04-4 Deep Foundations
04-4 Deep Foundations
nt
4.2.1 Scope 10
4.2.2 References 11
la
4.2.3 Submittals 11
tP
4.2.4 Quality Assurance 11
4.2.5 Tolerances in Pile Dimensions 11
al
4.2.6 Handling, Transportation, Storage and Acceptance of Piles 12
4.2.7 Materials and components 12
ph
4.3.1 Scope 15
ze
4.3.2 References 16
4.3.3 Quality Assurance 16
Ja
4.3.4 Materials 16
4.3.5 Boring 17
4.3.6 Extraction of casing 19
Al
nt
4.7 MICROPILES (TO BE ADDED LATER) ................................................................. 33
4.8 REDUCTION OF FRICTION ON PILES ................................................................ 33
la
4.8.1 Scope 33
tP
4.8.2 Submittals 33
4.8.3 Friction Reducing Methods 33
al
4.8.4 Inspection 34
ph
4.8.5 Driving resistance 35
4.9 PILE LOAD TESTING ........................................................................................... 35
As
nt
la
tP
al
ph
As
a
er
ze
Ja
Al
QCS 2014 Section 04: Foundations and Retaining Structures Page 4
Part 04: Deep Foundations
4 DEEP FOUNDATIONS
4.1.1 General
1 The provisions of this Part apply to end-bearing piles, friction piles, tension piles and
transversely loaded piles installed by driving, by jacking, and by screwing or boring with or
without grouting.
1 The following limit states shall be considered and an appropriate list shall be compiled:
nt
(b) bearing resistance failure of the pile foundation;
la
(c) Uplift or insufficient tensile resistance of the pile foundation;
tP
(d) Failure in the ground due to transverse loading of the pile foundation;
(e) Structural failure of the pile in compression, tension, bending, buckling or shear;
al
(f) combined failure in the ground and in the pile foundation;
ph
1 Scope
Ja
(a) This Part applies to precast concrete driven piles usually supplied for use in a single
length without facility for joining lengths together.
Al
2 References
3 Submittals
(a) The Contractor shall order the piles to suit the construction programme and seek the
Engineer's approval before placing the order. When preliminary piles are specified,
the approval of the piles for the main work will not necessarily be given until the results
of the driving and loading tests on preliminary piles have been received and evaluated.
QCS 2014 Section 04: Foundations and Retaining Structures Page 5
Part 04: Deep Foundations
4 Quality Assurance
(a) After a pile has been cast, the date of casting, reference number, length and, where
appropriate, the prestressing force shall be clearly inscribed on the top surface of the
pile and also clearly and indelibly marked on the head of the pile. Lifting positions shall
be marked at the proper locations on each pile.
(a) The cross-sectional dimensions of the pile shall be not less than those specified and
shall not exceed them by more than 6 mm. Each face of a pile shall not deviate by
more than 6 mm from any straight line 3 m long joining two points on that face, nor
shall the centre of area of the pile at any cross section along its length deviate by more
than 1/500 of the pile length from a line joining the centres of area at the ends of the
pile. Where a pile is less than 3 m long, the permitted deviation from straightness shall
nt
be reduced below 6 mm on a pro rata basis in accordance with actual length.
la
6 Handling, Transportation and Storage of Piles
tP
(a) The method and sequence of lifting, handling, and storage of piles transporting and
storing piles shall be such as to avoid shock loading and to ensure that the piles are
al
not damaged. Only the designated lifting and support points shall be used. During
transport and storage, piles shall be appropriately supported under the marked lifting
ph
(b) All piles within a stack shall be in groups of the same length. Packing of uniform
thickness shall be provided between piles at the lifting points.
(c) Concrete shall at no time be subjected to loading, including its own weight, which will
a
induce a compressive stress in it exceeding 0.33 of its strength at the time of loading
er
or of the specified strength, whichever is the lesser. For this purpose the assessment
of the strength of the concrete and of the stresses produced by the loads shall be
ze
(d) Pile may be rejected when the width of any transverse crack exceeds 0.3 mm. The
measurement shall be made with the pile in its working attitude.
Al
(a) In the manufacture of precast concrete piles, fabricated steel components shall comply
with BS 7613 grades 43A or 50B, cast steel components with BS 3100 grade A, and
ductile iron components with BS 2789.
2 Pile Toes
(a) Pile toes shall be constructed so as to ensure that damage is not caused to the pile
during installation. Where positional fixity is required on an inclined rock surface or in
other circumstances, an approved shoe may be required.
(a) The head of each pile shall be so reinforced or banded as to prevent bursting of the
pile under driving conditions.
QCS 2014 Section 04: Foundations and Retaining Structures Page 6
Part 04: Deep Foundations
4 Main Reinforcement
(a) The main longitudinal reinforcing bars in piles not exceeding 12 m in length shall be in
one continuous length unless otherwise specified. In piles more than 12 m long, lap
splicing will be permitted in main longitudinal bars at 12 m nominal intervals, with no
more than 25 % of the bars lapped at one location, and laps staggered by a minimum
of 1.2 m. Laps in reinforcement shall be such that the full strength of the bar is
effective across the joint.
(b) Lap or splice joints shall be provided with sufficient link bars to resist eccentric forces.
(c) Sufficient reinforcement shall be provided for lifting and handling purposes.
5 Concrete
(a) Unless otherwise agreed by the Engineer, concrete shall be compacted with the
nt
assistance of vibrators. Internal vibrators shall be capable of producing not less than
la
150 Hz and external vibrators not less than 50 Hz. Internal vibrators shall operate not
closer than 75 mm to shuttering.
(b)
tP
Vibrators shall be operated in such a manner that neither segregation of the concrete
al
mix constituents nor displacement of reinforcement occurs.
ph
(c) Immediately after compaction, concrete shall he adequately protected from the harmful
effects of the weather, including wind, rain, rapid temperature changes and frost. It
shall be protected from drying out by an approved method of curing.
As
(d) Piles shall not be removed from formwork until a sufficient pile concrete strength has
been achieved to allow the pile to be handled without damage.
a
er
(e) The period of curing at an ambient temperature of 10 °C shall not be less than that
shown in Table 4.1. If the temperature is greater or less than 10 °C, the periods given
ze
(f) When steam or accelerated curing is used the curing procedure shall be approved.
Four hours must elapse from the completion of placing concrete before the
temperature is raised. The rise in temperature within any period of 30 min shall not
Al
exceed 10 °C and the maximum temperature attained shall not exceed 70 °C. The rate
of subsequent cooling shall not exceed the rate of heating.
Table 4.1
Period of Curing at 10 °C
Wet curing time after
Type of cement
completion of placing concrete, d
Ordinary Portland 4
Sulphate-resisting Portland 4
Portland blast-furnace 4
Super-sulphated 4
Rapid-hardening Portland 3
QCS 2014 Section 04: Foundations and Retaining Structures Page 7
Part 04: Deep Foundations
6 Formwork
(a) shaped point or shoe, then the end of the pile shall be symmetrical about the
longitudinal axis of the pile. Holes for handling or pitching, where provided in the pile,
shall be lined with steel tubes; alternatively, approved inserts may be cast in.
(b) Formwork shall be robust, clean and so constructed as to prevent loss of grout or
aggregate from the wet concrete and ensure the production of uniform pile sections,
free from defects. The piles are to be removed from the formwork carefully so as to
prevent damage.
4.1.5 Prestressing
1 General
(a) Tensioning shall be carried out only when the Engineer is present, unless otherwise
approved. In cases where piles are manufactured off site, the Contractor shall ensure
nt
that the Engineer is given adequate notice and every facility for inspecting the
manufacturing process.
la
(b) Prestressing operations shall be carried out only under the direction of an experienced
tP
and competent supervisor. All personnel operating the stressing equipment shall have
been trained in its use. al
(c) The calculated extensions and total forces, including allowance for losses, shall be
agreed with the Engineer before stressing is commenced.
ph
(d) Stressing of tendons and transfer of prestress shall be carried out at a gradual and
steady rate. The force in the tendons shall be obtained from readings on a recently
As
calibrated load cell or pressure gauge incorporated in the equipment. The extension of
the tendons under the agreed total forces shall be within 5 % of the agreed calculated
extension.
a
er
2 Concrete Strength
(a) The Contractor shall cast sufficient cubes, cured in the same manner as the piles, to
ze
be able to demonstrate by testing two cubes at a time, with approved intervals between
pairs of cubes, that the specified transfer strength of the concrete has been reached.
Ja
(b) Unless otherwise permitted, concrete shall not be stressed until two test cubes attain
the specified transfer strength.
Al
3 Post-Tensioned Piles
(a) Ducts and vents in post-tensioned piles shall be grouted after the transfer of prestress.
4 Grouting Procedure
(a) Grout shall be mixed for a minimum of 2 min and until a uniform consistency is
obtained.
(b) Ducts shall not be grouted when the air temperature in the shade is lower than 3 °C.
(c) Before grouting is started all ducts shall be thoroughly cleaned by means of
compressed air.
(d) Grout shall be injected near the lowest point in the duct in one continuous operation
and allowed to flow from the outlet until the consistency is equivalent to that of the
grout being injected.
(e) Vents in ducts shall be provided in accordance with Clause 8.9.2 of BS 8110.
QCS 2014 Section 04: Foundations and Retaining Structures Page 8
Part 04: Deep Foundations
5 Grout
6 Records
(a) The Contractor shall keep detailed records of times of tensioning, measured
nt
extensions, pressure gauge readings or load cell readings and the amount of pull-in at
la
each anchorage. Copies of these records shall be supplied to the Engineer within
such reasonable time from completion of each tensioning operation as may be
tP
required, and in any case not later than noon on the following working day.
(b) The Contractor shall keep records of grouting, including the date, the proportions of
al
the grout and any admixtures used, the pressure, details of interruption and topping up
ph
required. Copies of these records shall be supplied to the Engineer within such
reasonable time after completion of each grouting operation as may be required, and
in any case not later than noon on the following working day.
As
1 Strength of Piles
er
(a) Piles shall not be driven until the concrete has achieved the specified strength.
ze
(a) At all stages during driving and until incorporation into the substructure, the pile shall
be adequately supported and restrained by means of leaders, trestles, temporary
supports or other guide arrangements to maintain position and alignment and to
Al
prevent buckling. These arrangements shall be such that damage to the pile does not
occur.
(a) The Contractor shall satisfy the Engineer regarding the suitability, efficiency and
energy of the driving equipment. Where designated, dynamic evaluation and analysis
shall be provided.
(b) Where a drop hammer is used, the mass of the hammer shall be at least half that of
the pile unless otherwise approved by the Engineer. For other types of hammer the
energy delivered to the pile per blow shall be at least equivalent to that of a drop
hammer of the stated mass. Drop hammers shall not be used from floating craft in
such a manner as to cause instability of the craft or damage to the pile.
4 Length of Piles
(a) The length of pile to be driven in any location shall be approved prior to the
commencement of driving.
QCS 2014 Section 04: Foundations and Retaining Structures Page 9
Part 04: Deep Foundations
(a) The driving of each pile shall be continuous until the specified depth or resistance
(set), or both, has been reached. In the event of unavoidable interruption to driving,
the pile will be accepted provided it can subsequently be driven to the specified depth
or resistance (set), or both, without damage. A follower shall not be used unless
approved, in which case the Engineer will require the set where applicable to be
revised in order to take into account reduction in the effectiveness of the hammer blow.
(b) The Contractor shall inform the Engineer without delay if an unexpected change in
driving characteristics is noted. A detailed record of the driving resistance over the full
length of the nearest available pile shall be taken if required.
(c) At the start of the work in a new area or section, a detailed driving record shall be
made over the full length of the first pile and during the last 3 m of subsequent piles
until consistency of behaviour is established. Where required, detailed driving records
nt
shall also be made for 5 % of the piles driven, the locations of such piles being
specified by the Engineer.
la
(d) The Contractor shall give adequate notice and provide all necessary facilities to enable
tP
the Engineer to check driving resistance. A set or resistance measurement shall be
taken only in the presence of the Engineer unless otherwise approved.
al
(e) Redrive checks, if required, shall be carried out to an approved procedure.
ph
6 Final Set
As
(a) When driving to a set criterion, the final set of each pile shall be recorded either as the
penetration in millimetres per 10 blows or as the number of blows required to produce
a penetration of 25 mm.
a
(b) When a final set is being measured, the following requirements shall be met:
er
(i) The exposed part of the pile shall be in good condition without damage or
ze
distortion.
