ENVIRONMENT
PT. SWADAYA CIPTA
PROJECT : JTB UNITIZATION GAS PROJECT
SUBCONTRACTOR CONTRACTOR
DATE
PREPARED CHECK APPROVED CHECK APPROVED
25-Nov-19
RANGGA ARUM
A. K. MIZAN FIRMAN HARI S.
HAYKAL ALBUNTANA
HSE ENVIRO HSE COORD Site Manager Enviro Staff Enviro Coord.
ENVIRONMENTAL SOCIALIZATION and TRAINING
REV 0
FOTO KEGIATAN
Sosialisasi house keeping area kerja Sosialisasi menjaga kesehatan dimusim penghujan Sosialisasi bahaya hewan melata diarea kerja Refresh training pencegahan dan penanganan
tumpahan
Attd.List
Sosialisasi house keeping area kerja Sosialisasi menjaga kesehatan dimusim penghujan Sosialisasi bahaya hewan melata diarea kerja Refresh training pencegahan dan penanganan
tumpahan
ENVIRONMENTAL DOCUMENTASI
REV 0
FOTO KEGIATAN
Housekeeping area shelter General House keeping House keeping area kerja Pengisian bahan bakar
Penyedotan Tinja Pond 2 Penyedotan Tinja Pond 3 House keeping toilet pengisian air toren
Pengecekan Eyewash Pengisian air toren Pembungan sampah & segregasi Buletin enviro
Pengecekan Eyewash Pengisian air toren Pembungan sampah & segregasi Buletin enviro
CONSORTI
UM
1 2 3
No Alat Spill Kit Jumlah Awal Tanggal Penggunaan Jumlah Pengunaan Catatan
No. Type of Chemical Trade Name Producer Name of Sub Contractor Where it is used MSDS Website / Email Controlling
2 Solar Bio Solar PT. Pertamina (Persero) Indonesia PT SWADAYA CIPTA-HS Heavy Equipment, Light Vehicle, Genset MSDS\01. msds-bio-solar.pdf mask, Ruber glove
Sep-19
KONSUMSI BBM ( HEAVY EQUIPMENT )
26-Dec
27-Dec
28-Dec
29-Dec
30-Dec
31-Dec
10-Jan
11-Jan
12-Jan
13-Jan
14-Jan
15-Jan
16-Jan
17-Jan
18-Jan
19-Jan
20-Jan
21-Jan
22-Jan
23-Jan
24-Jan
25-Jan
1-Jan
2-Jan
3-Jan
4-Jan
5-Jan
6-Jan
7-Jan
8-Jan
9-Jan
No Nama Alat
EXCAVATOR PC 78 60 N/A 60 N/A 60 N/A 0 60 N/A 60 N/A 60 N/A N/A N/A 60 N/A 60 N/A 60 N/A 60 N/A 60 N/A 60 N/A 60 N/A 60 N/A
EXCAVATOR PC 200 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
JUMLAH Total 160 100 160 100 160 100 0 160 100 160 100 160 100 100 100 160 100 160 100 160 100 160 100 160 100 160 100 160 100 160 100
Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter
Heavy Equipment
N/A
R I N C I A N
2 ELF 19 19 19 19 19 19 0 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
3 Pick UP 19 19 19 19 19 19 0 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
JUMLAH Total 57 57 57 57 57 57 0 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57
Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter Liter
Light Vehicle
Sep-19
26-Dec
27-Dec
28-Dec
29-Dec
30-Dec
31-Dec
10-Jan
11-Jan
12-Jan
13-Jan
14-Jan
15-Jan
16-Jan
17-Jan
18-Jan
19-Jan
20-Jan
21-Jan
22-Jan
23-Jan
24-Jan
25-Jan
1-Jan
2-Jan
3-Jan
4-Jan
5-Jan
6-Jan
7-Jan
8-Jan
9-Jan
Tanggal
Jumlah 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³
PEMAKAIAN KERTAS
A4 66 60 66 45 66 80 0 66 65 70 30 66 20 60 66 30 66 66 66 70 30 66 70 66 66 80 60 45 66 70 66
KANTOR
A3 8 40 10 15
Jumlah 66 60 74 45 66 80 0 66 65 70 30 66 60 60 66 30 76 66 66 70 45 66 70 66 66 80 60 45 66 70 66
26-Dec
27-Dec
28-Dec
29-Dec
30-Dec
31-Dec
10-Jan
11-Jan
12-Jan
13-Jan
14-Jan
15-Jan
16-Jan
17-Jan
18-Jan
19-Jan
20-Jan
