0% found this document useful (1 vote)
372 views

WHRB Sop

The document provides standard operating procedures for a 1x15 MW power plant with 5 waste heat recovery boilers (WHRBs) fired by cement kiln waste gases. It describes the boiler and plant configuration, including 6 boilers total with 3 PH boilers and 3 FBC boilers. It then gives the standard procedure for WHRB start up, which includes ensuring gas availability and flow, opening/closing various dampers in sequence to start gas flow through the WHRBs, and monitoring boiler parameters. It also provides the standard damper operation procedure during WHRB start up and shutdown.

Uploaded by

Mohan Babu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
372 views

WHRB Sop

The document provides standard operating procedures for a 1x15 MW power plant with 5 waste heat recovery boilers (WHRBs) fired by cement kiln waste gases. It describes the boiler and plant configuration, including 6 boilers total with 3 PH boilers and 3 FBC boilers. It then gives the standard procedure for WHRB start up, which includes ensuring gas availability and flow, opening/closing various dampers in sequence to start gas flow through the WHRBs, and monitoring boiler parameters. It also provides the standard damper operation procedure during WHRB start up and shutdown.

Uploaded by

Mohan Babu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

 

THERMAX LIMITED POWER DIVISION

O&M site Document title Revision Page no


!L"# Si$o%i# Raast%an Standard Operating ' (
Procedure 1x15 MW Power
Plant

STANDARD OPERATING PROCEDURE

FOR 1X 15 MW POWER PLANT WITH 5 NO. WHRB


AT JK LAKHSMI CEMENT,
 SIROHI
 

The plant has 6 boilers operating on the waste heat from the Cement Kiln.

1. 3 Nos
Nos.. PH
PH B
Boi
oile
lers
rs heate
heated
db by
y the
the exi
exitt gas
gases
es from
from th
the
e pre
prehea
heate
terr il
ilns
ns 1!"!
1!"!3
3
". 3 Nos
Nos.. #$C
#$C Boi
Boile
lers
rs heate
heated
d by
by exi
exitt gas
gases
es from
from %rat
%rate
e Cool
Cooler
er Ki
Kiln
lns
s 1!"
1!"

PH &1 1".'(' TPH

PH ) " "3.* TPH

PH ) 3 "1.+6' TPH

#$C&1# ,.3,* TPH

#$C&1B 6.' TPH

#$C&" 1*.""* TPH

T-rbine iemens mae 1'/0


%enerator TP mae 1'/0

P$e)a$e* +,- T%e$ma. limite* Po/e$ Division


 

THERMAX LIMITED POWER DIVISION

O&M site Document title Revision Page no


!L"# Si$o%i# Raast%an Standard Operating ' 0
Procedure 1x15 MW Power
Plant

STANDARD PROCEDURE
FOR 
 DAMPER OPERATION

DAMPER OPERATION
OPERATION DURING WHRB START UP

 2ns-re that waste heat gas is aailable at re4-ired temperat-re with


re4-ired 4-antity.
 0H5B by pass damper is open.
 Boiler dr-m leel is maintained at operating leel  '*78
 5e9ir9-lation p-mp is in operation and re9ir9-lation flow is established at
re4-isite al-e
 The gas :!; damper are open 9lose type whereas the bypass damper will
be reg-lating type and 9ontrolled by CPP;C. The /otori<ed ampers also
hae end portion limit swit9hes whi9h indi9ate open!9lose position of
dampers.
 %as bypass damper will be opened!9losed step by step and 9ontrolled by
CPP;C.
 :n9rease in 0H5B inlet gas temperat-re and draft a9ross boiler will ens-re
the fl-e gas flow thro-gh 0H5B.
 Che9 boiler inlet fl-e
fl-e gas parameter lie
lie fl-e gas temperat-re = draft.

P$e)a$e* +,- T%e$ma. limite* Po/e$ Division


 

THERMAX LIMITED POWER DIVISION

O&M site Document title Revision Page no


!L"# Si$o%i# Raast%an Standard Operating ' 1
Procedure 1x15 MW Power
Plant

STANDARD START UP AND SHUT DOWN PROCEDURE


PROCEDURE FOR WHRB

1X 15 MW WHRB BASE POWER PLANT

START UP OF WHRB

1. 2ns
2ns-r
-re
e th
that

 Normal operating leel of water is maintained in boiler.