Ja
(ii) The helmet, dolly and any packing shall be in sound condition.
(iii) The hammer blow shall be in line with the pile axis and the impact surfaces shall
be flat and at right angles to the pile and hammer axis, and the head of the pile
Al
7 Preboring
(a) If preboring is specified, the diameter and depth of prebore shall be as designated.
8 Jetting
(a) Jetting shall be carried out only when the Contractor's detailed proposals have been
approved.
QCS 2014 Section 04: Foundations and Retaining Structures Page 10
Part 04: Deep Foundations
(a) Piles shall be driven in an approved sequence to minimise the detrimental effects of
heave and lateral displacement of the ground.
(b) When required, levels and measurements shall be taken to determine the movement
of the ground or of any pile resulting from the driving process.
(c) When a pile has risen as a result of adjacent piles being driven, the Engineer may call
for redriving or other testing to demonstrate that the performance of the pile is
unimpaired. If required, the Contractor shall make proposals for correcting
detrimentally affected piles and for avoidance or control of heave effects in subsequent
work.
nt
(a) If it is necessary to repair the head of a pile during driving, the Contractor shall carry
la
out such repair in an approved way which allows the pile-driving to be completed
without further damage. If the driving of a pile has been accepted but sound concrete
tP
of the pile is below the required cut-off level, the pile shall be made good to the cut-off
level, using an approved method so that it will safely withstand the imposed design
al
load.
ph
(a) Any provision for lengthening piles incorporated at the time of manufacture shall be as
designed or approved.
(b) If no provision for lengthening piles was incorporated at the time of manufacture, any
a
method for lengthening shall be such that splices are capable of safely resisting the
er
stresses during driving and under service load and shall be subject to approval.
ze
(a) Repaired or lengthened piles shall not be driven until the added concrete has reached
Ja
1 Unless otherwise directed by the Engineer, when the driving of a pile has been approved the
concrete of the head of the pile shall be cut off to the designated level. The length of splice
reinforcing bars projecting above this level shall be as designated.
2 Care shall be taken to avoid shattering or otherwise damaging the rest of the pile. Any
cracked or defective concrete shall be cut away and the pile repaired in an approved manner
to provide a full and sound section at the cut-off level.
4.2.1 Scope
1 This Part applies to piles made of elements cast at a precasting works away from the site,
where work cannot normally be closely supervised by the Engineer. The elements are joined
together as necessary on site during driving using special proven steel joints incorporated
into the pile elements when cast.
QCS 2014 Section 04: Foundations and Retaining Structures Page 11
Part 04: Deep Foundations
This Section
Part 1, .............. General Requirements for Piling Works
Part 2, .............. Concrete Works for Piling
Section 5, Concrete.
4.2.2 References
nt
BS 8110,.....................Structural use of concrete.
la
4.2.3 Submittals
tP
1 The Contractor shall order the piles to suit the construction programme and seek the
Engineer's approval before placing the order. When preliminary piles are specified the
al
approval for the piles for the main work will not necessarily be given until the results of the
driving and tests on preliminary piles have been received and evaluated.
ph
1 A certificate of quality from the pile manufacturer shall be provided to the Engineer when
required stating that the designated requirements have been fulfilled during manufacture.
a
er
2 Each pile element shall be marked in such a manner that it can be identified with the records
of manufacture, which shall state the date of casting, the cement type, concrete grade,
ze
element length and any other relevant data. On delivery, the pile elements shall be
accompanied by records of manufacture.
Ja
1 The cross-sectional dimensions of the pile shall be not less than those designated.
2 The head of a pile element or the end of the pile upon which the hammer acts shall be
square to the pile axis within a tolerance of 1 in 50.
3 Each pile joint shall be square to the axis of the pile within a tolerance of 1 in 150. The
centroid of the pile joint shall lie within 5 mm of the true axis of the pile element.
4 Each face of a pile element shall not deviate by more than 6 mm from any straight line 3 m
long joining two points on that face, nor shall the centre of area of the pile at any cross-
section along its length deviate by more than 1/500 of the pile length from a line joining the
centres of area at the ends of the element. Where a pile element is less than 3 m long the
permitted deviation from straightness shall be reduced below 6 mm on a pro rata basis in
accordance with actual length.
QCS 2014 Section 04: Foundations and Retaining Structures Page 12
Part 04: Deep Foundations
1 The method and sequence of lifting, handling, transporting and storing piles shall be such as
to avoid shock loading and to ensure that the piles are not damaged. Only designed lifting
and support points shall be used. During transport and storage, piles shall be appropriately
supported under the marked lifting points or fully supported along their length.
2 All pile elements within a stack shall be in groups of the same length. Packing of uniform
thickness shall be provided between piles at the lifting points.
3 Concrete shall at no time be subjected to loading, including its own weight, which will induce
a compressive stress in it exceeding 0.33 of its strength at the time of loading or of the
specified strength, whichever is the less. For this purpose the assessment of the strength of
the concrete and of the stresses produced by the loads shall be subject to the approval of the
Engineer.
nt
4 A pile element shall be rejected when the width of any transverse crack exceeds 0.3 mm.
la
The measurement shall be made with the pile in its working attitude.
tP
4.2.7 Materials and components
al
1 Fabricated Steel Components
ph
(a) In the manufacture of jointed precast concrete segmental piles, fabricated steel
components shall comply with BS 7613 grades 43A or 50A, cast steel components
As
2 Pile Splices
a
(a) The splice joints shall be close-fitting face to face and the locking method shall be
er
such as to hold the faces in intimate contact. The design and manufacture of the
splicing system shall be approved by the Engineer prior to the commencement of the
ze
Contract.
Ja
(b) A spliced pile shall be capable of withstanding the same driving stresses or service
axial loads, moments and shear stresses as a single unspliced pile of the same cross-
sectional dimensions and materials.
Al
(c) The welding of a joint to main reinforcement in lieu of a lapped connection with
projecting bars affixed to the joint will not be permitted.
3 Pile Toes
(a) Pile toes shall be constructed so as to ensure that damage is not caused to the pile
during installation. Where fixity is required or socketing into rock, or in other
circumstances, an approved shoe may be required.
(a) Where the pile head is not furnished with a joint, it shall be so reinforced or banded as
to prevent bursting of the pile under driving conditions.
5 Main Reinforcement
(a) The main longitudinal reinforcing bars shall be in one continuous length. Splicing of
bars will not be permitted except at element ends.
QCS 2014 Section 04: Foundations and Retaining Structures Page 13
Part 04: Deep Foundations
(b) Concrete cover to steel reinforcement shall be in accordance with the requirements of
BS 8110.
(c) In very aggressive ground or exposure conditions, cover greater than 25 mm may be
required, but alternative protection methods may be approved.
6 Formwork
(a) If a pile is constructed with a shaped point or shoe, then the end of the pile shall be
symmetrical about the longitudinal axis of the pile.
(b) Holes for handling or pitching, where provided in the pile, shall be lined with steel
tubes; alternatively, approved inserts may be cast in.
(c) Formwork shall be robust, clean and so constructed as to prevent loss of grout or
aggregate from the wet concrete and ensure the production of uniform pile sections.
The piles are to be removed from the formwork carefully so as to prevent damage.
nt
4.2.8 Driving piles
la
1 Strength of Piles
tP
(a) Piles shall not be driven until the concrete has achieved the specified characteristic
strength.
al
2 Leaders and Trestles
ph
(a) At all stages during driving and until incorporation into the substructure, the pile shall
As
occur.
er
(a) The Contractor shall satisfy the Engineer regarding the suitability, efficiency and
Ja
the pile at the moment of driving unless otherwise approved by the Engineer. For
other types of hammer, the energy delivered to the pile per blow shall be at least
equivalent to that of a drop hammer of the stated mass. Drop hammers shall not be
used from floating craft in such a manner as to cause instability of the craft or damage
to the pile.
4 Length of Piles
(a) The length of pile supplied to be driven in any location and any additional lengths to be
added during driving shall he approved prior to the commencement of pile-driving.
During the execution of the Works, any changes to the supplied lengths shall be
approved.
QCS 2014 Section 04: Foundations and Retaining Structures Page 14
Part 04: Deep Foundations
(a) Except when making field splices, the driving of each pile shall he continuous until the
specified depth or resistance (set), or both, has been reached. In the event of
unavoidable interruption to driving, the pile will be accepted provided it can
subsequently be driven to the specified depth or resistance (set), or both, without
damage. A follower shall only be used when approved, in which case the Engineer will
require the set where applicable to be revised in order to take into account reduction in
the effectiveness of the hammer blow.
(b) The Contractor shall inform the Engineer without delay if an unexpected change in
driving characteristics is noted. A detailed record of the driving resistance over the full
length of the nearest available pile shall be taken if required.
(c) At the start of the work in a new area or section a detailed driving record shall be made
over the full length of the first pile and during the last 3 m of subsequent piles until
consistency of behaviour is established. Where required, detailed driving records shall
nt
also be made for 5 % of the piles driven, the positions of such piles being specified by
la
the Engineer.
tP
(d) The Contractor shall give adequate notice and provide all necessary facilities to enable
the Engineer to check driving resistance. A set or resistance measurement shall be
taken only in the presence of the Engineer unless otherwise approved.
al
(e) Redrive checks, if required, shall be carried out to an approved procedure.
ph
6 Final Set
As
(a) When driving to a set criterion, the final set of each pile shall be recorded either as the
penetration in millimetres per ten blows or as the number of blows required to produce
a penetration of 25 mm.
a
er
(b) When a final set is being measured, the following requirements shall be met:
ze
(i) The exposed part of the pile shall be in good condition, without damage or
distortion.
Ja
(ii) The helmet, dolly and any packing shall be in sound condition.
(iii) The hammer blow shall be in line with the pile axis and the impact surfaces shall
Al
7 Preboring
(a) If preboring is specified, the diameter and depth of prebore shall be as designated.
8 Jetting
(a) Jetting shall be carried out only when the Contractor's detailed proposals have been
approved.
(a) Piles shall be driven in an approved sequence to minimise the detrimental effects of
heave and lateral displacement of the ground.
QCS 2014 Section 04: Foundations and Retaining Structures Page 15
Part 04: Deep Foundations
(b) When required, levels and measurements shall be taken to determine the movement
of the ground or of any pile resulting from the driving process.
(c) When a pile has risen as a result of adjacent piles being driven, the Engineer may call
for redriving or other testing to demonstrate that the performance of the pile is
unimpaired. If required, the Contractor shall make proposals for correcting piles
detrimentally affected and for avoidance or control of heave effects in subsequent
work.
(a) If it is necessary to repair the head of a pile during driving, the Contractor shall carry
out such repair in an approved way which allows the driving of the pile to be completed
without further damage. If the driving of a pile has been accepted but sound concrete
of the pile is below the required cut-off level, the pile shall be made good to the cut-off
nt
level, using an approved method so that it will safely withstand the imposed design
la
load.
tP
2 Lengthening of Piles
(a) Where piles are required to be driven to depths exceeding those expected, leaving
al
insufficient projection for bonding into the following works, the piles shall be extended
ph
or replaced as required by the Engineer using approved materials and methods.
1 Unless otherwise specified, when the driving of a pile has been approved the concrete of the
head of the pile shall be cut off to the designated level. The length of splice reinforcing bars
a
2 Care shall be taken to avoid shattering or otherwise damaging the rest of the pile. Any
cracked or defective concrete shall be cut away and the pile repaired in an approved manner
to provide a full and sound section at the cut-off level.
Ja
4.3.1 Scope
1 This Part applies to bored piles in which the pile bore is excavated by rotary or percussive
means, or both, using short augers, buckets, grabs or other boring tools to advance the open
bore. Where the open bore is unstable, temporary or permanent casing or bentonite
suspension may be used to support the wall of the bore prior to concreting.
This Section
Part 1, .............. General Requirements for Piling Works
Part 2, .............. Concrete Works for Piling
4.3.2 References
1 Inspection
(a) Each pile bore which does not contain standing water or drilling fluid shall be inspected
directly or indirectly prior to concrete being placed in it. This inspection shall be carried
out from the ground surface in the case of piles of less than 750 mm diameter.
