NG-018-XX-PNL-023029 - Rev01 ITP Steel Pr. Piping Fabrication and Erection
NG-018-XX-PNL-023029 - Rev01 ITP Steel Pr. Piping Fabrication and Erection
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
Document Identification Number
INSPECTION AND TEST PLAN -STEEL PRESSURE NG-018-XX-PNL-023029
PIPING PREFABRICATION & ERECTION
Revision : 01 Status: AFC
Document Type : PLN System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Contractor document number NG-018-XX-PNL-023029 Page 2 of 36
TABLE OF CONTENT
1. GENERAL .......................................................................................................................................................................... 3
4. APPENDIX ......................................................................................................................................................................... 8
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
Document Identification Number
INSPECTION AND TEST PLAN -STEEL PRESSURE NG-018-XX-PNL-023029
PIPING PREFABRICATION & ERECTION
Revision : 01 Status: AFC
Document Type : PLN System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Contractor document number NG-018-XX-PNL-023029 Page 3 of 36
1. GENERAL
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
Document Identification Number
INSPECTION AND TEST PLAN -STEEL PRESSURE NG-018-XX-PNL-023029
PIPING PREFABRICATION & ERECTION
Revision : 01 Status: AFC
Document Type : PLN System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Contractor document number NG-018-XX-PNL-023029 Page 4 of 36
1.3. Involvement
P: Performance Point
ITP Inspection Point identifying the party responsible to perform the activity described.
H: Hold Point
ITP Inspection point means that the presence of the concerned party (COMPANY) is
mandatory.
Notification to COMPANY for inspection shall be issued by CONTRACTOR. Work cannot
proceed without the concerned party (ies) signing off the inspection activity, unless a waiver has
been received by CONTRACTOR in writing from COMPANY.
W: Witness Point
ITP Inspection point means that the presence of the concerned party (COMPANY) is NOT
mandatory.
Notification to COMPANY for inspection shall be issued by CONTRACTOR. If COMPANY does
not wish to attend (or does not attend) the witness point, CONTRACTOR must proceed with
internal inspection and work can go ahead, without presence of the COMPANY and without
delay.
R: Review
ITP Inspection point meaning that concerned party (COMPANY) must check CONTRACTOR’s
manufacturing documents and review inspection / tests records and certificates.
S: Surveillance Point
ITP Inspection point means that the presence of the concerned party (COMPANY) is not
mandatory.
No notification is required but COMPANY may carry out inspection / tests at any stage of the
fabrication.
CONTRACTOR must proceed with internal inspection and proceed with the work provided that
control and tests reports are available to COMPANY for review.
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
Document Identification Number
INSPECTION AND TEST PLAN -STEEL PRESSURE NG-018-XX-PNL-023029
PIPING PREFABRICATION & ERECTION
Revision : 01 Status: AFC
Document Type : PLN System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Contractor document number NG-018-XX-PNL-023029 Page 5 of 36
CC – Subcontractor
QC – QC contractor
CON – CONTRACTOR Construction
CONC – CONTRACTOR Commissioning
TP – Laboratory / Third Party
CPY – COMPANY
This Inspection and Test Plan is to be linked with the following documents:
3. APPLICABLE DOCUMENTATION
CONSTRUCTION CONTRACTOR shall ensure that inspection and test activities planned in
the ITP(s) are in compliance with the following applicable documentation:
- Contractual specifications:
- Project specifications, including:
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
Document Identification Number
INSPECTION AND TEST PLAN -STEEL PRESSURE NG-018-XX-PNL-023029
PIPING PREFABRICATION & ERECTION
Revision : 01 Status: AFC
Document Type : PLN System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Contractor document number NG-018-XX-PNL-023029 Page 6 of 36