 #ll the ents are open.
 #ll the boiler drains are 9losed
 tart -p ent is f-lly open.

>l-e gas is aailable with re4-isite temperat-re and flowing thro-gh
the 0H5B bye& pass line
 5e9ir9-lation p-mp is in operation and re9ir9-lation
r e9ir9-lation flow is established
at re4-isite al-e.
 Hammering system of PH Boilers is in operating 9ondition. Before
operating the hammering system ens-re that all the hammers are free
to rotate.

". tart CC?s


CC?s and 5#@?s
5#@?s of the
the 9orresponding
9orresponding boiler
boiler and obsere
obsere that
that Boiler
Boiler
AN Permissie is generated. #lso ens-re the Boiler is not tripped. Hen9e
the damper operation will start a-tomati9ally.

3. #fter Boiler
Boiler AN Permissi
Permissie
e the damper
damper operation
operation is as
as follows
follows

a8 0H5B fl-e gas iinlet


nlet damper will be opened.
opened.

b8 0H5B
0H5B o-tlet
o-tlet damp
damper
er will
will be o
open
pened.
ed.

98 Close
Close Bypass
Bypass damper
damper is steps
steps

,. Absere
Absere that amper
amper %ro
%ro-p
-p 5eady signal
signal is generated
generated on C
C -pon
s-99essf-l 9ompletion of damper operation.

'. #s the bypass


bypass damper
damper is partially
partially 9losed
9losed gas
gas starts
starts flowi
flowing
ng thro-gh
thro-gh
0H5B.

6. Control
Control the gas flow thro-gh
thro-gh 0H5B
0H5B by 9losing
9losing  step
step wise8
wise8 bypass
bypass damper
damper
in s-9h a way that in9rease in /ain
/ain steam temperat-re does not in9rease
more that 3 deg C per min-te.

(. ee that
that 0H5B
0H5B star
starts
ts stea
steamin
ming.
g.

P$e)a$e* +,- T%e$ma. limite* Po/e$ Division


 

THERMAX LIMITED POWER DIVISION

O&M site Document title Revision Page no


!L"# Si$o%i# Raast%an Standard Operating ' 2
Procedure 1x15 MW Power
Plant

+. Close ents at dr-m press-re at " g!9m".

. tart one B>P if re4-ired and maintain dr-m leel

1*. Charge /ain steam line at 1" to 1, g!9m" and temp at 3** deg C if 1st
boiler is started8.
started8. Apen the main steam line when normal operating press-re
and temp are a9hieed for 9onne9ting with the main steam header.

11. %rad-ally 9lose bye&pass damper and 9lose start -p ents f-lly as steam
demand is in9reased.

1". tart HP = ;P dosing p-mp.

SHUT DOWN PROCEDURE OF WHRB

>ollow below mentioned steps for stopping of 0H5B

1. :nform DK;C 9ontrol


9ontrol room
room for
for stoppa
stoppage
ge of 0H5B

". lowly
lowly operate
operate bypass
bypass damper
damper for by passin
passing
g fl-e gas from 0H5B

3. Absere
Absere that
that steam
steam generation
generation is de9reas
de9reasing
ing

,. 5ed-
5ed-9e
9e loa
load
d iin
n T%
T%

'. An9e steam generation


generation be9omes
be9omes <ero
<ero 9lose
9lose /@

6. Apen bypas
bypass
s damp
damper
er f-lly.
f-lly.

(. Close fl-e
fl-e gas o-tlet
o-tlet damper a
and
nd s-bse4-en
s-bse4-ently
tly 9lose
9lose inlet
inlet damper
damper

+. /a
/ain
inta
tain
in dr
dr-m
-m lee
leell
. Kee
Keep
p 5C p-m
p-mp
p operati
operation
on for ff-rt
-rther
her on
one
e 1 hr.

1*. top hammering system after 1 hr of stoppage of boiler

1*. top HP dosing


dosing p-mp

P$e)a$e* +,- T%e$ma. limite* Po/e$ Division


 

THERMAX LIMITED POWER DIVISION

O&M site Document title Revision Page no


!L"# Si$o%i# Raast%an Standard Operating ' 3
Procedure 1x15 MW Power
Plant

STANDARD START UP AND SHUT DOWN

PROCEDURE FOR

TOTAL POWER PLANT

START UP PROCEDURE OF POWER PLANT

.
 >ollow below mentioned
mentioned steps for start -p of power plant.