Torches or other approved means of lighting, measuring tapes, and a means of
nt
measuring verticality shall be provided. For piles of 750 mm diameter or larger,
equipment shall be provided, by the Contractor to enable his representatives and the
la
Engineer to descend into the bore for the purpose of inspection. Any method of
descent and the equipment used shall comply with the requirements of BS 5573.
concrete is placed. Large debris and accumulated sediment shall be removed using
appropriate approved methods, which shall be designed to clean while at the same
time minimising ground disturbance below the pile bases. Water or drilling fluid shall
a
be maintained at such levels throughout and following the cleaning operation that
er
(a) If required in the Contract, soil, rock or groundwater samples shall be taken or soil
Ja
tests carried out in-situ while the pile is being bored. The samples shall be taken to an
approved laboratory for testing as specified.
Al
(b) The taking of samples and all subsequent handling, transporting and testing shall be
carried out in accordance with Section 3, Ground Investigation.
4.3.4 Materials
1 Permanent Casings
(a) A certificate shall be obtained by the Contractor from the manufacturer of the bentonite
powder showing the properties of each consignment delivered to the Site. This
certificate shall be made available to the Engineer on request. The properties to be
given by the manufacturer are the apparent viscosity range (in Pascal seconds) and
the gel strength range (in Pascal) for solids in water.
QCS 2014 Section 04: Foundations and Retaining Structures Page 17
Part 04: Deep Foundations
(a) Bentonite shall be mixed thoroughly with clean fresh water to make a suspension
which will maintain the stability of the pile bore for the period necessary to place
concrete and complete construction. The temperature of the water used in mixing the
bentonite suspension, and of the suspension when supplied to the borehole, shall be
not lower than 5 C.
(b) Where saline or chemically contaminated groundwater occurs, special precautions
shall be taken to modify the bentonite suspension or prehydrate the bentonite in fresh
water so as to render it suitable in all respects for the construction of piles.
(a) The frequency of testing drilling fluid and the method and procedure of sampling shall
be proposed by the Contractor for approval prior to the commencement of the work.
The frequency may subsequently be varied as required, depending on the consistency
of the results obtained, subject to approval.
nt
(b) Control tests shall be carried out on the bentonite suspension, using suitable
apparatus. The density of freshly mixed bentonite suspension shall be measured daily
la
as a check on the quality of the suspension being formed. The measuring device shall
be calibrated to read to within 0.005 g/ml. Tests to determine density, viscosity, shear
tP
strength and pH value shall be applied to bentonite supplied to the pile bore. For
average soil conditions the results shall generally be within the ranges in Table 4.2.
al
Table 4.2.Tests on Bentonite
ph
Viscosity or
less than 0.020 Pa • s
er
Fann viscometer*
1.4-10 Pa Shear meter
Shear strength
ze
Or
(10 minute gel strength)
4-40 Pa Fann viscometer
Ja
* Where the Fann viscometer is specified, the fluid sample should be screened by a
number 52 sieve (300 m) prior to testing.
(c) The tests shall be carried out until a consistent working pattern has been established
account being taken of the mixing process, any blending of freshly mixed bentonite
suspension and previously used bentonite suspension, and any process which may be
used to remove impurities from previously used bentonite suspension. When the
results show consistent behaviour, the tests for shear strength and pH value may be
discontinued, and tests to determine density and viscosity shall be carried out as
agreed with the Engineer. In the event of a change in the established working pattern,
tests for shear strength and pH value shall be reintroduced for a period if required.
4.3.5 Boring
(a) Piles shall not be bored so close to other recently completed piles as to damage them.
QCS 2014 Section 04: Foundations and Retaining Structures Page 18
Part 04: Deep Foundations
2 Temporary Casings
(a) Temporary casing of approved quality or an approved alternative method shall be used
to maintain the stability of a pile bore which might otherwise collapse.
(b) Temporary casings shall be free from significant distortion. They shall be of uniform
cross-section throughout each continuous length. During concreting they shall be free
from internal projections and encrusted concrete which might adversely affect the
proper formation of piles.
(c) The use of a vibrator to insert and withdraw temporary casing may be permitted by the
Engineer subject to compliance with Noise and Disturbance and Damage to Adjacent
Structures of this section and to the method not causing disturbance of the ground
which would adversely affect the construction or the capacity of piles.
(d) Where piles are bored under water or bentonite suspension in an unlined state, the
insertion of a full-length loosely fitting casing to the bottom of the bore prior to placing
nt
concrete will not be permitted.
(e) Where permanent casing is specified to ensure the integrity of a pile, the Contractor
la
shall submit for approval his proposals regarding the method of installation.
tP
3 Stability of Pile al
(a) Where boring takes place through unstable water-bearing strata, the process of
excavation and the depth of temporary casing employed shall be such that soil from
ph
outside the area of the pile is not drawn into the pile section and cavities are not
created outside the temporary casing as it is advanced.
As
(b) Where the use of drilling fluid is specified or approved for maintaining the stability of a
bore, an adequate temporary casing shall be used in conjunction with the method so
a
as to ensure stability of the strata near ground level until concrete has been placed.
er
During construction the level of drilling fluid in the pile excavation shall be maintained
within the cased or stable bore so that it is not less than 1.0 m above the level of
ze
(c) In the event of a rapid loss of drilling fluid from a pile excavation, the bore shall be
backfilled without delay and the instructions of the Engineer shall be obtained before
boring at that location is resumed.
Al
(a) All reasonable steps shall be taken to prevent the spillage of bentonite suspension on
the Site in areas outside the immediate vicinity of boring. Discarded bentonite shall be
removed from the Site without undue delay. Any disposal of bentonite shall comply
with the regulations of the local controlling authority.
(a) Pumping from pile bores shall not be permitted unless the bore has been sealed
against further water entry by casing or unless the soil is stable and will allow pumping
to take place without ground disturbance below or around the pile.
6 Continuity of Construction
(a) For a pile constructed in a stable cohesive soil without the use of temporary casing or
other form of support, the pile shall be bored and the concrete shall be placed without
such delay as would lead to significant impairment of the soil strength.
QCS 2014 Section 04: Foundations and Retaining Structures Page 19
Part 04: Deep Foundations
(a) A mechanically formed enlarged base shall be no smaller than the dimensions
specified and shall be concentric with the pile shaft to within a tolerance of 10 % of the
shaft diameter. The sloping surface of the frustum forming the enlargement shall make
an angle to the axis of the pile of not more than 35 .
1 Workability of Concrete
(a) Temporary casings shall be extracted while the concrete within them remains
sufficiently workable to ensure that the concrete is not lifted. During extraction the
motion of the casing shall be maintained in an axial direction relative to the pile.
2 Concrete Level
nt
(a) When the casing is being extracted, a sufficient quantity of concrete shall be
maintained within it to ensure that pressure from external water, drilling fluid or soil is
la
exceeded and that the pile is neither reduced in section nor contaminated.
tP
(b) The concrete level within a temporary casing shall be topped up where necessary
during the course of casing extraction in such a way that the base of the casing is
al
always below the concrete surface until the casting of the pile has been completed.
ph
(c) Adequate precautions shall be taken in all cases where excess heads of water or
drilling fluid could occur as the casing is withdrawn because of the displacement of
As
water or fluid by the concrete as it flows into its final position against the walls of the
pile bore. Where two or more discontinuous lengths of casing (double casing) are
used in the construction the proposed method of working shall be approved.
a
er
(a) For piles cast in dry bores using temporary casing and without the use of a permanent
lining, pile heads shall be cast to a level above the specified cut-off so that, after
trimming, a sound concrete connection with the pile can be made. The casting level
Ja
shall be within the tolerance above the cut-off level shown in Table 4.3, but shall not be
above the original ground level. No pile shall be cast with its head below standing
Al
water level unless approved measures are taken to prevent inflow of water causing
segregation of the concrete as temporary casing is extracted, and, where approved by
the Engineer, the groundwater level for each pile shall be treated as the cut-off level for
the purpose of calculating tolerance.
(b) For piles cast in dry bores within permanent lining tubes or permanent casings, or
where their cut-off levels are in stable ground below the base of any casing used, pile
heads shall be cast to a level above the specified cut-off so that, after trimming, a
sound concrete connection with the pile can be made. The casting level shall be within
the tolerance above the cut-off level shown in Table 4.4, but shall not be above the
original ground level.
QCS 2014 Section 04: Foundations and Retaining Structures Page 20
Part 04: Deep Foundations
(c) For piles cast under water or drilling fluid, the pile heads shall be cast to a level above
the specified cut-off so that, after trimming to remove all debris and contaminated
concrete, a sound concrete connection with the pile can be made. The casting level
shall be within the tolerance above the cut-off level shown in Table 4.4, but shall not be
above the commencing surface level. Cut-off levels may be specified below the
standing groundwater level, and where this condition applies the borehole fluid level
shall not be reduced below the standing groundwater level until the concrete has set.
(d) Where the cut-off level of piles lies at depths greater than 10 m below the original
ground level, then the tolerances given in Tables 4.3, 4.4 and 4.5 will be varied after
discussion with the Contractor and before the commencement of the piling to take
account of the special conditions which apply.
Table 4.3
Casting Tolerance above Cut-off Level for Piles Cast In Dry Bores Using Temporary Casing
and Without the Use of a Permanent Lining
nt
Cut-off distance below commencing surface, Casting tolerance above cut-off level, m
la
H, m
0.3 + H/12 + C/8
tP
where C = length of temporary casing
0.15-10.00 below the commencing surface*
al
* If H is greater than C, then this tolerance is no longer applicable and the tolerances in
ph
Casting Tolerance above Cut-off Level for Piles Cast in Dry Bores within Permanent Lining
Tubes or Permanent Casings, or Where Their Cut-Off Levels is in Stable Ground below the
a
Cut-off distance below commencing surface, Casting tolerance above cut-off level, m
ze
H, m
Ja
Table 4.5
Al
Casting Tolerance above Cut-off Level for Piles Cast Under Water or Drilling Fluid**
Cut-off distance below commencing surface, Casting tolerance above cut-off level, m
H, m
** In cases where a pile is cast so that the cut-off is within a permanent lining tube, the appropriate
tolerance is given by deletion of the casing term C/8 in the table.
4 Water levels
(a) During extraction of temporary casings, where circumstances are such that newly
placed unset concrete is brought into contact with external groundwater, precautions
shall be taken to ensure that the internal concrete pressure at all levels within the pile
exceeds the external groundwater pressure.
QCS 2014 Section 04: Foundations and Retaining Structures Page 21
Part 04: Deep Foundations
(a) After each pile has been cast, any empty bore remaining shall be protected and shall
be carefully backfilled as soon as possible with approved materials.
(a) Disposal of excavated material shall be carried out by the Contractor as necessary to
facilitate the Works and to the satisfaction of the Engineer.
(a) When cutting off and trimming piles to the specified cut-off level, the Contractor shall
take care to avoid shattering or otherwise damaging the rest of the pile. Any cracked
or defective concrete shall be cut away and the pile repaired in an approved manner to
provide a full and sound section at the cut-off level
nt
AND CONCRETE OR GROUT INJECTION TROUGH HOLLOW AUGER
STEMS
la
tP
4.4.1 Scope
1 This Part applies to bored piles which employ a continuous flight auger for both advancing
al
the bore and maintaining its stability. The spoil-laden auger is not removed from the ground
ph
until concrete or grout is pumped into the pile bore from the base of the hollow-stemmed
auger to replace the excavated soil.
As
This Section
er
Section 5, Concrete
4.4.2 Materials
Al
(a) Where not otherwise stated in this Part, the concrete shall comply with Section 5. The
design and workability of concrete to be used in the formation of a pile shall produce a
mix which is suitable for pumping. It shall have a minimum slump of 150 mm unless
3
otherwise approved and a minimum cement content of 340 kg/m . The mix shall be
designed so that segregation does not occur during the placing process, and bleeding
of the mix shall be minimised.
(a) Mix design of grout shall be subject to approval. Cement, water and aggregates for
grout shall be according to Section 5. Course aggregate to be used shall be of 6 mm
nominal size and shall be rounded and evenly graded.
