0% found this document useful (0 votes)
263 views

B1 XPMS Waiver Processing Training Notes 30-July-09

The document provides guidelines for the waiver processing in the Excavation Permit Management System (XPMS). There are four types of waivers that can be applied for: Shallow Cover Utility Area (SCA), Road Opening Restriction Zone (ORZ), Registration Lead Time (RLT), and Repeated Road Opening (ROP). For each waiver type, the document outlines the user roles and responsibilities in the application and approval process, which typically involves the UU Working submitting the waiver application, the ECTO reviewing and recommending, the ME reviewing, and finally the SE or SME approving the waiver.

Uploaded by

hessian123
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
263 views

B1 XPMS Waiver Processing Training Notes 30-July-09

The document provides guidelines for the waiver processing in the Excavation Permit Management System (XPMS). There are four types of waivers that can be applied for: Shallow Cover Utility Area (SCA), Road Opening Restriction Zone (ORZ), Registration Lead Time (RLT), and Repeated Road Opening (ROP). For each waiver type, the document outlines the user roles and responsibilities in the application and approval process, which typically involves the UU Working submitting the waiver application, the ECTO reviewing and recommending, the ME reviewing, and finally the SE or SME approving the waiver.

Uploaded by

hessian123
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 34

TRAINING NOTES

EXCAVATION PERMIT MANAGEMENT SYSTEM (XPMS)

WAIVER PROCESSING
(B1)

30 July 2009

Version 0.0.1
Purpose
This document provides a general idea of the Waiver Processing in Excavation Permit Management
System (XPMS). Details of the procedures involved in the waiver processing will be further explained in
the following sections.

Ref. No: B1 Version 0.0.1 2


Acknowledgement
This document is confined to provide a guideline for the use of XPMS system, for details of the business
rules guiding the use of XPMS, please refer to the Processing Manual.

Ref. No: B1 Version 0.0.1 3


TABLE OF CONTENTS
1. Introduction............................................................................................................................. 1
2. Shallow Cover Utility Area (SCA) ......................................................................................... 2
2.1. User Roles Involved and Actions Required.................................................................... 2
2.2. SCA Waiver Application by UU Working ..................................................................... 2
2.3. Waiver Vetting (SCA) by ECTO.................................................................................... 4
2.4. Waiver Review (SCA) by ME ........................................................................................ 6
2.5. Waiver Approval (SCA) by SE/ SME ............................................................................ 7
3. Road Opening Restriction Zone (ORZ)................................................................................ 10
3.1. User Roles Involved and Actions Required.................................................................. 10
3.2. ORZ Waiver Application by UU Working................................................................... 10
3.3. Waiver Vetting (ORZ) by IOW .................................................................................... 12
3.4. Waiver Recommendation (ORZ) by ECTO ................................................................. 14
3.5. Waiver Approval (ORZ) by SE .................................................................................... 15
3.6. Waiver Endorsement (ORZ) by CE.............................................................................. 17
4. Registration Lead Time (RLT) ............................................................................................. 19
4.1. User Roles Involved...................................................................................................... 19
4.2. RLT Waiver Application by UU Working ................................................................... 19
4.3. Waiver Vetting (RLT) by IOW..................................................................................... 20
4.4. Waiver Approval (RLT) by ECTO ............................................................................... 21
5. Repeated Road Opening (ROP) ............................................................................................ 24
5.1. User Roles Involved...................................................................................................... 24
5.2. ROP Waiver Application by UU Working ................................................................... 24
5.3. Waiver Vetting (ROP) by IOW .................................................................................... 25
5.4. Waiver Recommendation (ROP) by ECTO.................................................................. 28
5.5. Waiver Approval (ROP) by SE..................................................................................... 29
XPMS USER TRAINING NOTES - WAIVER PROCESSING

1. Introduction

When the plan violates some restrictions and that that violation cannot be avoided by changing
the work dates and work location, applicants should apply for waivers corresponding to the
restrictions being violated through XPMS.

Note: some violations can be avoided by changing the work dates and work location.

