinal and transverse
Girder. Refer MORTH Span 2
beams
Guideline) RCC Solid Slab over Longitudinal and transverse
Span 3
beams
RCC Solid Slab over Longitudinal and transverse
Span 4
beams
RCC Solid Slab over Longitudinal and transverse
Span 5
beams
RCC Solid Slab over Longitudinal and transverse
Span 6
beams

Page 16
ANNEXURE A3: Format C- Standard Pro-forma for Inspection Report (for Passage of ODC/OWC)
FORMAT C: STANDARD PROFORMA FOR INSPECTION REPORT (FOR PASSAGE OF ODC/OWC)

Ite Description Observations/Measurements Remarks


m
No.
RCC Solid Slab over Longitudinal and transverse
Span 7
beams
RCC Solid Slab over Longitudinal and transverse
Span 8
beams
RCC Solid Slab over Longitudinal and transverse
Span 9
beams
RCC Solid Slab over Longitudinal and transverse
Span 10
beams
RCC Solid Slab over Longitudinal and transverse
Span 11
beams
RCC Solid Slab over Longitudinal and transverse
Span 12
beams
RCC Solid Slab over Longitudinal and transverse
Span 13
beams
RCC Solid Slab over Longitudinal and transverse
Span 14
beams
RCC Solid Slab over Longitudinal and transverse
Span 15
beams
RCC Solid Slab over Longitudinal and transverse
Span 16
beams
RCC Solid Slab over Longitudinal and transverse
Span 17
beams
RCC Solid Slab over Longitudinal and transverse
Span 18
beams
RCC Solid Slab over Longitudinal and transverse
Span 19
beams
RCC Solid Slab over Longitudinal and transverse
Span 20
beams
Span 21 RCC Solid Slab over Longitudinal and transverse

Page 17
ANNEXURE A3: Format C- Standard Pro-forma for Inspection Report (for Passage of ODC/OWC)
FORMAT C: STANDARD PROFORMA FOR INSPECTION REPORT (FOR PASSAGE OF ODC/OWC)

Ite Description Observations/Measurements Remarks


m
No.
beams
Span No. Structural System
1.5 Bridge Statical System  
Span 1 Continuous
(Simply Supported/
Continuous) Span 2 Continuous
Span 3 Continuous
Span 4 Continuous
Span 5 Continuous
Span 6 Continuous
Span 7 Continuous
Span 8 Continuous
Span 9 Continuous
Span 10 Continuous
Span 11 Continuous
Span 12 Continuous
Span 13 Continuous
Span 14 Continuous
Span 15 Continuous
Span 16 Continuous
Span 17 Continuous
Span 18 Continuous
Span 19 Continuous
Span 20 Continuous
Span 21 Continuous
1.6 Pay load to be carried over Detailed drawings not available. So allowable Pay load is not known  

Page 18
ANNEXURE A3: Format C- Standard Pro-forma for Inspection Report (for Passage of ODC/OWC)
FORMAT C: STANDARD PROFORMA FOR INSPECTION REPORT (FOR PASSAGE OF ODC/OWC)

Ite Description Observations/Measurements Remarks


m
No.

the bridge(GVW)

1.7 Type of HT arrangement to MORTH guideline HT arrangement can be considered over Chandmari Bridge; detaisl will be furnished after detail  
be considered. study of NDT & load testing.

2. SALIENT STRUCTURAL SCHEME & GEOMETRIC DETAILS OF THE BRIDGE

2.1 Type of bridge (River  


ROB
bridge, ROB, flyover,…etc)

2.2 Span arrangement ( Provide Span No. Length (m)  


c/c of exp. Jt. As well as Span 1 4.0
effective span along with Span 2 5.7
skew angle if any) Span 3 3.1
Span 4 3.5
Span 5 6.0
Span 6 6.0
Span 7 6.0
Span 8 6.0
Span 9 6.0
Span 10 6.0
Span 11 6.0
Span 12 3.2
Span 13 3.0
Span 14 6.0

Page 19
ANNEXURE A3: Format C- Standard Pro-forma for Inspection Report (for Passage of ODC/OWC)
FORMAT C: STANDARD PROFORMA FOR INSPECTION REPORT (FOR PASSAGE OF ODC/OWC)