QCS 2014 Section 04: Foundations and Retaining Structures Page 22
Part 04: Deep Foundations
(b) The workability of grout mixes, where used, shall be measured by a suitable and
approved means. The procedure for monitoring the suitability of grout throughout the
Works shall be stated in writing to the Engineer before beginning of the Works and
shall be subject to approval.
(c) Additives to the grout shall require prior approval of the Engineer.
3 Reinforcement
(a) All reinforcement shall be placed with the minimum delay after the completion of the
concreting or grouting operation. It shall be designed and fabricated in cages to permit
it to be placed in the correct position and to the depth specified through the concrete or
grout of the pile. Suitable approved spacers shall be provided to maintain the specified
concrete or grout cover to steel.
(b) The transverse reinforcement of any reinforcing cage shall be approved and may
consist of either spirals, hoops or links.
nt
(c) Longitudinal main steel reinforcement shall be continuous over the specified length.
la
Where splices are necessary, the number of laps shall be kept to a minimum and bars
shall be welded or joined together in an approved manner.
tP
(d) Reinforcement shall be supported and centred so that it will provide the required
projection above the cut-off level, and the proper concrete cover.
al
4.4.3 Boring
ph
1 General
As
(a) During uncased boring with continuous flight auger, the feed forward and speed
(revolutions per minute) are to be adjusted according to the soil conditions in a way
a
that the excavation of soil will be limited to a quantity that the lateral support of the
er
(a) Piles shall not be bored so close to other piles which have recently been cast as to
damage them.
Al
(a) Augers shall not be extracted from the ground during the boring or construction of a
pile in such a way that an open unsupported bore or inflow of water into the pile section
would result. While withdrawing the continuous flight auger, the auger shall be rotated
in the same direction as during drilling into the soil or shall be withdrawn without
rotation.
4 Depth of Piles
(a) Any failure of a pile to reach the designated depth shall be reported to the Engineer
without delay and a full statement of the reasons given.
(a) The piles shall be bored using approved and suitable equipment capable of
penetrating the ground without drawing surrounding soils laterally into the pile bore.
QCS 2014 Section 04: Foundations and Retaining Structures Page 23
Part 04: Deep Foundations
(a) Grout or concrete shall be supplied to the pile through suitable tubing and the hollow
auger stem. All pipe fitments and connections shall be so constructed that grout does
not leak during the injection process.
(a) The base of the auger stem shall be fitted with a suitable means of sealing it against
ingress of water and soil until concrete or grout placing begins.
(b) At the beginning of concrete or grout placement this sealing device shall be removed
by the application of concrete or grout pressure. Care shall be taken to ensure that the
auger is lifted only sufficiently to initiate the flow of concrete or grout, and that water
inflow and soil movement at the base of the auger are minimised. The technique and
equipment used to initiate and maintain the concrete or grout flow shall be such that a
nt
pile of the full specified cross-section is obtained from the maximum depth of boring to
the final pile cut-off level.
la
3 Rate of Supply of Concrete or Grout
tP
(a) The concrete or grout shall be supplied to the pile at a sufficient rate during auger
withdrawal to ensure that a continuous monolithic shaft of the full specified cross-
al
section is formed, free from debris or any segregated concrete or grout.
ph
(b) The rate of withdrawal of the auger, the injection pressures and the rate of supply of
concrete or grout shall be measured and recorded throughout the phase of auger
withdrawal for each pile.
As
(c) The Contractor shall submit proposals for his method of monitoring construction for
approval before beginning the Works.
a
4 Completion of Piles
er
(a) If the concrete or grout placing in any pile cannot be completed in the normal manner,
ze
then the pile shall be rebored before concrete has hardened and shall be completely
replaced.
Ja
(a) Concrete or grout shall be cast to the original ground level in all cases, and the
Al
1 When cutting off and trimming piles to the specified cut-off level, the Contractor shall take
care to avoid shattering or otherwise damaging the rest of the pile. Any laitance, or
contaminated, cracked or defective concrete shall be cut away and the pile repaired in an
approved manner to provide a full and sound section up to the cut-off level.
4.5.1 Scope
1 This Part applies to piles for which a permanent casing of steel or concrete is driven,
reinforcement placed within it if required, and the casing filled with concrete. It also applies to
piles in which a temporary casing is driven, reinforcement placed within it and the pile formed
in the ground by filling the temporary casing with concrete before and during its extraction.
QCS 2014 Section 04: Foundations and Retaining Structures Page 24
Part 04: Deep Foundations
This Section
Part 1, .............. General Requirements for Piling Works
Part 2, .............. Concrete Works for Piling
Section 5, Concrete
Section 3, Ground Investigation.
4.5.2 Submittals
1 Where the Contractor wishes to form a pile with an enlarged base, details of the proposed
method of forming the base and the materials to be used shall be submitted at the time of
tendering.
nt
1 Before placing concrete in a pile casing, the Contractor shall check in an approved manner
la
that the casing is undamaged, and free from water or other foreign matter. In the event of
water or foreign matter having entered the pile casing, either the casing shall be withdrawn,
tP
repaired if necessary and re-driven, or other action shall be taken as may be approved to
continue the construction of the pile.
al
4.5.4 Materials
ph
1 Permanent Casings
As
continuous water-free shaft. The dimensions and quality of the casing shall be
er
adequate to withstand the stresses caused by handling and driving without damage or
distortion.
ze
2 Temporary Casings
Ja
(a) Temporary casings shall be free from significant distortion. They shall be of uniform
external cross-section throughout each continuous length. During concreting they
Al
shall be free from internal projections and encrusted concrete which might prevent the
proper formation of piles.
3 Pile Shoes
(a) Pile shoes shall be manufactured from durable material capable of withstanding the
stresses caused by driving without damage, and shall be designed to give a watertight
joint during construction.
4 Reinforcement
(a) This type of pile shall normally be reinforced over its full length unless permanently
cased. The use of shorter reinforcement in piles which are not permanently cased
shall be subject to the approval of the Engineer.
(b) The number of splices in longitudinal steel bars shall be kept to a minimum. The full
strength of each bar shall be effective across each splice, which shall be made so that
there is no detrimental displacement of the reinforcement during the construction of
the pile.
QCS 2014 Section 04: Foundations and Retaining Structures Page 25
Part 04: Deep Foundations
(a) Casings shall not be driven or piles formed so close to other piles which have recently
been cast as to damage them.
(a) The Contractor shall satisfy the Engineer regarding the suitability, efficiency and
energy of the driving equipment
(b) Drop hammers shall not be used from floating craft in such a manner as to cause
instability of the craft.
3 Length of Piles
nt
la
4 Driving Procedure
tP
(a) Each pile casing shall be driven continuously until the specified or approved depth or
resistance (set), or both, has been reached. In the event of unavoidable interruption to
driving, the pile will be accepted provided on resumption the casing can be driven to
al
the specified depth or resistance (set), or both, without damage.
ph
(b) The Contractor shall inform the Engineer without delay if an unexpected change in
driving characteristics is encountered. A detailed record of the driving resistance over
As
the full length of the nearest available subsequent pile shall be taken if required.
(c) At the start of the work in a new area or section a detailed driving record shall be made
a
over the full length of the first pile to be installed and over the last 3 m of the driving of
er
Engineer to check driving resistance. A set shall be taken only in the presence of the
Engineer unless otherwise approved.
Al
5 Final Set
(a) Where piles are driven to a set, the final set of each pile, pile shell or casing shall be
recorded either as the penetration in millimetres per ten blows or as the number of
blows required to produce a penetration of 25 mm.
(b) When a final set is being measured, the following requirements shall be met:
(i) The exposed part of the pile casing shall be in good condition, without damage
or distortion.
(ii) The dolly, helmet and packing, if any, shall be in sound condition.
(iii) The hammer blow shall be in line with the pile axis and the impact surfaces shall
be flat and at right angles to the pile and hammer axis.
(iv) The hammer shall be in good condition, delivering adequate energy per blow,
and operating correctly.
(v) Temporary compression of the pile casing shall be recorded if required.
QCS 2014 Section 04: Foundations and Retaining Structures Page 26
Part 04: Deep Foundations
6 Preboring
(a) If preboring is specified the pile casing shall be pitched after preboring to the
designated depth and diameter.
7 Jetting
(a) Jetting shall be carried out only when the Contractor's detailed proposals have been
approved by the Engineer
(a) Where a casing for a pile without an enlarged base is to be driven by an internal drop
hammer, a plug consisting of concrete grade 20 with a water/cement ratio not
exceeding 0.25 shall be placed in the pile. This plug shall have a compacted height of
not less than 2.5 times the diameter of the pile. Fresh concrete shall be added to
ensure that this height of driving plug is maintained in the casing throughout the period
nt
of driving, and in any event a plug of fresh concrete shall be added after 1.5 h of
normal driving or after 45 min of hard driving, or, should the driving of a pile be
la
interrupted for 30 min or longer, fresh concrete shall be added prior to driving being
tP
resumed.
2 When required, levels and measurements shall be taken to determine the movement of the
ground or any pile resulting from the driving process.
a
3 When a pile has risen with detrimental effects as a result of adjacent piles being driven the
er
Contractor shall, if required, submit to the Engineer his proposals for correcting or
ze
compensating for this and for avoidance or control of heave effects in subsequent work.
Ja
1 Workability of Concrete
Al
(a) Temporary casings shall be extracted while the concrete within them remains
sufficiently workable to ensure that the concrete is not lifted.
2 Concrete Level
(a) When the casing is being extracted, a sufficient quantity of concrete shall be
maintained within it to ensure that pressure from external water or soil is exceeded and
that the pile is neither reduced in section nor contaminated.
(b) Concrete shall be topped up as necessary while the casing is extracted until the
required head of concrete to complete the pile in a sound and proper manner has been
provided. No concrete is to be placed once the bottom of the casing has been lifted
above the top of the concrete.
3 Vibrating Extractors
(a) The use of vibrating casing extractors will be permitted subject to Part 1 (Noise and
Disturbance) and (Damage to Adjacent Structures).
QCS 2014 Section 04: Foundations and Retaining Structures Page 27
Part 04: Deep Foundations
(a) For piles constructed without the use of a rigid permanent lining, pile concrete shall be
cast to the original ground level.
(b) Where piles are constructed inside rigid permanent lining tubes or permanent casings,
pile heads shall be cast to a level above the specified cut-off so that, after trimming, a
sound concrete connection with the pile can be made. In this case, the tolerance of
casting above the cut-off level shall be determined according to Table 4.6.
Table 4.6
Casting Tolerance above Cut-off Level for Piles Constructed Inside Rigid Permanent Lining
Tubes or Permanent Casings
nt
la
0.15 to any depth 2.2 + H/10
5
tP
Repair of damaged pile heads and making-up of piles to the correct level
al
(a) When repairing or extending the head of a pile, the head shall be cut off square in
ph
sound concrete, and all loose particles shall be removed by wire brushing, followed by
washing with water.
As
(b) If the driving of a pile has been accepted but sound concrete of the pile is below the
cut-off level, the pile shall be made good to the cut-off level with concrete of a grade
not inferior to that of the concrete of the pile.
a
er
(a) When it is required to extend a cast-in-place driven pile above ground, the materials to
be used and procedures to be adopted shall be subject to the approval of the
Ja
Engineer.
(a) The lengthening of permanent steel pile casings by adding an additional length of the
same steel casing during construction shall be carried out in accordance with the
relevant clauses of this Section or by other approved methods. The use of casing
extension materials and methods other than those specified shall be subject to
approval.
(a) After each pile has been cast, any hole remaining shall be protected and shall be
carefully backfilled as soon as possible with approved materials.
(a) When cutting off and trimming piles to the specified cut-off level, the Contractor shall
take care to avoid shattering or otherwise damaging the rest of the pile. Any cracked
or defective concrete shall be cut away and the pile repaired in an approved manner to
provide a full and sound section to the cut-off level.