21-Jan
22-Jan
23-Jan
24-Jan
25-Jan
1-Jan
2-Jan
3-Jan
4-Jan
5-Jan
6-Jan
7-Jan
8-Jan
9-Jan
Tanggal
SAMPAH
2 2 2 1 2 2 0 2 2 2 1 2 2 2 2 2 2 1 2 2 2 2 2 2 1 2 2 2 2 2 2
ORGANIC
Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg
6 6 6 3 6 6 0 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 6 6
NON ORGANIC
Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg
HAZARDOUZ
Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg
ORGANIC 56 Kg
Jumlah
Pemakaian NON
Dalam Satu ORGANIC 168 Kg
Bulan
HAZARDOUZ 0 Kg
B3 CAIR
Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr
MAJUN
Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg
Jumlah 300 300 300 300 300 300 300 300 3300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 3300 300 300 300 300 300
CV KAISAR CV MAHARANI
No Month Company Day Water Truck Rates Volume (L) Total Volume (L) Location
1 July SWG 31 3 5 5000 2325000 Jalan (A) Akses Perhutani, plus Pioneer Area
2 SWG 31 2 5 5000 1550000 Jalan (A) Akses Perhutani
August
3 YIN 31 2 6 5000 1860000 Jalan (A) Akses Perhutani
4 SWG 30 2 5 5000 1500000 Jalan (A) Akses Perhutani
5 September YIN 30 2 6 5000 1800000 Jalan (A) Akses Perhutani
6 RJJ 30 1 5 5000 750000 Jalan (A) Akses Perhutani, plus Pioneer Area
7 SWG 31 2 5 5000 1550000 Jalan (A) Akses Perhutani
8 October YIN 31 2 6 5000 1860000 Jalan (A) Akses Perhutani
9 RJJ 31 1 5 5000 775000 Jalan (A) Akses Perhutani, plus Pioneer Area
10 SWG 25 2 5 5000 1250000 Jalan (A) Akses Perhutani
11 November (Hujan) YIN 25 2 6 5000 1500000 Jalan (A) Akses Perhutani
12 RJJ 25 1 5 5000 625000 Jalan (A) Akses Perhutani, plus Pioneer Area
13 SWG 25 2 5 5000 1250000 Jalan (A) Akses Perhutani
14 December 2018 (Hujan) YIN 25 2 6 5000 1500000 Jalan (A) Akses Perhutani
15 RJJ 7 1 5 5000 175000 Jalan (A) Akses Perhutani, plus Pioneer Area
16 SWG 25 1 5 5000 625000 Jalan (A) Akses Perhutani
January 2019 (Hujan)
17 YIN 25 1 6 5000 750000 Jalan (A) Akses Perhutani
18 SWG 25 1 7 5000 875000 Jalan (A) Akses Perhutani
February 2019 (Hujan)
19 YIN 25 1 8 5000 1000000 Jalan (A) Akses Perhutani
20 SWG 31 1 5 5000 775000 Jalan (A) Akses Perhutani
March 2019 (Hujan)
21 YIN 31 1 6 5000 930000 Jalan (A) Akses Perhutani
22 SWG 30 1 5 5000 750000 Jalan (A) Akses Perhutani
April 2019 (Hujan)
23 YIN 30 1 6 5000 900000 Jalan (A) Akses Perhutani
ENVIRONMENTAL PERFORMANCE
REV 0 REV
CONSORTIUM
MONTH 0
Number of Env. Accident Energy and Natural Resource Consumption Total Waste
Remarks
Oil / chemical spill Fuel LIMBAH B3
No Period Oil/ chemical spill Oil / Chemical Spill Black
Electrical Water Paper Organic Inorganic
10-100 barel <5 Barrel Water
> 100 Barrel Diesel Petrol PADAT CAIR
a2 b c KWH Liter Liter Liiter (reams) Ton Ton Liter Ton Liter
1 January 3,443 7,500 0.036 0.118 6000 Periode 26 Desember - 25 Januari 2020
2 February
3 March
4 April
5 May
6 June
7 July
8 August
9 September
10 October
11 November
Sub-total 0.00 0.00 0.00 0.00 5393 0.00 9300.00 0 0.056 0.168 6000 0.000 0.000
Previous Total 0.00 0.00 0.00 0.00 0 0.00 0.00 0 0.000 0.000 0 0.000 0.000
Total 0.00 0.00 0.00 0.00 5393 0.00 9300.00 0 0.056 0.168 6000 0.000 0.000