0% found this document useful (0 votes)
59 views

Question Details of Subject:QUIZ-CST-312

The document provides details of a quiz containing 279 questions divided across 3 units and groups. It lists the number of questions for each group and unit. It then provides 15 sample questions from the quiz with their corresponding question IDs, descriptions, and answers. The questions cover topics related to software testing concepts like bugs, risks, test types, reviews, validation, verification etc.

Uploaded by

Aditya Jha
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views

Question Details of Subject:QUIZ-CST-312

The document provides details of a quiz containing 279 questions divided across 3 units and groups. It lists the number of questions for each group and unit. It then provides 15 sample questions from the quiz with their corresponding question IDs, descriptions, and answers. The questions cover topics related to software testing concepts like bugs, risks, test types, reviews, validation, verification etc.

Uploaded by

Aditya Jha
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 54

Question Details of Subject :QUIZ-CST-312

Page 1 of 54

Unit Code Group 1 Group 2 Group 3 Unit Wise Total Total Questions : 279
1 82 0 0 82

2 0 99 1 100

3 0 0 97 97
Group Wise Total 82 99 98

QNo Question Id Question Description


1 1679089 According to the ISTQB Glossary, the word 'bug' is synonymous with which of the following words?
Unit : 1, Group : 1 1.Incident
2.Defect (Right)
3.Mistake
4.Error
2 1679094
According to the ISTQB Glossary, a risk relates to which of the following?
Unit : 1, Group : 1

1. Negative feedback to the tester


2.Negative consequences that will occur.
3.Negative consequences that could occur. (Right)
4.. Negative consequences for the test object
3 1679111
Which of the following is most important to promote and maintain good relationships between testers and developers?
Unit : 1, Group : 1

1.Understanding what managers value about testing.


2. Explaining test results in a neutral fashion. (Right)
3.Identifying potential customer work-arounds for bugs.
4.Promoting better quality software whenever possible.
4 1679113
Which of the statements below is the best assessment of how the test principles apply
Unit : 1, Group : 1
across the test life cycle?

1.Test principles only affect the preparation for testing.


2.Test principles only affect test execution activities.
3.Test principles affect the early test activities such as review.
4.Test principles affect activities throughout the test life cycle. (Right)

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 2 of 54
QNo Question Id Question Description
5 1679122
Which option best describes objectives for test levels with a life cycle model?
Unit : 1, Group : 1

1.Objectives should be generic for any test level.


2.Objectives are the same for each test level.
3.The objectives of a test level don't need to be defined in advance.
4.Each level has objectives specific to that level. (Right)
6 1679128
Which of the following is a test type?
Unit : 1, Group : 1

1.Component testing
2.Functional testing (Right)
3.System testing
4.Acceptance testing
7 1679139
Which of these is a functional test?
Unit : 1, Group : 1

1. Measuring response time on an on-line booking system.


2.Checking the effect of high volumes of traffic in a call-center system
3. Checking the on-line bookings screen information and the database contents against the information on the letter to the customers.
(Right)
4.Checking how easy the system is to use.
8 1679146
Which of the following is a true statement regarding the process of fixing emergency changes?
Unit : 1, Group : 1

1.There is no time to test the change before it goes live, so only the best developers should do this work and should not involve testers as
they slow down the process.
2.Just run the retest of the defect actually fixed
3.Always run a full regression test of the whole system in case other parts of the system have been adversely affected.
4.Retest the changed area and then use risk assessment to decide on a reasonable subset of the whole regression test to run in case other
parts of the system have been adversely affected. (Right)
9 1679162
Beta testing is:
Unit : 1, Group : 1

1.Performed by customers at their own site. (Right)


2.Performed by customers at the software developer's site.
3.Performed by an independent test team.
4.Useful to test software developed for a specific customer or user.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 3 of 54
QNo Question Id Question Description
10 1679177
Which is not a type of review?
Unit : 1, Group : 1

1.Walkthrough
2.Inspection
3.Informal review
4.Management approval (Right)
11 1679222
Executing the same test case by giving the number of inputs on same build called as
Unit : 1, Group : 1

1.Regression Testing
2.Retesting (Right)
3.Ad hoc Testing
4.Sanity Testing
12 1679228
To check whether we are developing the right product according to the customer requirements are not. It is a static process
Unit : 1, Group : 1

1.Validation (Right)
2.Verification
3.Quality Assurance
4.Quality Control
13 1679237
To check whether we have developed the product according to the customer requirements r not. It is a Dynamic process.
Unit : 1, Group : 1

1.Validation
2.Verification (Right)
3.Quality Assurance
4.Quality Control
14 1679245
A Non-Functional Software testing done to check if the user interface is easy to use and understand
Unit : 1, Group : 1

1.Usability Testing (Right)


2.Security Testing
3.Unit testing
4.Block Box Testing
15 1679270
What are the Testing Levels?
Unit : 1, Group : 1

1.Unit Testing
2.Integration Testing
3.System Testing and Acceptance Testing.
4.All the above (Right)

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 4 of 54
QNo Question Id Question Description
16 1679297
Verification is
Unit : 1, Group : 1

1.Process based (Right)


2.Product based
3.
4.
17 1679303
White box testing is not called as___________
Unit : 1, Group : 1

1.Glass box testing


2.Closed box testing (Right)
3.Open box testing
4.Clear box testing
18 1679361
The testing which is done by going thro' the code is known as
Unit : 1, Group : 1

1.Unit Testing
2.Black box testing
3.White box Testing (Right)
4.Regression testing
19 1679387
Retesting modules connected to the program or component after a change has been made?
Unit : 1, Group : 1

1.Full Regression Testing


2.Unit Regression
3.Regional Regression (Right)
4.Retesting
20 1679389
Alpha testing will be done at
Unit : 1, Group : 1

1.User's site (Right)


2.Developers' site
3.
4.
21 1679396
Integration, It will come under
Unit : 1, Group : 1

1.CMM Level 1
2.CMM Level 3 (Right)
3.CMM Level 2
4.None

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 5 of 54
QNo Question Id Question Description
22 1679403
Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself
Unit : 1, Group : 1

1.Water fall model (Right)


2.Spiral Model
3.V-model
4.V-model
23 1679412
How severely the bug is effecting the application is called as
Unit : 1, Group : 1

1.Severity (Right)
2. Priority
3.Fix ability
4.Traceability
24 1679420
From a Testing perspective, what are the MAIN purposes of Configuration Management?:
Unit : 1, Group : 1
i) Identifying the version of software under test.

ii) Controlling the version of testware items.

iii) Developing new testwareitems.


iv) Tracking changes to testware items.
v) Analysing the need for new testware items.

1.ii, iv and v.
2.ii, iii and iv.i,
3.. i, ii and iv. (Right)
4.i, iii and v.
25 1679429
Which of the following BEST describes the difference between an inspection and a walkthrough?
Unit : 1, Group : 1

1.Both inspections and walkthroughs are led by the author.


2.An inspection is led by a moderator and a walkthrough is led by the author. (Right)
3.Both inspections and walkthroughs are led by a trained moderator.
4.A walkthrough is led by the author. The author is not present during inspections.
26 1679448
What is the MAIN objective when reviewing a software deliverable?
Unit : 1, Group : 1

1.To identify potential application failures by use of a test specification.


2.To identify defects in any software work product. (Right)
3.To identify spelling mistakes in a requirements specification.
4.To identify standards inconsistencies in the code.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 6 of 54
QNo Question Id Question Description
27 1679453
Which of the following would you NOT usually find on a software incident report?
Unit : 1, Group : 1

1.The name and/or organisational position of the person raising the problem.
2.Version of the Software Under Test.
3.Suggestions as to how to fix the problem. (Right)
4.Actual and expected results.
28 1679456
Which of the following defines the expected results of a test?
Unit : 1, Group : 1

1.Test case specification. (Right)


2.Test design specification.
3.Test procedure specification.
4.Test results.
29 1679463
As part of which test process do you determine the exit criteria?
Unit : 1, Group : 1

1.Test planning. (Right)


2.Evaluating exit criteria and reporting.
3.Test closure.
4.Test control.
30 1679465
Which of the following is a MAJOR task of test implementation and execution?
Unit : 1, Group : 1

1.Measuring and analyzing results.


2.Reporting discrepancies as incidents. (Right)
3.Identifying test conditions or test requirements.
4.Assessing if more tests are needed.
31 1679479
When should configuration management procedures be implemented?
Unit : 1, Group : 1

1.During test planning. (Right)


2.During test analysis.
3.During test execution.
4.When evaluating exit criteria

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 7 of 54
QNo Question Id Question Description
32 1679487
Which of the following are characteristic of regression testing ?
Unit : 1, Group : 1
i) Regression testing is run ONLY once

ii) Regression testing is used after fixes have been made

iii) Regression testing is often automated

iv) Regression tests need not be maintained

1.ii, iv.
2. ii, iii. (Right)
3. i, iii, iv.
4. iii.
33 1679506
Which of the following benefits are MOST likely to be achieved by using test tools?
Unit : 1, Group : 1
i) Easy to access information about tests and testing.
ii) Reduced maintenance of testware.
iii) Easy and cheap to implement.
iv) Greater consistency of tests.