QCS 2014 Section 04: Foundations and Retaining Structures Page 28
Part 04: Deep Foundations
4.6.1 Scope
1 This Part applies to driven steel piles designed to act as bearing piles.
This Section
Part 1, .............. General Requirements for Piling Works
Part 2, .............. Concrete Works for Piling
nt
la
1 The following standards and other documents are referred to in this Part:
tP
BS 4, ..........................Structural steel sections
BS 3100, ....................Steel casting for general engineering purposes.
al
BS 5135, ....................Process of arc-welding of carbon and carbon manganese steels
BS 6265, ....................Resistance steam welding of uncoated and coated low carbon steel
ph
BS 7613, ....................Hot rolled quenched and tempered weldable structural steel plates
As
4.6.3 Submittals
a
1 Where coatings are specified, the Contractor shall submit for approval full details of the
er
Standards.
Ja
1 The Contractor shall provide the Engineer with Works test certificates, analyses, and mill
Al
sheets, together with a tube manufacturer's certificate showing details of the pile number,
cast number of the steel and a record of all tests and inspections carried out. The Engineer
has the right to inspect any stage of the manufacturing processes and shall be given
adequate notice by the Contractor of such processes and production tests, provided that,
once he has been notified, any delay in his attendance does not cause delay to, or disrupt,
the manufacturing process. The Contractor shall provide the Engineer with samples for
independent testing when requested.
2 The Contractor shall submit for approval full details of the welding procedures and
electrodes, with drawings and schedules as may be necessary. Tests shall be undertaken as
may be required by the relevant British Standard or as may be required by the Engineer.
Only welders who are qualified in the approved welding procedure in accordance with the
tests laid down in the relevant British Standard, or who have a proven record over the
previous six months, or who have attained a similar standard, shall be employed on the
Works. Proof of welders' proficiency shall be made available to the Engineer on request.
QCS 2014 Section 04: Foundations and Retaining Structures Page 29
Part 04: Deep Foundations
2 When preliminary piles are specified, the approval for the piles for the main work will not
necessarily be given until the results of the driving and tests on preliminary piles have been
received and evaluated.
3 Each pile shall be clearly numbered and its length shown near the pile head using white
paint. In addition, before being driven, each pile shall be graduated at appropriate intervals
along its length and at intervals of 250 mm along the top 3 m.
4 All piles within a stack shall be in groups of the same length and on approved supports. All
nt
operations such as handling, transporting and storing of piles shall be carried out in a manner
la
such that damage to piles and their coatings is minimised.
tP
4.6.6 Materials
al
1 Pile Shoes
ph
(a) Cast steel shoes shall be of steel to BS 3100, grade Al. Flat plate and welded
fabricated steel shoes shall be grade 43A or 50A, conforming to BS 7613 and related
As
standards.
2 Strengthening of Piles
a
(a) The strengthening to the toe of a pile in lieu of a shoe or the strengthening of the head
er
of a pile shall be made using material of the same grade as the pile unless otherwise
approved.
ze
3 Manufacturing Tolerance
Ja
(a) All piles shall be of the type and cross-sectional dimensions specified. For standard
rolled sections the dimensional tolerances and weight shall comply with the relevant
Al
standard. The tolerance on length shall be -0 and +75 mm unless otherwise specified.
For proprietary sections the dimensional tolerances shall comply with the
manufacturer's standards. The rolling or manufacturing tolerances for proprietary
sections shall be such that the actual weight of section does not differ from the
theoretical weight by more than +4 % or -2½ % unless otherwise agreed. The rolling
or manufacturing tolerances for steel tubular piles shall be such that the actual weight
of section does not differ from the theoretical weight by more than ±5 %.
4 Straightness of Piles
(a) For standard rolled sections the deviation from straightness shall be within the
compliance provisions of BS 4, Part 1. When two or more rolled lengths are joined by
butt-jointing, the deviation from straightness shall not exceed 1/600 of the overall
length of the pile.
(b) For proprietary sections made up from rolled sections, and for tubular piles, the
deviation from straightness on any longitudinal face shall not exceed 1/600 of the
length of the pile nor 5 mm in any 3 m length.
QCS 2014 Section 04: Foundations and Retaining Structures Page 30
Part 04: Deep Foundations
5 Fabrication of Piles
(a) For tubular piles where the load will be carried by the wall of the pile, and if the pile will
be subject to loads that induce reversal of stress during or after construction, the
external diameter at any section as measured by using a steel tape on the
circumference shall not differ from the theoretical diameter by more than ±1.
(b) The ends of all tubular piles as manufactured shall be within a tolerance on ovality of
±1 % as measured by a ring gauge for a distance of 100 mm at each end of the pile
length.
(c) The root edges or root faces of lengths of piles that are to be shop butt-welded shall
not differ by more than 25 % of the thickness of pile walls not exceeding 12 mm thick
or by more than 3 mm for piles where the wall is thicker than 12 mm. When piles of
unequal wall thickness are to be butt-welded, the thickness of the thinner material shall
be the criterion.
nt
6 Matching of Pile Lengths
la
(a) Longitudinal seam welds and spiral seam welds of two lengths of tubular piles being
joined shall, whenever possible, be evenly staggered at the butt. However, if in order
tP
to obtain a satisfactory match of the ends of piles or to meet specified straightness, the
seams cannot be staggered evenly, then they shall be staggered by at least 100 mm.
al
7 Welding
ph
(a) Welding of H-piles and piles that will be subjected to stress reversal, during or after
As
(a) Where coatings are specified they shall be provided in accordance with the Particular
Ja
Specification. In general, coatings will not be called for where piles are fully in contact
with undisturbed natural soils or below the standing water table. Cathodic protection
may be called for when there is a possibility of stray electrical current from the
Al
(a) Longitudinal or spiral welds made in the manufacture of tubular piles are subject to the
acceptance standard for interpretation of non-destructive testing specified in latest
edition of API 5L. The maximum projecting height of weld reinforcement shall not
exceed 3 mm for wall thicknesses not exceeding 13 mm and 5 mm for wall
thicknesses greater than 13 mm.
(b) Longitudinal welds joining the constituent parts of the box or proprietary section shall
be in accordance with the manufacturer's specification.
(c) The maximum projecting height of weld reinforcement for circumferential welds in
tubular piles shall be the same as specified above for longitudinal welds in tubular
piles.
QCS 2014 Section 04: Foundations and Retaining Structures Page 31
Part 04: Deep Foundations
(a) Welds shall comply with the requirements of the Weld Quality Acceptance Standards
for Site Butt Welds in Steel Bearing Piles published by British Steel Corporation,
General Steels Group.
1 The finished coating shall be generally of smooth and uniform texture and free from sharp
protuberances or pin holes. Excessive sags, dimpling or curtaining will not be acceptable.
2 Any coat damaged by subsequent processes, or which has deteriorated to an extent such
that proper adhesion of the coating is in doubt, shall be removed and the surface shall be
cleaned to the original standard and recoated with the specified number and thicknesses of
coats.
nt
3 The completed coating shall be checked for thickness by an approved magnetic thickness
gauge. Areas where the thickness is less than that specified shall receive approved
la
additional coating.
tP
4 Average measured thickness should be equal to or greater than the specified thickness and
no single reading should be less than 85 % of the specified thickness. The completed
al
coating shall also be checked for adhesion by the cross-hatching method with lines spaced at
ph
ten times the thickness of the coating. Adhesion tests should not be carried out prior to
seven days after coating.
As
5 The tests shall be made on 10 % of the piles. Areas where the adhesion is not approved
shall be sand blasted and recoated. The coating shall be approved before pitching and
a
(a) At all stages during driving and until incorporation in the superstructure, the free length
of the pile shall be adequately supported and restrained by means of leaders, trestles,
Al
(a) The Contractor shall satisfy the Engineer regarding the suitability, efficiency and
energy of the driving equipment. Where required in the Contract, dynamic evaluation
and analysis shall be provided.
(b) Where a drop hammer is used, the mass of the hammer shall be at least half that of
the pile unless otherwise approved by the Engineer. For other types of hammer the
energy delivered to the pile per blow shall be at least equivalent to that of a drop
hammer of the stated mass. Drop hammers shall not be used from floating craft in
such a manner as to cause instability of the craft.
QCS 2014 Section 04: Foundations and Retaining Structures Page 32
Part 04: Deep Foundations
3 Length of Piles
(a) The length of pile to be driven and any additional lengths of pile to be added during
driving shall be approved by the Engineer.
(a) The driving of each pile shall be continuous until the specified depth or resistance
(set), or both, has been reached. In the event of unavoidable interruption to driving,
the pile will be accepted provided it can be driven to the specified depth or resistance
(set), or both, without damage.
(b) A follower shall not be used unless approved, in which case the Engineer will require
the set where applicable to be revised in order to take into account reduction in the
effectiveness of the hammer blow.
(c) The Contractor shall inform the Engineer as soon as an unexpected change in driving
nt
characteristics is noted. A detailed record of the driving resistance over the full length
of the nearest subsequent pile shall be taken, if required by the Engineer.
la
(d) At the start of the work in a new area or section a detailed record shall be made over
tP
the full driving length of the first pile, and during the last 3 m of the driving of
subsequent piles, to establish the driving behaviour. Where required, detailed driving
al
records shall also be made for 5 % of the piles driven, the locations of such piles being
specified by the Engineer.
ph
(e) The Contractor shall give adequate notice and provide all necessary facilities to enable
the Engineer to check driving resistance. A set or resistance measurement shall be
As
procedure.
er
(a) When driving to a set criterion, the final set of each pile shall be recorded either as the
penetration in millimetres per ten blows or as the number of blows required to produce
Ja
a penetration of 25 mm.
(b) When a final set or resistance is being measured, the following requirements shall be
Al
met:
(i) The exposed part of the pile shall be in good condition, without damage or
distortion.
(ii) The dolly and packing, if any, shall be in sound condition.
(iii) The hammer blow shall be in line with the pile axis and the impact surfaces shall
be flat and at right angles to the pile and hammer axis.
(iv) The hammer shall be in good condition, delivering adequate energy per blow
and operating correctly.
(v) The temporary compression of the pile shall be recorded, if required by the
Engineer.
6 Preboring
(a) If preboring is specified the pile shall be pitched after preboring to the designated
depth and diameter.
QCS 2014 Section 04: Foundations and Retaining Structures Page 33
Part 04: Deep Foundations
7 Jetting
(a) Jetting shall be carried out only when the Contractor's detailed proposals have been
approved.
1 Piles shall be driven in an approved sequence to minimise any detrimental effects of heave
and lateral displacement of the ground.
2 When required by the Engineer, levels and measurements shall be taken to determine the
movement of the ground or any pile resulting from the driving of adjacent piles.
3 When a pile has risen as a result of adjacent piles being driven, the Engineer may call for
redriving or other testing to demonstrate that the performance of the pile under load is
unimpaired. If required, the Contractor shall make proposals for correcting detrimentally
nt
affected piles and for avoidance or control of heave in subsequent work.
la
4.6.11 Preparation of pile heads
tP
1 If a steel superstructure is to be welded to piles, the pile cut-off shall be square and to within
5 mm of the elevations shown on the Drawings. If pile heads are to be encased in concrete
al
they shall be cut to that same tolerance and protective coatings shall be removed from the
ph
surfaces of the pile heads down to a level 100 mm above the soffit of the concrete.
4.8.1 Scope
ze
1 This Part includes preapplied bituminous or other proprietary friction-reducing coating, pre-
applied low-friction sleeving, formed-in-place low-friction surround, and preinstalled low-
Ja
friction sleeving.
This Section
Part 1, .............. General Requirements for Piling Works
Part 2, .............. Concrete Works for Piling
Section 3, Ground Investigation.
4.8.2 Submittals
1 Where the particular method of reducing friction is not specified, the Contractor shall submit
full details of the method which he proposes.
1 General
(a) Where a means of reducing friction on any specified length of pile is required by the
Contract, the Contractor shall provide a suitable interface between pile and soil by one
of the following, or other approved, methods
QCS 2014 Section 04: Foundations and Retaining Structures Page 34
Part 04: Deep Foundations
(a) Where a proprietary product is specified, the process of cleaning pile surfaces, and the
conditions and methods of application shall conform to the manufacturer's current
instructions. All materials shall conform to the manufacturer's specification, which
shall be given to the Engineer before any coating is applied.