Reference Title
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
Document Identification Number
INSPECTION AND TEST PLAN -STEEL PRESSURE NG-018-XX-PNL-023029
PIPING PREFABRICATION & ERECTION
Revision : 01 Status: AFC
Document Type : PLN System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Contractor document number NG-018-XX-PNL-023029 Page 7 of 36
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
Document Identification Number
INSPECTION AND TEST PLAN -STEEL PRESSURE NG-018-XX-PNL-023029
PIPING PREFABRICATION & ERECTION
Revision : 01 Status: AFC
Document Type : PLN System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Contractor document number NG-018-XX-PNL-023029 Page 8 of 36
4. APPENDIX
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
COMPANY: TOTAL E&P NIGERIA LIMITED ITP No NG-018-XX-PNL-XXXXX
PLANT LOCATION: OFON
QUALITY INVOLVEMENT
REFERENCE ACCEPTANCE
QC CODE DESCRIPTION RECORD NOTES
DOCUMENT CRITERIA CC
CO Q T CO
CPY
FORM N C P NC
TB 0101 03 Approval of NDT GS PVV 611 GS PVV 611 NDT controller list R R
agents certifications Sec 9(b)
TB 0101 04 Reception of welding NG-018-XX-PNL- ASME Sec. II part Welding H S/R S for the actual activity
consumables 430918 C consumable batch
number register R for the register
TB 0101 06 Control of piping NG-018-XX-PNL- GS PVV 171 P S S OSD reports are raised if necessary
material received in 430915 Sec-5.1.2
yard
TB 0101 07 UIN affectation and TRACE ABILITY GS PVV 171 UIN register P S S/R S for the actual activity
tagging Sec-5.2 R for the register
TB 0101 08 Storage NG-018-XX-PNL- GS PVV 171 P W/S S
430915 Sec-5.4
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
COMPANY: TOTAL E&P NIGERIA LIMITED ITP No NG-018-XX-PNL-XXXXX
PLANT LOCATION: OFON
QUALITY INVOLVEMENT
REFERENCE ACCEPTANCE
QC CODE DESCRIPTION RECORD NOTES
DOCUMENT CRITERIA CC
CO Q T CO
CPY
FORM N C P NC
TB 0101 09 Inspection of NG-018-XX-PNL- Listed in NG22- Material receiving P S W/R Inspection prior to use.
material delivered to 430915 280-PVV-SPD- and inspection Including review of certificates.
yard 000002 report
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
COMPANY: TOTAL E&P NIGERIA LIMITED ITP No NG-018-XX-PNL-XXXXX
PLANT LOCATION: OFON
QUALITY INVOLVEMENT
REFERENCE ACCEPTANCE
QC CODE DESCRIPTION RECORD NOTES
DOCUMENT CRITERIA CC
CO Q T CO
CPY
FORM N C P NC
- Tacking
TB 0101 16 Dimensional check NG-018-XX-PNL- GS PVV 171 Supporting WPS P S S
before welding 431202
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
COMPANY: TOTAL E&P NIGERIA LIMITED ITP No NG-018-XX-PNL-XXXXX
PLANT LOCATION: OFON
QUALITY INVOLVEMENT
REFERENCE ACCEPTANCE
QC CODE DESCRIPTION RECORD NOTES
DOCUMENT CRITERIA CC
CO Q T CO
CPY
FORM N C P NC
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
Document Identification Number
INSPECTION AND TEST PLAN FOR PRESSURE NG-018-XX-PNL-023029
PIPING PREFABRICATION AND ERECTION
Revision : 01 Status: AFC
Document Type : PRC System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Contractor document number NG-018-XX-PNL-023029 Page 13 of 36
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
COMPANY: TOTAL E&P NIGERIA LIMITED ITP No NG-018-XX-PNL-023029
PLANT LOCATION: OFON SHEET No REVISION
QUALITY INVOLVEMENT
REFERENCE ACCEPTANCE
QC CODE DESCRIPTION RECORD C NOTES
DOCUMENT CRITERIA Q T CO
FORM CC O
C P NC
CPY
N
TB 0101 34 Reception of welding NG-018-XX-PNL- ASME Sec. II part Welding P R S/R S for the actual activity
consumables 430918 C consumable batch
number register R for the register
TB 0101 36 Control of piping NG-018-XX-PNL- GS PVV 171 H S S OSD reports are raised if necessary
material received on 430915
site
TB 0101 37 UIN affectation and GS PVV 171 UIN register P H S/R S for the actual activity
tagging
R for the register
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
COMPANY: TOTAL E&P NIGERIA LIMITED ITP No NG-018-XX-PNL-023029
PLANT LOCATION: OFON SHEET No REVISION
QUALITY INVOLVEMENT
REFERENCE ACCEPTANCE
QC CODE DESCRIPTION RECORD C NOTES
DOCUMENT CRITERIA Q T CO
FORM CC O
C P NC
CPY
N
TB 0101 39 Inspection of NG-018-XX-PNL- GS PVV 171 Material receiving H W/R Inspection prior to use.