Ite Description Observations/Measurements Remarks


m
No.
Span 15 6.0
Span 16 6.0
Span 17 6.0
Span 18 6.4
Span 19 6.0
Span 20 13.0
Span 21 6.0
Total Length 119.9m
2.3 Maximum Height between  
soffit of Superstructure & 6.50m
river bed

2.4 Width of carriageway  


(between inner edge of 7.30m
kerbs/crash barrier)

2.5 Width of footpath (Please  


also mention whether the Right side 1.2m; Left Side 0.8m (in Span 12-20)
footpath is raised and
1.0m in A1 Side with kerb width of 0.4m
whether it is provided on
both sides or only on one 1.0m in A2 Side with kerb width of 0.6m
side)

2.6 Overall deck width (from From Span 1-11 -: 12.7m  


outer to outer)
From Span 12-21-: 10.5m

Page 20
ANNEXURE A3: Format C- Standard Pro-forma for Inspection Report (for Passage of ODC/OWC)
FORMAT C: STANDARD PROFORMA FOR INSPECTION REPORT (FOR PASSAGE OF ODC/OWC)

Ite Description Observations/Measurements Remarks


m
No.

2.7 Type of carriageway (Type 1  


to 5 …refer MORTH 2 lanes undivided
guideline)

2.8 Depth of Superstructure  


(Please capture overall
depth as well as depth of
girder)
Members Type Height
2.9 Type of Pier (Circular,  
Pier P1 Octagonal type No records
Rectangular, Plate type…
Pier P2 Octagonal type No records
etc)
Pier P3 Octagonal type No records
Pier P4 Octagonal type No records
Pier P5 Octagonal type No records
Pier P6 Octagonal type No records
Pier P7 Octagonal type No records
Pier P8 Octagonal type No records
Pier P9 Octagonal type No records
Pier P10 Octagonal type No records
Pier P11 Octagonal type No records
Pier P12 Octagonal type No records
Pier P13 Octagonal type No records
Pier P14 Octagonal type No records
Pier P15 Octagonal type No records
Pier P16 Octagonal type No records
Page 21
ANNEXURE A3: Format C- Standard Pro-forma for Inspection Report (for Passage of ODC/OWC)
FORMAT C: STANDARD PROFORMA FOR INSPECTION REPORT (FOR PASSAGE OF ODC/OWC)

Ite Description Observations/Measurements Remarks


m
No.
Pier P17 Octagonal type No records
Pier P18 Octagonal type No records
Pier P19 Octagonal type No records
Pier P20 Octagonal type No records
2.10 Type of abutment ( Solid Members Type Height  
type,Spill through type… Abutment A1 RCC wall type No record
etc) Abutment A2 RCC wall type No records

2.11 Type of foundation(Add  


Not Visible/ No record
only in case visible)

2.12 Nos. of Girders & X-girders Span no. Main girder X girders  
in Superstructure (to be
Span 1 02 03
picked up for each type Span 2 02 03
spans) Span 3 02 03
Span 4 02 03
Span 5 02 03
Span 6 02 03
Span 7 02 03
Span 8 02 03
Span 9 02 03
Span 10 02 03
Span 11 02 03
Span 12 02 02
Span 13 02 02
Span 14 02 03

Page 22
ANNEXURE A3: Format C- Standard Pro-forma for Inspection Report (for Passage of ODC/OWC)
FORMAT C: STANDARD PROFORMA FOR INSPECTION REPORT (FOR PASSAGE OF ODC/OWC)

Ite Description Observations/Measurements Remarks


m
No.
Span 15 02 03
Span 16 02 03
Span 17 02 03
Span 18 02 03
Span 19 02 03
Span 20 02 03
Span 21 02 03
2.13 Horizontal alignment of  
bridge (report whether it is Straight at Abutment A1 side & Straight at Abutment A2 Side.
curved or straight)

3. DATE OF INSPECTION 27/07/2020 to 30/07/2020  

4. APPROACHES  

4.1 Approach geometrics (report  


whether approach Straight at Abutment A1 side & Curved at Abutment A2 Side & is conducive.
geometry is conducive)

5. PROTECTIVE WORKS Not a river bridge/ Not applicable for this structure  

5.1 Extent of scour Not a river bridge/ Not applicable for this structure  

CONDITION OF  Not visible/ No record  


6.
FOUNDATION ( TO BE
REPORTED FOR EACH
Page 23
ANNEXURE A3: Format C- Standard Pro-forma for Inspection Report (for Passage of ODC/OWC)
FORMAT C: STANDARD PROFORMA FOR INSPECTION REPORT (FOR PASSAGE OF ODC/OWC)

Ite Description Observations/Measurements Remarks


m
No.