(b) Where a friction-reducing material has been applied to a preformed pile prior to
installation, it shall be protected from damage during handling and transportation. In
the event of inadvertent damage to the coating, it shall be repaired on site, prior to the
nt
pile being driven, to the same specification as the original coating. Where bituminous
materials are involved, precautions shall be taken as necessary in hot weather to
la
prevent excessive flow or displacement of the coating. The coated piles shall be
tP
adequately protected against direct sunlight and, if stacked, they shall be separated to
prevent their coatings sticking together. al
(c) In the case of applied coatings, the piles shall not be driven when the air temperature
is such that the coating will crack, flake or otherwise be damaged prior to entry into the
ph
ground. Where bituminous materials are involved, driving shall be carried out while
the temperature is at or above 5 °C unless otherwise approved or called for in the
As
manufacturer's instructions.
(a) Piles may be driven with a preapplied low-friction sleeving subject to the approval of
the detailed design and method by the Engineer.
ze
(a) Where a hole is bored in the ground and filled with low-friction material through which a
pile is subsequently driven or placed, the method and the properties of the low-friction
Al
material both above and below standing groundwater level, together with the
dimensions of the prebored hole in relation to the pile, shall be approved by the
Engineer.
(a) Where a system is employed involving placing a low-friction sleeve in the ground prior
to pile installation, the detailed materials and method of installation of the sleeving shall
be approved by the Engineer.
4.8.4 Inspection
1 The Engineer may call for piles to be partially exposed or extracted at the commencement of
a contract in order to demonstrate that the method of installation does not impair the
effectiveness of the system in the circumstances of use on the particular site. Where damage
is found to have occurred, or is likely to occur in the opinion of the Engineer, additional
measures or variation of the method may be called for. At the discretion of the Engineer,
further inspections shall be carried out to ascertain the effectiveness of the additional
measures.
QCS 2014 Section 04: Foundations and Retaining Structures Page 35
Part 04: Deep Foundations
1 Allowance shall be made in driving piles to a required resistance or set for any differences
between the short-term driving resistance and the long-term static resistance of the coating
or surrounding low-friction material which is in use.
1 Scope
(a) This Part deals with the testing of a pile by the controlled application of an axial load. It
covers vertical and raking piles tested in compression (i.e. subjected to loads or forces
in a direction such as would cause the piles to penetrate further into the ground) and
vertical or raking piles tested in tension (i.e., subjected to forces in a direction such as
nt
would cause the piles to be extracted from the ground).
la
2 References
tP
The following standard is referred to in this Part:
BS 1881, ....................Methods of testing concrete.
al
ph
3 Submittals
(a) When required, the design and full details of the proposed load application system
As
shall be submitted to the Engineer prior to the commencement of testing. The load
application system shall be satisfactory for the required test.
a
4 Definitions
er
(a) Allowable pile capacity: a load which is not less than the specified working load and
ze
which takes into account the pile's ultimate bearing capacity, the materials from which
the pile is made, the required factor of safety, settlement, pile spacing, downdrag, the
Ja
overall bearing capacity of the ground beneath the piles and any other relevant factors.
The allowable pile capacity indicates the ability of a pile to meet the specified loading
requirements.
Al
(b) Compression pile: a pile which is designed to resist compressive (downward) axial
load.
(c) Constant rate of penetration (CRP) test: a test in which the pile is made to penetrate
the soil at a constant controlled speed, while the loads applied at the top of the pile in
order to maintain the constant rate of penetration are continuously measured. The
purpose of the test is to derive the ultimate bearing capacity of a pile and not its load
settlement characteristics.
(d) Constant rate of uplift (CRU) test: the same in principle as the CRP test, but the pile is
subject to tension rather than compression. The purpose of the test is to determine
the 'pull-out' capacity of a pile.
(e) Design verification load (DVL): a test load, in lieu of a specified working load, applied
to a single pile at the time of testing to determine that site conditions conform to design
assumptions. This load will be peculiar to each preliminary (test) pile and should equal
the maximum specified working load for a pile of the same dimensions and material,
plus allowances for soil-induced forces and any other particular conditions of the test.
QCS 2014 Section 04: Foundations and Retaining Structures Page 36
Part 04: Deep Foundations
nt
(l) Specified working load (SWL): the designated load on the head of a pile.
la
(m) Tension pile: a pile which is designed to resist a tensile (upward) axial force.
tP
(n) Test pile: any pile, preliminary or part of the works, to which a test is applied.
(o) Ultimate bearing capacity: the load at which the resistance of the soil becomes fully
al
mobilised through friction, end bearing or a combination thereof.
ph
(p) Working pile: one of the piles forming the foundation of a structure.
As
(i) The Contractor shall give the Engineer at least 48 hours' notice of the
er
(i) Each preliminary test pile shall be constructed in a manner similar to that to be
used for the construction of the working piles, and by the use of similar
equipment and materials. Any variation will be permitted only with prior approval.
Al
(ii) The pile test shall not be started until the strength of the cubes taken from the
pile exceeds twice the average direct stress in any pile section under the
maximum required test load, and the strength of the cubes taken from the cap
exceeds twice the average stress at any point in the cap under the same load.
Variation of procedure will be permitted only if approved by the Engineer.
(e) Preparation of a Working Pile to be Tested
(i) If a test is required on a working pile the Contractor shall cut off or otherwise
prepare the pile for testing as required by the Engineer.
(f) Cut-off Level
(i) The cut-off level for a preliminary test pile shall be approved by the Engineer.
6 Supervision
(a) The setting-up of pile testing equipment shall be carried out under competent
nt
supervision and the equipment shall be checked to ensure that the set-up is
satisfactory before the commencement of load application.
la
(b) All tests shall be carried out only under the direction of an experienced and competent
tP
supervisor experienced with the test equipment and test procedure. All personnel
operating the test equipment shall have been trained in its use.
al
7 Safety precautions
ph
(a) General
As
(i) Design, erection and dismantling of the pile test reaction system and the
application of load shall be carried out according to the requirements of the
various applicable statutory regulations concerned with lifting and handling
a
heavy equipment and shall safeguard operators and others who may from time
er
(b) Kentledge
(i) Where kentledge is used, the Contractor shall construct the foundations for the
Ja
nt
(ii) If in the course of carrying out a test any unforeseen occurrence should take
la
place, further loading shall not be applied until a proper engineering assessment
of the condition has been made and steps have been taken to rectify any fault.
tP
Reading of gauges should, however, be continued where possible and if it is
safe to do so.
al
(iii) Where an inadequacy in any part of the system might constitute a hazard,
ph
means shall be provided to enable the test to he controlled from a position
remote from of the kentledge stack or test frame.
As
(iv) The hydraulic jack, pump, hoses, pipes, couplings and other apparatus to be
operated under hydraulic pressure shall be capable of withstanding a pressure
of 1.5 times the maximum pressure used in the test without leaking. The
a
give a plane surface which is normal to the axis of the pile, sufficiently large to
accommodate the loading and settlement measuring equipment and adequately
Al
8 Reaction systems
nt
reaction system shall be coaxial with the test pile.
la
(ii) Where inclined piles or reactions are proposed, full details shall be submitted for
approval prior to the commencement of testing.
(c) Working Piles
tP
al
(i) Working piles shall not be used as reaction piles without approval from the
Engineer.
ph
(ii) Where working piles are used as reaction piles their movement shall be
As
(i) Where kentledge is used for loading vertical piles in compression, the distance
er
from the edge of the test pile to the nearest part of the crib supporting the
kentledge stack in contact with the ground shall be not less than 1.3 m.
ze
(ii) The centre-to-centre spacing of vertical reaction piles from a test pile shall
conform to Paragraph 1 above, but shall be not less than three times the
Ja
diameter of the test pile or the reaction piles or 2 m, whichever is the greatest,
except in the case of piles of 300 mm diameter (or equivalent) or less, where the
Al
(a) The equipment used for applying load shall consist of a hydraulic ram or jack. The
jack shall be arranged in conjunction with the reaction system to deliver an axial load
to the test pile. Proposals to use more than one ram or jack will be subject to approval
by the Engineer of the detailed arrangement. The complete system shall be capable of
safely transferring the maximum load required for the test. The length of stroke of a
ram shall be sufficient to account for deflexion of the reaction system under load plus a
deflection of the pile head by up to 15 % of the pile shaft diameter unless otherwise
specified or agreed prior to commencement of test loading.
10 Measurement of load
nt
(a) A load measuring device shall be used and in addition a calibrated pressure gauge
la
included in the hydraulic system. Readings of both the load measuring device and the
tP
pressure gauge shall be recorded. In interpreting the test data the values given by the
load measuring device shall normally be used; the pressure gauge readings are
required as a check for gross error.
al
(b) The load measuring device may consist of a load measuring column, pressure cell or
ph
application and measuring system. Load measuring and application devices shall be
short in axial length in order to secure stability. The Contractor shall ensure that axial
loading is maintained.
a
er
(c) The load measuring device shall be calibrated before and after each series of tests,
whenever adjustments are made to the device or at intervals appropriate to the type of
ze
equipment. The pressure gauge and hydraulic jack shall be calibrated together.
Certificates of calibration shall be supplied to the Engineer.
Ja
11 Control of loading
Al
(a) The loading equipment shall enable the load to be increased or decreased smoothly or
to be held constant at any required value.
nt
fixed to the pile cap or head and normal to the pile axis. Alternatively, the
gauges may be fixed to the pile and bear on prepared surfaces on the reference
la
beam or beams. The dial gauges shall be placed equidistant from the pile axis
tP
and from each other. The dial gauges shall enable readings to be made to an
accuracy of at least 0.1 mm and have a stem travel of at least 25 mm.
Machined spacer blocks may be used to extend the range of reading. Equivalent
al
electrical displacement-measuring devices may be substituted.
ph
attached to the pile or pile cap may be used instead of a levelling staff. At least
er
two reliable independent datum points shall be established. Each datum point
ze
shall be so situated as to permit a single setting-up position of the level for all
readings.
Ja
(iii) No datum point shall be located where it can be affected by the test loading or
other operations on the Site.
Al
14 Notice of test
(i) The Contractor shall give the Engineer at least 24 hours' notice of the
commencement of the test. No load shall be applied to the test pile before the
nt
commencement of the specified test procedure.
la
15 Test procedure
tP
(a) Proof Load Test Procedure (working compression piles)
(i) The maximum load which shall be applied in a proof test shall normally be the
al
sum of the design verification load (DVL) plus 50 % of the specified working load
ph
(SWL). The loading and unloading shall be carried out in stages as shown in
Table 4.7. Any particular requirements given in the particular contract
As
the rate of settlement is less than 0.25 mm/h and decreasing. The rate of
er
settlement shall be calculated from the slope of the line obtained by plotting
values of settlement versus time and drawing a smooth curve through the
ze
points.
Ja
(iii) Each decrement of unloading shall proceed after the expiry of the period shown
in Table 4.7.
Al
(iv) For any period when the load is constant, time and settlement shall be recorded
immediately on reaching the load, at not more than 5 min intervals up to 15 min;
at approximately 15 min intervals up to 1 h; at 30 min intervals between 1 h and
4 h; and 1 h intervals between 4 h and 12 h after the application of the increment
of load.
(v) Where the methods of measuring pile head movement given in Item 11 is used,
the periods of time for which loads must be held constant to achieve the
specified rates of settlement shall be extended as necessary to take into
account the lower levels of accuracy available from these methods and to allow
correct assessment of the settlement rate.
QCS 2014 Section 04: Foundations and Retaining Structures Page 43
Part 04: Deep Foundations
Table 4.7
Load * Minimum time of holding load
25% DVL 1h
50% DVL 1h
75% DVL 1h
100% DVL 1h
75% DVL 10 min
50% DVL 10 min
25% DVL 10 min
0 1h
100% DVL 6h
100% DVL + 25% SWL 1h
100% DVL + 50% SWL 6h
100% DVL + 25% SWL 10 min
100% DVL 10 min
nt
75% DVL 10 min
50% DVL 10 min
la
25% DVL 10 min
tP
0 1h
100% DVL 6h
100% DVL + 50% SWL 6h
al
100% DVL + 75% SWL 1h
ph
100% DVL + 100% SWL 6h
100% DVL + 75% SWL 10 min Applicable
100% DVL + 50% SW 10 min to tests on
As
* SWL denotes specified working load; DVL denotes design verification load.