Four types of Waivers can be applied by the UU Working in Excavation Permit Management
System (XPMS), they are:
- Shallow Cover Utility Area (SCA)
- Road Opening Restriction Zone (ORZ)
- Registration Lead Time (RLT), and
- Repeated Road Opening (ROP)

Waiver Processing is applicable to NXP, CWXP, and SSW Jobs. The following shows the
permit with applicable waiver types:

Permit Type Applicable Waiver Types


NXP SCA, ROP, ORZ, RLT
CWXP ROP, ORZ, SCA
SSW Jobs ORZ, SCA

The workflow involved in each of the four types of waivers, beginning from the waiver
application at UU Working, up to the final approval of the waiver, will be further discussed in
the following sections.

Workflow for Waiver Processing:

Ref. No: B1 Version 0.0.1 1


XPMS USER TRAINING NOTES - WAIVER PROCESSING

2. Shallow Cover Utility Area (SCA)


2.1.User Roles Involved and Actions Required
SCA Waiver should be applied by UU Working through plan search after the plan has been
submitted by UU Management. The waiver applied by the applicant should be reviewed and
recommended by ECTO and ME, and should be approved by SE or SME.

Role Activity Tabs Actions


UU Working Waiver Main - Apply for SCA waiver
Application
ECTO Waiver Vetting Main - Recommend the waiver
application
ME Waiver Review Main - Review the waiver application
SE / SME Waiver Approval Main - Final approval of the waiver
application

2.2.SCA Waiver Application by UU Working

UU Working – Waiver Application

Note:
SCA Waiver can be applied by UU Working once the Plan/Job has been submitted by the UU
Management.

Follow the following steps to apply for SCA Waiver:

Step 1 Login the portal with UU Working user right.

Step 2 Go to the “Search plan” page through the Menu bar. Search for the plan that requires
SCA Waiver (Figure 2.2.1).

Step 3 In the result list, click “Create Waiver” and <OK> to confirm. A popup message “Create
Waiver Success” should be displayed (Figure 2.2.1). A new task with “Waiver
Submission (SCA)” should have been created in the UU Working’s inbox.

Step 4 Go to the inbox and click “Play” button to open the task with activity “Waiver
Submission (SCA)” (Figure 2.2.2).

Step 5 Click “Open” in the Waiver Application tray under the Main tab to open the action box
for SCA Waiver application.

Step 6 Edit the “Remark” field and click <Browse> to upload attachments if necessary (Figure
2.2.3).

Step 7 Click <Save> to save the waiver application. Click <Submit> to finish the process and
submit the waiver application to ECTO for Waiver Vetting.

Ref. No: B1 Version 0.0.1 2


Figure 2.2.1

Figure 2.2.2

Ref. No: B1 Version 0.0.1 3


Figure 2.2.3

2.3.Waiver Vetting (SCA) by ECTO

ECTO - Waiver Vetting (SCA)

Follow the following steps for Waiver Vetting:


Step 1 Login the portal with E/CTO user right

Step 2 Select Excavation Permit (or other Permits types) from the workbench (Figure 2.3.1), and
click “Play” button to open the plan for Waiver Vetting (SCA).

Step 3 After E/CTO reviewing the waiver application, click <Open> in the Waiver Application
Tray to open the E/CTO action box for SC Waiver (Figure 2.3.2).

Step 4 Enter comments in the E/CTO Recommendation textbox. Click <Browse> to upload
attachments if necessary (Figure 2.3.3).

Step 5 Click <Save> to save the changes (Figure 2.3.3).

Step 6 Click <Submit> to finish the process and submit the application to MEs for the next
processing stage (Figure 2.3.3)

Ref. No: B1 Version 0.0.1 4


Figure 2.3.1

Figure 2.3.2

Ref. No: B1 Version 0.0.1 5


Figure 2.3.3

2.4.Waiver Review (SCA) by ME


ME – Waiver Review (SCA)

Follow the following steps for Waiver Review:

Step 1 Login the portal with ME user right

Step 2 Select Excavation Permit (or other Permits types) from the workbench, and click “Play”
button to open the plan for Waiver Review (SCA).

Step 3 Click “Open” in the Waiver Application Tray to open the ME action box for SCA Waiver.

Step 4 Enter comments in the ME Recommendation box. Upload attachments if necessary


(Figure 2.4.1).

