This inspection and test plan outlines 19 inspection activities and tests for electrical works, specifically for a 20/0.4 kV power transformer distribution. The plan lists the inspection activity, method of inspection, acceptance criteria reference, responsibility, and remarks. Inspections include verifying documentation and name plates, visual checks of installation and components, and electrical tests like insulation resistance, vector group, and transformer turning ratio. Records of inspections and test results will be documented in inspection reports.

Uploaded by

rombi aritonang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
115 views

Check List

This inspection and test plan outlines 19 inspection activities and tests for electrical works, specifically for a 20/0.4 kV power transformer distribution. The plan lists the inspection activity, method of inspection, acceptance criteria reference, responsibility, and remarks. Inspections include verifying documentation and name plates, visual checks of installation and components, and electrical tests like insulation resistance, vector group, and transformer turning ratio. Records of inspections and test results will be documented in inspection reports.

Uploaded by

rombi aritonang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 25

JOB NO.

: 10 - 1617 REV

INSPECTION AND TEST PLAN FOR ELECTRICAL WORKS DOC. NO. : 0

2
(ITP FIELD) DATE : BY CHD APVD
22 Agustus 2020 SGT BR DAY

LEVEL OF RESPONSIBILITY
METHOD OF VERIFYING
No. INSPECTION ACTIVITY/TEST ITEM ACCEPTANCE / PJIT/ REMARKS
INSPECTION DOCUMENT S/C Rekind NR
REFERENCE Migas
1 ELECTRICAL
1.1 20/0.4 kv Power Transformer Distribution

A. Documentation
(1) Completed report Review MDR & ITP Migas Report P R R A
(2) Issued SKKP Review MDR & ITP Migas SK Dirjen Migas P R R A
No. 84 K

B INSPECTION AND TESTING ON SITE :


(1) Inspection of transformer installation condition Visual Enginering Spec. & IFC Inspection Report P V V V
Drawing
(2) Equipment name plate verification with data sheet Visual Data sheet & IFC Inspection Report P V V V
Drawing
(3) Inspection of transformer lay - out base on classification area Visual IFC Drawing & Data Inspection Report P V V V
Sheet
(4) Inspection of Equipment and components condisition from physical damages Visual IFC Drawing & Inspection Report P V V V
Engginering Spec.
(5) Inspection of control panel condition and function test Test IFC Drawing & Inspe.Report & P V V V
Engginering Spec. certificated
(6) Inspection condition and test of the main cable and neutral generator ( size, type, Test IFC Drawing & Inspe.Report & P V V V
indentification of cable ) Engginering Spec. certificated
(7) Inspection of safety personnal and waring sign Visual IFC Drawing & Inspection Report P W W R
Engginering Spec.
(8) Earting measurement test Test IFC Drawing & Inspection Report P W W R
Engginering Spec.
(9) Inspection of fire and gas protection system ( if any ) Visual IFC Drawing & Inspe.Report & P W W R
Engginering Spec. certificated
(10) Vector group test Test Procedure & Inspection Report P W W R
Engginering Spec.
(11) Transformer turning ratio test Test Procedure & Inspection Report P W W R
Engginering Spec.
(12) Insulation resistance test Test Procedure & Inspection Report P W W R
Engginering Spec.
JOB NO. : 10 - 1617 REV

INSPECTION AND TEST PLAN FOR ELECTRICAL WORKS DOC. NO. : 0

2
(ITP FIELD) DATE : BY CHD APVD
22 Agustus 2020 SGT BR DAY

LEVEL OF RESPONSIBILITY
METHOD OF VERIFYING
No. INSPECTION ACTIVITY/TEST ITEM ACCEPTANCE / PJIT/ REMARKS
INSPECTION DOCUMENT S/C Rekind NR
REFERENCE Migas
(13) Gas Detector relay test Test Procedure & Inspection Report P W W R
Engginering Spec.
(14) Oil temperatur Indication test Test Procedure & Inspection Report P W W R
Engginering Spec.
(15) Winding temperatur indicator test Test Procedure & Inspection Report P W W R
Engginering Spec.
(16) Oil level Indicator test Visual Data sheet & Inspection Report P W W R
Engginering Spec
(17) Cooling fan test Test Procedure & Inspection Report P W W R
Engginering Spec.
(18) insulation oil test Test Procedure & Inspection Report P W W R
Engginering Spec.
(19) Control panel test Test Procedure & Inspection Report P W W R
Engginering Spec.
C For Generator Transformer ( Additional Inspection )
(1) Check the cooling equipment installed properly Visul Procedure & Inspection Report P V V V
Engginering Spec.
(2) Check the components are installed specified and properly ( as gauges, pressure Visul Procedure & Inspection Report P V V V
relay, ect) Engginering Spec.
(3) Check the transformer from oil leaks Visul Procedure & Inspection Report P V V V
Engginering Spec.
(4) Check the transformer tank / casing is grounded properly Visul Procedure & Inspection Report P V V V
Engginering Spec.
(3) Check that crystal in silica gel breather are mostly blue Visul Procedure & Inspection Report P V V V
Engginering Spec.
D COMMISSIONING TEST, FINAL INSPECTION
(1) Energizing and loaded Test Procedure & Inspe. Report & P W W W
Engginering Spec. Certificated
JOB NO. : 10 - 1617 REV