1.ii and iv
2. E=constant (Right)
3. dQ?0
4.ii and iii
5. i and iv (Right)
6. dW?0
34 1679512
Which activities form part of test planning?
Unit : 1, Group : 1
i) Developing test cases.i
i) Defining the overall approach to testing.
iii) Assigning resources.
iv) Building the test environment
v) Writing test conditions.

1.i, ii & iv are true, iii & v are false.


2.ii & iii are true, i, iv & v are false. (Right)
3.iv & v are true, i, ii & iii are false.
4.i, ii & iii are true iv & v are false.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 8 of 54
QNo Question Id Question Description
35 1679522
Which type of test design techniques does the following statement best describe a procedure to derive test cases based on the
Unit : 1, Group : 1 specification of a component?

1.Black Box Techniques. (Right)


2.White Box Techniques.
3.Glass Box Techniques.
4.Experience Based Techniques.
36 1679548
Which of the following is MOST characteristic of specification based (black-box) techniques?
Unit : 1, Group : 1

1.Test cases can be easily automated.


2.Test cases are independent of each other.
3.Test cases are derived systematically from models of the system . (Right)
4.Test cases are derived systematically from the delivered code.
37 1679553 Which is the best definition of complete testing
Unit : 1, Group : 1 1.
2.
3.
4.
38 1679556
Complete statement and branch coverage means:
Unit : 1, Group : 1

1.That you have tested every statement in the program.


2.That you have tested every statement and every branch in the program. (Right)
3.That you have tested every IF statement in the program.
4.That you have tested every combination of values of IF statements in the program
39 1679564
There are several risks of managing your project's schedule with a statistical reliability model. These include (choose one or more of the
Unit : 1, Group : 1 following):

1.Testers spend more energy early in the product trying to find bugs than preparing to do the rest of the project's work more efficiently
2.Managers might not realize that the testing effort is ineffective, late in the project, because they expect a low rate of bug finding, so the
low rate achieved doesn't alarm them.
3.It can increase the end-of-project pressure on testers to not find bugs, or to not report bugs.
4.All of the above (Right)

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 9 of 54
QNo Question Id Question Description
40 1679570
Typical defects that are easier to find in reviews than in dynamic testing are:
Unit : 1, Group : 1

1.Deviations from standards,


2.Requirement defects,
3.Design defects
4.Insufficient maintainability and incorrect interface specifications.
5.All of the above. (Right)
41 1679573
Reviews, static analysis and dynamic testing have the same objective
Unit : 1, Group : 1

1.Identifying defects. (Right)


2.Fixing defects.
3.A. and B
4.None of the above
42 1679580
We can achieve complete statement coverage but still miss bugs because:
Unit : 1, Group : 1

1.The failure occurs only if you reach a statement taking the TRUE branch of an IF statement, and you got to the statement with a test that
passed through the FALSE branch.
2.The failure depends on the program's inability to handle specific data values, rather than on the program's flow of control. (Right)
3.We are not required to test code that customers are unlikely to execute.
4.All of the above
43 1679621
Which is not the project risks
Unit : 1, Group : 1

1.Supplier issues
2.Organization factors
3.Technical issues
4.Error-prone software delivered (Right)
44 1679657 Which granularity level of testing checks the behavior of module cooperation?
Unit : 1, Group : 1

1.Unit Testing
2.Integration Testing (Right)
3.Acceptance Testing
4.Regression Testing

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 10 of 54
QNo Question Id Question Description
45 1679084
A company recently purchased a commercial off-the-shelf application to automate their bill-paying process. They now plan to run a acceptance test
Unit : 1, Group : 1 against the package prior to putting it into production. Which of the following is their most likely reason for testing?

1.To build confidence in the application (Right)


2.To detect bugs in the application.
3.To gather evidence for a lawsuit.
4.To train the users.
46 1679098
Ensuring that test design starts during the requirements definition phase is important to enable which of the following test objectives?
Unit : 1, Group : 1

1.Preventing defects in the system. (Right)


2.Finding defects through dynamic testing.
3.Gaining confidence in the system.
4.Finishing the project on time.
47 1679101
A test team consistently finds between 90% and 95% of the defects present in the system under test. While the test manager understands that this is a
Unit : 1, Group : 1 good defect-detection percentage for her test team and industry, senior management and executives remain disappointed in the test group, saying
that the test team misses too many bugs. Given that the users are generally happy with the system and that the failures which have occurred have
generally been low impact which of the following testing principles is most likely to help the test manager explain to these managers and executives
why some defects are likely to be missed?

1.Exhaustive testing is impossible (Right)


2.Defect clustering
3.Pesticide paradox
4.Absence-of-errors fallacy
48 1679108
According to the ISTQB Glossary, regression testing is required for what purpose?
Unit : 1, Group : 1

1.To verify the success of corrective actions.


2.To prevent a task from being incorrectly considered completed
3.To ensure that defects have not been introduced by a modification. (Right)
4.To motivate better unit testing by the programmers.
49 1679117
What are good practices for testing within the development life cycle?
Unit : 1, Group : 1

1.Early test analysis and design.


2.Different test levels are defined with specific objectives.
3.Testers will start to get involved as soon as coding is done
4.A and B above. (Right)

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 11 of 54
QNo Question Id Question Description
50 1679131
Which of the following is a non-functional quality characteristic?
Unit : 1, Group : 1

1.Feasibility
2.Usability (Right)
3.Maintenance
4.Regression
51 1679150
A regression test:
Unit : 1, Group : 1

1.Is only run once.


2.Will always be automated.
3.Will check unchanged areas of the software to see if they have been affected. (Right)
4.Will check changed areas of the software to see if they have been affected.
52 1679156
Non-functional testing includes:
Unit : 1, Group : 1

1.Testing to see where the system does not function correctly.


2.Testing the quality attributes of the system including reliability and usability. (Right)
3.Gaining user approval for the system.
4.Testing a system feature using only the software required for that function.
53 1679168
Which of the following artifacts can be examined by using review techniques?
Unit : 1, Group : 1

1.Software code
2.Requirements specification
3.Test designs
4.All of the above (Right)
54 1679173
Which statement about the function of a static analysis tool is true?
Unit : 1, Group : 1

1.Gives quality information about the code without executing it. (Right)
2.Checks expected results against actual results.
3.Can detect memory leaks.
4.Gives information about what code has and has not been exercised.
55 1679183
What is the main difference between a walkthrough and an inspection?
Unit : 1, Group : 1

1.An inspection is led by the authors, whilst a walk through is led by a trained moderator.
2.An inspection has a trained leader, whilst a walk through has no leader.
3.Authors are not present during inspections, whilst they are during walkthroughs.
4.A walkthrough is led by the author, whilst an inspection is led by a trained moderator (Right)

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 12 of 54
QNo Question Id Question Description
56 1679192
Which of the following statements about early test design are true and which are false?
Unit : 1, Group : 1
1. Defects found during early test design are more expensive to fix.

2. Early test design can find defects.

3. Early test design can cause changes to the requirements.

4. Early test design takes more effort.

1.1 and 3 are true. 2 and 4 are false.


2.2 is true. 1, 3 and 4 are false.
3.2 and 3 are true. 1 and 4 are false. (Right)
4.2, 3 and 4 are true. 1 is false.
57 1679201
Static code analysis typically identifies all but one of the following problems. Which is it?
Unit : 1, Group : 1

1. Unreachable code
2.Undeclared variables
3.Faults in the requirements (Right)
4.Too few comments
58 1679215
The approach/document used to make sure all the requirements are covered when writing test cases
Unit : 1, Group : 1

1.Test Matrix
2.Checklist
3.Test bed
4.Traceability Matrix (Right)
59 1679290
It measures the quality of processes used to create a quality product.
Unit : 1, Group : 1 It is a system of management activities, It is a preventive process, It applies for entire life cycle & Deals with Process.

