This document provides a key plan and notes for pot cum bearing installation on a bridge. The key plan shows the arrangement and location of bearings B1-B4 at the centerline of bearings, expansion joints, and the centerline of the bridge. The notes specify that dimensions are in mm and meters, approved manufacturers and specifications, testing requirements, and requirements for erection clamps and templates during installation.

Uploaded by

Shivendra Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views1 page

KQC - CP - MN20 - Bridge - 020

This document provides a key plan and notes for pot cum bearing installation on a bridge. The key plan shows the arrangement and location of bearings B1-B4 at the centerline of bearings, expansion joints, and the centerline of the bridge. The notes specify that dimensions are in mm and meters, approved manufacturers and specifications, testing requirements, and requirements for erection clamps and templates during installation.

Uploaded by

Shivendra Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

20000 CL OF BEARING CL OF BEARING

250 19500 250 B3 B4

3000
500 500
B3 B4
CL OF EXPANSION JOINT

1500 1500
CL OF EXPANSION JOINT CL OF BIRDGE

CL OF BEARING CL OF BEARING B1 B2

3000
B3 B4
1500

CL OF BEARING
G1 KEY PLAN
B3 B4 (KEY PLAN SHOWING ARRANGEMENT OF BEARING
LOCATION FOR POT CUM PIT BEARING)
3000

3000
NOTES:-
1. ALL DIMENSION ARE IN mm, LEVEL ARE IN METRES AND UNLESS OTHERWISE SPECIFIED ONLY
G2 WRITTEN DIMENSION SHALL BE FOLLOWED.
2. BEARING SHALL BE PROCURED FOR THE LIST OF APPROVED MANUFACTURER BY MORTH&H.
B3 B4 3. ALL BEARING SHALL CONFIRM TO THE LATEST MORTH&H SPECIFICATION, IRC:83 (PART III)- 2002 AND
TENDER STIPULATION. IF ANY.
1500

1500
4. THE TESTING OF RAW MATERIALS, METALIC COMPONENTS, ELASTOMER & PTFE AND ACCEPTANCE
TESTS ON BEARING SHALL CONFORM TO MOST SPECIFICATION/ TENDER SPECIFICATION.
5. MANUFACTURER SHALL SUBMIT THE CERTIFICATES FOR LOAD TESTING AND DIMENSIONS OF
12000

BEARING.
6. SUITABLE ERECTION CLAMPS FOR SAFE TRANSPORTATION AND HANDLING ALONG WITH TEMPLET
FOR ALIGNMENT SHALL BE PROVIDED BY THE MANUFACTURER.
1500

1500
7. THE PLAN SIZE AND HEIGHT OF PEDESTAL SHALL BE ADJUSTED TO SUIT THE FINALISED SIZE
G3 BEARINGS AT THE TIME OF EXECUTION.
B1 B2 8. THE GROUT/BEARING MORTAR SHALL BE OF HIGH STRENGTH FREE FLOWING NON- SHRINK TYPE.
9. GRADE OF CONCRETE OF PEDESTAL FOR BEARING IS M35.
10. SIZE OF PEDESTAL FOR BEARING IS 700MMX700MM.

c
3000

3000
G4
B3 B4
1500

CL OF SPLICES
12000 7500

POT CUM PTFE BEARING LAYOUT


0 1.25 2.5m

LOAD DATA OF POT-PTFE BEARING


VERTICAL LOAD IN KN LONGITUDINAL FORCE IN KN TRANSVERSE FORCE IN KN ROTATION
S.NO. NOTATIONS DESCRIPTION NOS
DL SIDL LIVE SEISMIC DL SIDL LIVE SEISMIC DL SIDL LIVE SEISMIC DL+SIDL LIVE

B1 FIXED BEARING 1 427.60 530.90 478.10 144 85.52 106.18 95.62 346 0.00 0.00 95.62 346 0.0021 0.0012

B2 LONG GUIDED BEARING 1 427.60 530.90 478.10 144 0.00 0.00 0.00 0.00 0.00 0.00 95.62 346 0.0021 0.0012

B3 TRANSVERSE GUIDED BEARING 3 427.60 530.90 478.10 144 85.52 106.18 95.62 346 0.00 0.00 0.00 0.00 0.0021 0.0012

B4 BOTH SIDE GUIDED BEARING 3 427.60 530.90 478.10 144 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0021 0.0012

OWNER ENGINEERING : SAFETY CONSULTANT : EPC CONTRACTOR: PROOF CONSULTANT: PROJECT: TITLE : CHAMOLI TO PAINI
DRAWN BY : VKS
KQC GLOBAL CONSULTANTS PVT. LTD. CONSTRUCTION & UPGRADATION OF EXISTING ROAD 20m SPAN STEEL COMPOSITE BRIDGE
125m TO 2-LANE WITH PAVED SHOULDERS FROM KM POSITION AND LOAD DATA OF POT CUM PTFE BEARING
DESIGNED BY : SK
301 Kautilya, Sector 14, Dwarka, 430.000 TO KM 468.000 OF CHAMOLI TO PAINI AT CH.442+940
New Delhi, Delhi 110075 (EXCLUDING KM 437.625 TO KM 437.775, KM 458.900 TO
APPROVED BY : DK DRG. NO. : KQC_ CP_MN20_ BRIDGE_020
www.kqcglobalconsultants.com KM 459.475 AND KM 464.425 TO KM 464.525) OF NH-07
National Highways & Infrastructure MANOMAV ENGINEERS NKG INFRASTRUCTURE LTD. UNDER CHARDHAM PARIYOJNA ON EPC BASIS IN THE
Development Corporation Ltd. (NHIDCL) PVT. LTD. MEPL 1:50 (A1)
STATE OF UTTRAKHAND (PKG-III) REV. DATE DESCRIPTION SCALE : REVISION : R-0 JUNE 2019
1:100 (A3)

You might also like