material delivered on 430915 and inspection
site report
TB 0101 45 Erection: NG-018-XX-PNL- GS PVV 171 Supporting WPS P S S/R S for the actual activity
- Fit up 431202
R for the WPS
- Tacking
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
COMPANY: TOTAL E&P NIGERIA LIMITED ITP No NG-018-XX-PNL-023029
PLANT LOCATION: OFON SHEET No REVISION
QUALITY INVOLVEMENT
REFERENCE ACCEPTANCE
QC CODE DESCRIPTION RECORD C NOTES
DOCUMENT CRITERIA Q T CO
FORM CC O
C P NC
CPY
N
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
COMPANY: TOTAL E&P NIGERIA LIMITED ITP No NG-018-XX-PNL-023029
PLANT LOCATION: OFON SHEET No REVISION
QUALITY INVOLVEMENT
REFERENCE ACCEPTANCE
QC CODE DESCRIPTION RECORD C NOTES
DOCUMENT CRITERIA Q T CO
FORM CC O
C P NC
CPY
N
TB 0101 57 Checking before NG-018-XX-PNL- GS PVV 171 Punch list H H Clearing of item type A.
hydro test 430909
TB 0101 59 Preparation of NG-018-XX-PNL- GS PVV 171 Hydrostatic test P S S S/R S for the actual activity
hydrostatic test 430909 report
R for the report
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
COMPANY: TOTAL E&P NIGERIA LIMITED ITP No NG-018-XX-PNL-023029
PLANT LOCATION: OFON SHEET No REVISION
QUALITY INVOLVEMENT
REFERENCE ACCEPTANCE
QC CODE DESCRIPTION RECORD C NOTES
DOCUMENT CRITERIA Q T CO
FORM CC O
C P NC
CPY
N
TB 0101 63 Reinstatement after NG-018-XX-PNL- GS PVV 171 Hydrostatic test P H S S/R S for the actual activity
hydrostatic test 430909 report
R for the report
TB 0101 65 Checking NG-018-XX-PNL- GS PVV 171 Punch list H H H Clearing of item type B to handover to
430909 Commissioning team.
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the Company”.
Document Identification Number
INSPECTION AND TEST PLAN FOR PRESSURE NG-018-XX-PNL-023029
PIPING PREFABRICATION AND ERECTION
Revision : 00 Status: AFC
Document Type : PRC System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Contractor document number NG-018-XX-PNL-023029 Page 19 of 36
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from the
Company”.
1 of 1
JOB UNIT
COMPANY :
REPORT N:
PLANT LOCATION
QC CODE PROGRESS. N.
RFI –
PROJECT TITLE :
ITP REF.
ST
1 INSPECTION RFI - REQUEST FOR INSPECTION RFI No.
MONTH DAY HOUR MIN
JAN FEB MAR APR 1 2 3 4 5 6 7 8 9 10 11 00 01 02 03 04 05 06 07 08 00 10
MAY JUN JUL AUG 12 13 14 15 16 17 18 19 20 21 22 09 10 11 12 13 14 15 16 17 20 30
SEP OCT NOV DEC 23 24 25 26 27 28 29 30 31 18 19 20 21 22 23 40 50
REFERENCE DRAWING FOR RESULT
No Item ITEM DESCRIPTION
LOCATION POS. NEG.
Note:
QC. SUPERVISOR
COMPANY
QC CONTRACTOR CONTRACTOR
NAME : NAME : NAME :
No. Inspection and test report issued? YES NO Form Code Report number
1 □ □
2 □ □
3 □ □
4 □ □
DOC.TITLE
MATERIAL RECEIVING AND INSPECTION UNIT
REPORT
COMPANY REPORT No : 0
QC CODE PROGRESSIVE No
PLANT LOCATION
PNL YARD
ITP Ref.
PROJECT TITLE Date of issue:
Purchase Order No. : PNL Yard delivery n° : PAGE 1 OF1
Packing List N° :
Supplier: Carrier: Invoice / Way Bill
Page 1/1
Référence client / Client :
Bordereau de sortie
Référence projet / Project :
Material issue report PROJECT OFON PHASE 2
Commentaire / Comments :
Isométrique PF / PF Isometric :
Longueur
requise /
Item / Item Diam / Diam Ep. / Thk. Longueur / Length Commentaires / Comments
Required
length
A
Page : 1 /1
"Cannot be reproduced, completely or partially, without the preliminary
Edition du 05/11/2009 authorization of Ponticelli Frères."
Bon de Travail Référence client / Client :
Préfabrication Référence projet / Project :
Fabrication WorkSheet PROJECT OFON PHASE 2
Pouces 2nde Phase / 2nd stage inches : Pouces support / support inches : 0
1 21" S1.
A
2
Signature /
Signature
Page / Page : 1 /1
"Cannot be reproduced, completely or partially, without the preliminary authorization of Ponticelli
Edition du 05/11/2009 Frères.
Frères."
WELDING CONSUMABLE
PRODUITS D’APPORT Page :
_______________
Name
COMPANY
REPORT NO:
PLANT LOCATION
QC CODE PROGRESS N.