1. P-t tt-rb
-rbine
ine on Barr
Barring
ing gear
gear by star
startin
ting
g #AP
". tart C2P on re9ir9-lati
re9ir9-lation
on mod
mode
e and maint
maintain
ain CT leel.
3. tart PH" and
and #$C"
#$C" as per start
start pro9ed-
pro9ed-re
re of 0H5B
,. Charge steam
steam line
line and heat
heat -p line
line -p to t-
t-rbine
rbine inlet
inlet by opening
opening warm
warm -p
ent line and drain lines.
'. P-ll a9--m
a9--m in
in 9ondenser
9ondenser by tain
taing
g hogger eEe9tor
eEe9tor first
first and m
mainta
aintain
in
a9--m by taing seri9e eEe9tor in line.
6. An9e re4-isi
re4-isite
te temperat-re
temperat-re  3", deg C8 is a9hieed
a9hieed roll the
the t-rbine
t-rbine as
per t-rbine start-p pro9ed-re.
(. 0hile steam
steam line
line is 9harged
9harged with
with the steam
steam from
from PH an
and
d #$C boilers
boilers
mae ready to start other 0H5B . Please
 Please note that with only PH1 and 
 AQC1 alone, turbine can not be loaded. So it is advisable tto
o have at 
turbine 8
least one more WHRB ready beore synchroni!in" the turbine8
+. yn
yn9hr
9hroni
oni<e
<e T% with
with two
two 0H5
0H5B?s
B?s in
in line.
line.
. %ra
%rad-a
d-ally
lly in9rea
in9rease
se load
load in
in T
T%.
%.
1*. tart 9ooling tower fans as per re4-irement.
11. -bse4-ently tae other 0H5B in line one by one.
1". tabili<e the power plant and note down all the parameter.

P$e)a$e* +,- T%e$ma. limite* Po/e$ Division


 

THERMAX LIMITED POWER DIVISION

O&M site Document title Revision Page no


!L"# Si$o%i# Raast%an Standard Operating ' 4
Procedure 1x15 MW Power
Plant

SHUT DOWN PROCEDURE OF POWER PLANT

>ollow below mentioned steps for taing sh-t down of power plant

1. Tae sh-t
sh-t down of
of 0H5B as
as per standar
standard
d pro9ed-re
pro9ed-re of 0H5B
0H5B sh-t d
down.
own.

-ring sh-t down red-9e load and maintain t-rbine inlet steam press-re.

". -bse4-entl
-bse4-ently
y tae sh-t
sh-t down of
of other 0H5B
0H5B one by one followi
following
ng aboe

mentioned step.

3. #99ordingly
#99ordingly red
red-9e
-9e load
load to T%. -ring
-ring red-9tio
red-9tion
n of load maintain
maintain steam
steam

press-re by opening start -p ents of 0H5Bs.

,. Ap
Apen
en gen
genera
erato
torr brea
breae
er.
r.

'. 2ns-re that l-be oil press-re


press-re is maintained.
maintained.

6. 2ns-re barring
barring gear a-to start at 1'*rpm speed of T%.

(. Kee
Keep
p C2P in o
oper
perati
ation
on fo
forr another
another one
one ho-r.
ho-r.

+. Keep T%
T% on barring
barring gear till
till the bearing
bearing tem
temperat-
perat-re
re is aro-nd
aro-nd ,* deg C.
C.

P$e)a$e* +,- T%e$ma. limite* Po/e$ Division


 

THERMAX LIMITED POWER DIVISION

O&M site Document title Revision Page no


!L"# Si$o%i# Raast%an Standard Operating ' 5
Procedure 1x15 MW Power
Plant

EMERGENCIES

IN

1X 15 MW WHRB BASE POWER PLANT

P$e)a$e* +,- T%e$ma. limite* Po/e$ Division


 

THERMAX LIMITED POWER DIVISION

O&M site Document title Revision Page no


!L"# Si$o%i# Raast%an Standard Operating ' 6
Procedure 1x15 MW Power
Plant

EMERGENCIES IN 15 MW POWER PLANT

>ollowing emergen9ies are enisaged d-ring operation of 1' /0 power plant.

