Scope Management PMP Questions
Scope Management PMP Questions
Questions
B. The work performed to deliver a product, service, or result with the specified features
and functions
2. You are a new project manager that is replacing a previous project manager. You want to
know more about the scope baseline of the project. Which three documents will be most
useful to you?
3. You as the project manager are in the planning phase of your project. In order to collect
all of the scope requirements, you want to use a systematic approach to evaluate and rank
many ideas that are generated by your team. Which group creativity technique should you
use?
A. Brainstorming
B. Idea/mind mapping
C. Facilitated workshops
statement?
C. Acceptance criteria
D. Project deliverables
decomposition of all of the work to be carried by the project team to accomplish the project
and create the required documents. What is wrong with this team member’s statement?
A. Program manager
B. Project manager
A. Variance analysis
B. Inspection
C. Expert judgment
D. Product analysis
8. During project executing, a team member comes to project manager because he is not
sure of what work needs to be accomplished on the project. Which of the following
A. WBS dictionary.
B. Activity List.
9. During a meeting with some of the project stakeholders, the project manager is asked to
add work to the project scope. The project manager had access to correspondence about
the project before the project charter was signed and remembers that the project sponsor
specifically denied funding for the scope mentioned by the stakeholders’. The BEST thing for
10. The Work Breakdown Structure can BEST be thought of as an effective aid for
__________ communications.
A. Team
B. Project manager
C. Customer
D. Stakeholder
11. Which of the following is the KEY output of Verify Scope process?
12. A detailed project schedule can be created only after creating the:
A. Project budget.
13. All the below are inputs to Define Scope process EXCEPT:
A. Project Charter
B. Requirements Document
A. Collect requirements
B. Define Scope
C. Create WBS
15. Which of the following can be BEST described as a characteristic of Work Package?
B. Can be scheduled
A. Define Scope
B. Create WBS
C. Validate Scope
D. Control Scope
18. Validate Scope defines a process that:
A. Allows the customer to verify what was built against the requirements
D. Verifies the scope management plan is aligned with the project management plan
A. Breaking down the work into increments of less than 40 hours each
D. Senior management