1.Validation
2.Verification
3.Quality Assurance (Right)
4.Quality Control

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 13 of 54
QNo Question Id Question Description
60 1679365
Boundary value analysis belongs to which testing method?
Unit : 1, Group : 1

1.Black Box testing (Right)


2.White Box testing
3.A. It is concerned that it represents unfair risks to policyholders (Right)
4.B. It is concerned that the product is priced above that of market competitors.
5.C. The insurer has declared the intention to target the product at high net worth individuals.
6.D. The insurer has failed to submit full documented details.
61 1679377
A metric used to measure the characteristic of documentation and code called as
Unit : 1, Group : 1

1.Process metric
2.Product Metric (Right)
3.Test metrics
4.
62 1679385
Executing the same test case on a modified build called as
Unit : 1, Group : 1

1.Regression Testing (Right)


2. Retesting
3.Ad hoc Testing
4.Sanity Testing
63 1679392
SPICE Means
Unit : 1, Group : 1

1.Software Process Improvement and Capability Determination (Right)


2.Software Process Improvement and Compatibility Determination
3.Software Process Invention and Compatibility Determination.
4.Software Process Improvement and Control Determination
64 1679424
Which of the following is a MAJOR task of test planning?
Unit : 1, Group : 1

1.Scheduling test analysis and design tasks. (Right)


2.Initiating corrective actions.
3.Monitoring progress and test coverage.
4. Measuring and analyzing results.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 14 of 54
QNo Question Id Question Description
65 1679434
Where may functional testing be performed?
Unit : 1, Group : 1

1.At system and acceptance testing levels only


2.At all test levels. (Right)
3.At all levels above integration testing.
4.At the acceptance testing level only.
66 1679452
Who would USUALLY perform debugging activities?
Unit : 1, Group : 1

1.Developers. (Right)
2.Analysts.
3.Testers.
4.Incident Managers.
67 1679460
Which of the following is correct?
Unit : 1, Group : 1

1.Impact analysis assesses the effect on the system of a defect found in regression testing.
2.Impact analysis assesses the effect of a new person joining the regression test team.
3.Impact analysis assesses whether or not a defect found in regression testing has been fixed correctly.
4.Impact analysis assesses the effect of a change to the system to determine how much regression testing to do. (Right)
68 1679469
What is beta testing?
Unit : 1, Group : 1

1.Testing performed by potential customers at the developers location.


2.Testing performed by potential customers at their own locations. (Right)
3.Testing performed by product developers at the customer's location.
4.Testing performed by product developers at their own locations
69 1679474
Which of the following is TRUE?
Unit : 1, Group : 1

1.Confirmation testing is testing fixes to a set of defects and Regression testing is testing to establish whether any defects have been
introduced as a result of changes. (Right)
2.Confirmation testing is testing to establish whether any defects have been introduced as a result of changes and Regression testing is
testing fixes to a set of defects.
3.Confirmation testing and Regression testing are both testing to establish whether any defects have been introduced as a result of
changes
4.Confirmation testing and Regression testing are both testing fixes to a set of defects.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 15 of 54
QNo Question Id Question Description
70 1679494
Which of the following activities should be performed during the selection and implementation of a testing tool?
Unit : 1, Group : 1
i) Investigate the organisation's test process.

ii) Conduct a proof of concept.

iii) Implement the selected tool on a project behind schedule to save time.

iv) Identify coaching and mentoring requirements for the use of the selected tool.

1. i, ii, iii.
2.ii, iii, iv.
3.i, iii, iv.
4.i, ii, iv. (Right)
71 1679499
What is the MAIN benefit of designing tests early in the life cycle?
Unit : 1, Group : 1

1.It is cheaper than designing tests during the test phases.


2.It helps prevent defects from being introduced into the code. (Right)
3.Tests designed early are more effective than tests designed later.
4.It saves time during the testing phases when testers are busy.
72 1679508
What is the purpose of exit criteria?
Unit : 1, Group : 1

1.To define when a test level is complete. (Right)


2.To determine when a test has completed.
3.To identify when a software system should be retired.
4.To determine whether a test has passed.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 16 of 54
QNo Question Id Question Description
73 1679518
Match the following terms and statements.
Unit : 1, Group : 1
1.Decision Table Testing

2.Decision Testing

3.State Transition Testing

4.Exploratory Testing

W. Testing carried out w boxes to achieve specific test objectives, possibly to complement structured testing.

X. A test technique used which may be used to verify different system re depending on current conditions or previous history.

Y. A test technique which combines combinations of inputs that might not otherwise have been exercised during testing.

Z. A form of control flow testing based on decision outcomes.

1.1Y, 2Z, 3X, 4W. (Right)


2.1X ,2W, 3Z, 4Y.
3.1Z, 2X, 3W, 4Y.
4.1Z, 2Y, 3X, 4W.
74 1679536
Which of the following types of defects is use case testing MOST LIKELY to uncover?
Unit : 1, Group : 1
i) Defects in the process flows during real-world use of the system.

ii) Defects in the interface parameters in integration testing.

iii) Integration defects caused by the interaction and interference of different components.

iv) Defects in the system as it transitions between one state and another.

1.ii, iii.
2.i, iii (Right)
3. iii, iv
4. i, ii
75 1679541
Which of the following is MOST important in the selection of a test approach?
Unit : 1, Group : 1

1.Availability of tools to support the proposed techniques.


2.The budget allowed for training in proposed techniques.
3.Available skills and experience in the proposed techniques. (Right)
4.The willingness of the test team to learn new techniques.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 17 of 54
QNo Question Id Question Description
76 1679549
Which of the following combinations correctly describes a valid approach to component testing:
Unit : 1, Group : 1
i) Functional testing of the component in isolation.

ii) Structure-based testing of the code without recording incidents.

iii) Automated tests that are run until the component passes.

iv) Functional testing of the interfaces between modules.

1.i and ii
2.i, ii and iii (Right)
3.iii
4.ii and iv
77 1679552
Which of the following is a purpose of the review planning phase?
Unit : 1, Group : 1

1.Log defects.
2.Explain the documents to the participants.
3.Gather metrics.
4.Allocate the individual roles. (Right)
78 1679586
Important consequences of the impossibility of complete testing are (Choose one or more answers):
Unit : 1, Group : 1

1.We can never be certain that the program is bug free.


2.We have no definite stopping point for testing, which makes it easier for some managers to argue for very little testing.
3.We have no easy answer for what testing tasks should always be required, because every task takes time that could be spent on other
high importance tasks.
4.All of the above. (Right)
79 1679593
Poor software characteristics are
Unit : 1, Group : 1

1.Only Project risks


2.Only Product risks (Right)
3.Project risks and Product risks
4.Project risks or Product risks
80 1679600
System testing should investigate
Unit : 1, Group : 1

1.
2.
3.
4.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 18 of 54
QNo Question Id Question Description
81 1679611
Find the correct flow of the phases of a formal review
Unit : 1, Group : 1

1.Planning, Review meeting, Rework, Kick off


2.Planning, Individual preparation, Kick off, Rework
3.Planning, Review meeting, Rework, Follow up (Right)
4.Planning, Individual preparation, Follow up, Kick off
82 1679616
Which is not the testing objectives
Unit : 1, Group : 1

1.Finding defects
2.Gaining confidence about the level of quality and providing information
3.Preventing defects.
4.Debugging defects (Right)
83 1679649 What do you understand by V&V in software testing?
Unit : 2, Group : 2

1.Verified Version
2.Version Validation
3.Verification and Validation (Right)
4.Version Verification
84 1679651 In static test techniques, behavioral and performance properties of the program are observed.
Unit : 2, Group : 2
1.True
2.False (Right)
3.
4.
85 1679675 In which test design each input is tested at both ends of its valid range and just outside its valid range?
Unit : 2, Group : 2
1.Boundary value testing (Right)
2.Equivalence class partitioning
3.Boundary value testing AND Equivalence class partitioning
4.Decision tables
86 1679685 When does the testing process stops?
Unit : 2, Group : 2

1.When resources (time and budget) are over


2.When some coverage is reached
3.When quality criterion is reached (Right)
4.Testing never ends

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 19 of 54
QNo Question Id Question Description
87 1679702

Unit : 2, Group : 2
Test Implementation and execution has which of the following major tasks?
i. Developing and prioritizing test cases, creating test data, writing test procedures and optionally
preparing the test harnesses and writing automated test scripts.
ii. Creating the test suite from the test cases for efficient test execution.
iii. Verifying that the test environment has been set up correctly.
iv. Determining the exit criteria.

1.i,ii,iii are true and iv is false (Right)


2.i,,iv are true and ii is false
3.i,ii are true and iii,iv are false
4.ii,iii,iv are true and i is false
88 1679709

Unit : 2, Group : 2
One of the fields on a form contains a text box which accepts numeric values in the range of 18 to
25. Identify the valid Equivalence class

1.17
2.18 (Right)
3.26
4.30
89 1679718

Unit : 2, Group : 2
In an Examination a candidate has to score minimum of 24 marks in order to clear the exam. The
maximum that he can score is 40 marks. Identify the Equivalence values if the student fails the
exam.

1.22,23,26
2.21,39,40
3.29,30,31
4.0,15,22 (Right)
90 1679759

Unit : 2, Group : 2
__________ scenario aim to have a higher probability of detecting errors

1.Positive
2.Negative (Right)
3.Exceptional
4.Alternate

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 20 of 54
QNo Question Id Question Description
91 1679768

Unit : 2, Group : 2
The components of Use Cases(choose the correct)

1.Test data
2.Triggers (Right)
3.Test Plan
4.Test Cases
92 1679775

Unit : 2, Group : 2
____________can be used as a training tool to enhance the Domain specific knowledge of the
testing team.