PROJECT TITLE
WELDER RECORD
This Qualification is Valid Until Date : ( See below Re‐validations of Approvals )
Welder Name :
CID( Candidate ID ) :
ID ( Stamp )
Code/Testing Standard:
Photo
RE‐VALIDATION OF APPROVAL
____________ ____________ _____________ ___________ _________ _________ ________________ ______________ 1 Fissure - Cracks
____________ ____________ _____________ ___________ _________ _________ ________________ ______________ 2 Porosité Soufflures
Porosity Gas pores
____________ ____________ _____________ ___________ _________ _________ ________________ ______________ 3 Inclusion débouchante
Inclusion to surface
____________ ____________ _____________ ___________ _________ _________ ________________ ______________ 4 Rochage
Oxidation
____________ ____________ _____________ ___________ _________ _________ ________________ ______________ 5 Amorçage d’arc
Arc strike
____________ ____________ _____________ ___________ _________ _________ ________________ ______________ 6 Manque de Fusion
Lack of Fusion
____________ ____________ _____________ ___________ _________ _________ ________________ ______________ 7 Manque de Pénétration
Lack of Penetration
____________ ____________ _____________ _________ _________ _________ ________________ ______________ 8 Caniveau
Undercutting
____________ ____________ _____________ ___________ _________ _________ ________________ ______________ 9 Retassure
Concave root surface
____________ ____________ ____________ ___________ _________ _________ _______________ ______________ 10 Surépaisseur exessive
Excess weld metal
____________ ____________ _____________ ___________ _________ _________ ________________ ______________ 11 Excès de Pénétration
Excess of Penetration
____________ ____________ _____________ ___________ _________ _________ ________________ ______________ 12 Effondrement
Sagging
____________ ____________ _____________ ___________ _________ _________ ________________ ______________ 13 Manque d’épaisseur
Incompletely fillet groove
____________ ____________ _____________ ___________ _________ _________ ________________ ______________ 14 Défaut d’aspect
Weaving Faults
____________ ____________ _____________ ___________ _________ _________ ________________ ______________ 15 Autres
Others
Note - Remarks :
_______________________________________________________________________________________________________________
_______________________________________________________________________________________________________________
_______________________________________________________________________________________________________________
_______________________________________________________________________________________________________________
_______________________________________________________________________________________________________________
_______________________________________________________________________________________________________________
Date
Signature
CERTIF. N°: _______________________
PROCES-VERBAL DE CONTROLE PAR
MAGNETOSCOPIE
Magnetic Particle Examination Report Page n° de
Sheet nr _________ of _________
Démagnétisation
Demagnetization ________________________________________________________________________________________________________________________________
Signature
. PROCES-VERBAL DE CONTROLE PAR CERTIF. N°:
RADIOGRAPHIE
Radiographic Test Report Page n° de
Sheet nr _________ of _________
_______________________ ___________________________
______________________
Extension du contrôle
__________________________
Critères d'Acceptation
Rayons IR 192 Ci __________________
Control Extension Acceptance Criteria
Ray Co 60 Ci __________________
_______________________ ___________________________
_
_______________________ ___________________________
Pb Ecran Type d'Exposition : Panoramique _ Projection Contact
Pb Screen mm ________________ Exposure Type : Panoramic Projection Contact
1 Fissure - Cracks
_________________________ _____________________ ____________ ___________ ________________ ______________ 2 Manque de Fusion
Lack Fusion
_________________________ _____________________ ____________ ___________ ________________ ______________ 3 Manque de Pénétration
Lack Penetration
_________________________ _____________________ ____________ ___________ ________________ ______________ 4 Excès de Pénétration
Excess Penetration
_________________________ _____________________ ____________ ___________ ________________ ______________ 5 Caniveau
Undercutting
