Syllabus and Evaluation Criteria: CPM and PERT (CE 306)
Syllabus and Evaluation Criteria: CPM and PERT (CE 306)
COURSE OUTCOMES:
CO2: Develop critical path method (CPM) based network and estimate various times and floats,
CO4: Develop PERT based network and find probability of completion of a project in a specified duration, and
1. Project Planning and Control with PERT and CPM by B.C. Punmia and K.K. Khandelwal.
2. Project Management Technique in Planning and Controlling Construction Projects by H.N. Ahuja.
4. Project Management with CPM, PERT and Precedence Diagramming byJ. Moder, , C. Phillips and E. Davis.
Course work
Sessional Exmaination
End Term Examination
Total 100%
Course Work
Contents Nos. Date Distribution
Objective Test 5 10%
Assignment/Class Test 5 10%