1.Decision table
2.Ep
3.Bva
4.Ace (Right)
93 1679784

Unit : 2, Group : 2
Consider the following statements about early test design:
i. early test design can prevent fault multiplication
ii. faults found during early test design are more expensive to fix
iii. early test design can find faults
iv. early test design can cause changes to the requirements
v. early test design takes more effort

1. i, iii & iv are true. ii& v are false (Right)


2.iii is true, i, ii, iv & v are false
3.iii & iv are true. i, ii & v are false
4.i, iii, iv & v are true, ii is false

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 21 of 54
QNo Question Id Question Description
94 1679801

Unit : 2, Group : 2
Given the following code, which is true:
IF A > B THEN
C = A ±B
ELSE C = A + B
ENDIF Read D
IF C = D Then
Print ³Error´
ENDIF

1.1 test for statement coverage, 3 for branch coverage


2.2 tests for statement coverage, 2 for branch coverage (Right)
3.2 tests for statement coverage. 3 for branch coverage
4.3 tests for statement coverage, 3 for branch coverage
95 1679809

Unit : 2, Group : 2
A number of critical bugs are fixed in software. All the bugs are in one module, related to reports. The
test manager decides to do regression testing only on the reports module.

1.The test manager should do only automated regression testing.


2.The test manager is justified in her decision because no bug has been fixed in other modules
3.The test manager should only do confirmation testing. There is no need to do regression testing
4.Regression testing should be done on other modules as well because fixing one module may affect other modules (Right)
96 1679817

Unit : 2, Group : 2
Boundary value testing

1.Is the same as equivalence partitioning tests?


2.Test boundary conditions on, below and above the edges of input and output equivalence classes (Right)
3.Tests combinations of input circumstances
4.Is used in white box testing strategy
97 1679819

Unit : 2, Group : 2
Test cases are designed during:

1.Test recording.
2.Test planning.
3.Test configuration
4.Test development (Right)

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 22 of 54
QNo Question Id Question Description
98 1679820

Unit : 2, Group : 2
A test design technique is

1.A process for selecting test cases (Right)


2.A process for determining expected outputs
3.A way to measure the quality of software
4.A way to measure in a test plan what has to be done
99 1679825

Unit : 2, Group : 2
You are the test manager and you are about the start the system testing. The developer team says
that due to change in requirements they will be able to deliver the system to you for testing 5 working
days after the due date. You can not change the resources(work hours, test tools, etc.) What steps
you will take to be able to finish the testing in time.

1.Tell to the development team to deliver the system in time so that testing activity will be finish in time.
2.Extend the testing plan, so that you can accommodate the slip going to occur the business rules
3.Rank the functionality as per risk and concentrate more on critical functionality testing (Right)
4.Add more resources so that the slippage should be avoided
100 1679828

Unit : 2, Group : 2
Which of the following is a valid collection of equivalence classes for the following problem: Paying
with credit cards shall be possible with Visa, Master and Amex cards only.

1.Visa, Master, Amex


2.No card, other cards, any of Visa ±Master ±Amex (Right)
3.Visa, Master, Amex, Diners, Keycards, and other option
4.Visa, Master, Amex, any other card, no card
101 1679833

Unit : 2, Group : 2
A __________ is a group of tests in a Quality Center project designed for achieving some particular
testing objectives

1.Test data
2.Test scenario
3.Test case
4.Test set (Right)

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 23 of 54
QNo Question Id Question Description
102 1679835

Unit : 2, Group : 2
This part of a program is given:- WHILE (condition A) Do B END WHILE How many decisions should
be tested in this code in order to achieve 100% decision coverage?

1.2 (Right)
2.Indefinite
3.1
4.None
103 1679842

Unit : 2, Group : 2
In Decision table the actions refers to

1.Cause
2.Condition
3.Expected Results (Right)
4.Actual Results
104 1679844 Benefits of ACE Methodology
Unit : 2, Group : 2
1.Reduced Knowledge Acquisition time (Right)
2.KT is needed for the whole application
3.Scenario¶s cannot be reused
4.None of above
105 1679851

Unit : 2, Group : 2
Test Runs can be created based on a) Functionalities that are being tested in a build. b)Dependency
between test cases c)Grouping of similar functionality based on the test scenarios d)Prioritization of
test cases.

1.a and c are true


2.a,c ,d are true and b is false
3.b, d , are true
4.All the above (Right)
106 1696122

Unit : 2, Group : 2
The system is treated as a "black box", and the interactions with system, including system
responses, are perceived from outside the system.

1.Decision table
2.Prototype
3.ACE Methodology
4.Use case modeling (Right)

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 24 of 54
QNo Question Id Question Description
107 1696131
Which of the following type of testing is done without Planning and Documentation?
Unit : 2, Group : 2

1.Unit Testing
2.Retesting
3.Ad hoc Testing (Right)
4.Regression Testing
108 1696138
Which of the following is / are the Review Technique documented?
Unit : 2, Group : 2

1.Inspection (Right)
2. walkthrough
3.Both of These
4.
109 1696155 Which of the following is a MAJOR task of test planning?
Unit : 2, Group : 2
1.Scheduling test analysis and design tasks. (Right)
2.Initiating corrective actions.
3.Monitoring progress and test coverage.
4.Measuring and analyzing results
110 1696161
Reporting Discrepancies as incidents is a part of which phase :-
Unit : 2, Group : 2

1.Test Analysis and Design


2.Test Implementation and execution (Right)
3.Test Closure Activities
4.Evaluating exit criteria and reporting
111 1696163 Incidents would not be raised against:
Unit : 2, Group : 2
1.Requirements
2.Documentation
3.Test cases
4. Improvements suggested by users (Right)
112 1696164 The Planning phase of a formal review includes the following :-
Unit : 2, Group : 2
1.Explaining the objectives
2.Selecting the personnel, allocating roles. (Right)
3.Follow up
4.Individual Meeting preparations

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 25 of 54
QNo Question Id Question Description
113 1696872 Test Case are grouped into Manageable (and scheduled) units are called as
Unit : 2, Group : 2
1.Test Harness
2.Test Suite (Right)
3.Test Cycle
4.Test Driver
114 1696873 Configuration and compatibility testing are typically good choices for outsourcing
Unit : 2, Group : 2
1.True (Right)
2.False
3.
4.
115 1696875 What type of tools to be used for Regression Testing
Unit : 2, Group : 2
1.Performance
2.Record/Playback (Right)
3.A. & B.
4.None
116 1696881
A white box testing technique that measures the number of or percentage of decision directions executed by the test
Unit : 2, Group : 2
case designed is called

1.Condition coverage
2.Decision/Condition coverage (Right)
3.Decision Coverage
4.Branch coverage
117 1696882 Which summarizes the testing activities associated with one or more test design specifications.
Unit : 2, Group : 2
1.Test Summary report
2.Test Log
3.Test Incident Report (Right)
4.Test Script
118 1696883 Boundary value analysis can only be used during white-box testing.
Unit : 2, Group : 2
1.True
2.False (Right)
3.
4.
119 1696888 Boundary value testing
Unit : 2, Group : 2
1.Is the same as equivalence partitioning tests
2.Test boundary conditions on, below and above the edges of input and output equivalence classes (Right)
3.Tests combinations of input circumstances
4.Is used in white box testing strategy

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 26 of 54
QNo Question Id Question Description
120 1696889 A common test technique during component test is
Unit : 2, Group : 2
1.Statement and branch testing (Right)
2.Usability testing
3.Security testing
4.Performance testing
121 1696890 Acceptance test cases are based on what
Unit : 2, Group : 2
1.Requirements (Right)
2. Design
3.Code
4.Decision table
122 1696891 The inputs for developing a test plan are taken from
Unit : 2, Group : 2
1.Project plan (Right)
2.Business plan
3.Support plan
4.None of the above
123 1696897
Which of the following is NOT part of configuration management:
Unit : 2, Group : 2

1.Status accounting of configuration items


2.Auditing conformance to ISO 9001 (Right)
3.Identification of test versions
4.Record of changes to documentation over time
5.controlled library access
124 1696898 What is the purpose of test completion criteria in a test plan:
Unit : 2, Group : 2
1.To know when a specific test has finished its execution
2.To ensure that the test case specification is complete
3.To set the criteria used in generating test inputs
4.To plan when to stop testing

(Right)
125 1696900 Which of the following is NOT included in the Test Plan document of the Test Documentation Standard:
Unit : 2, Group : 2
1.Test items (i.e. software versions)
2.What is not to be tested
3.Test environments
4.Quality plans (Right)
5.Schedules and deadlines

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 27 of 54
QNo Question Id Question Description
126 1696905 The Provision and Management of a controlled library containing all the configurations items is called as
Unit : 2, Group : 2
1.Configuration Control (Right)
2.Status Accounting
3.Configuration Identification
4.Configuration Identification
127 1696907 Test Conditions are derived from:
Unit : 2, Group : 2
1.Specifications (Right)
2.Test Cases
3.Test Data
4.Test Design
128 1696913 Regression testing should be performed:
Unit : 2, Group : 2
i. Every week

ii. After the software has changed

iii. As often as possible

iv. When the environment has changed

v. When the project manager says

1.i & ii are true, iii, iv & v are false


2.ii, iii & iv are true, i & v are false
3.ii & iv are true, i, iii & v are false (Right)
4.ii is true, i, iii, iv & v are false
129 1696915
Test planning has which of the following major tasks?
Unit : 2, Group : 2
i. Determining the scope and risks, and identifying the objectives of testing.

ii. Determining the test approach (techniques,test items, coverage, identifying and interfacing the teams involved in
testing , testware)

iii. Reviewing the Test Basis (such as requirements,architecture,design,interface)

iv. Determining the exit criteria.