Step 5 Choose the approval party (Figure 2.4.1). The approval party can be either SE or SME.
a) SE: Choose SE, the waiver application will be submitted to SE for Waiver
Approval.
b) SME: Choose SME, the waiver application will be submitted to SME for Waiver
Approval.

Step 6 Click <Save> to save the changes (Figure 2.4.1).

Step 7 Click <Submit> to finish the process and submit the application to the approval party (SE
or SME) for Waiver Approval.

Ref. No: B1 Version 0.0.1 6


Figure 2.4.1

2.5.Waiver Approval (SCA) by SE/ SME


SE or SME – Waiver Approval (SCA)
SE or SME is responsible for the final approval of SCA Waiver.

Note: Whether the Waiver should be approved by SE or SME is specified by ME at the


Waiver Review stage.

Follow the following steps for Waiver Approval at SE / SME:

Step 1 Login with SE or SME user right.

Step 2 Select Excavation Permit (or other Permits types) from the workbench and click “Play”
button to open the plan for Waiver Approval (Figure 2.5.1).

Step 3 Click “Open” in the Waiver Application Tray to open the SE or SME action box for SCA
Waiver (Figure 2.5.2)

Step 4 SE or SME is responsible for the final approval of the SCA Waiver. SE or SME can either
choose to Approve or Reject the application (Figure 2.5.3).
a) Approve: Choose Approve to approve the SCA Waiver.
b) Reject: Choose Reject to reject to reject the SCA Waiver. The plan will be
returned back to UU Working for Plan Maintenance / Registration. Applicant can
choose to resubmit a new waiver application.

Note: Choose Reject:


1. For SSW Jobs, the job will be returned back to UU Working for SSW Job
Maintenance.
Ref. No: B1 Version 0.0.1 7
2. For CWXP and NXP, the plan will be returned back to UU Working for Plan
Maintenance/ Plan Registration.

Step 5 Click <Save> to save the action (Figure 2.5.3).

Step 6 Click <Submit> to submit the plan to the next processing stage (Figure 2.5.3).

Note: All waivers should be approved before the plan can proceed to the next processing
stage.

Figure 2.5.1

Ref. No: B1 Version 0.0.1 8


Figure 2.5.2

Figure 2.5.3

Ref. No: B1 Version 0.0.1 9


XPMS USER TRAINING NOTES - WAIVER PROCESSING

3. Road Opening Restriction Zone (ORZ)


3.1.User Roles Involved and Actions Required
ORZ Waiver should be applied by UU Working, reviewed by IOW, recommended by ECTO,
approved by SE, and finally approved by CE.

Role Activity Tabs Actions


UU Working Waiver Main - Apply for waiver
Application
IOW Waiver Vetting Main - Review the waiver application
ECTO Waiver Main - Recommend for the waiver
Recommendation application
SE Waiver Approval Main - Approve for the waiver
CE Waiver Main - Endorse the approved waiver
Endorsement

3.2.ORZ Waiver Application by UU Working


UU Working – Waiver Application

Note:
1. For CWXP and NXP, ORZ Waiver should be applied by UU Working at the Plan
Maintenance / Plan Registration stage.
2. For SSW Jobs, ORZ Waiver should be applied by UU Working at the Job Maintenance
stage.

Follow the following steps to apply for ORZ Waiver:

Step 1 Login with UU Working user right.

Step 2 Create a new plan that requires ORZ Waiver or select an existing plan in the Plan
Maintenance / Plan Registration stage and requires ORZ Waiver.

Note:
1. ORZ Waiver is required if work location that is inside the Road Opening
Restriction Zone.
2. ORZ area and the ORZ period can be seen in the map (Figure 3.2.1).
3. For NXP, users may also click “Check Repeated Road Opening and Road
Opening Restriction” in the Map Details tab after PPA has been created to detect
if any of the work items is in ORZ area. Warning message will be shown if any
of the plan items is in ORZ.
4. For CW and SSW Jobs, ORZ warning message will be shown in Map Details tab
after the alignments have been digitized on the map.

Step 3 If any of the work items is in ORZ area, users should apply for ORZ waiver. Go to the
Main tab of the plan and click <Create> button under the Waiver Application tray
(Figure 3.2.2).