INSPECTION AND TEST PLAN FOR ELECTRICAL WORKS DOC. NO. : 0

2
(ITP FIELD) DATE : BY CHD APVD
22 Agustus 2020 SGT BR DAY

LEVEL OF RESPONSIBILITY
METHOD OF VERIFYING
No. INSPECTION ACTIVITY/TEST ITEM ACCEPTANCE / PJIT/ REMARKS
INSPECTION DOCUMENT S/C Rekind NR
REFERENCE Migas

1.2 400V LV SWITCHGEAR AND MCC

A Documentation
(1) Completed Report Review MDR & ITP Migas Report P R R A
(2) Issued SKPP Review MDR & ITP Migas SK Dirjen Migas P R R A
No. 84 K
B. Inspection
(1) Inspection of switchgear installation condition Visual Drawing & Procedure, Inspection Report P V V V
Engginering Spec.

(2) Equipment name plate verification with data sheet Visual IFC Drawing & Data Inspection Report P V V V
sheet
(3) Inspection of switchgear lay out based on classification area Visual IFC Drawing & Data Inspection Report P V V V
sheet
(4) Inspection of the equipment and components Condistion from physical damages Visual Drawing & Procedure, Inspection Report P V V V
Engginering Spec.
(5) Check the switchgear are grounded properly Visual Drawing & Procedure, Inspection Report P V V V
Engginering Spec.
(6) Check the power, control and instrumentation cable entering the Switchgear are Visual Drawing & Procedure, Inspection Report P V V V
properly Colour Coded Engginering Spec.
(7) Check the cable feeder termination Visual Drawing & Procedure, Inspection Report P V V V
Engginering Spec.
(8) Check the component install and are specified Visual Drawing & Procedure, Inspection Report P V V V
Engginering Spec.
C. Testing
(1) Current & potensial switchgear test Test Procedure & Inspection Report P W W R
engginering Spec.
(2) Insulation resistance test Test Procedure & Inspection Report P W W R
engginering Spec.
JOB NO. : 10 - 1617 REV

INSPECTION AND TEST PLAN FOR ELECTRICAL WORKS DOC. NO. : 0

2
(ITP FIELD) DATE : BY CHD APVD
22 Agustus 2020 SGT BR DAY

LEVEL OF RESPONSIBILITY
METHOD OF VERIFYING
No. INSPECTION ACTIVITY/TEST ITEM ACCEPTANCE / PJIT/ REMARKS
INSPECTION DOCUMENT S/C Rekind NR
REFERENCE Migas
(3) Hi-Pot test Test Procedure & Inspection Report P W W R
engginering Spec.
(4) switchgear circuit breaker test Test Procedure & Inspection Report P W W R
engginering Spec.
(5) Electrical & Mechanical Interlock test Test Procedure & Inspection Report P W W R
engginering Spec.
(6) Protective relay and meter test Test Procedure & Inspection Report P W W R
engginering Spec.
(7) Secondary current injection test Test Procedure & Inspection Report P W W R
engginering Spec.
(8) Primery Injection Voltage Test Test Procedure & Inspection Report P W W R
engginering Spec.
(9) Grounding syatem test Test Procedure & Inspection Report P W W R
engginering Spec.
(10) Function Test Test Procedure & Inspection Report P W W W
engginering Spec.
D COMMISSIONING TEST, FINAL INSPECTION
(1) Energizing and loaded Test Procedure & Inspection Report P W W W
engginering Spec.
1.3 20 KV MV SWITCHGEAR
A Documentation
(1) Completed Report Review MDR & ITP Migas Report P R R A
(2) Issued SKPP Review MDR & ITP Migas SK Dirjen Migas P R R A
No. 84 K
B Inspection
(1) Inspection of switchgear installation condition Visual Drawing & Procedure, Inspection Report P V V V
Engginering Spec.
(2) Equipment name plate verification with data sheet Visual IFC Drawing & Data Inspection Report P V V V
sheet
(3) Inspection of switchgear lay out based on classification area Visual IFC Drawing & Data Inspection Report P V V V
sheet
JOB NO. : 10 - 1617 REV

