0% found this document useful (0 votes)
648 views

WTP Drawings PDF

The document is a schematic diagram of a proposed water treatment plant for a prototype water vending station. It shows the flow of raw water from a borehole through various treatment stages including sedimentation tanks, sand filters, UV and ozone treatment units, and a treated water storage tank before being dispensed through water vending machines. It includes labels for major system components and treatment stages.

Uploaded by

pastorgee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
648 views

WTP Drawings PDF

The document is a schematic diagram of a proposed water treatment plant for a prototype water vending station. It shows the flow of raw water from a borehole through various treatment stages including sedimentation tanks, sand filters, UV and ozone treatment units, and a treated water storage tank before being dispensed through water vending machines. It includes labels for major system components and treatment stages.

Uploaded by

pastorgee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

NOTE

DATE REVISION SIGN

CLIENT

EMANI GLOBAL

PROJECT

PROPOSED PROTOTYPE
WATER VENDING STATION

MECHANICAL ENGINEERS

PLOT 26 DBS ROAD, ASABA, DELTA STATE.


E-mail: [email protected]
0803-091-6984, 0808-470-7466

DESIGN TEAM
Engr. Godwin E. Iweka
Engr. Okey Ani
Wilson Odu

DWG TITLE DWG. No.

WATER TREATMENT
FLOW CHART P 01
PROJECT No.
DATE
AWGN/0920 - EG01 SEPT., 2020
NOTE

Plant Control Panel


Raw Water DATE REVISION SIGN
3 From Borehole
Water Transfer Pumps

Low Pressure Air Compressor


Sand Filter Unit Treated Water Tank
(Elevated Tank) 3 2 1 Raw Water Tank
UV Unit (Sec. Sedimentation)

CLIENT
4
Micron Filter
Ozonator 1 EMANI GLOBAL
5

Low Pressure 4 2
Sand Filter Unit PROJECT

PROPOSED PROTOTYPE
WATER VENDING STATION

Raw Water Tank


(Pry. Sedimentation)
MECHANICAL ENGINEERS

Raw Water Tank


(Aerated & Pre-Filter)

PLOT 26 DBS ROAD, ASABA, DELTA STATE.


5 E-mail: [email protected]
0803-091-6984, 0808-470-7466

Toi
DESIGN TEAM
Raw Water Tank Engr. Godwin E. Iweka
Water Dispensing Machines Ticket Station Engr. Okey Ani
(Aerated & Pre-Filter)
Wilson Odu

DWG TITLE DWG. No.

Treatment Plant Layout P 02


PROJECT No.
DATE
AWGN/0920 - EG01 SEPT., 2020
NOTE

DATE REVISION SIGN

Capacitor
CLIENT
Pump 1 Alarm

A V V A EMANI GLOBAL
Pump 2

DPST S/W Overload


PROJECT

Black (Common)
L N

Gr/Yel (Earth)

Brown (Start)

Blue (Run)
0
0
PROPOSED PROTOTYPE
1 3
2
3 1 Pump 3 WATER VENDING STATION

B1 B2 B3

MECHANICAL ENGINEERS
C A 3 2 1 NB
1 2 3 A C

C A 3 2 1
PLOT 26 DBS ROAD, ASABA, DELTA STATE.
E-mail: [email protected]
0803-091-6984, 0808-470-7466
FRONT VIEW BACK OF COVER INSIDE ARRANGEMENT
DESIGN TEAM
Engr. Godwin E. Iweka
Engr. Okey Ani
Wilson Odu

DWG TITLE DWG. No.

Electrical Control Panel P 03


PROJECT No.
DATE
AWGN/0920 - EG01 SEPT., 2020

You might also like