Ja
compression piles shall be either the extended proof load test procedure or the
constant rate of penetration testing procedure given below. A normal proof load
test will constitute the first stage of such a test unless otherwise specified.
(ii) Extended proof load test procedure. Where test pile is to be loaded up to the
sum of design verification load (DVL) plus 100 % of the specified working load,
the loading procedure may be carried out as a continuation of the proof load
testing procedure given in Item 14 (a).
(iii) Following the completion of the proof load test, the load shall be restored in two
stages (DVL, DVL +50 % SWL), and shall subsequently be increased by stages
of 25 % of the specified working load. Following each application of an
increment of load, the load shall be maintained at the specified value for the
period shown in Table 4.7 and until the rate of settlement is decreasing and is
less than 0.25 mm/h.
QCS 2014 Section 04: Foundations and Retaining Structures Page 44
Part 04: Deep Foundations
(iv) Where verification of required minimum factor of safety is called for or the pile is
to be tested to failure, the loading procedure shall be continued after reaching
DVL +100 % SWL stage by increasing the load in increments of 25 % of the
specified working load or other specified amount until the maximum specified
load of the test is reached. Following each application of increment of load, the
load shall be maintained at the specified value for not less than 1 h and until the
rate of settlement is decreasing and is less than 0.25 mm/h, or other approved
rate appropriate to the stage of loading and its proximity to a failure condition.
Permissible settlement at the load corresponding to the required minimum factor
of safety called for in the design will not normally be specified.
(v) The rate of settlement shall be calculated from the slope of the line obtained by
plotting values of settlement versus time and drawing a smooth curve through
the points. Reduction of load at the end of the test shall be gradual as required
by Item 14 (a).and the final rebound of the pile head shall be recorded.
(vi) Constant rate of penetration (CRP) testing procedure. Where it is required to
nt
determine the ultimate load of a preliminary compression pile, and particularly
la
where piles are largely embedded in and bearing on clay soils, the CRP testing
procedure will normally be specified.
(vii)
tP
The rate of movement of the pile head shall be maintained constant in so far as
is practicable and shall be approximately 0.01 mm/s.
al
(viii) Readings of loads, penetration and time shall be made simultaneously at regular
ph
intervals; the interval chosen shall be such that a curve of load versus
penetration can be plotted without ambiguity.
As
(ix) Loading shall be continued until one of the following results is obtained
1. The maximum required test load.
a
er
(x) The load shall then be reduced in five approximately equal stages to zero load,
penetration and load being recorded at each stage.
Al
16 Completion of a test
(i) On completion of a test and subject to the approval of the Engineer, all
measuring equipment and load application devices shall be dismantled and
checked. All other test equipment, including kentledge, beams and supporting
structures shall be removed from the test pile location. Measuring and other
demountable equipment shall be stored in a safe manner so that it is available
for further tests, or removed from the Site as approved by the Engineer.
(ii) Temporary tension piles and ground anchorages shall be cut off below ground
level, and off-cut materials removed from the Site. The ground shall be restored
to the original contours.
(b) Preliminary Test Pile Cap
(i) Unless otherwise specified, the head of each preliminary test pile shall be cut off
below ground level, off-cut material shall be removed from the Site and the
ground restored to the original contours.
(c) Proof Test Pile Cap
nt
(i) On completion of a test on a proof pile, the test pile cap shall be prepared as
la
specified and left in a state ready for incorporation into the Permanent Works.
tP
Any resulting off-cut materials shall be removed from the Site.
(a) During the progress of a test, all records taken shall be available for inspection by the
As
Engineer.
(b) Results shall be submitted as
a
(i) Preliminary report of the test results to the Engineer, unless otherwise directed,
er
1. For a test by maintained load: for each stage of loading, the period for
which the load was held, the load and the maximum pile movement at the
Ja
(a) The Contractor shall provide information about the test pile in accordance with the
following schedule where applicable.
(i) General.
1. site location contract identification
2. proposed structure
3. main contractor
4. piling contractor
5. engineer client/employer
6. date and time of test
QCS 2014 Section 04: Foundations and Retaining Structures Page 46
Part 04: Deep Foundations
nt
10. shoe or base details
la
11. head details
tP
12. length in ground
13. tip Elevation
al
14. dimensions of any permanent casing
ph
concrete mix/grade
aggregate type and source
a
admixtures
slump
ze
2. bored piles
type of equipment used and method of boring
temporary casing - diameter, type and length
QCS 2014 Section 04: Foundations and Retaining Structures Page 47
Part 04: Deep Foundations
nt
produce penetration of 25 mm or other agreed amount at final
set and at redrive set, for a drop hammer or for a single acting
la
hammer the length of the drop or stroke, for a diesel hammer
the length of the stroke and the blows per minute, for a double
tP
acting hammer the operating pressure and the number of blows
per minute
al
condition of pile head or temporary casing after driving
ph
use of a follower
use of preboring
As
use of jetting
lengthening
a
1. mass of kentledge
Ja
1 This test shall be carried out in accordance with ASTM D5882 in a frequency as mentioned in
Section 2
QCS 2014 Section 04: Foundations and Retaining Structures Page 48
Part 04: Deep Foundations
1 This test shall be carried out in accordance with ASTM D4428, D6760 in a frequency as
mentioned in Section 2
1 This test shall be carried out in accordance with ASTM D6167 in a frequency as mentioned in
Section 2
1 This test shall be carried out in accordance with ASTM D3689 in a frequency as mentioned in
Section 2
nt
la
1 This test shall be carried out in accordance with ASTM D3966 in a frequency as mentioned in
Section 2
(a) This Part outlines the alternative methods for testing piles. A significant advance in
As
identifying the existence of defects in construction of piles has been the development
and adoption of modern integrity testing systems which may be employed to check the
quality of construction when required by the Engineer.
a
(b) Dynamic pile-testing is normally used to evaluate the pile capacity, soil resistance
er
This Section
Al
Section 2
2 Quality Assurance
3 Integrity-testing of piles
(a) General
QCS 2014 Section 04: Foundations and Retaining Structures Page 49
Part 04: Deep Foundations
nt
(b) Method of Testing
la
(i) Where integrity-testing is called for but the method is not specified, the method
tP
to be adopted shall be approved by the Engineer and shall be one of the
following al
1. The sonic method.
ph
2. The vibration method.
3. The sonic logging method.
As
(ii) Other methods may be adopted subject to the approval of the Engineer and
subject to satisfactory evidence of performance.
a
(i) In the case of cast-in-place concrete piles, integrity tests shall not be carried out
ze
the pile head, the head shall be clean, free from water, laitance and loose
concrete and readily accessible for the purpose of testing.
4 Dynamic pile-testing
(a) General
(i) Dynamic pile-testing involves monitoring the response of a pile to a heavy
impact applied at the pile head. The impact is often provided by the pile-driving
hammer and response is normally measured in terms of force and acceleration
or displacement close to the pile head.
(ii) The results directly obtained refer to dynamic loading conditions. Interpretation
in terms of static loading requires soil- and pile-dependent adjustments, and
corroboration from experience may be required to correlate dynamic testing with
normal static load tests as specified in clause 4.9.1 of this Section.
(iii) Details of the equipment to be used and of the method of analysis of test results
shall be provided to the Engineer before the commencement of testing.
QCS 2014 Section 04: Foundations and Retaining Structures Page 50
Part 04: Deep Foundations
nt
stresses. The impact surface shall be flat and normal to the axis of the pile.
la
(e) Time of Testing
tP
(i) Dynamic load tests shall be carried out at appropriate and approved times after
pile installation. The time between the completion of installation and testing for
a preformed pile shall normally be more than 12 h, and in the case of a cast-in-
al
place concrete piles shall be after the concrete has reached 75 % of its specified
ph
28 day strength so that the pile is not damaged under the impact stresses.
(f) Set Measurements
As
(i) Where required and appropriate, the permanent penetration per blow and
temporary compression of the pile and soil system shall be measured
a
independently of the instruments being used to record the dynamic test data.
er
(g) Results
ze
(i) Initial the results shall be provided to the Engineer within 24 hours of the
completion of a test. These shall include
Ja
nt
(a) The results of static load tests, which have been demonstrated, by means of
la
calculations or otherwise, to be consistent with other relevant experience;
tP
(b) Empirical or analytical calculation methods whose validity has been demonstrated by
static load tests in comparable situations;
al
(c) The results of dynamic load tests whose validity has been demonstrated by static load
tests in comparable situations;
ph
(d) The observed performance of a comparable piles foundation, provided that this
As
2 Design values for parameters used in the calculations should be in general accordance with
design parameters from geotechnical investigations report, but the results of load tests may
a
3 Static load tests may be carried out on trial piles, installed for test purposes only, before the
design is finalized, or on working piles, which form part of the foundation.
Ja
4.10.2 Verification of Resistance for Structural and Ground Limit States in Persistent and
Transient Situations
Al
1 The behavior of individual piles and pile groups and the stiffness and strength of the structure
connecting the piles shall be considered.
2 In selecting calculation methods and parameter values and in using load test results, the
duration and variation in time of the loading shall be considered.
4 The choice of type of pile, including the quality of the pile material and the method of
installation, shall take into account:
QCS 2014 Section 04: Foundations and Retaining Structures Page 52
Part 04: Deep Foundations
(a) the ground and ground-water conditions on the site, including the presence or
possibility of obstructions in the ground;
(b) the stresses generated in the pile during installation;
(c) the possibility of preserving and checking the integrity of the pile being installed;
(d) the effect of the method and sequence of pile installation on piles, which have already
been installed and on adjacent structures or services;
(e) the tolerances within, which the pile can be installed reliably;
(f) the deleterious effects of chemicals in the ground;
(g) the possibility of connecting different ground-water regimes;
(h) the handling and transportation of piles;
(i) the effects of pile construction on neighboring buildings.
nt
5 In considering the aspects listed above, the following items should receive attention:
la
(a) the spacing of the piles in pile groups;
tP
(b) displacement or vibration of adjacent structures due to pile installation;
(c) the type of hammer or vibrator used;
al
(d) the dynamic stresses in the pile during driving;
ph
(e) for those types of bored pile where a fluid is used inside the borehole, the need to
keep the pressure of the fluid at a level to ensure that the borehole will not collapse
As
(g) local instability of a shaft during concreting, which may cause a soil inclusion within
ze
the pile;
(h) ingress of soil or water into the section of a cast-in-situ pile and possible disturbance
Ja
concrete;
(j) the retarding influence of chemicals in the soil;
(k) soil compaction due to the driving of displacement piles;
(l) soil disturbance due to the boring of a pile shaft.
1 The design shall demonstrate that exceeding the following limit states is sufficiently
improbable:
(a) ultimate limit states of compressive or tensile resistance failure of a single pile;
(b) ultimate limit states of compressive or tensile resistance failure of the pile foundation
as a whole;
QCS 2014 Section 04: Foundations and Retaining Structures Page 53
Part 04: Deep Foundations
(c) ultimate limit states of collapse or severe damage to a supported structure caused by
excessive displacement or differential displacements of the pile foundation;
(d) serviceability limit states in the supported structure caused by displacement of the piles.
2 Normally the design should consider the margin of safety with respect to compressive or
tensile resistance failure, which is the state in which the pile foundation displaces significantly
downwards or upwards with negligible increase or decrease of resistance.
3 For piles in compression it is often difficult to define an ultimate limit state from a load
settlement plot showing a continuous curvature. In these cases, settlement of the pile top
equal to 10% of the pile base diameter should be adopted as the "failure" criterion.
4 For piles that undergo significant settlements, ultimate limit states may occur in supported
structures before the resistance of the piles is fully mobilized. In these cases a cautious
estimate of the possible range of the settlements shall be adopted in design.
nt
la
4.11.2 Compressive Ground Resistance
tP
1 To demonstrate that the pile foundation will support the design load with adequate safety
against compressive failure, the following inequality shall be satisfied for all ultimate limit
al
state load cases and load combinations:
ph
Fc ≤ Rc
As
Where
Fc: design axial compression load on a pile or a group of piles
a
2 In principle Fc should include the weight of the pile itself and Rc should include the
overburden pressure of the soil at the foundation base. However these two items may be
Ja
3 For piles in groups, two failure mechanisms shall be taken into account:
4 The compressive resistance of the pile group acting as a block may be calculated by
treating the block as a single pile of large diameter.