INSPECTION AND TEST PLAN FOR ELECTRICAL WORKS DOC. NO. : 0

2
(ITP FIELD) DATE : BY CHD APVD
22 Agustus 2020 SGT BR DAY

LEVEL OF RESPONSIBILITY
METHOD OF VERIFYING
No. INSPECTION ACTIVITY/TEST ITEM ACCEPTANCE / PJIT/ REMARKS
INSPECTION DOCUMENT S/C Rekind NR
REFERENCE Migas
(4) Inspection of the equipment and components Condistion from physical damages Visual Drawing & Procedure, Inspection Report P V V V
Engginering Spec.
(5) Check the switchgear are grounded properly Visual Drawing & Procedure, Inspection Report P V V V
Engginering Spec.
(6) Check the power, control and instrumentation cable entering the Switchgear are Visual Drawing & Procedure, Inspection Report P V V V
properly Colour Coded Engginering Spec.
(7) Check the cable feeder termination Visual Drawing & Procedure, Inspection Report P V V V
Engginering Spec.
(8) Check the component install and are specified Visual Drawing & Procedure, Inspection Report P V V V
Engginering Spec.
C Testing
(1) Current & potensial switchgear test Test Procedure & Inspection Report P W W R
engginering Spec.
(2) Insulation resistance test Test Procedure & Inspection Report P W W R
engginering Spec.
(3) Hi-Pot test Test Procedure & Inspection Report P W W R
engginering Spec.
(4) switchgear circuit breaker test Test Procedure & Inspection Report P W W R
engginering Spec.
(5) Electrical & Mechanical Interlock test Test Procedure & Inspection Report P W W R
engginering Spec.
(6) Protective relay and meter test Test Procedure & Inspection Report P W W R
engginering Spec.
(7) Secondary current injection test Test Procedure & Inspection Report P W W R
engginering Spec.
(8) Primery Injection Voltage Test Test Procedure & Inspection Report P W W R
engginering Spec.
(9) Grounding syatem test Test Procedure & Inspection Report P W W R
engginering Spec.
(10) Function Test Test Procedure & Inspection Report P W W W
engginering Spec.
JOB NO. : 10 - 1617 REV

INSPECTION AND TEST PLAN FOR ELECTRICAL WORKS DOC. NO. : 0

2
(ITP FIELD) DATE : BY CHD APVD
22 Agustus 2020 SGT BR DAY

LEVEL OF RESPONSIBILITY
METHOD OF VERIFYING
No. INSPECTION ACTIVITY/TEST ITEM ACCEPTANCE / PJIT/ REMARKS
INSPECTION DOCUMENT S/C Rekind NR
REFERENCE Migas
D COMMISSIONING TEST, FINAL INSPECTION
(1) Energizing and loaded Test Procedure & Inspection Report P W W W
engginering Spec.

1.4 AC UPS System


A Preparation
(1) Location /Area Classification Visual IFC Drawing Inspection Report M W W -

(2) Foundation as per Civil Data Visual IFC Drawing Inspection Report M W W -

(3) Name plate, rating and layout Visual IFC Drawing & data Inspection Report M W W -
sheet
(4) Check enclosure and safety device Visual IFC Drawing & Inspection Report M W W -
Engginering Spec.
(5) Tools / Equipment Tester Calibration / Procedure & Certificated & M W W -
Review Engginering spec. Inspec. Report
B Installation
(1) Visual & dimensional Visual Drawing, Procedure & Inspection Report M W W -
Engginering Spec.
(2) Check bolting connections Visual Procedure & Inspection Report M W W -
Engginering spec.
(3) Check termination and wiring number Visual Procedure & Inspection Report M W W -
Engginering spec.
(4) Check grounding connection Visual Procedure & Inspection Report M W W -
Engginering spec.
(6) Check battery rack installation Visual Procedure & Inspection Report M W W -
Engginering spec.
(5) Check the electrolyte Visual Procedure & Inspection Report M W W -
Engginering spec.
C Testing

