Syllabus and Evaluation Criteria: CPM and PERT (CE 306)

This 3-page document provides information about the CPM and PERT course for the 3rd year B.Tech program. The course aims to introduce fundamental concepts of project scheduling using CPM and PERT techniques. It will be taught over 36 hours across topics like work breakdown structure, bar charts, network techniques, critical path method, probability concept, and cost-time analysis. Student performance will be evaluated through course work including assignments and tests worth 20% and an end term examination worth 80%. Contact details for the instructor Dr. Jitendra Singh Yadav are also provided.

Uploaded by

Harry Stark
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
144 views

Syllabus and Evaluation Criteria: CPM and PERT (CE 306)

This 3-page document provides information about the CPM and PERT course for the 3rd year B.Tech program. The course aims to introduce fundamental concepts of project scheduling using CPM and PERT techniques. It will be taught over 36 hours across topics like work breakdown structure, bar charts, network techniques, critical path method, probability concept, and cost-time analysis. Student performance will be evaluated through course work including assignments and tests worth 20% and an end term examination worth 80%. Contact details for the instructor Dr. Jitendra Singh Yadav are also provided.

Uploaded by

Harry Stark
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Introduction

Syllabus and Evaluation Criteria


CPM and PERT (CE 306)

B.Tech 3rd Year (Sem-V):


Dr. Jitendra Singh Yadav
Assistant Professor, Dept of Civil Engineering
National Institute of Technology Hamirpur
B. Tech. (Open Elective)
PROGRAMME
V/3rd
SEM./YEAR
CPM and PERT
COURSE NAME
CE 306
COURSE CODE
3
CREDIT
3(Theory) + 0(Tutorial) + 0(Practical) = 3 (In Week)
CONTACT HOURS
36 hrs.
TOTAL LECTURE HRS.
COURSE OBJECTIVES:

• To introduce the fundamental concepts relevant to project scheduling.

• To impart knowledge about the basic principles of CPM and PERT.

• To enable the students to find probability of completion of a project in a specified duration.

COURSE OUTCOMES:

Upon successful completion of the course, the students will be able to

CO1: Develop bar-chart based schedule and understand its limitations,

CO2: Develop critical path method (CPM) based network and estimate various times and floats,

CO3: Understand the implementation of network technique,

CO4: Develop PERT based network and find probability of completion of a project in a specified duration, and

CO5: Understand time-cost relationship for projects.


Lecture Plan
SN TOPICS LEC. HRS
1. Project Planning: 6 Hours

Definition, Importance of Subject and Applications. 1


Work breakdown structure, scheduling by bar charts, 2
Limitation of bar charts, milestone charts, and multiple calendar date scheduling 3
using bar chart.
2. Network Techniques in Project Management-I (CPM): 12 Hours

Introduction with network techniques, classification of activities, 2

Rules for developing networks, network development-logic of network, 2


Numbering events, network analysis, determination of project schedules, 4
Critical path, floats in activities, updating, resources allocation, resources 4
smoothing and resources leveling
3. Network Techniques in Project Management-II (PERT): 10 Hours
Probability concept in network, optimistic time, pessimistic time, 3
Most likely time, lapsed time, deviation, variance, standard deviation, 3
Slack critical path, probability of achieving completion time, central limit 4
theorem.
4. Cost-Time Analysis 8 Hours
Cost versus time, direct cost, indirect cost, total project cost and optimum 3
duration,
4
Contracting the network for cost optimization, steps in time cost optimization 5
BOOKS and References:

1. Project Planning and Control with PERT and CPM by B.C. Punmia and K.K. Khandelwal.

2. Project Management Technique in Planning and Controlling Construction Projects by H.N. Ahuja.

3. Construction Project Management: Planning, Scheduling and Control by K.K. Chitkara.

4. Project Management with CPM, PERT and Precedence Diagramming byJ. Moder, , C. Phillips and E. Davis.

5. PERT and CPM -Principles and Applications by L.S. Srinath.


EVALUATION FORMAT AND CRITERIA

Course work
Sessional Exmaination
End Term Examination
Total 100%

Course Work
Contents Nos. Date Distribution
Objective Test 5 10%
Assignment/Class Test 5 10%
*tentative date; final date will be finalized between mutual understanding
CONTACT DETAILS

Seating Place: Room-205, Department of Civil Engineering, NITH


E-mail: [email protected]
Contact No.: +91 96537871650,
Thank You!!!