IEM527 Wakeboard
IEM527 Wakeboard
A Project
Submitted in Partial fulfillment of the
Subject Requirements in
IEM527 – Elective 4: Product Design and Development
March 3, 2018
1|Page
TABLE OF CONTENTS
I. INTRODUCTION 4
II. IDENTIFYING CUSTOMER NEEDS 6
III. CONCEPT GENERATION AND SELECTION 7
IV. CONCEPT TESTING 9
V. PRODUCT SPECIFICATION 14
Two-tower wakeboard cable system 14
Full-size cable system 15
Other Facilities 17
Other Amenities 18
VI. PRODUCT ARCHITECTURE 19
Site Vicinity Map 20
Site Location Map 21
Top Views 22
Isometric Views 26
VII. DESIGN FOR MANUFACTURING 29
Summary 29
Land 30
Wakeboard System 30
Administration Building 31
Restaurant 31
Souvenir Shop 31
Amenities 32
Accommodations 32
Swimming Pool 53
Cost Reduction 55
2|Page
VIII. PROTOTYPING 56
Top View 56
Isometric View 57
IX. PRODUCT DEVELOPMENT AND ECONOMICS 58
Economic Analysis 58
Operating Hours/ Selling Price 59
Influences of the Qualitative Factors on Project Success 61
X. PRODUCT MANAGEMENT 63
Goals and Objective 63
Wakeboard Park Logo 64
Organizational Chart 65
Personnel Description 66
Project Execution 68
Marketing Strategies 69
Project Control 74
XI. DESIRABILITY OF THE PROJECT 75
Conclusion/Generalization 75
3|Page
CHAPTER I
INTRODUCTION
Adrenaline rush, adventure or the feel of flying along the wind, that’s
gaining momentum nearly at par with other popular sports like surfing and diving. Standing
on a small board through a serene lake. This calm, relaxing ride a quickly changes into a
Cable parks are becoming more popular and go by many names. So, whether you
call them a cable park like everyone do, or a cable wakeboard park, cable wake park,
wakeboard cable park, wakeboard park, or wake park, they’re all the same and they are all
about having fun. Cable Wakeboarding is increasingly popular sport that is already well
established internationally with more than 400 cable parks around the world over 30 years
ago. It has been claimed over the years that wakeboarding originated in variety of different
places. Wakeboarding in the Philippines is not as new as most people would think. In fact,
it has been around for quite some time, since early 90s via waterski enthusiasts who have
access to boats and would ride wakeboards, which would resemble surfboards with sandals.
Nowadays, wakeboarding is one of the fastest growing watersports in the world, and the
4|Page
Following the extensive success of cable parks around the world, developing a
cable park will make a positive contribution to Subic Bay. The location of having Cable
Park in Subic Bay will provide an exciting, new experience to riders of all levels. The cable
may wish to sit back and relax as they watch friends and family out on the water. Cable
Wakeboarding Park fits well within the Subic Bay’s desire to sustain its environmentally
5|Page
CHAPTER II
Subic Bay Freeport Zone is one of the most exciting and fun-filled summer
destinations. Only a couple of hours from the hustle and bustle of Manila, Subic is a
peaceful, safe and controlled environment. It is also known for different kind of watersports
for the reason of multiple beaches around the city. Flyboard, Jetovator, Bandwagon, Jetski,
Banana Boat, Hoverboard, and Parasail are some of the water activities they can find in
Subic Bay. Currently, cable wakeboarding has not yet introduced in Subic Bay. And there
are only 9 places to visit wakeboarding destination in the Philippines. To gain more and
more followers from adventure seekers, cable wakeboarding wants to introduce for the first
time in the city. To experience the thrill and fun of wakeboarding, enabling people to do
Lago de Oro in Batangas is the first cable wakeboarding Park in the Philippines and
Pampanga is the nearest place to try cable wakeboarding. The researchers want to design
and build Cable Wakeboarding in Subic Bay according to customer needs. Easy access to
the place of cable wakeboarding is the first thing that customer wants. Affordable price
for the watersport activity especially for beginners must also keep in mind. And for the fact
that not everyone wakeboards, other establishments are important to consider. Featuring a
hotel and several restaurants for a more enjoyable and relaxing stay. Some of the existing
cable Wakeboarding Park in the Philippines includes other amenities such as adult and
children swimming pools, playground, water sport equipment rental, golf, board games,
6|Page
CHAPTER III
To be able to select the best concept for a cable wakeboarding in Subic Bay, the
researchers targeted specifications, thorough search has been done internally and externally
slowly gaining momentum here in the Philippines. To develop a world-class cable park
that will represent the city to worldwide competition there are things to be consider, such
as the cable system, land and water requirements, location and the customer requirements.