FOUNDATION)

6.1 Report settlement if any Not visible  

6.2 Report cracking,  


Not visible
disintegration, decay
erosion, cavitations,etc.

6.3 Report damage due to  


Not visible
impact of floating
bodies,boulders,etc.

7. CONDITION OF  
SUBSTRUCTURE ( PIERS,
ABUTMENTS…ETC)(TO
BE REPORTED FOR
EACH SUBSTRUCTURE)

7.1 Report cracking, Members Condition  


disintegration, decay, Abutment A1 Satisfactory condition
tilting etc. Pier P1 Satisfactory condition
Pier P2 Satisfactory condition
Pier P3 Crack observed
Pier P4 Hair crack observed
Pier P5 Good Condition
Pier P6 Good Condition
Pier P7 Good Condition

Page 24
ANNEXURE A3: Format C- Standard Pro-forma for Inspection Report (for Passage of ODC/OWC)
FORMAT C: STANDARD PROFORMA FOR INSPECTION REPORT (FOR PASSAGE OF ODC/OWC)

Ite Description Observations/Measurements Remarks


m
No.
Pier P8 Good Condition
Pier P9 Satisfactory condition
Pier P10 Satisfactory condition
Pier P11 Satisfactory condition
Pier P12 Satisfactory condition
Pier P13 Satisfactory condition
Pier P14 Satisfactory condition
Pier P15 Satisfactory condition
Pier P16 Satisfactory condition
Pier P17 Satisfactory condition
Pier P18 Satisfactory condition
Pier P19 Satisfactory condition
Not accessible due to very low vertical
Pier P20
clearance
Not accessible due to very low vertical
Abutment A2
clearance
8. CONDITION OF  
BEARINGS (TO BE
REPORTED FOR EACH
SPAN)

8.1 Metallic Bearings Not present  

8.1. Report general condition Not present  


1 (check rusting, cleanliness,

Page 25
ANNEXURE A3: Format C- Standard Pro-forma for Inspection Report (for Passage of ODC/OWC)
FORMAT C: STANDARD PROFORMA FOR INSPECTION REPORT (FOR PASSAGE OF ODC/OWC)

Ite Description Observations/Measurements Remarks


m
No.

ceasing of plates)

8.1. Functioning (report  


2 excessive movement, Not present
tilting ,jumping off girders)

8.1. Report cracks in supporting  


3 member (abutment cap, Not present
pier cap, pedestal)

8.1. Report effectiveness of  


4 anchor bolts (check whether
Not present
they are in position and
tight)

8.2 Elastomeric bearings Not present  

8.2. Report condition of pads  


1 (oxidation, creep, fattening, Not present
bulging, splitting)

8.2. Report general cleanliness  


Not present
2

Page 26
9.1

9.1.6
9.1.5
9.1.4
9.1.3
9.1.2
9.1.1

if
of
of
ion
BE

etc.
ON

honey

Report
Report
Report
Report
Report
Report

moving
explain
stressed
RE(TO

vehicles
concrete
concrete

spalling,

cracking
combing

location,
members

(pattern,

corrosion

condition

excessive
SUPERS

preferabl

articulatio
REPORT

disintegrat
TRUCTU

deflection,
reinforcem
1) CONDITI

Reinforced

and pre-

any due to
OF

damages if
or

No
Reinforceme
Spalling observed in deck
Not visible beam nt exposed in Reinforced Concrete Span 1

No
No
slab
longitudinal

No
Reinforceme Spalling observed in deck
Not visible Deck slab beam Reinforced Concrete Span 2