1.i,ii,iv are true and iii is false (Right)


2. i,,iv are true and ii is false
3.i,ii are true and iii,iv are false
4.ii,iii,iv are true and i is false

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 28 of 54
QNo Question Id Question Description
130 1679663 Which test refers to the retesting of a unit, integration and system after modification, in order to ascertain that
Unit : 2, Group : 2 the change has not introduced new faults?
1.Regression Test (Right)
2.Smoke Test
3.Alpha Test
4.Beta Test
131 1679665 Which of the following is a black box testing strategy?
Unit : 2, Group : 2
1.All Statements Coverage
2.Control Structure Coverage
3.Cause-Effect Graphs (Right)
4.All Paths Coverage
132 1679670 A set of inputs, execution preconditions and expected outcomes is known as a
Unit : 2, Group : 2

1.Test plan
2.Test case (Right)
3.Test document
4. Test Suite
133 1679681 A white box test scales up well at different granularity levels of testing
Unit : 2, Group : 2
1.True
2.False (Right)
3.
4.
134 1679690 Which of the following is not a part of a test design document?
Unit : 2, Group : 2

1.Test Plan
2.Test Design Specification
3.Test Case Specification
4.Test Log (Right)
135 1679695

Unit : 2, Group : 2
Designing the test environment set-up and identifying any required infrastructure and tools are a part
of which phase

1. Test Implementation and execution


2.Test Analysis and Design (Right)
3.Evaluating the Exit Criteria and reporting
4.Test Closure Activities

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 29 of 54
QNo Question Id Question Description
136 1679722 A Person who issues, problems documents all the and open points that were identified during a
Unit : 2, Group : 2 formal review.
1.Moderator.
2.Scribe (Right)
3.Author
4.Manager
137 1679730 Switch PC on Start ³outlook´IF outlook appears THEN Send an email Close outlook
Unit : 2, Group : 2
1.1 test for statement coverage, 1 for branch coverage
2.1 test for statement coverage, 2 for branch coverage (Right)
3.1 test for statement coverage. 3 for branch coverage
4.2 tests for statement coverage, 2 for branch coverage
138 1679737

Unit : 2, Group : 2
The process of designing test cases consists of the following activities: i. Elaborate and describe test
cases in detail by using test design techniques. ii. Specify the order of test case execution. iii.
Analyse requirements and specifications to determine test conditions. iv. Specify expected results.
According to the process of identifying and designing tests, what is the correct order of these
activities?

1.iii, i, iv, ii (Right)


2.iii, iv, i, ii
3.iii, ii, i, iv
4.ii, iii, i, iv
139 1679745

Unit : 2, Group : 2
Which of the following is false?

1.Incidents should always be fixed. (Right)


2.An incident occurs when expected and actual results differ.
3.Incidents can be analysed to assist in test process improvement.
4.An incident can be raised against documentation
140 1679749

Unit : 2, Group : 2
Test Basis documents: (choose the correct)

1.Test Plan
2.Test cases
3.Functional design (Right)
4.Test Tools

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 30 of 54
QNo Question Id Question Description
141 1679755

Unit : 2, Group : 2
_______represent a powerful tool for test design and are a single event or a sequence of events that
happen during the actual usage of the application.

1.Test case
2.Test data
3.Test scenario (Right)
4.Test suite
142 1679764 A __________ defines a goal-oriented set of interactions between external actors and the system
Unit : 2, Group : 2 under consideration.
1.Scenario
2.Test case
3.Ace
4.Use case (Right)
143 1679790

Unit : 2, Group : 2
What is the purpose of test completion criteria in a test plan:

1.To know when a specific test has finished its execution


2.To ensure that the test case specification is complete
3.To set the criteria used in generating test inputs
4.To plan when to stop testing (Right)
144 1679797 Which of the following statements is NOT true:
Unit : 2, Group : 2
1.Inspection is the most formal review process
2.Inspection is appropriate even when there are no written documents (Right)
3.Managers can perform inspections on management documents
4.Inspections should be led by a trained leader
145 1679804

Unit : 2, Group : 2
Which of the following is NOT a black box technique:

1.Equivalence partitioning
2.State transition testing
3.LCSAJ (Right)
4.Boundary value analysis

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 31 of 54
QNo Question Id Question Description
146 1679807

Unit : 2, Group : 2
What statement about expected outcomes is FALSE:

1.Expected outcomes are defined by the software¶s behavior


2.Expected outcomes are derived from a specification, not from the code (Right)
3. Expected outcomes include outputs to a screen and changes to files and databases
4.Expected outcomes should be predicted before a test is run
147 1679812

Unit : 2, Group : 2
In a flight reservation system, the number of available seats in each plane model is an input. A plane
may have 100 available seats, up to the given capacity of the plane. Using Boundary Value
analysis, a list of available ±seat values were generated. Which of the following lists is correct?

1.1, 2, capacity -1, capacity, capacity plus 1


2.99, 100, capacity, capacity plus 1 (Right)
3.0, 1, 2, capacity plus 1, a very large number
4.0, 1, 10, 100, capacity, capacity plus one.
148 1679814 Why does the boundary value analysis provide good test cases?
Unit : 2, Group : 2
1.Because it is an industry standard
2.Because errors are frequently made during programming of the different cases near the µedges¶of the range of values (Right)
3.Because only equivalence classes that are equal from a functional point of view are considered in the test cases
4.Because the test object is tested under maximal load up to its performance limits
149 1679815

Unit : 2, Group : 2
Which of the following is a valid collection of equivalence classes for the following problem: An
integer field shall contain values from and including 1 to and excluding 15.

1.Less than 1, 1 through 15, more than 15


2.Negative numbers, 1 through 15, above 15
3.Less than 1, 1 through 14, more than 14 (Right)
4.Less than 0, 1 through 14, 15 and more
150 1679821 What is the important criterion in deciding what testing technique to use?
Unit : 2, Group : 2
1.How well you know a particular technique
2.The objective of the test (Right)
3.How appropriate the technique is for testing the application
4.Whether there is a tool to support the technique

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 32 of 54
QNo Question Id Question Description
151 1679823

Unit : 2, Group : 2
If the pseudo code below were a programming language, how many tests are required to achieve
100% statement coverage?
1. If x=3 then
2.Display_messageX;
3. If y=2 then
4. Display_messageY;
5. Else
6. Display_messageZ;
7. Else
8. Display_messageE;

1.1
2.2
3.3
4.4 (Right)
152 1679829

Unit : 2, Group : 2
_______ is the information input by day-to-day system functions

1.Environment data
2.Input data (Right)
3.Output data
4.None
153 1679831 As a result of the Test Development, _________ is created for a particular Application/Functionality
Unit : 2, Group : 2
1.Test data
2.Test scenario
3.Test case
4.Test suite (Right)
154 1679838

Unit : 2, Group : 2
_____________ is the description of how a user uses the system being designed to perform a given
a task.

1.Test case (Right)


2.Use case
3.Test reports
4.Test data

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 33 of 54
155 1679840

Unit : 2, Group : 2
Requirement Traceability Matrix is maintained in the Test Scenarios Document.