Step 4 Choose “Road Opening Restriction” from the drop down list. Enter “Remark” in the
remark field. Click <Browse> to upload attachments if necessary (Figure 3.2.3).

Ref. No: B1 Version 0.0.1 10


Step 5 Click <Save> to save the waiver application.

Note: When the plan is submitted by UU Working/UU Management, the waiver


application will also be submitted.

Figure 3.2.1 – ORZ area and the ORZ period (the shaded area)

Figure 3.2.2

Ref. No: B1 Version 0.0.1 11


Figure 3.2.3

3.3.Waiver Vetting (ORZ) by IOW


IOW – Waiver Vetting

Follow the following steps for Waiver Vetting at IOW:

Step 1 Login the with IOW user right

Step 2 Select Excavation Permit (or other Permits types) from the workbench and click “Play”
button to open the plan for ORZ Waiver Vetting (Figure 3.3.1)

Step 3 Click <Open> of the ORZ Waiver under the Waiver Application tray to open the IOW
action box for ORZ Waiver.

Step 4 IOW can either Recommend or Reject the waiver application (Figure 3.3.2)
a) Recommend: Choose Recommend, the waiver application will be submitted to
ECTO for ORZ Waiver Recommendation.
b) Reject: Choose Reject to reject to reject the ORZ Waiver. The plan will be
returned back to UU Working for Plan Maintenance / Registration. Applicant can
choose to resubmit a new waiver application.

Note: Choose Reject:


1. For SSW Jobs, the job will be returned back to UU Working for SSW Job
Maintenance.
2. For CWXP and NXP, the plan will be returned back to UU Working for Plan
Maintenance/ Plan Registration.

Ref. No: B1 Version 0.0.1 12


Step 5 Click <Save> to save the changes (Figure 3.3.2).

Step 6 Click <Submit> to finish the process and submit the application to the next processing
stage. (Figure 3.3.2)

Figure 3.3.1

Figure 3.3.2
Ref. No: B1 Version 0.0.1 13
3.4.Waiver Recommendation (ORZ) by ECTO
ECTO – Waiver Recommendation

Follow the following steps for Waiver Recommendation at ECTO:

Step 1 Login the with ECTO user right.

Step 2 Select Excavation Permit (or other Permits types) from the workbench and click “Play”
button to open the plan for ORZ Waiver Recommendation (Figure 3.4.1)

Step 3 Click “Open” of the ORZ Waiver under the Waiver Application tray to open the ECTO
action box for ORZ Waiver.

Step 4 ECTO can either Recommend or Reject the waiver application at this stage (Figure 3.4.2)
a) Recommend: Choose Recommend, the waiver application will be submitted to SE
for ORZ Waiver Approval.
b) Reject: Choose Reject to reject to reject the ORZ Waiver. The plan will be
returned back to UU Working for Plan Maintenance / Registration. Applicant can
choose to resubmit a new waiver application.

Note: Choose Reject:


1. For SSW Jobs, the job will be returned back to UU Working for SSW Job
Maintenance.
2. For CWXP and NXP, the plan will be returned back to UU Working for
Plan Maintenance/ Plan Registration.

Step 5 Click <Save> to save the changes (Figure 3.4.2).

Step 6 Click <Submit> to finish the process and submit the application to the next processing
stage. (Figure 3.4.2)

Ref. No: B1 Version 0.0.1 14


Figure 3.4.1

Figure 3.4.2

3.5.Waiver Approval (ORZ) by SE


SE – Waiver Approval

Follow the following steps for Waiver Approval at SE:


Step 1 Login with SE user right.

Step 2 Select Excavation Permit (or other Permits types) from the workbench and click “Open”
to open the plan for ORZ Waiver Approval(Figure 3.5.1)

Step 3 Click <Open> of the ORZ Waiver under the Waiver Application tray to open the SE
action box for ORZ Waiver Approval.

Step 4 SE can either Approve or Reject the waiver application (Figure 3.5.2)
a) Approve: Choose Approve, the approved waiver application will be submitted to
CE for ORZ Waiver Endorsement.
b) Reject: Choose Reject to reject to reject the ORZ Waiver. The plan will be
returned back to UU Working for Plan Maintenance / Registration. Applicant can
choose to resubmit a new waiver application.