No
No
nt exposed in slab and in longitudinal

No
Spalling observed in
Not visible beam Reinforced Concrete Span 3

No
No
No
longitudinal and transverse

No
Reinforceme Spalling observed in
Not visible deck slab slab Reinforced Concrete Span 4

No
No

Page 27
nt exposed in longitudinal beam and deck

No
Reinforceme Yes, cracks Spalling observed in
Not visible transverse
nt exposed
beams
in observed in longitudina and transversel Reinforced Concrete Span 5

No
deck slab longitudinal and beam and deck slab

No
Reinforceme
longitudinal and Yes, cracks Spalling observed in
Not visible deck slab Reinforced Concrete Span 6

No
nt exposed
transverse
in beams observed in longitudinal beam

No
Reinforceme Yes, cracks Spalling observed in
Not visible longitudinal beams Reinforced Concrete Span 7

No
nt exposed observed in longitudinal beam

No
Not visible surface Gunitted Gunitted surface Gunitted surface Reinforced Concrete Span 8

No
Not visible No surface Gunitted Gunitted surface Gunitted surface Reinforced Concrete Span 9

No
No

Not visible surface Gunitted Gunitted surface Gunitted surface Reinforced Concrete Span 10

No
No

Not visible surface Gunitted Gunitted surface Gunitted surface Reinforced Concrete Span 11

No
No

No Not visible surface Gunitted Gunitted surface Gunitted surface Reinforced Concrete Span 12
No

Not visible surface Gunitted Gunitted surface Gunitted surface Reinforced Concrete Span 13
No
No

Not visible surface Gunitted Gunitted surface Gunitted surface Reinforced Concrete Span 14
No
No

Not visible surface Gunitted Gunitted surface Gunitted surface Reinforced Concrete Span 15
No
No

Not visible surface Gunitted Gunitted surface Gunitted surface Reinforced Concrete Span 16
No
No

Not visible surface Gunitted Gunitted surface Gunitted surface Reinforced Concrete Span 17
No
No

Not visible surface Gunitted Gunitted surface Gunitted surface Reinforced Concrete Span 18
No
No

Not visible surface Gunitted Gunitted surface Gunitted surface Reinforced Concrete Span 19
No
No

Not visible accessible


to low vertical
Not Not
vertical
accessible
clearance
due Not accessible due to low Pre Stressed Concrete Span 20
No
No

Not visible accessible


to low vertical
Not Not
vertical
accessible
clearance
due Not accessible due to low Pre Stressed Concrete Span 21
No

 
 
 
 
 
 
 

Remarks
9.3
9.2

9.2.4
9.2.3
9.2.2
9.2.1
9.1.8
9.1.7

if
of
end

Steel

if any
if any

Report
Report
Report
Report
Report
Report

arches
condition

excessive

Masonry
Buckling,
members
deflection
anchorage

deflection,
connection
at central

corrosion ,
hinge, tip
cracks in

Not a
Not a steel Not a PSC
Not a masonry arch Not a steel bridges Not a steel bridges Not a steel bridges Not a steel bridges cantilever
bridges member
span

Not a steel Not a Not a PSC


Not a masonry arch Not a steel bridges Not a steel bridges Not a steel bridges Not a steel bridges span
bridges cantilever member

Not a steel Not a Not a PSC


Not a masonry arch Not a steel bridges Not a steel bridges Not a steel bridges Not a steel bridges span
bridges cantilever member

Not a steel Not a Not a PSC


Not a masonry arch Not a steel bridges Not a steel bridges Not a steel bridges Not a steel bridges span

Page 28
bridges cantilever member

Not a
Not a steel Not a PSC
Not a masonry arch Not a steel bridges Not a steel bridges Not a steel bridges Not a steel bridges cantilever
bridges member
span

Not a steel Not a Not a PSC


Not a masonry arch Not a steel bridges Not a steel bridges Not a steel bridges Not a steel bridges span
bridges cantilever member

Not a steel Not a Not a PSC


Not a masonry arch Not a steel bridges Not a steel bridges Not a steel bridges Not a steel bridges span
bridges cantilever member

Not a masonry arch Not a steel bridges Not a steel bridges


bridges Not a steel Not a steel bridges Not a steel bridgescantilever member
Not a Not a PSC