(1) Battery
JOB NO. : 10 - 1617 REV

INSPECTION AND TEST PLAN FOR ELECTRICAL WORKS DOC. NO. : 0

2
(ITP FIELD) DATE : BY CHD APVD
22 Agustus 2020 SGT BR DAY

LEVEL OF RESPONSIBILITY
METHOD OF VERIFYING
No. INSPECTION ACTIVITY/TEST ITEM ACCEPTANCE / PJIT/ REMARKS
INSPECTION DOCUMENT S/C Rekind NR
REFERENCE Migas
- Visual of Initial Record Visual Procedure & Inspection Report M W W -
Engginering spec.
- Check of Initial Charge Record Visual Procedure & Inspection Report M W W -
Engginering spec.
- Check of Initial Discharge Record Visual Procedure & Inspection Report M W W -
Engginering spec.
- Charging test Test Procedure & Inspection Report M W W -
Engginering spec.
- Back up time measurement (normal load) Test Procedure & Inspection Report M W W -
Engginering spec.
(2) Inverter
- Performance Test Test Procedure & Certificated & M W W -
Engginering spec. Inspec.Report
- Sequence and Alarm Test Test Procedure & Inspection Report M W W -
Engginering spec.
- Insulation Resistance Measurement Test Procedure & Inspection Report M W W -
Engginering spec.
- Noise Level Measurement Test Procedure & Inspection Report M W W -
Engginering spec.
(3) Routine Test
- Insulation / H V test Test Procedure & Inspection Report M W W -
Engginering spec.
- internal test report Test Procedure & Inspection Report M W W -
Engginering spec.
(4) Rectifier test Test Procedure & Inspection Report M W W -
Engginering spec.
(5) Simulation of alarms and contacts Test Procedure & Inspection Report M W W -
Engginering spec.
(6) Bypass operation test (bypass mode test) Test Procedure & Inspection Report M W W -
Engginering spec.
JOB NO. : 10 - 1617 REV

INSPECTION AND TEST PLAN FOR ELECTRICAL WORKS DOC. NO. : 0

2
(ITP FIELD) DATE : BY CHD APVD
22 Agustus 2020 SGT BR DAY

LEVEL OF RESPONSIBILITY
METHOD OF VERIFYING
No. INSPECTION ACTIVITY/TEST ITEM ACCEPTANCE / PJIT/ REMARKS
INSPECTION DOCUMENT S/C Rekind NR
REFERENCE Migas
(7) Transfer and retransfer test ( Switch over test ) Test Procedure & Inspection Report M W W -
Engginering spec.
(8) Manual By pass Switch test Test Procedure & Inspection Report M W W -
Engginering spec.
(9) Breaker / switch isolation test Test Procedure & Inspection Report M W W -
Engginering spec.

1.5 LV DISTRIBUTION BOARD AND LIGHTING PANEL


A Preparation
(1) Location /Area Classification Visual IFC Drawing Project Spec. M W W -
(2) Foundation as per Civil Data/ Support accepted Visual IFC Drawing Project Spec. M W W -
(3) Pulling cable accepted Visual IFC Drawing Project Spec. M W W -
(4) Check Name plate and Rating Visual IFC Drawing Project Spec. M W W -
(5) Tools / Equipment Tester Calibration / Engineering Spec. Project Spec. M W W -
Review
Installation
(1) Visual & dimensional Visual IFC Drawing Project Spec. M W W -
(2) Board assembly and bolting Visual IFC Drawing Project Spec. M W W -
(3) Busbars bolted connection Visual IFC Drawing Project Spec. M W W -
(4) Check Fuse and Circuit breaker ratings Visual IFC Drawing Project Spec. M W W -
(5) Contact alignment of draw-out mechanism Visual IFC Drawing Project Spec. M W W -
(6) Cable glands, clamping and installation Visual IFC Drawing Project Spec. M W W -
(7) Tag & wire number Visual IFC Drawing Project Spec. M W W -
(8) Check grounding connections Visual IFC Drawing Project Spec. M W W -
(9) Check termination and wiring number Visual IFC Drawing Project Spec. M W W -

C Testing
(1) Continuity test Test IFC Drawing Project Spec. M W W -
(2) Insulation resistance measurement Test Engineering Spec. Project Spec. M W W -
(3) Phase sequence test Test Engineering Spec. Project Spec. M W W -
(4) Operation test Test Engineering Spec. Project Spec. M W W -

1.6 POWER CONTROL CABLE INSTALLATION


JOB NO. : 10 - 1617 REV

INSPECTION AND TEST PLAN FOR ELECTRICAL WORKS DOC. NO. : 0

2
(ITP FIELD) DATE : BY CHD APVD
22 Agustus 2020 SGT BR DAY

LEVEL OF RESPONSIBILITY
METHOD OF VERIFYING
No. INSPECTION ACTIVITY/TEST ITEM ACCEPTANCE / PJIT/ REMARKS
INSPECTION DOCUMENT S/C Rekind NR
REFERENCE Migas
A Preparation
(1) Location /Area Classification Visual IFC Drawing Project Spec. M W W -
(2) Cable Trench/ Cable Trays accepted Visual IFC Drawing Project Spec. M W W -
(3) Underground conduit accepted Visual IFC Drawing Project Spec. M W W -
(4) Aboveground conduit accepted Visual IFC Drawing Project Spec. M W W -
(5) Tools / Equipment Tester Calibration / Engineering Spec. Project Spec. M W W -
Review

