BHP Data Acquisition 42: S.p.A. Identification Code 4 108 Revision

This document discusses well testing procedures and equipment. It covers topics like emergency shutdown systems, data gathering instrumentation, bottomhole pressure acquisition gauges, perforating systems, preparing the well for testing, brine preparation, downhole equipment preparation, and tubing preparation. Sections include descriptions of chemical injection pumps, sand detectors, crossovers, rig equipment, offshore laboratories, separators, surge tanks, steam heaters, types of bottomhole pressure gauges, gauge installation methods, tubing conveyed and wireline conveyed perforating, guidelines for testing liner laps, brine preparation onshore and on the rig, well and surface system displacement procedures, test tools, tubing connections, and tubing grades.

Uploaded by

snnsnnsnn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views

BHP Data Acquisition 42: S.p.A. Identification Code 4 108 Revision

This document discusses well testing procedures and equipment. It covers topics like emergency shutdown systems, data gathering instrumentation, bottomhole pressure acquisition gauges, perforating systems, preparing the well for testing, brine preparation, downhole equipment preparation, and tubing preparation. Sections include descriptions of chemical injection pumps, sand detectors, crossovers, rig equipment, offshore laboratories, separators, surge tanks, steam heaters, types of bottomhole pressure gauges, gauge installation methods, tubing conveyed and wireline conveyed perforating, guidelines for testing liner laps, brine preparation onshore and on the rig, well and surface system displacement procedures, test tools, tubing connections, and tubing grades.

Uploaded by

snnsnnsnn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A RPO IDENTIFICATION CODE PAGE 4 OF 108

EN I S.p.A.
REVISION
A g ip Div isio n
STAP-P-1-M-7130 0

7.2. Emergency Shut Down System 38


7.3. Accessory Equipment 39
7.3.1. Chemical Injection Pump 39
7.3.2. Sand Detectors 39
7.3.3. Crossovers 40
7.4. Rig Equipment 40
7.5. Data Gathering Instrumentation 40
7.5.1. Offshore Laboratory and Instrument Manifold Equipment 40
7.5.2. Separator 41
7.5.3. Surge Or Metering Tank 41
7.5.4. Steam Heater 41

8. BHP DATA ACQUISITION 42


8.1.1. Quartz Crystal Gauge 42
8.1.2. Capacitance Gauge 42
8.1.3. Strain Gauge 42
8.1.4. Bourdon Tube Gauge 43
8.2. Gauge Installation 43
8.2.1. Tubing Conveyed Gauges 43
8.2.2. Gauge Carriers 43
8.2.3. SRO Combination Gauges 44
8.2.4. Wireline Conveyed Gauges 44
8.2.5. Memory Gauges Run on Slickline 44
8.2.6. Electronic Gauges Run on Electric Line 45

9. PERFORATING SYSTEMS 46
9.1. Tubing Conveyed Perforating 46
9.2. Wireline Conveyed Perforating 46
9.3. Procedures For Perforating 46

10. PREPARING THE WELL FOR TESTING 48


10.1. Preparatory Operations For Testing 48
10.1.1. Guidelines For Testing 7ins Liner Lap 48
10.1.2. Guidelines For Testing 95/8ins Liner Lap 48
10.1.3. General Technical Preparations 48
10.2. Brine Preparation 49
10.2.1. Onshore Preparation of Brine 49
10.2.2. Transportation and Transfer of Fluids 49
10.2.3. Recommendations 49
10.2.4. Rig Site Preparations 50
10.2.5. Well And Surface System Displacement To Brine 52
10.2.6. Displacement Procedure 52
10.2.7. On-Location Filtration And Maintenance Of Brine 52
10.3. Downhole Equipment Preparation 53
10.3.1. Test tools 53
10.4. TUBING PREPARATION 54
10.4.1. Tubing Connections 54
10.4.2. Tubing Grade 55