Not a masonry arch Not a steel bridges Not a steel bridges


bridges Not a steel Not a steel bridges Not a steel bridgescantilever member
Not a Not a PSC

Not a masonry arch Not a steel bridges Not a steel bridges


bridges Not a steel Not a steel bridges Not a steel bridgescantilever member
Not a Not a PSC

Not a masonry arch Not a steel bridges Not a steel bridges


bridges Not a steel Not a steel bridges Not a steel bridgescantilever member
Not a Not a PSC

Not a masonry arch Not a steel bridges Not a steel bridges


bridges Not a steel Not a steel bridges Not a steel bridgescantilever member
Not a Not a PSC

Not a masonry arch Not a steel bridges Not a steel bridges


bridges Not a steel Not a steel bridges Not a steel bridgescantilever member
Not a Not a PSC

Not a masonry arch Not a steel bridges Not a steel bridges


bridges Not a steel Not a steel bridges Not a steel bridgescantilever member
Not a Not a PSC

Not a masonry arch Not a steel bridges Not a steel bridges


bridges Not a steel Not a steel bridges Not a steel bridgescantilever member
Not a Not a PSC

Not a masonry arch Not a steel bridges Not a steel bridges


bridges Not a steel Not a steel bridges Not a steel bridgescantilever member
Not a Not a PSC

Not a masonry arch Not a steel bridges Not a steel bridges


bridges Not a steel Not a steel bridges Not a steel bridgescantilever member
Not a Not a PSC

Not a masonry arch Not a steel bridges Not a steel bridges


bridges Not a steel Not a steel bridges Not a steel bridgescantilever member
Not a Not a PSC

Not a masonry arch Not a steel bridges Not a steel bridges


bridges Not a steel Not a steel bridges Not a steel bridgescantilever member
Not a Not a PSC

Not a masonry arch Not a steel bridges Not a steel bridges


bridges Not a steel Not a steel bridges Not a steel bridgescantilever member
Not a Not a PSC

Not a masonry arch Not a steel bridges Not a steel bridges


bridges Not a steel Not a steel bridges Not a steel bridgescantilever member
Not a Not a PSC
 
 
 
 
 
 
 
 
9.3.5
9.3.4
9.3.3
9.3.2
9.3.1

of
by

any
report

Check
Check
Report

Profile
mortar,

Reports

spandrel
drainage
(indicate
condition

flattening

vegetation
of joints

growth of
cracks if
Not a Not a Not a Not a

No
masonry arch masonry arch masonry arch masonry arch

Not a Not a Not a Not a

No
masonry arch masonry arch masonry arch masonry arch

Not a Not a Not a Not a

No
masonry arch masonry arch masonry arch masonry arch

Not a Not a Not a Not a


No

Page 29
masonry arch masonry arch masonry arch masonry arch

Not a Not a Not a Not a


No

masonry arch masonry arch masonry arch masonry arch

Not a Not a Not a Not a


No

masonry arch masonry arch masonry arch masonry arch

Not a Not a Not a Not a


No

masonry arch masonry arch masonry arch masonry arch

masonry arch masonry


Not a arch masonry
Not a arch masonry
Not a arch Not a
No

masonry arch masonry


Not a arch masonry
Not a arch masonry
Not a arch Not a
No

masonry arch masonry


Not a arch masonry
Not a arch masonry
Not a arch Not a
No

masonry arch masonry


Not a arch masonry
Not a arch masonry
Not a arch Not a
No

masonry arch masonry


Not a arch masonry
Not a arch masonry
Not a arch Not a
No

masonry arch masonry


Not a arch masonry
Not a arch masonry
Not a arch Not a
No

masonry arch masonry


Not a arch masonry
Not a arch masonry
Not a arch Not a
No

masonry arch masonry


Not a arch masonry
Not a arch masonry
Not a arch Not a
No

masonry arch masonry


Not a arch masonry
Not a arch masonry
Not a arch Not a
No

masonry arch masonry


Not a arch masonry
Not a arch masonry
Not a arch Not a
No

masonry arch masonry


Not a arch masonry
Not a arch masonry
Not a arch Not a
No

masonry arch masonry


Not a arch masonry
Not a arch masonry
Not a arch Not a
No

masonry arch masonry


Not a arch masonry
Not a arch masonry
Not a arch Not a
No

masonry arch masonry


Not a arch masonry
Not a arch masonry
Not a arch Not a
No
 
 
FORMAT C: STANDARD PROFORMA FOR INSPECTION REPORT (FOR PASSAGE OF ODC/OWC)

