0% found this document useful (0 votes)
35 views

Exercises 2

i) The ordinates of the design hydrograph (DRH) due to a rainfall excess of 3.5 cm over 6 hours are computed using the given 6-hour unit hydrograph. ii) The resulting DRH from two successive storms of 6 hours each with rainfall excess of 3.0 cm and 2.0 cm respectively is calculated. iii) The flood hydrograph is derived using the given accumulated rainfall and storm loss rate, assuming a base flow of 15 cumecs increasing by 2 cumecs every 12 hours until the end of the DRH.

Uploaded by

sirkali1973
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views

Exercises 2

i) The ordinates of the design hydrograph (DRH) due to a rainfall excess of 3.5 cm over 6 hours are computed using the given 6-hour unit hydrograph. ii) The resulting DRH from two successive storms of 6 hours each with rainfall excess of 3.0 cm and 2.0 cm respectively is calculated. iii) The flood hydrograph is derived using the given accumulated rainfall and storm loss rate, assuming a base flow of 15 cumecs increasing by 2 cumecs every 12 hours until the end of the DRH.

Uploaded by

sirkali1973
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

PROBLEM No.

1
The ordinates of a 6 hr unit hydrograph for a catchment are given below
Time(hr) 0 3 6 9 12 15 18
UHO (Cumecs) 0 25 50 85 125 160 185

i) Compute the ordinates of the DRH due to rainfall excess of 3.5 cm occurring in 6 hr
ii)Two storms each of 6 hr duration and having rainfall excess values of 3.0cm and 2.0 cm respe
The 2 cm rainfall excess follows the 3 cm rainfall. Calculate the resulting DRH

iii) Derive the flood hydrograph due to the storm given below
Time from start of storm(h) 0 6 12 18
Accumulated rainfall (cm) 0 3.5 11 16.5
The storm loss rate for the catchment is estimated as 2.5mm/hr The base flow can be assumed a
and increasing by 2.0Cumecs for every 12 hrs till the end of the DRH.

PROBLEM No. 2
The runoff data at a stream gauging station for a flood are given below. The drainage area is 40 k
for the basin and plot the same.
Time(hr) 2 5 8 11 14 17 20
Discharge (Cume 50 47 75 120 225 290 270
State the peak of the unit hydrograph.
24 30 36 42 48 54 60 69
160 110 60 36 25 16 8 0

occurring in 6 hr
of 3.0cm and 2.0 cm respectively occur successively.
ing DRH

ase flow can be assumed as 15 Cumecs at the beginning

. The drainage area is 40 km2. The duration of rainfall is 3 hours. Derive the 3-hour unit hydrograph

23 26 29 32 35 38 41 44 47
145 110 90 80 70 60 55 51 50
nit hydrograph

You might also like