Note: Choose Reject:


1. For SSW Jobs, the job will be returned back to UU Working for SSW Job
Maintenance.
2. For CWXP and NXP, the plan will be returned back to UU Working for
Plan Maintenance/ Plan Registration.

Ref. No: B1 Version 0.0.1 15


Step 5 Click <Save> to save the changes (Figure 3.5.2).

Step 6 Click <Submit> to finish the process and submit the application to the next processing
stage. (Figure 3.5.2)

Figure 3.5.1

Figure 3.5.2

Ref. No: B1 Version 0.0.1 16


3.6.Waiver Endorsement (ORZ) by CE
CE – Waiver Endorsement

Follow the following steps for Waiver Endorsement at CE:

Step 1 Login with CE user right.

Step 2 Select Excavation Permit (or other Permits types) from the workbench and click ‘Play”
button to open the plan for ORZ Waiver Endorsement.(Figure 3.6.1)

Step 3 Click “Open” of the ORZ Waiver under the Waiver Application tray to open the CE
action box for ORZ Waiver Endorsement.

Step 4 CE is responsible for the final endorsement stage of the approved ORZ Waiver. CE can
either Endorse or Reject the waiver application (Figure 3.6.2)
a) Endorse: Choose Endorse, the approved waiver will be accepted. And the process
for ORZ Waiver is finished. Proceed to next processing stage if all waivers have
been approved.
b) Reject: Choose Reject to reject to reject the ORZ Waiver. The plan will be
returned back to UU Working for Plan Maintenance / Registration. Applicant can
choose to resubmit a new waiver application.

Note: Choose Reject:


1. For SSW Jobs, the job will be returned back to UU Working for SSW Job
Maintenance.
2. For CWXP and NXP, the plan will be returned back to UU Working for
Plan Maintenance/ Plan Registration.

Step 5 Click <Save> to save the changes (Figure 3.6.2).

Step 6 Click <Submit> submit the plan to the next processing stage. (Figure 3.6.2)

Note: All waivers should be approved before the plan can proceed to the next processing
stage.

Ref. No: B1 Version 0.0.1 17


Figure 3.6.1

Figure 3.6.2

Ref. No: B1 Version 0.0.1 18


XPMS USER TRAINING NOTES - WAIVER PROCESSING

4. Registration Lead Time (RLT)


Note: RLT Waiver is applicable for NXP only. It is not applicable for CWXP and SSW Jobs.

4.1.User Roles Involved


RLT Waiver should be applied by UU Working at the Plan Maintenance stage, and should be
reviewed by IOW, and finally approved by ECTO.

Role Activity Tabs Actions


UU Working Waiver Main - Apply for the RLT waiver
Application
IOW Waiver Vetting Main - Review and recommend the RLT
waiver
ECTO Waiver Approval Main - Approve the RLT waiver

4.2.RLT Waiver Application by UU Working


UU Working – Waiver Application (RLT)

RLT Waiver should be applied by UU Working at the NXP Plan Maintenance stage.

Note:
1. Lead time requirement for NXP Plan is calculated automatically by the system after the
PPA has been created.
2. After PPA has been created for the NXP plan, lead time requirement for the plan will be
shown in the Main tab of the plan.
3. If the plan start date does not meet the lead time requirement, RLT Waiver should be
applied. Otherwise the plan cannot be submitted (A warning message will be displayed to
notify the user to apply for RLT Waiver).

Follow the following steps for RLT Waiver application:

Step 1 Login with UU Working user right.

Step 2 Create a new plan that requires RLT Waiver or select an existing plan in the Plan
Maintenance stage and requires RLT Waiver.

Step 3 Go to the Main tab of the plan and click <Create> button under the Waiver Application
tray.

Step 4 Choose “Registration Lead Time” from the drop down list. Enter “Remark” in the
remark field. Click <Browse> to upload attachments if necessary (Figure 4.2.1).

Step 5 Click <Save> to save the waiver application.

Note: When the plan is submitted by UU Working/UU Management, the waiver


application will also be submitted.