B Installation
(1) Visual inspection during pulling cable Visual IFC Drawing Project Spec. M W W -
(2) Check cable size and installation Visual IFC Drawing Project Spec. M W W -
(3) Check cable route markers Visual IFC Drawing Project Spec. M W W -
(4) Check cable end seal and cable gland Visual IFC Drawing Project Spec. M W W -
(5) Check the cable protection Visual IFC Drawing Project Spec. M W W -
(6) Check underground cable jointing Visual IFC Drawing Project Spec. M W W -
(7) Check cable termination and connection Visual IFC Drawing Project Spec. M W W -
(8) Check grounding connection Visual/ Test IFC Drawing Project Spec. M W W -
(9) Check cable marker Visual IFC Drawing Project Spec. M W W -

C Testing
(1) Continuity test Test IFC Drawing Project Spec. M W W -
(2) Insulation resistance measurement Test Engineering Spec. Project Spec. M W W -
(3) High Voltage test (MV Cable) Test Engineering Spec. Project Spec. M W W -

1.7 GROUNDING SYSTEM


A Preparation
(1) Location /Area Classification Visual IFC Drawing Project Spec. M W W -
(2) Cable Trench/ Excavation accepted Visual IFC Drawing Project Spec. M W W -
(3) Tools / Equipment Tester Calibration / Engineering Spec. Project Spec. M W W -
Review

B Installation
(1) Visual inspection during pulling cable Visual IFC Drawing Project Spec. M W W -
JOB NO. : 10 - 1617 REV

INSPECTION AND TEST PLAN FOR ELECTRICAL WORKS DOC. NO. : 0

2
(ITP FIELD) DATE : BY CHD APVD
22 Agustus 2020 SGT BR DAY

LEVEL OF RESPONSIBILITY
METHOD OF VERIFYING
No. INSPECTION ACTIVITY/TEST ITEM ACCEPTANCE / PJIT/ REMARKS
INSPECTION DOCUMENT S/C Rekind NR
REFERENCE Migas
(2) Check cable size and installation Visual IFC Drawing Project Spec. M W W -
(3) Check underground cable jointing Visual IFC Drawing Project Spec. M W W -
(4) Check construction electrodes Visual IFC Drawing Project Spec. M W W -
(5) Check cable clamp and layout Visual IFC Drawing Project Spec. M W W -
(6) Check protective measurement Visual IFC Drawing Project Spec. M W W -
(7) Check grounding connection Visual IFC Drawing Project Spec. M W W -

C Testing
(1) Grounding continuity test Test IFC Drawing Project Spec. M W W -
(2) Inspect resistance of each electrodes Test Engineering Spec. Project Spec. M W W -
(3) Insulation Resistance Measurement Test Engineering Spec. Project Spec. M W W -

1.8 LIGHTING FIXTURE AND RECEPTACLE


A Preparation
(1) Location /Area Classification Visual IFC Drawing Project Spec. M W W -
(2) Pulling cable accepted Visual IFC Drawing Project Spec. M W W -
(3) Condition of material accepted Visual Engineering Spec. Project Spec. M W W -
(4) Tools / Equipment Tester Calibration / Engineering Spec. Project Spec. M W W -
Review
B Installation
(1) Visual and dimensional Visual IFC Drawing Project Spec. M W W -
(2) Inspect personal safety device Visual IFC Drawing Project Spec. M W W -
(3) Check grounding connection Visual IFC Drawing Project Spec. M W W -
(4) Check lighting fixture c/w accessories Visual IFC Drawing Project Spec. M W W -
(5) Check receptacle c/w accessories Visual IFC Drawing Project Spec. M W W -
(6) Check the mounting system Visual IFC Drawing Project Spec. M W W -

C Testing
(1) Test operation and setting of time switches photoelectric. Setting / Test Engineering Spec. Project Spec. M W W -
JOB NO. : 10 - 1617 REV