_________________________ _____________________ ____________ ___________ ________________ ______________ 6 Porosité
Porosity
_________________________ _____________________ ____________ ___________ ________________ ______________ 7 Soufflure vermiculaire
Worm Holes
_________________________ _____________________ ____________ ___________ ________________ ______________ 8 Inclusion de laitier
Slags Inclusion
_________________________ _____________________ ____________ ___________ ________________ ______________ 9 Inclusion de tungstène
Tungsten Inclusion
_________________________ _____________________ ____________ ___________ ________________ ______________ 10 Soudure irrégulière
Irregular Seam
_________________________ _____________________ ____________ ___________ ________________ ______________ 11 Défaut d'aspect
Weaving Faults
_________________________ _____________________ ____________ ___________ ________________ ______________ 12 Concavité
Concavity
_________________________ _____________________ ____________ ___________ ________________ ______________ 13 Défaut d'alignement
Misalignment
_________________________ _____________________ ____________ ___________ ________________ ______________ 14 Rochage
Oxidation
15 Défaut dans le film
I.Q.I. Note - Remarks Film Defect
Date
Signature
COMPANY
ISOMETRIC PF-A12EP567-3
CLIENT REVISION 2
PF REVISION 0
Piping class BA325
TYPE OF PED II
Client control class
Fluid P
GRADE CS
Site d'édition PROJECT
VISUAL Radiograph Radio-Node Dye-penetrant Ultra sound Magnetoscopy Heat treatment PMI Hardness Ferrite
C
I O
W T R R R R R R R R R E
n O D N
E H e e e e e e e e e X R
N c P I T C C C C C C C C C C R
L I p p p p p p p p p T E
U h E A R l l l l l l l l l l E
D M C o o o o o o o o o E M
M U e R M O P i P i P i P i P i P i P i P i P i P i S
O K r r r r r r r r r N A
B P s A E L F e F e F e F e F e F e F e F e F e F e U
T S N t t t t t t t t t S R
E T T n n n n n n n n n n L
Y E I K
R q O E D t t t t t t t t t t T
P S n n n n n n n n n O S
t R R A
E S ° ° ° ° ° ° ° ° ° N
y T
E
S1 BW A 6 102 CC57 6 PCE 7,11 MM
31/01/2008
C S C
S101 FW A 2 114 CC57 6 PCE 7,11 MM
13/02/2008
C S C
S2 BW A 6 102 CC57 6 PCE 31/01/2008
7,11 MM C S C
S3 BW A 6 102 CC57 6 PCE 7,11 MM
31/01/2008
C S C
S4 BW A 6 102 CC57 6 PCE 7,11 MM
31/01/2008
C S C
S5 PIQ A 3,6 109 CC57 2 PCE 3,91 MM
31/01/2008
C S C
S6 BW A 2 101 CC57 2 PCE 3,91 MM
31/01/2008
C S C
S7 BW B 2 101 CC57 2 PCE 3,91 MM
31/01/2008
C S C
S8 BW B 2 101 CC57 2 PCE 3,91 MM
31/01/2008
C S C
S9 BW B 1 101 CC57 1 PCE 4 MM31/01/2008
C S C
OBSERVATIONS :
Ref. PV : _________________
Test pack Nbr: Subcontractor ref:
VERIFICATIONS
1. BEFORE TEST Date Visa Drawing N°
Cleaning YES NO
Pressure Test
Punch list item “A” cleared YES NO
bars
Conform to drawings (iso) YES NO
Isometrics drawing tested
Pressure gauges calibrated YES NO
Possibility to check all joints (Insulation – access) YES NO N° _______ /Rev.
Preparation of lines before test (blanks, open valves) YES NO
Temporary supports – Supports blocked YES NO
Modifications in progress YES NO N° __________________________________________
Non conformity YES NO N° __________________________________________
NOTES
VERIFICATIONS
2. DURING TEST
Fluid used Water o others __________________________
CONSTRUCTION COMPANY
Date
Name :
APPROVAL BEFORE TEST
Signature :
Date
Name :
HYDROSTATIC TEST
Signature :
Date
Name :
AFTER TEST
Signature :
______________________________________________________________________________________________________________________________
AO34-4-54-X00-00-0-PR-0036-A03
PUNCH LIST Client Ref:
Project Ref :
ITEM CLEARANCE
DESCRIPTION CAT. CONSTR.
N° DATE
TEAM
CLIENT
NAME
VISA
BON DE TRAVAIL Client : Raffinerie de Provence
DIVISION TUYAUTERIE INDUSTRIELLE
MONTAGE Projet : DGO3 - Boucle HP
1, rue lilienthal
Contrat :
Emerainville - BP 79 Erection job card
77 312 marne la vallée cedex 2
Aire / secteur (Area) N° Iso : Rev Cli / Pf : /
Nuance Traitement thermique (thermal treatment)
PED cat Fluide service (serv. Fluide)
Code inspec. (inspect. code) Classe de tuy. (Piping class)
Fluide de test (test fluide) Système de paint. (Painting system)
*NE0340AA1*
Pièces préfabriquées et longueurs droites Supports
date lancement Repère Poids Diam Avancement Observations Repère Qté date sort. mag. Observations
start date Spool n° Weight progress Comments spool n° Qty output date Comments
Façonnage (ø<2")
date lancement Métré Avancement Observations
start date pipe length progress Comments
M
Nbre pouces montage (erection weld inches) Temps de réal. prévu (Estimated time)
Visa (stamp)