Ref. No: B1 Version 0.0.1 19


Figure 4.2.1

4.3.Waiver Vetting (RLT) by IOW


IOW – Waiver Vetting (RLT)

Follow the following steps for Waiver Vetting at IOW:

Step 1 Login with IOW user right

Step 2 Select Excavation Permit (or other Permits types) from the workbench and click “Play”
button to open the plan for RLT Waiver Vetting (Figure 4.3.1)

Step 3 Click “Open” of the RLT Waiver under the Waiver Application tray to open the IOW
action box for RLT Waiver Vetting.

Step 4 IOW can either Recommend or Reject the RLT Waiver (Figure 4.3.2)
a) Recommend: Choose Recommend, the waiver application will be submitted to
ECTO for Waiver Approval (RLT).
b) Reject: Choose Reject to reject to reject the RLT Waiver. The plan will be
returned back to UU Working for Plan Maintenance. Applicant can choose to
resubmit a new waiver application.

Step 5 Click <Save> to save the changes (Figure 4.3.2).

Step 6 Click <Submit> to finish the process and submit the application to the next processing
stage. (Figure 4.3.2)

Ref. No: B1 Version 0.0.1 20


Figure 4.3.1

Figure 4.3.2

4.4.Waiver Approval (RLT) by ECTO


ECTO - Waiver Approval (RLT)

Follow the following steps for RLT Waiver Approval:

Step 1 Login with ECTO user right.


Ref. No: B1 Version 0.0.1 21
Step 2 Select Excavation Permit (or other Permits types) from the workbench and click “Play”
button to open the plan for RLT Waiver Approval (Figure 4.4.1)

Step 3 Click “Open” of the RLT Waiver under the Waiver Application tray to open the ECTO
action box for RLT Waiver Approval.

Step 4 ECTO is responsible for the final approval of RLT Waiver. ECTO can either Approve or
Reject the RLT waiver (Figure 4.4.2)
a) Approve: Choose Approve to approve the RLT Waiver and the process for RLT
Waiver is finished. Proceed to next processing stage if all waivers have been
approved.
b) Reject: Choose Reject to reject the RLT waiver application. Plan will be returned
back to UU Working for Plan Maintenance. UU Working may choose to resubmit
a new waiver application.

Step 5 Click <Save> to save the changes (Figure 4.4.2).

Step 6 Click <Submit> to submit the plan to the next processing stage (Figure 4.4.2).

Note: All waivers should be approved before the plan can proceed to the next processing
stage.

Figure 4.4.1

Ref. No: B1 Version 0.0.1 22


Figure 4.4.2

Ref. No: B1 Version 0.0.1 23


XPMS USER TRAINING NOTES - WAIVER PROCESSING

5. Repeated Road Opening (ROP)


5.1.User Roles Involved
ROP Waiver should be applied by UU Working, reviewed and recommended by IOW and
ECTO, and finally approved by SE.

Role Activity Tabs Actions


UU Working Waiver Main - Apply for waiver
Application
IOW Waiver Vetting Main - Review the waiver application
ECTO Waiver Main - Recommend for the waiver
Recommendation application
SE Waiver Approval Main - Final approval of the waiver

5.2.ROP Waiver Application by UU Working


UU Working – Waiver Application (ROP)

Note:
1. ROP Waiver should be applied by UU Working at the Plan Maintenance / Plan
Registration stage.

Follow the following steps for ROP Waiver application:

Step 1 Login as UU Working user right.

Step 2 Create a new plan that requires ROP Waiver or select an existing plan in the Plan
Maintenance / Plan Registration stage and requires ROP Waiver.

Note:
1. For NXP, users may click “Check Repeated Road Opening and Road Opening
Restriction” in the Map Details tab after PPA has been created to detect if any of
the work items violates ROP. Warning message will be shown if any of the plan
items is in ROP (Figure 5.2.1).
2. For CWXP, ROP warning message will be shown in Map Details tab after the
alignments have been digitized on the map.

Step 3 If any of the alignments violates ROP, ROP waiver should be applied by the applicant.
Go to the Main tab of the plan and click <Create> button under the Waiver Application
tray to create a new waiver.

Step 4 Choose “Repeated Road Opening” from the drop down list. Enter “Remark” in the
remark field. Click <Browse> to upload attachments if necessary (Figure 5.2.2).