1. Stu
Stuck
ck u
u
 !" F#u
F#u$
$ %&
%&'
' (&)$
(&)$*.
*.

+. T*
T*
-%
-% !" R$
R$c*
c*cu#
cu#&t
&t!-
!- u)
u).
.

. T*
T*
-%
-% !" B!
B!#$*
#$* "$$(
"$$( u).
u).

/. S0$&*-%
S0$&*-% !" D*&% c0&-
c0&- c!-$
c!-$2!*
2!* S0$&*
S0$&* -.

5. I-c*$&'$
I-c*$&'$ - "#u$
"#u$ %&' t$)$
t$)$*&tu*
*&tu*$
$ 3$2!-(
3$2!-( /44 ($%
($% C.

. T*
T*
-%
-% !" &'0 Sc*
Sc*$6
$67P&
7P&-
- c!-$2
c!-$2!*.
!*.

8. T*
T*
-%
-% 7 't!
't!&
&%$
%$ !" WHR
WHR B!#$
B!#$*'.
*'.

9. T*
T*

-%
-% !" k
k#-
#-

:. T*-%
T*-% !" tu*3-
tu*3-$
$ &-( &## WHRB'
WHRB' &*
&*$
$ - '
'$*
$*c$.
c$.

P$e)a$e* +,- T%e$ma. limite* Po/e$ Division


 

THERMAX LIMITED POWER DIVISION

O&M site Document title Revision Page no


!L"# Si$o%i# Raast%an Standard Operating ' 7
Procedure 1x15 MW Power
Plant

1. Stuck u !" F#u$ %&' (&)$*

Tae following a9tions while fl-e gas damper!s are st-9 -p

 Aperate damper man-ally as per se4-en9e mentioned in D&)$*


O$*&t!- P*!c$(u*$

 Boiler 9an be ept in operation een by operating the dampers man-ally.

 -ring sh-t down please stop! 9lose damper as per the se4-en9e
mentioned in damper operation pro9ed-re.

+. T*-% !" R$c*cu#&t!-


R$c*cu#&t!- u).

Tae following a9tions are to be taen while 5e9ir9-lation p-mp trips

 5C p-mp shall trip on low dr-m leel and ele9tri9al fa-lt.


 :f the p-mp trips on ele9tri9al fa-lt restart stand by p-mp.  Normal
dr-m leel ens-res that 5C p-mp tripped on ele9tri9al fa-lt8
 :f there is low dr-m leel try to maintain dr-m leel as early as possible.
 :f dr-m leel 9an not be maintained within 1* min-tes by pass fl-e gas to
tae sh-t down of the boiler.
 -ring bypassing the se4-en9e of damper operation shall be as per the
damper operating pro9ed-re.

. T*-% !" B!#$*


B!#$* "$$( u)

Boiler feed p-mp may trip d-e to low deaerator leel or d-e to any ele9tri9al
fa-lt

:f B>P trips on ele9tri9al fa-lt start stand by B>P immediately within '
min-tes8.

:f stand by 9an not be started d-e to any reason follow the steps to tae sh-t
down of all the boilers

 Apen fl-e gas by pass damper.


 Close 0H5B o-tlet damper.
 Close inlet damper.

P$e)a$e* +,- T%e$ma. limite* Po/e$ Division


 

THERMAX LIMITED POWER DIVISION

O&M site Document title Revision Page no


!L"# Si$o%i# Raast%an Standard Operating ' ('
Procedure 1x15 MW Power
Plant

 :solate main steam line ales.

/. S0$&*-% !" D*&% c0&- S0$&* -

 :nform Cement plant 9ontrol room.


 tart by passing fl-e gas and a99ordingly red-9e load in T%.
 An9e fl-e gas is totally by passed repla9e shear pin.
 An9e the rag 9hain feeder is operatable start taing fl-e gas in 0H5B as
per 0H5B start -p pro9ed-re.
 :n9rease load in T%.

5. I-c*$&'$ - "#u$ %&' t$)$*&tu*$ 3$2!-( /44 ($% C

By in9reasing fl-e gas temperat-re / temp will in9rease beyond 3"' deg C.

 Apen by pass damper partially and see that /ain steam temperat-re is
-nder 9ontrol and 0H5B steam generation has red-9ed.
 e9rease T% load.
 :nform DK;C 9ontrol room.
 An9e >l-e gas temp is within ,** deg C grad-ally 9lose the by pass
damper.
 ee that boiler load has again in9reased in9rease T% load and normali<e.