INSPECTION AND TEST PLAN FOR ELECTRICAL WORKS DOC. NO. : 0

2
(ITP FIELD) DATE : BY CHD APVD
22 Agustus 2020 SGT BR DAY

LEVEL OF RESPONSIBILITY
METHOD OF VERIFYING
No. INSPECTION ACTIVITY/TEST ITEM ACCEPTANCE / PJIT/ REMARKS
INSPECTION DOCUMENT S/C Rekind NR
REFERENCE Migas
(2) Continuity Test Test IFC Drawing Project Spec. M W W -
(3) Insulation resistance measurement Test Engineering Spec. Project Spec. M W W -
(4) Lighting circuit test Test Engineering Spec. Project Spec. M W W -
(5) Illumination quality check Test Engineering Spec. Project Spec. M W W -
(6) Inspect phase sequence of receptacle Test Engineering Spec. Project Spec. M W W -

1.9 COMMUNICATION EQUIPMENT PAGING, INTERCOM AND TELEPHONE


A Preparation
(1) Location /Area Classification Visual IFC Drawing Project Spec. M W W -
(2) Pulling cable accepted Visual IFC Drawing Project Spec. M W W -
(3) Condition of material accepted Visual Engineering Spec. Project Spec. M W W -
(4) Tools / Equipment Tester Calibration / Engineering Spec. Project Spec. M W W -
Review
B Installation
(1) Visual and dimensional Visual IFC Drawing Project Spec. M W W -
(2) Inspect personal safety device Visual IFC Drawing Project Spec. M W W -
(3) Check board assembly and bolting Visual IFC Drawing Project Spec. M W W -
(4) Check the mounting system Visual IFC Drawing Project Spec. M W W -
(5) Check grounding connection Visual IFC Drawing Project Spec. M W W -
(6) Check termination and wiring number Visual IFC Drawing Project Spec. M W W -

C Testing
(1) Continuity test Test IFC Drawing Project Spec. M W W -
(2) Insulation resistance measurement Test Engineering Spec. Project Spec. M W W -
(3) Operation test Test Engineering Spec. Project Spec. M W W -

1.10 CABLE TRAY


A Preparation
(1) Location /Area Classification Visual IFC Drawing Project Spec. M W W -
(2) Foundation as per Civil Data / Support accepted Visual IFC Drawing Project Spec. M W W -
(3) Check enclosure and safety device Visual IFC Drawing Project Spec. M W W -
(4) Condition and type of material accepted Visual Engineering Spec. Project Spec. M W W -
JOB NO. : 10 - 1617 REV

INSPECTION AND TEST PLAN FOR ELECTRICAL WORKS DOC. NO. : 0

2
(ITP FIELD) DATE : BY CHD APVD
22 Agustus 2020 SGT BR DAY

LEVEL OF RESPONSIBILITY
METHOD OF VERIFYING
No. INSPECTION ACTIVITY/TEST ITEM ACCEPTANCE / PJIT/ REMARKS
INSPECTION DOCUMENT S/C Rekind NR
REFERENCE Migas

B Installation
(1) Visual and dimensional inspection Visual IFC Drawing Project Spec. M W W -
(2) Check support of cable tray Visual IFC Drawing Project Spec. M W W -
(3) Alignment of cable tray Visual IFC Drawing Project Spec. M W W -
(4) Check installation of separator Visual IFC Drawing Project Spec. M W W -
(5) Check tightening bolt & nuts Visual IFC Drawing Project Spec. M W W -
(6) Check grounding connection Visual IFC Drawing Project Spec. M W W -
(7) Check completely of cover with clamp Visual IFC Drawing Project Spec. M W W -

1.11 CONDUIT
A Preparation
(1) Location /Area Classification Visual IFC Drawing Project Spec. M W W -
(2) Support or bracket accepted Visual IFC Drawing Project Spec. M W W -
(3) Check enclosure and safety device Visual IFC Drawing Project Spec. M W W -
(4) Condition and type of material accepted Visual Engineering Spec. Project Spec. M W W -

B Installation
(1) Visual and dimensional Visual IFC Drawing Project Spec. M W W -
(2) Check Support of conduit Visual IFC Drawing Project Spec. M W W -
(3) Alignment of conduit installation Visual IFC Drawing Project Spec. M W W -
(4) Check tightening bolt & nuts Visual IFC Drawing Project Spec. M W W -
(5) Check backfill and compaction of soil or sand ( if underground ) Visual IFC Drawing Project Spec. M W W -
(6) Make sure of conduit's clean and free damages Visual IFC Drawing Project Spec. M W W -
(7) Check bending radius of conduit Visual IFC Drawing Project Spec. M W W -
Doc. No :
Date :

APPLICATION FOR INSPECTION

PT. PERTAMINA (KPB) :


Inspector

Project Title : EPC Lawe-lawe Facilities RDMP RU-V Balikpapan

Gentlement,

We would like to have your presence for inspection according to the following schedules.