1.True
2.False (Right)
3.
4.
156 1679847

Unit : 2, Group : 2
Given the following decision table: What is the expected result for each of the following test cases?
P)Gold Frequent Flyer,travelling in economy class Q)Silver Frequent Flyer, travelling in Business
class
Conditions

Frequent Flyer
Gold
Gold
Silver
Silver
Class
Business
Economy
Business
Economy
Actions

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 34 of 54

Free Upgrade
First
Business
No
Business
Discounted Upgrade
N/A
First
First
None

1.P. Offer free upgrade to Business and discounted upgrade to first . Q. Offer discounted upgrade to first (Right)
2.P. Offer free upgrade to business but cannot upgrade to first . Q. Offer discounted upgrade to first
3.P. Offer free upgrade to First . Q. Cannot upgrade to first
4.P.Offer Discounted upgrade to First . Q. Offer free upgrade to First
157 1679849 Benefits of reviews doesn¶t includes
Unit : 2, Group : 2
1.Avoids rework
2.Helps to detect defects at an earlier stage
3.Can be customized based on project specific standards
4.Increases the amount of time spent for testing (Right)
158 1696119 .-------------------correlates any two base lined documents that require a many to many relationship to
Unit : 2, Group : 2 determine the completeness of the relationship.
1.Scenario
2.Traceability Matrix (Right)
3.Test case
4.Test Data

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 35 of 54
QNo Question Id Question Description
159 1696127
Which of the following is / are not a characteristic of Regression Testing?
Unit : 2, Group : 2

1.Regression Testing can be performed on each level.


2.It is done to illustrate that software is not changed internationally. (Right)
3.It is done to illustrate that new defects are not introduced after adding a new functionality or correcting previous one.
4.It is best candidate for automation.
160 1696134 Which of the following situations in Regression Testing is not performed?
Unit : 2, Group : 2
1.When project manager asks to perform. (Right)
2.When new functionality is introduced.
3.When database system is changed
4.When system is installed on different hardware configuration than previously tested
161 1696141
A set of inputs, execution preconditions and expected outcomes is known as a
Unit : 2, Group : 2

1.Test plan
2.Test case (Right)
3.Test document
4.Test Suite
162 1696151
From a Testing perspective, what are the MAIN purposes of Configuration Management?:
Unit : 2, Group : 2
i) Identifying the version of software under test.

ii) Controlling the version of testware items.

iii) Developing new testwareitems.iv) Tracking changes to testware items.

v) Analysing the need for new testware items.

1.ii, iv and v
2.ii, iii and iv
3.i, ii and iv. (Right)
4.i, iii and v.
163 1696158
What is the MAIN objective when reviewing a software deliverable?
Unit : 2, Group : 2

1.To identify potential application failures by use of a test specification.


2.To identify defects in any software work product. (Right)
3.To identify spelling mistakes in a requirements specification.
4.To identify standards inconsistencies in the code.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 36 of 54
QNo Question Id Question Description
164 1696159
What is an equivalence partition (also known as an equivalence class)?
Unit : 2, Group : 2

1.A set of test cases for testing classes of objects


2.An input or output range of values such that only one value in the range becomes a test case (Right)
3.An input or output range of values such that each value in the range becomes a test case
4.An input or output range of values such that every tenth value in the range becomes a test case.
165 1696166 One of the fields on a form contains a text box which accepts numeric values in the range of 18 to 25. Identify the invalid
Unit : 2, Group : 2
Equivalance class

1.17 (Right)
2.19
3.24
4.21
166 1696168
Majority of system errors occur in the _________ phase
Unit : 2, Group : 2

1.Requirements Phase (Right)


2.Analysis and Design Phase
3.Development Phase
4.Testing Phase
167 1696867
The specification which describes steps required to operate the system and exercise test cases in order to implement the
Unit : 2, Group : 2
associated test design

1.Test Case Specification


2.Test Design Specification
3.Test Procedure Specification (Right)
4.None
168 1696868 Equivalence testing divides the input domain into classes of data from which test cases can be derived to reduce the
Unit : 2, Group : 2
total number of test cases that must be developed.

1.True (Right)
2.False
3.
4.
169 1696871 The person who leads the review of the document(s), planning the review,running the meeting and follow-up after the
Unit : 2, Group : 2
meeting

1.Reviewer
2.Author
3.Moderator (Right)
4.Auditor

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 37 of 54
QNo Question Id Question Description
170 1696877 The principal attributes of tools and automation are
Unit : 2, Group : 2
1.Speed & efficiency
2.Accuracy & precision
3.All of the above (Right)
4.
171 1696878 The testing technique that requires devising test cases to demonstrate that each program function is operational is
Unit : 2, Group : 2
called

1.Black-box testing
2.Glass-box testing
3.Grey-box testing (Right)
4.White-box testing
172 1696885
Which of the following tools would be involved in the automation of regression test?
Unit : 2, Group : 2

1.Data tester
2.Boundary tester
3.Capture/Playback (Right)
4.Output comparator
173 1696887
Pick the best definition of quality
Unit : 2, Group : 2

1.Quality is job one


2.Zero defects
3.Conformance to requirements (Right)
4.Work as designed
174 1696892
Equivalence partitioning is:
Unit : 2, Group : 2

1.A black box testing technique used only by developers


2.A black box testing technique than can only be used during system testing
3.A black box testing technique appropriate to all levels of testing (Right)
4.A white box testing technique appropriate for component testing
175 1696893 If an expected result is not specified then
Unit : 2, Group : 2
1.We cannot run the test
2.It may be difficult to repeat the test
3.It may be difficult to determine if the test has passed or failed (Right)
4.We cannot automate the user inputs

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 38 of 54
QNo Question Id Question Description
176 1696894 A regression test:
Unit : 2, Group : 2
1.Will always be automated
2.Will help ensure unchanged areas of the software have not been affected (Right)
3.Will help ensure changed areas of the software have not been affected
4.Can only be run during user acceptance testing
177 1696895 The difference between re-testing and regression testing is
Unit : 2, Group : 2
1.Re-testing is running a test again; regression testing looks for unexpected side effects (Right)
2.Re-testing looks for unexpected side effects; regression testing is repeating those tests
3.Re-testing is done after faults are fixed; regression testing is done earlier
4.Re-testing uses different environments, regression testing uses the same environment testers
178 1696902 The place to start if you want a (new) test tool is:
Unit : 2, Group : 2
1.Attend a tool exhibition
2.Invite a vendor to give a demo
3.Analyse your needs and requirements (Right)
4.Find out what your budget would be for the tool
179 1696904 Error guessing is best used
Unit : 2, Group : 2
1.As the first approach to deriving test cases
2.After more formal techniques have been applied (Right)
3.By inexperienced testers
4.After the system has gone live
180 1696909 Which of the following is not phase of the Fundamental Test Process?
Unit : 2, Group : 2
1.Test Planning and Control
2.Test implementation and Execution
3.Requirement Analysis (Right)
4.Evaluating Exit criteria and reporting
181 1696911
Repeated Testing of an already tested program, after modification, to discover any defects introduced or uncovered as a result of the changes in the
Unit : 2, Group : 2 software being tested or in another related or unrelated software component:

1.Re-Testing
2.Confirmation Testing
3.Regression Testing (Right)
4.Negative Testing
182 1700964

Unit : 2, Group : 3
What are the Mandatory Quality Procedures?

1.Control of documents
2.Control of records
3.Control of Production Equipment, tools and CNC programs
4.All of these (Right)

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 39 of 54
QNo Question Id Question Description
183 1700972

Unit : 3, Group : 3
Which metric is related to the software maintenance

1.Development
2.Software (Right)
3.Process
4.Product
184 1697621
What is the MAIN objective when reviewing a software deliverable?
Unit : 3, Group : 3

1.To identify potential application failures by use of a test specification.


2.To identify defects in any software work product (Right)
3.To identify spelling mistakes in a requirements specification
4.To identify standards inconsistencies in the code.
185 1697628 Which of the following is not included in failure costs?
Unit : 3, Group : 3
1.rework
2.repair
3.failure mode analysis
4.none of the mentioned (Right)
186 1697629 Which requirements are the foundation from which quality is measured?
Unit : 3, Group : 3
1.Hardware
2.Software (Right)
3.Programmers
4.None of above
187 1697631 Which of the following is not a SQA plan for a project?
Unit : 3, Group : 3
1.evaluations to be performed
2.amount of technical work (Right)
3.audits and reviews to be performed
4.documents to be produced by the SQA group
188 1697636 Degree to which design specifications are followed in manufacturing the product is called
Unit : 3, Group : 3

1.Quality Control
2.Quality of conformance (Right)
3.Quality Assurance
4.None of the mentioned

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 40 of 54
QNo Question Id Question Description
189 1697637 Which of the following is not included in External failure costs?
Unit : 3, Group : 3

1.testing (Right)
2.help line support
3.warranty work
4.complaint resolution
190 1697645 The primary objective of formal technical reviews is to find _________ during the process so that they do not
Unit : 3, Group : 3 become defects after release of the software.
1.errors (Right)
2.equivalent faults
3.failure cause
4.none of the mentioned
191 1697647 What is not included in prevention costs?
Unit : 3, Group : 3

1.quality planning
2.formal technical reviews
3.test equipment
4.equipment calibration and maintenance (Right)
192 1697648 Software quality assurance consists of the auditing and reporting functions of management.
Unit : 3, Group : 3

1.True (Right)
2.False
3.
4.
193 1697871 To check whether we are developing the right product according to the customer requirements are
Unit : 3, Group : 3 not. It is a static process
1.Validation
2.Verification (Right)
3.Quality Assurance
4.Quality Control