Step 5 Click <Save> the waiver application.

Note: When the plan is submitted by UU Working/UU Management, the waiver


application will also be submitted.

Ref. No: B1 Version 0.0.1 24


Figure 5.2.1 – Warning Message for ROP

Figure 5.2.2

5.3.Waiver Vetting (ROP) by IOW


IOW – Waiver Vetting (ROP)

Follow the following steps for Waiver Vetting (ROP):

Ref. No: B1 Version 0.0.1 25


Step 1 Login with IOW user right.

Step 2 Select Excavation Permit (or other Permits types) from the workbench and click “Play”
button to open the plan for ROP Waiver Vetting (Figure 5.3.1)

Step 3 Click “Open” of the ROP Waiver under the Waiver Application tray to open the IOW
action box for ROP Waiver Vetting.

Step 4 IOW can either Recommend or Reject the ROP waiver application at this stage (Figure
5.3.2)
a) Recommend: Choose Recommend, the waiver application will be submitted to
ECTO for Waiver Recommendation (ROP).
b) Reject: Choose Reject to reject to reject the ROP Waiver. The plan will be
returned back to UU Working for Plan Maintenance / Registration. Applicant can
choose to resubmit a new waiver application.

Step 5 Click <Save> to save the changes (Figure 5.3.2).

Step 6 Click <Submit> to finish the process and submit the application to the next processing
stage (Figure 5.3.2).

Figure 5.3.1

Ref. No: B1 Version 0.0.1 26


Figure 5.3.2

Ref. No: B1 Version 0.0.1 27


5.4.Waiver Recommendation (ROP) by ECTO
ECTO – Waiver Recommendation

Follow the following steps for Waiver Recommendation at ECTO:

Step 1 Login with ECTO user right.

Step 2 Select Excavation Permit (or other Permits types) from the workbench and click “Play”
button to open the plan for Waiver Recommendation (ROP) (Figure 5.4.1)

Step 5 Click “Open” of the ROP Waiver under the Waiver Application tray to open the ECTO
action box for ROP Waiver Recommendation.

Step 6 E/CTO can either Recommend or Reject the ROP waiver application (Figure 5.4.2)
a) Recommend: Choose Recommend to pass the ROP Waiver application to SE for
the final approval process.
b) Reject: Choose Reject to reject to reject the ROP Waiver. The plan will be
returned back to UU Working for Plan Maintenance / Registration. Applicant can
choose to resubmit a new waiver application.

Step 7 Click <Save> to save the changes (Figure 4.4.2).

Step 8 Click <Submit> to finish the process and submit the application to the next processing
stage. (Figure 5.4.2)

Figure 5.4.1

Ref. No: B1 Version 0.0.1 28


Figure 5.4.2

5.5.Waiver Approval (ROP) by SE


SE – Waiver Approval
Follow the following steps for ROP Waiver Approval at SE:

Step 1 Login with SE user right.

Step 2 Select Excavation Permit (or other Permits types) from the workbench and click “Play”
button to open the plan for ROP Waiver Approval (Figure 5.5.1)

Step 3 Click “Open” of the ROP Waiver under the Waiver Application tray to open the SE action
box for ROP Waiver Approval (Figure 2.3.2).

Step 4 SE is responsible for the final approval of the ROP Waiver. SE can either Approve or
Reject the ROP waiver application (Figure 5.5.2)
a) Approve: Choose Approve to approve the ROP Waiver. The process for ROP
Waiver is finished. Proceed to the next processing stage if all waivers have been
approved.
b) Reject: Choose Reject to reject to reject the ROP Waiver. The plan will be
returned back to UU Working for Plan Maintenance / Registration. Applicant can
choose to resubmit a new waiver application.

Step 5 Click <Save> to save the changes (Figure 5.5.2).

Step 6 Click <Submit> to submit the plan to the next processing stage. (Figure 5.5.2)

Note: All waivers should be approved before the plan can proceed to the next processing
stage.

Ref. No: B1 Version 0.0.1 29


Figure 5.5.1

Figure 5.5.2

Ref. No: B1 Version 0.0.1 30

You might also like