Date and time Place / Area Inspection Item Remarks

Result Accepted Rejected

Reinspection Required Yes No

Comments :

SUBCONT CONTRACTOR ( CPPHK) PT .PERTAMINA ( KPB)


Print Name

Signature

Date
Date
QI - E.02
Doc. No Page
of

Job no :
Subject : INSULATION RESISTANCE TEST DATA
Client : Test instrument : A

Equipment No. : Type :


Area/ location : Range :
Temperature : Voltage :
Weather : Serial No. :
Reference Drawing : : Manufacture :
NO. CABLE RATING INSTALLED INSULATION RESISTANCE TEST ( M ohm ) CONCLUSION
NO. VOLTAGE FROM TO R-S R-T S-T R-N S-N T-N R-G S-G T-G N-G ACCEPTED REJECTED

Sub-Contractor Contractor Client


CPPHK PT PERTAMINA (KPB)
Print Name
Signature

Date
Date
QI - E.01.04
Doc. No Page
of

Job :
Subject : INSPECTION FOR CABLE INSTALLATION
Location : Erection by. :
Voltage : Weather :
Conductor Cross section : Temperature :
Cable construction :
Reference drawing :

RESULT ACCEPT
ITEM TO CHECK REMARKS
YES NA DATE SIGNATURE
1 Visual inspection during pulling cable

2 Check cable size and installation

3 Check cable route markers

4 Check cable end seal and cable gland

5 Check the cable protection

6 Check underground cable jointing (if required)

7 Check cable termination and connection

8 Check grounding connection

9 Continuity test

10 Insulation resistance measurement

11
12
13
14
Note : (*) Shop test items, For Field test will be done if required.
Remarks :

Sub-Contractor Contractor Client


CPPHK PT PERTAMINA (KPB)
Print Name

Signature

Date
Date
QI - E.01.06
Doc. No Page
of

Job no :
Subject : INSPECTION OF LIGHTING & RECEPTACLE INSTALLATION
Location/ Type of installation : Erection by. :
Panel board No. and type : Weather :
Feeder cable size : Temperature :
Voltage :
Reference drawing :

RESULT ACCEPT
ITEM TO CHECK REMARKS
YES NA DATE SIGNATURE
1 Visual & dimensional

2 Inspect personal safety device

3 Check grounding connection

4 Check lighting fixture c/w accessories

5 Check receptacle c/w accessories

6 Check the mounting system

7 Test operation and setting of time switches photoelectric

8 Continuity test

9 Insulation resistance measurement

10 Lighting circuit test

11 Illumination quality check

12 Inspect phase sequence of receptacle

13
14
15
Remarks :

Sub-Contractor Contractor Client


CPPHK PT PERTAMINA (KPB)
Print Name

Signature

Date
Date
QI - E.01.12
Doc. No Page
of

Job no :
Subject : INSPECTION OF PAGING, INTERCOM & TELEPHONE SYSTEM
Equipment No. : Erection by. :
Location/ station : Weather :
Tag. No. : Temperature :
Reference Drawing :

RESULT ACCEPT
ITEM TO CHECK REMARKS
YES NA DATE SIGNATURE
1 Visual and dimensional

2 Inspect personal safety device

3 Check board assembly and bolting

4 Check the mounting system

5 Check grounding connection

6 Check termination and wiring number

7 Continuity test

8 Insulation resistance measurement

9 Operation test

10

11

Remarks :

Sub-Contractor Contractor Client


CPPHK PT PERTAMINA (KPB)
Print Name
Signature

Date
Date
QI - E.01.15
Doc. No Page
of

Job no :
Subject : INSPECTION FOR CABLE TRAY INSTALLATION
Location : Erection by. :
Reference drawing : Weather :
Temperature :

RESULT ACCEPT
ITEM TO CHECK REMARKS
YES NA DATE SIGNATURE
1 Visual & dimensional

2 Check support of cable tray accepted

3 Alignment of cable tray correctly

4 Check installation of separator

5 Check tightening bolt & nuts

6 Check grounding connection

7 Check completely of cover with clamp

10

11

Remarks :

Sub-Contractor Contractor Client


CPPHK PT PERTAMINA (KPB)
Print Name

Signature

Date
Date
QI - E.01.16
Doc. No Page
of

Job no :
Subject : INSPECTION FOR ABOVEGROUND CONDUIT INSTALLATION
Location : Erection by. : A

Type of Conduit : Weather :


Reference drawing : Temperature :