5 The stiffness and strength of the structure connecting the piles in the group shall be
considered when deriving the design resistance of the foundation.
QCS 2014 Section 04: Foundations and Retaining Structures Page 54
Part 04: Deep Foundations
6 If the piles support a stiff structure, advantage may be taken of the ability of the structure
to redistribute load between the piles. A limit state will occur only if a significant numbe r of
piles fail together; therefore a failure mode involving only one pile need not be considered.
7 If the piles support a flexible structure, it should be assumed that the compressive
resistance of the weakest pile governs the occurrence of a limit state.
8 Special attention should be given to possible failure of edge piles caused by inclined or
eccentric loads from the supported structure.
9 If the layer in which the piles bear overlies a layer of weak soil, the effect of the weak layer
on the compressive resistance of the foundation shall be considered.
10 The strength of a zone of ground above and below the pile base shall be taken into
account when calculating the pile base resistance.
nt
la
NOTE: This zone may extend several diameters above and below the pile base. Any weak
ground in this zone has a relatively large influence on the base resistance.
11 tP
Punching failure should be considered if weak ground is present at a depth of less than 4
al
times the base diameter below the base of the pile.
ph
12 Where the pile base diameter exceeds the shaft diameter, the possible adverse effect
As
shall be considered.
13 For open-ended driven tube or box-section piles with openings of more than 500 mm in
a
any direction, and without special devices inside the pile to induce plugging, the base
er
(a) the shearing resistance between the soil plug and the inside face of the pile;
(b) the base resistance derived using the cross-sectional area of the base.
Ja
1 The manner in which load tests are carried out shall be in accordance with 4.11.2 and shall be
specified in the Geotechnical Design Report.
2 Trial piles to be tested in advance shall be installed in the same manner as the piles that will
form the foundation and shall be founded in the same stratum.
3 If the diameter of the trial pile differs from that of the working piles, the possible difference in
performance of piles of different diameters should be considered in assessing the
compressive resistance to be adopted.
4 In the case of a very large diameter pile, it is often impractical to carry out a load test on a full
size trial pile. Load tests on smaller diameter trial piles may be considered provided that:
(a) the ratio of the trial pile diameter/working pile diameter is not less than 0,5;
(b) the smaller diameter trial pile is fabricated and installed in the same way as the piles
used for the foundation;
QCS 2014 Section 04: Foundations and Retaining Structures Page 55
Part 04: Deep Foundations
(c) the trial pile is instrumented in such a manner that the base and shaft resistance can be
derived separately from the measurements.
NOTE: This approach should be used with caution for open-ended driven piles because of
the influence of the diameter on the mobilisation of the compressive resistance of a soil plug
in the pile.
5 In the case of a pile foundation subjected to downdrag, the pile resistance at failure, or at a
displacement that equals the criterion for the verification of the ultimate limit state determined
from the load test results, shall be corrected. The correction shall be achieved by subtracting
the measured, or the most unfavorable, positive shaft resistance in the compressible stratum
and in the strata above, where negative skin friction develops, from the loads measured at
the pile head.
6 During the load test of a pile subject to downdrag, positive shaft friction will develop along the
total length of the pile. The maximum test load applied to the working pile should be in excess
nt
of the sum of the design external load plus twice the downdrag force.
la
7 When deriving the ultimate characteristic compressive resistance from values measured in
one or several pile load tests, an allowance shall be made for the variability of the ground and
tP
the variability of the effect of pile installation.
al
8 The systematic and random components of the variations in the ground shall be recognized
in the interpretation of pile load tests.
ph
9 The records of the installation of the test pile(s) shall be checked and any deviation from the
As
10 The characteristic compressive resistance of the ground may be derived from the
a
characteristic values of the base resistance and of the shaft resistance in accordance with
er
Eurocode1997-1.
ze
1 Methods for assessing the compressive resistance of a pile foundation from ground test
results shall have been established from pile load tests and from comparable experience.
Al
2 A model factor may be introduced as described as following to ensure that the predicted
compressive resistance is sufficiently safe :
3 In assessing the validity of a model based on ground test results, the following items should
be considered:
1 Where a dynamic impact (hammer blow) pile test [measurement of strain and acceleration
versus time during the impact event is used to assess the resistance of individual
compression piles, the validity of the result shall have been demonstrated by previous
evidence of acceptable performance in static load tests on the same pile type of similar
length and cross-section and in similar ground conditions.
2 When using a dynamic impact load test, the driving resistance of the pile should be
measured directly on the site in question.
NOTE A load test of this type can also include a process of signal matching to
measured stress wave figures. Signal matching enables an approximate evaluation of shaft
and base resistance of the pile as well as a simulation of its load-settlement behaviour.
3 The impact energy shall be high enough to allow for an appropriate interpretation of
nt
the pile capacity at a correspondingly high enough strain level.
la
4 The design value of the compressive resistance of the pile could be calculated and
tP
verified according to Eurocode1997-1.
2 If pile driving formulae are used to assess the ultimate compressive resistance of individual
piles in a foundation, the validity of the formulae shall have been demonstrated by previous
a
experimental evidence of acceptable performance in static load tests on the same type of
pile, of similar length and cross-section, and in similar ground conditions.
er
ze
3 For end-bearing piles driven into non-cohesive soil, the design value of the compressive
resistance shall be assessed by the same procedure as in 4.11.5.
Ja
4 When a pile driving formula is applied to verify the compression resistance of a pile, the pile
driving test should have been carried out on at least 5 piles distributed at sufficient spacing in
Al
the piling area in order to check a suitable blow count for the final series of blows.
5 The penetration of the pile point for the final series of blows should be recorded for each pile.
1 Wave equation analysis shall only be used where stratification of the ground has been determined
by borings and field tests.
2 Where wave equation analysis is used to assess the resistance of individual compression piles,
the validity of the analysis shall have been demonstrated by previous evidence of acceptable
performance in static load tests on the same pile type, of similar length and cross- section, and in
similar ground conditions.
3 The design value of the compressive resistance derived from the results of wave equation analysis
of a number of representative piles, shall be assessed by the same procedure as in 4.11.3.
QCS 2014 Section 04: Foundations and Retaining Structures Page 57
Part 04: Deep Foundations
NOTE Wave equation analysis is based on a mathematical model of soil, pile and driving
equipment without stress wave measurements on site. The method is usually applied to
study hammer performance, dynamic soil parameters and stresses in the pile during driving.
It is also, on the basis of the models, possible to determine the required driving resistance
(blow count) that is usually related to the expected compressive resistance of the pile.
1 The design of piles in tension shall be consistent with the design rules given in 4.11.2, where
applicable. Design rules that are specific for foundations involving piles in tension are presented
below.
2 To verify that the foundation will support the design load with adequate safety against a failure in
tension, the following inequality shall be satisfied for all ultimate limit state load cases and load
combinations in accordance with Eurocode1997-1.
nt
3 For isolated tensile piles or a group of tensile piles, the failure mechanism may be governed by the
pull-out resistance of a cone of ground, especially for piles with an enlarged base or rock socket.
la
tP
4 When considering the uplift of the block of ground containing the piles the shear resistance along
the sides of the block may be added to the resisting forces.
al
5 Normally the block effect will govern the design tensile resistance if the distance between the piles
ph
is equal to or less than the square root of the product of the pile diameter and the pile penetration
into the main resisting stratum.
As
6 The group effect, which may reduce the effective vertical stresses in the soil and hence the shaft
resistances of individual piles in the group, shall be considered when assessing the tensile
a
7 The severe adverse effect of cyclic loading and reversals of load on the tensile resistance shall be
ze
considered.
Ja
8 Comparable experience based on pile load tests should be applied to appraise this effect.
1 Pile load tests to determine the ultimate tensile resistance of an isolated pile shall be carried out in
accordance with 4.9.1 and with regard to 4.11.3.
2 The design tensile resistance could be calculated and verified according to Eurocode1997-1.
1 Methods for assessing the tensile resistance of a pile foundation from ground test results shall
have been established from pile load tests and from comparable experience.
2 A model factor may be introduced as following to ensure that the predicted tensile resistance is
sufficiently safe.
3 The design value of tensile resistance of a pile could be calculated and verified according to
Eurocode1997-1.
1 Vertical displacements under serviceability limit state conditions shall be assessed and checked.
2 When calculating the vertical displacements of a pile foundation, the uncertainties involved in the
calculation model and in determining the relevant ground properties should be taken into account.
Hence it should not be overlooked that in most cases calculations will provide only an approximate
estimate of the displacements of the pile foundation.
NOTE For piles bearing in medium-to-dense soils and for tension piles, the safety
requirements for the ultimate limit state design are normally sufficient to prevent a
serviceability limit state in the supported structure.
nt
4.11.12 Pile foundations in compression
la
1 The occurrence of a serviceability limit state in the supported structure due to pile settlements shall
tP
be checked, taking into account downdrag, where probable.
NOTE When the pile toe is placed in a medium-dense or firm layer overlying rock or very
al
hard soil, the partial safety factors for ultimate limit state conditions are normally sufficient to
satisfy serviceability limit state conditions.
ph
2 Assessment of settlements shall include both the settlement of individual piles and the settlement
As
3 The settlement analysis should include an estimate of the differential settlements that may occur.
a
er
4 When no load test results are available for an analysis of the interaction of the piled foundation with
the superstructure, the load-settlement performance of individual piles should be assessed on
ze
1 The assessment of upward displacements shall be done and Particular attention should be paid to
Al
2 When very severe criteria are set for the serviceability limit state, a separate check of the upward
displacements shall be carried out.
1 The design of piles subjected to transverse loading shall be consistent with the design rules given
in 4.10, where applicable. Design rules specifically for foundations involving piles subjected to
transverse loading are presented below.
QCS 2014 Section 04: Foundations and Retaining Structures Page 59
Part 04: Deep Foundations
2 To demonstrate that a pile will support the design transverse load with adequate safety against
failure, the following inequality shall be satisfied for all ultimate limit state load cases and load
combinations:
Ftr ≤ Rtr
Where;
Ftr: design value of the transverse load on a pile or a pile foundation
Rtr : design resistance of transversally loaded pile
nt
displacement of the soil near the top of the pile.
la
4 The group effect shall be considered when assessing the resistance of transversely loaded piles.
tP
5 It should be considered that a transverse load applied to a group of piles may result in a
combination of compression, tension and transverse forces in the individual piles.
al
4.12.2 Transverse load resistance from pile load tests
ph
1 Transverse pile load tests shall be carried out in accordance with 4.9.6.
As
2 Contrary to the load test procedure described in 4.9 tests on transversely loaded piles need not
normally be continued to a state of failure. The magnitude and line of action of the test load should
a
3 An allowance shall be made for the variability of the ground, particularly over the top few meters of
ze
the pile, when choosing the number of piles for testing and when deriving the design transverse
resistance from load test results.
Ja
4 Records of the installation of the test pile(s) should be checked, and any deviation from the normal
construction conditions should be accounted for in the interpretation of the pile load test results.
Al
For pile groups, the effects of interaction and head fixity should be accounted for when deriving the
transverse resistance from the results of load tests on individual test piles.
4.12.3 Transverse load resistance from ground test results and pile strength parameters
1 The transverse resistance of a pile or pile group shall be calculated using a compatible set of
structural effects of actions, ground reactions and displacements.
2 The analysis of a transversely loaded pile shall include the possibility of structural failure of the pile
in the ground.
3 The calculation of the transverse resistance of a long slender pile may be carried out using the
theory of a beam loaded at the top and supported by a deformable medium characterized by a
horizontal modulus of subgrade reaction.
4 The degree of freedom of rotation of the piles at the connection with the structure shall be taken
into account when assessing the foundation’s transverse resistance.
QCS 2014 Section 04: Foundations and Retaining Structures Page 60
Part 04: Deep Foundations
1 The assessment of the transverse displacement of a pile foundation shall take into account:
(a) the stiffness of the ground and its variation with strain level;
(b) the flexural stiffness of the individual piles;
(c) the moment fixity of the piles at the connection with the structure;
(d) the group effect;
(e) the effect of load reversals or of cyclic loading
2 A general analysis of the displacement of a pile foundation should be based on expected degrees
of kinematic freedom of movement.
END OF PART