Certificate to be accorded by the inspecting  


------------------
official

10.2.3 Report perceptible vibrations, if any No perceptible vibration is  


observed

10.2.4 Report on alignment of members of  


Members are aligned
superstructure

11.1 Report functioning of expansion joints  


( Report cracks in deck in the existing gap Expansion Joint not present
and approximate temperatures)

11.2 Report condition of sealing material ( for  


neoprene sealing material, check for splitting
oxidation, creep flattening, bulging and for Expansion Joint not present
bitumen filler, check for hardening, cracking,
etc.)

11.7 Report rattling of expansion joints, if any No  

CHAPTER-6: PHOTOGRAPHS
Approach towards Fansi Tallah more

Page 30
PH 1: General view approach wearing course PH 2: General view approach wearing course

PH 3: Side View of the bridge PH 4: General view Superstructure

PH 5: General view Superstructure PH 6: General view Substructure

Page 31
PH 7: General view Superstructure PH 8: Reinforcement exposed in superstructure

PH 10: Crack in substructure


PH 9: Crack in superstructure

PH 11: General view of superstructure PH 12: Reinforcement exposed in superstructure

Page 32
PH 13: Reinforcement exposed in superstructure PH 14: General view arch structure in approach

PH 15: Side view of the bridge PH 16: Side view of the bridge
Approach towards Punjab lane side

PH 17: General view approach wearing course PH 18: General view approach wearing course

Page 33
PH 19: General view of Superstructure PH 20: General view of Substructure

PH 21: General view of Superstructure PH 22: Reinforcement exposed in superstructure

PH 23: Crack in superstructure PH 24: Side view of the bridge

Page 34
PH 25: Boundary wall of Bhawani Apartment blocking PH 26: Reinforcement exposed in superstructure
access to the bridge

PH 27: General view of substructure PH 28: General view of superstructure

PH 29: Side view of the bridge PH 30: General view of substructure

Page 35
PH 31: Side view of the bridge PH 32: Side view of abutment

Page 36
1.1. Bridge Rating on basis of condition survey courtesy(IBMS) Indian bridge
management system under the guide line of MoRT&H
SI.
Title Rating Description of title/Rating
No.
Satisfactory condition mean: Potential exists for major
Integral and Non
1 5 maintenance; Minor spalling of deck; deck edges are poorly kept
Integral Deck
Satisfactory condition mean: Potential exists for major
Super-structure maintenance; some cracking is observed on deck and girder; bridge
2 5
deck and girder requires attention
Fair condition mean: Potential exists for minor maintenance;
3 Sub-Structure 6 moderate cracking of concrete units; initial disintegration of
concrete units
Not applicable: Bridge is not over water way
4 Bank and Channel N

Bridge components are in working condition but require attention


5 Structural Evolution 5 and repairs
= 7.30 m; Carriage way width 7.30 m curb to curb with 2 lanes on
6 Deck Geometry 7 ODR.
> 5.02m; Maximum height between the soffit of superstructure
7 Vertical Clearance 9 and bed.
Waterway Not applicable: Bridge is not over water way
8 N
Adequacy
Not applicable: Bridge is not over water way
9 Scour efficiency N
Highly populated area: Bridge connects population centres of over
10 Connectivity 5 15 lakh & is located on Major district road.
>7500; Average Daily Traffic volume for existing route on which
11 Average Daily Traffic 0 the bridge is located
Bridge ease the movement from one end to the other end
12 Social Importance 3

The bridge connects the two important areas which are dependent
13 Economic Growth 7 for economic growth.
1 to 2 kms/ additional 10 minutes.
14 Alternate Route 1

Environmental The bridge does affect the environment: No impact is possible or


15 Impact 9 noticed.