. T*-% !" &'0 'c*$6 c!-$2!*

 :nform DK;C 9ontrol room as maintenan9e of s9rew!pan 9oneyor is in


9-stomer?s s9ope.
 :> the same is not attended within 1* min-tes by pass fl-e gas from
0H5B following the damper operating se4-en9e.

8. T*-% 7 't!&%$ !" WHRB

 :nform DK;C 9ontrol room and grad-ally de9rease load in T%.


 2ns-re that 0H5B fl-e gas by passing has been done as per damper
operation pro9ed-re.

P$e)a$e* +,- T%e$ma. limite* Po/e$ Division


 

THERMAX LIMITED POWER DIVISION

O&M site Document title Revision Page no


!L"# Si$o%i# Raast%an Standard Operating ' ((
Procedure 1x15 MW Power
Plant

9. T*-% !" k#-

 An9e iln is tripped! stopped 9orresponding Boiler is re4-ired to be


stopped.
 top the Boiler as per Boiler h-t down pro9ed-re mentioned aboe.
 5ed-9e T% load grad-ally. #t 1.' /0 load open the generator breaer.
 top t-rbine as per normal sh-t down pro9ed-re.

:. T*-% !" tu*3-$ &-( &## WHRB'


WHRB' &*$ - '$*c$
'$*c$

 /aintain dr-m press-re by opening start -p ents of all the 0H5B


 :nform DK;C 9ontrol room.
 By pass fl-e gas from 0H5Bs one by one

Tae sh-t down of all 0H5Bs one by one as per sh-t down pro9ed-re.
 /aintain dr-m leel all the time.

P$e)a$e* +,- T%e$ma. limite* Po/e$ Division


 

THERMAX LIMITED POWER DIVISION

O&M site Document title Revision Page no


!L"# Si$o%i# Raast%an Standard Operating ' (0
Procedure 1x15 MW Power
Plant

D!' AND D!-;t'

FOR

1X 15 MW WHRB BASE POWER PLANT

IMPORTANT D!' AND D!-;t' DURING PLANT OPERATION


OPERATION

D!'

1. %o thro-gh
thro-gh all APs
APs in detai
details
ls and eep
eep se4-en9e
se4-en9e of dampers
dampers operat
operation
ion in
mind.

". o as in
in 9ase
9ase of any do-bts
do-bts to
to yo-r seniors
seniors before
before any
any operation.
operation.

3. o note all
all parameter
parameter of 0H5Bs and
and T% areas
areas on reg-la
reg-larr basis.
basis.

,. o tae
tae safety
safety meas-res
meas-res while worin
woring
g in power
power plant.
plant.

D!-;t'

1. o not 9arry
9arry o-t
o-t any of the
the operation
operation in
in h-rry and
and with o-t -nderstandi
-nderstanding
ng
the reason for operation.

". o not do any mainte


maintenan9
nan9e
e a9tiities
a9tiities witho-t
witho-t 0or permit
permit an
and
d informing
informing
DK;C CC5.
3. o not allow
allow any
any -na-thori<e
-na-thori<ed
d person to
to perform
perform plan
plantt operations
operations from
from
C.
,. o not by pass any
any prote9tion
prote9tion and
and interlo9
interlo9 of the power
power plant
plant
'. o no
nott hesitat
hesitate
e to as in
in 9ase
9ase of do-bts
do-bts..

P$e)a$e* +,- T%e$ma. limite* Po/e$ Division


 

THERMAX LIMITED POWER DIVISION

O&M site Document title Revision Page no


!L"# Si$o%i# Raast%an Standard Operating ' (1
Procedure 1x15 MW Power
Plant

STEAM T8R9INE :ENERA


:ENERATOR
TOR ; (NO< =>REE
=>REE S8PPL
S8PPL?# ERE"TION
ERE"TION AND
"OMMISSIONIN: 9? "8STOMER@

Parameter Unit Value

Power at generator terminal (Approx) kW 15000

Main Steam Pressure at Turbine inlet Ata   15

Main Steam Temperature at Turbine inlet °C   324.3

Main S
Stteam l
low a
att Turbine in
inlet iin
n!lu"ing au
auxiliaries TP#   72

$x%aust steam Pressure Ata   0.2

Cooling water &nlet Temperature °C   33

Cooling water outlet Temperature °C   42