RESULT ACCEPT
ITEM TO CHECK REMARKS
YES NA DATE SIGNATURE

1 Visual & dimensional

2 Check support of conduit

3 Alignment of conduit installation

4 Check tightening bolt & nuts

5 Make sure of conduit's clean and free damages

6 Check bending radius of conduit

Remarks :

Sub-Contractor Contractor Client


CPPHK PT PERTAMINA (KPB)
Print Name

Signature

Date
Date
QI - E.01.17
Doc. No Page
of

Job no :
Subject : INSPECTION FOR UNDERGROUND CONDUIT INSTALLATION
Location : Erection by. : A

Type of Conduit : Weather :


Reference drawing : Temperature :

RESULT ACCEPT
ITEM TO CHECK REMARKS
YES NA DATE SIGNATURE

1 Visual & dimensional

2 Alignment of conduit installation

3 Check bending radius of conduit

4 Make sure of conduit's clean and free damages

5 Check backfill and compaction of soil or sand

Note : Underground electrical ducts must be adequately protected during construction.

Sub-Contractor Contractor Client


CPPHK PT PERTAMINA (KPB)
Print Name

Signature

Date
Date
QI - E.01.18
Doc. No Page
of

Job no :
Subject : INSPECTION OF PANEL DISTRIBUTION BOARD & LIGHTING PANEL

Equipment No. : Erection by. :


Location : Weather :
Voltage : Temperature :
Reference Drawing :
RESULT ACCEPT
ITEM TO CHECK REMARKS
YES NA DATE SIGNATURE
1 Visual & dimensional

2 All MCB operational and correct rating.

3 All fuses correct rating.

4 All terminal wiring completed and secure.

5 All cables connected and glanded correctly.

6 Earthing connected and correct.

7 All terminations secured.

8 All internal equipment labeled correctly.

9 Cable tags labeled correctly.

10 Installation Accepted.

11 Insulation Resistance measurement

12 Test anti-condensation heater

13 Phase sequence test

14 Inspect interlock & control correctly operate

15 Test indicating and signaling lamps or devices

16 Operation / Function test

17
18
19
20
Note : (*) Shop test items, for Field test will be done if required.

Sub-Contractor Contractor Client


CPPHK PT PERTAMINA (KPB)
Print Name
Signature

Date
Date
QI - E.06
Doc. No Page
of

Project no :
Subject : ELECTRICAL CONTINUITY TEST DATA
Client Test Instrument A
Location : Type :
Reference Drawing : Range :
Temperature : Serial No. :
Weather : Manufacture :

CABLE WIRE DESCRIPTION CABLE CONTINUITY


NO. NO. FROM TO SPEC. ACCEPTED REJECTED

REMARKS :

Sub-Contractor Contractor Client


Print Name CPPHK PT.PERTAMINA (KPB)
Signature

Date
Date
QI - E.10
Doc. No Page
of
Project no :
Subject : LIGHTING CIRCUIT TEST DATA
Client : Voltage : A

Equipment : Temperature :
Location : Weather :
Reference Drawing :

BRANCH CIRCUIT
PANEL NO. RESULT REMARKS
CIRCUIT NO. VOLTAGE

REMARKS :

Sub-Contractor Contractor Client


Print Name CPPHK PT.PERTAMINA (KPB)

Signature

Date
Date
QI - E.18
Doc. No Page
of

Project no : 10-1617
Subject : ILLUMINATION LEVEL MEASUREMENT DATA
Client : Test Intrument A

Battery type : Type :


Location : Range :
Reference Drawing : Serial No. :
Manufacture :

MEASUREMENT HEIGHT FROM ILLUMINATION STANDARD JUDGEMENT


NO.
POSITION GROUND LEVEL ( Lux ) ILLUMINATION (Lux) (Accepted/ Rejected)

REMARKS :

Sub-Contractor Contractor Client


Print Name CPPHK PT.PERTAMINA(KPB)
Signature

Date
Date
QI - E.20
Doc. No Page
of

Project no : 10-1617
Subject : CHECK LIST FOR UNDERGROUND CABLE LAYING
Description of Items accepted : A

Location :
Reference Drawing :
RED CABLE
1st SAND CABLE 2nd SAND 3rd SAND BACK CABLE ROUTE
EXCAVATION CONCRETE WARNING/
FILLING LAYING FILLING FILLING FILLING MARKER BLOCK
COVER PROTECTION
NOTE

DATE

CHECK MARKS

REMARKS :

PT Rekayasa Industri CONTRACTOR CLIENT


Print Name CPPHK PERTAMINA (KPB)
Signature
Date