Code No. Requirement Unit Unit Rate Description Labor

The document contains a list of codes, requirements, units, unit rates and descriptions for labor, materials and equipment for a construction project. Labor rates range from $5-15 per man-day and include blacksmiths, foremen, masons and various skilled and unskilled laborers. Material costs are listed per cubic meter, kilogram, bag, piece or meter and include concrete, sand, gravel, cement and other building materials. Equipment hourly rental rates include excavators, dump trucks, wheel loaders, vibratory rollers and water tank trucks ranging from $25-85 per hour.

Uploaded by

Yedid Amq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

Code No. Requirement Unit Unit Rate Description Labor

The document contains a list of codes, requirements, units, unit rates and descriptions for labor, materials and equipment for a construction project. Labor rates range from $5-15 per man-day and include blacksmiths, foremen, masons and various skilled and unskilled laborers. Material costs are listed per cubic meter, kilogram, bag, piece or meter and include concrete, sand, gravel, cement and other building materials. Equipment hourly rental rates include excavators, dump trucks, wheel loaders, vibratory rollers and water tank trucks ranging from $25-85 per hour.

Uploaded by

Yedid Amq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Code No.

Requirement Unit Unit Rate Description

LABOR
L01 Blacksmith md $ 12.00
L02 Foreman md $ 15.00
L03 Mason md $ 10.00
L04 L Stone mason md $ 12.00
L05 Skilled labor md $ 8.00
L06 Skilled head md $ 12.00
L07 Unskilled labor md $ 5.00
MATERIALS
M 01 Concrete sand m3 $ 15.00 on site
M 02 Concrete wire kg $ 3.00 on site
M 03 Filled sand m3 $ 15.00 on site
M 04 Formwork Complete m2 $ 10.00 on site
M 05 Granular Filled material m3 $ 1.00 on site
M 06 Gravel m3 $ 35.00 on site
M 07 M Portland cement bag $ 5.50 on site
M 08 Project name plate piece $ 175.00 on site
M 09 PVC pipe m $ 3.00 on site
M 10 Stone masonry 15/20 cm m3 $ 25.00 on site
M 11 Sand m3 $ 25.00 on site
M 12 Steel Reinforced kg $ 1.25 on site
M 13 Geotextile m2 $ 1.00 on site
EQUIPMENT
E 01 Excavator Hour $ 85.00
E 02 Dump Truck Hour $ 35.00
E 03 E Wheel Loader Hour $ 65.00
E 04 vibratoory Dump Truck Roller 3-5 To Hour $ 65.00
E 05 Water Tank Truck Hour $ 25.00