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 41 of 54
QNo Question Id Question Description
194 1697872 To check whether we have developed the product according to the customer requirements r not. It is
Unit : 3, Group : 3 a Dynamic process.
1.Validation (Right)
2.Verification
3.Quality Assurance
4.Quality Control
195 1697873 Staff development plan describes how the skills and experience of the project team members will be
Unit : 3, Group : 3 developed.
1.True (Right)
2.False
3.
4.
196 1697879 What are the Testing Levels?
Unit : 3, Group : 3
1.Unit Testing
2.Integration Testing
3.System Testing and Acceptance Testing.
4.All the above (Right)
197 1697880 Cost of quality = Prevention Cost + Appraisal cost + Failure cost
Unit : 3, Group : 3
1.True (Right)
2.False
3.
4.
198 1697882 A useful tool to visualize, clarify, link, identify, and classify possible cause of a problem. This is also
Unit : 3, Group : 3 called as ³fishbone diagram´what is this?
1.Pareto Analysis
2.Cause-and-Effect Diagram (Right)
3.
4.
199 1697887 White box testing is not called as___________
Unit : 3, Group : 3
1.Glass box testing
2.Closed box testing (Right)
3.Open box testing
4.Clear box testing

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 42 of 54
QNo Question Id Question Description
200 1697888 Name the events that will be analyzed, Count the named incidents, Rank the count by frequency
Unit : 3, Group : 3 using a bar chart & Validate reasonableness of the analysis is called as
1.Pareto Analysis (Right)
2.Cause and Effect Diagram
3.SWOT Analysis
4.Pie Charts
201 1697889 Retesting of a single program or component after a change has been made?
Unit : 3, Group : 3
1.Full Regression Testing
2.Unit Regression (Right)
3.Regional Regression
4.Retesting
202 1698500 This type of testing method attempts to find incorrect or missing functions, errors in data structures or
Unit : 3, Group : 3 external database access, interface errors, Performance errors and initialization and Termination
errors. It is called as
1.White Box Testing
2.Grey Box Testing
3.Black Box Testing (Right)
4.Open Box Testing
203 1699132 Acceptance testing is known as
Unit : 3, Group : 3
1.Beta Testing (Right)
2.Greybox testing
3.Test Automation
4.White box testing
204 1699133 Retesting the entire application after a change has been made called as?
Unit : 3, Group : 3
1.Full Regression Testing (Right)
2.Unit Regression
3.Regional Regression
4.Retesting
205 1699135 Boundary value analysis belongs to which testing method?
Unit : 3, Group : 3
1.Black Box testing (Right)
2.White Box testing
3.
4.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 43 of 54
QNo Question Id Question Description
206 1699140 Which is non-functional software testing?
Unit : 3, Group : 3
1.Unit Testing
2.Block box testing
3.Performance Testing (Right)
4.Regression testing
207 1699141 The process that deals with the technical and management issues of software development called
Unit : 3, Group : 3 as?
1.Delivery Process
2.Testing Process
3.Software Process (Right)
4.
208 1699143 Executing the same test case on a modified build called as
Unit : 3, Group : 3
1.Regression Testing (Right)
2.Retesting
3.Ad hoc Testing
4.Sanity Testing
209 1699149 Earlier a defect is found the cheaper it is to fix it.
Unit : 3, Group : 3
Is the above statement correct?
1.Yes (Right)
2.No
3.
4.
210 1699150 Informing to the developer which bug to be fix first is called as
Unit : 3, Group : 3
1.Severity
2.Priority (Right)
3.Fix ability
4.Traceability
211 1699151 Software Testing is a process of evaluating a system by manual or automatic means and verify that it
Unit : 3, Group : 3 satisfies specified requirements or identity differences between expected and actual results.
1.True (Right)
2.False
3.
4.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 44 of 54
QNo Question Id Question Description
212 1699157 Requirements Specification, Planning, Test case Design, Execution,
Unit : 3, Group : 3 Bug Reporting & Maintenance This Life Cycle comes Under
1.SDLC
2.STLC (Right)
3.SQLC
4.BLC
213 1699159 It provides a set of levels and an assessment model, and presents a set of recommended practices
Unit : 3, Group : 3 that allow organizations to improve their testing processes.
1.TIM (Testing Improving Model) (Right)
2.TMM (Testing Maturity Model)
3.TQM(Total Quality Management)
4.
214 1699934 Standards and procedures for managing changes in an evolving software product is called?
Unit : 3, Group : 3
1.Confirmation Management
2.Confederation Mangement
3.Configuration Management (Right)
4.Compartability Management
215 1700695 Path Tested = Number of Path Tested / Total Number of Paths
Unit : 3, Group : 3
1.True (Right)
2.False
3.
4.
216 1700898 This Testing Technique examines the basic program structure and it derives the test data from the
Unit : 3, Group : 3 program logic; Ensuring that all statements and conditions executed at least once. It is called as
1.Block box Testing
2.White box Testing (Right)
3.Grey Box Testing
4.Closed Box Testing
217 1700904 Conducted to validate that the application, database, and network they may be running on can
Unit : 3, Group : 3 handle projected volumes of users and data effectively. The test is conducted jointly by developers,
testers, DBA¶s and network associates after the system Testing called as
1.Functional Testing
2.Stress/Load Testing (Right)
3.Recovery Testing
4.Integration Testing

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 45 of 54
QNo Question Id Question Description
218 1700905 Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and
Unit : 3, Group : 3 effort required
1.True (Right)
2.False
3.
4.
219 1700906 Beta testing will be done by
Unit : 3, Group : 3
1.Developer
2.User (Right)
3.Tester
4.
220 1700914 Which Software Development Life cycle model will require to start Testing Activities when starting
Unit : 3, Group : 3 development activities itself
1.Water fall model
2.Spiral Model
3.V-model (Right)
4.Linear model
221 1700915 A metric used to measure the characteristic of the methods, Techniques and tools employed in
Unit : 3, Group : 3 developing, implementing and maintaining the software system called as
1.Process metric (Right)
2.Product metric
3.Test Metrics
4.
222 1700929 Check Sheet(Checklist) is considered a simple , but powerful statistical tool because it differentiates
Unit : 3, Group : 3 between two extremes.
1.True (Right)
2.False
3.
4.
223 1700932 Application should be stable. Clear Design and Flow of the application is needed for Automation
Unit : 3, Group : 3 testing.
1.False
2.True (Right)
3.
4.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 46 of 54
QNo Question Id Question Description
224 1700937 Project Risk affects The Schedule or Resources.
Unit : 3, Group : 3
1.True (Right)
2.False
3.
4.
225 1700939 The name of the testing which is done to make sure the existing features are not affected by new
Unit : 3, Group : 3 changes
1.Recursive testing
2.White box testing
3.Unit testing
4.Regression testing (Right)
226 1700945 Cost of Production = Right The First time cost(RTF) + Cost of Quality.
Unit : 3, Group : 3
1.True (Right)
2.False
3.
4.
227 1700948 ------------- means under what test environment(Hardware, software set up) the application will run
Unit : 3, Group : 3 smoothly
1.Test Bed (Right)
2.Checkpoint
3.Code Walk through
4.Checklist
228 1700954 A Plan to overcome the risk called as
Unit : 3, Group : 3
1.Migration Plan
2.Master plan
3.Maintenance plan
4.Mitigation Plan (Right)
229 1700956 Splitting project into tasks and estimate time and resources required to complete each task called as
Unit : 3, Group : 3 Project Scheduling
1.True (Right)
2.False
3.
4.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 47 of 54
QNo Question Id Question Description
230 1700957

Unit : 3, Group : 3
-----------is the ability to encourage by "push or pull" technical people to produce to their best ability.

1.Evaluating
2.Motivation (Right)
3.Monitoring
4.
231 1700962 Which of the following is responsible for the quality objective?
Unit : 3, Group : 3
1.Top level management (Right)
2.Middle level management
3.Frontline management
4.All of the above
232 1700963

Unit : 3, Group : 3
Which of the following is not a core step of Six Sigma?

1.Define
2.Control (Right)
3.Measure
4.Analyse
233 1697618
Where may functional testing be performed?
Unit : 3, Group : 3

1.At system and acceptance testing levels only


2.At all test levels. (Right)
3.At all levels above integration testing.
4.At the acceptance testing level only.
234 1697626
3 Given the following state transition diagram Which of the following series of state transitions contains an INVALID transition which may indicate a
Unit : 3, Group : 3 fault in the system design?

Exhibit:

1.Login Browse Basket Checkout Basket Checkout Pay Logout


2.Login Browse Basket Checkout Pay Logout.
3.Login Browse Basket Checkout Basket Logout. (Right)
4.Login Browse Basket Browse Basket Checkout Pay Logout.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 48 of 54
QNo Question Id Question Description
235 1697640 Which of the following is not an appraisal cost in SQA?
Unit : 3, Group : 3
1.inter-process inspection
2.maintenance
3.quality planning (Right)
4.testing
236 1697643 Who identifies, documents, and verifies that corrections have been made to the software?
Unit : 3, Group : 3

1.Project manager
2.Project team
3.SQA group (Right)
4.All of the mentioned
237 1697649 The approach/document used to make sure all the requirements are covered when writing test cases
Unit : 3, Group : 3
1.Test Matrix
2.Checklist
3.Test bed
4.Traceablity Matrix (Right)
238 1697868 Executing the same test case by giving the number of inputs on same build called as
Unit : 3, Group : 3
1.Regression Testing
2.ReTesting (Right)
3.Ad hoc Testing
4.Sanity Testing
239 1697869 Control Charts is a statistical technique to assess, monitor, and maintain the stability of a process.
Unit : 3, Group : 3
1.True (Right)
2.False
3.
4.
240 1697874 It is a set of levels that defines a testing maturity hierarcy
Unit : 3, Group : 3
1.TIM (Testing Improving Model)
2.TMM (Testing Maturity Model) (Right)
3.TQM(Total Quality Management)
4.
241 1697875 A Non-Functional Software testing done to check if the user interface is easy to use and understand
Unit : 3, Group : 3
1.Usability Testing (Right)
2.Security Testing
3.Unit testing
4.Block Box Testing

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 49 of 54
QNo Question Id Question Description
242 1697877 The review and approved document (i.e. Test plan, System Requirement Specification¶s) is called as
Unit : 3, Group : 3
1.Delivery Document
2.Baseline Document (Right)
3.Checklist
4.
243 1697883 It measures the quality of processes used to create a quality product.
Unit : 3, Group : 3 It is a system of management activities,
It is a preventive process, It applies for entire life cycle & Deals with Process.
what is this?

1.Validation
2.Verification
3.Quality Assurance (Right)
4.Quality Control
244 1697884 Variance from product specifications is called?
Unit : 3, Group : 3
1.Report
2.Requirement
3.Defect (Right)
4.
245 1697885 Verification is
Unit : 3, Group : 3
1.Process based (Right)
2.Product based
3.
4.
246 1698377 Requirement and Analysis, Design, Development or Coding, Testing and Maintenance is called
Unit : 3, Group : 3 as Software Development Life Cycle (SDLC )
1.True (Right)
2.False
3.
4.
247 1698378 The testing which is done by going thro' the code is known as,
Unit : 3, Group : 3
1.Unit Testing
2.Black box testing
3.White box Testing (Right)
4.Regression testing

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 50 of 54
QNo Question Id Question Description
248 1698379 Configuration Management Plan describes the Configuration Management procedures and
Unit : 3, Group : 3 structures to be used.
1.True (Right)
2.False
3.
4.
249 1698501 Phase Definition. It will come under
Unit : 3, Group : 3
1.CMM Level 1
2.CMM Level 2 (Right)
3.None
4.
250 1698653 Software testing which is done without planning and Documentation is known as
Unit : 3, Group : 3
1.adHoc Testing (Right)
2.Unit Testing
3.Regression testing
4.Functional testing
251 1699136 What are the Types of Integration Testing?
Unit : 3, Group : 3
1.Big Bang Testing
2.Bottom Up Testing
3.Top Down Testing
4.All the above (Right)
252 1699137 Product Risk affects The quality or performance of the software.
Unit : 3, Group : 3
1.True (Right)
2.False
3.
4.
253 1699139 A metric used to measure the characteristic of documentation and code called as
Unit : 3, Group : 3
1.Process metric
2.Product Metric (Right)
3.Test metrics
4.
254 1699144 Which is Black-Box Testing method?
Unit : 3, Group : 3
1.equivalence partitioning (Right)
2. code coverage
3.fault injection
4.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 51 of 54
QNo Question Id Question Description
255 1699145 Business Risk affects The Organization developing or Procuring the software.
Unit : 3, Group : 3
1.True (Right)
2.False
3.
4.
256 1699147 Stratification is a Technique used to analyze/divide a universe of data into homogeneous groups
Unit : 3, Group : 3 (strata).
1.True (Right)
2.False
3.
4.
257 1699148 Automation Testing should be done before starting Manual testing.
Unit : 3, Group : 3 Is the above statement correct?
1.Yes
2.No (Right)
3.
4.
258 1699153 Retesting modules connected to the program or component after a change has been made?
Unit : 3, Group : 3
1.Full Regression Testing
2.Unit Regression
3.Regional Regression (Right)
4.Retesting.
259 1699154 An Important metric is the number of defects found in internal testing compared to the defects found
Unit : 3, Group : 3 in customer tests, Status of test activities against the plan, Test coverage achieved so far, comes
under
1.Process Metric
2.Product Metric
3.Test Metric (Right)
4.
260 1699156 Alpha testing will be done at,
Unit : 3, Group : 3
1.User's site
2.Developers' site (Right)
3.
4.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 52 of 54
QNo Question Id Question Description
261 1700900 This type of test include, how well the user will be able to understand and interact with the system?
Unit : 3, Group : 3
1.Usability Testing (Right)
2.User Acceptance Testing
3.Alpha Testing
4.Beta Testing.
262 1700901 Defects generally fall into the following categories?
Unit : 3, Group : 3
1.WRONG
2.MISSING
3.EXTRA
4.All the above (Right)
263 1700902 What is correct Software Process Cycle?
Unit : 3, Group : 3
1.Plan(P)------>Check(C)------>Act(A)----->Do(D)
2.Plan(P)------>Do(D)------>Check(C)----->Act(A) (Right)
3.Plan(P)------>Do(D)------>Act(A)----->Check(C)
4.
264 1700908 Validation plan describes the approach ,resources and schedule used for system validation
Unit : 3, Group : 3
1.True (Right)
2.False
3.
4.
265 1700910 Integration, It will come under
Unit : 3, Group : 3
1.CMM Level 1
2.CMM Level 3 (Right)
3.CMM Level 2
4.None
266 1700911 Types of quality tools are Problem Identification Tools and Problem Analysis Tools.
Unit : 3, Group : 3
1.True (Right)
2.False
3.
4.
267 1700933 Quality plan describes the quality procedures and standards that will be used in a project.
Unit : 3, Group : 3
1.False
2.True (Right)
3.
4.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 53 of 54
QNo Question Id Question Description
268 1700935 How severely the bug is effecting the application is called as
Unit : 3, Group : 3
1.Severity (Right)
2.Priority
3.Fix ability
4.Traceability
269 1700942 Management and Measurement, It will come under
Unit : 3, Group : 3
1.CMM Level 1
2.CMM Level 3
3.CMM Level 4 (Right)
4.CMM Level 2
270 1700944 AdHoc testing is a part of
Unit : 3, Group : 3
1.Unit Testing
2.Regression Tesing
3.Exploratory Testing (Right)
4.Performance Testing
271 1700949 TQM represents
Unit : 3, Group : 3
1.Tool Quality Management
2.Test Quality Manager
3.Total Quality Management (Right)
4.Total Quality Manager
272 1700951 Optimization, Defect Prevention, and Quality Control. Its come under the
Unit : 3, Group : 3
1.CMM Level 2
2.CMM Level 3
3.CMM Level 4
4.CMM Level5 (Right)
273 1700952 Unit Testing will be done by
Unit : 3, Group : 3
1.Testers
2.End Users
3.Customer
4.Developers (Right)
274 1700953 Beta testing will be done at
Unit : 3, Group : 3
1.User place (Right)
2.Developers place
3.
4.

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM
Question Details of Subject :QUIZ-CST-312
Page 54 of 54
QNo Question Id Question Description
275 1700959

Unit : 3, Group : 3
Inspections and testing are what kinds of Quality Costs?

1.Prevention
2.Internal Failure
3.External Failure
4.Appraisal (Right)
276 1700960 The percentage increase in the area of a rectangle, if each of its sides is increased by 20% is
Unit : 3, Group : 3
1.40%
2.42%
3.44% (Right)
4.46%
277 1700966

Unit : 3, Group : 3
What should a project manager do or follow to ensure clear boundaries for project completion?

1.Scope verification
2.Completing a scope statement (Right)
3.Scope definition
4.Risk management plan
278 1700967

Unit : 3, Group : 3
Constantine suggests four ³organizational paradigms´for software engineering teams. The best project
team organizational model to use when handling extremely complex problems is ________

1.Random paradigm (Right)


2.Open paradigm
3.Synchronous paradigm
4.Closed paradigm
279 1700969

Unit : 3, Group : 3
The process mapping is a ______ diagram

1.Data flow
2.Workflow (Right)
3.Circular
4.Audit

Note: This view may vary from the view shown to student during online Test.

University Information System - By - ERP Division Tuesday, November 05, 2019 1:40:17 PM

You might also like