Rixen, and Sesitec are two major companies that offered and install cable system
around the world. Currently, Rixen provided cable system to the different cable park in the
Philippines, like the Camsur Watersports Complex, Decawake in Pampanga, Lubao Cable
Park and many other. Full-size cable system and two-tower cable system are used with a
speed of 0-62 km/hr that can carry 6-12 people simultaneously. And in building a cable
other buildings. With a good location and a calm water in order to showcase the thrill of
the ride.
Providing a twenty-three (13) hectare cable park that maximize the customer
requirement is the goal of the researchers. Cable wakeboarding as the main attraction of
the park, where in beginners and professional wakeboarders are separated. The beginner
area will feature a two-tower cable system called little bro made by Rixen, it is ideal for
learning tricks that can cater both beginners and expert wakeboarders, it is also a straight-
line system that is made perfectly for learning. The expert area will have a full-size cable
7|Page
system that run counter-clockwise around the lake. The park will also introduce different
amenities like souvenir shops, accommodations, and restaurants for people to enjoy.
8|Page
CHAPTER IV
CONCEPT TESTING
Cable Wakeboarding is one of the hottest growing water sports trends. A kind of
water sports that helps to exercise all muscles in a human body and gives exceptional
extreme sensations while being one of the safest sports suitable for people of all ages.
Introducing new challenging kind of sports in the city will surely derive great pleasure from
everyone. The researchers conducted a survey to get a precise idea of what the customers
need.
• Have you or members of your household visited any watersports during the past year?
Yes
No
0 10 20 30 40
Figure 1
9|Page
• Approximately how often did you or members of your household visit watersports
over the past 12 months
1 to 5
6 to 10
11 to 19
20 or more
I don't know
0 10 20 30 40 50
Figure 2
• Overall how would you rate the physical condition of all the watersports you have
visited?
Excellent
Good
Fair
Poor
0 10 20 30 40
Figure 3
10 | P a g e
• Are you familiar with cable wakeboarding?
Yes
No
Not sure
0 5 10 15 20 25 30 35 40 45 50
Figure 4
Yes
No
0 10 20 30 40 50 60
Figure 5
11 | P a g e
• Would you be interested to visit a cable wakeboarding in Olongapo City?
Yes
No
Maybe
0 10 20 30 40 50 60
Figure 6
Lake
Seaside
Both
I have no idea
0 5 10 15 20 25 30
Figure 7
12 | P a g e
• What facilities would you like to find in a cable wakeboarding park?
Café
Restaurant
Souvenir Shop
Accomodations
Bar
Pool
Playground
Picnic Area
Others
0 5 10 15 20 25 30 35 40
Figure 8
The data was collected through 60 respondents, which reside nearby Subic Bay
premises. The place has long been known as a lifestyle city for adventurous and outdoors
enthusiasts. Out of 60 respondents, 30 of them stated that they have been into water sports
facilities at least 5 times within this year. Number of 34 respondents declared that they are
satisfied with the facility they have visited, while only 12 of them rated it as excellent. Not
all of the respondents are familiar with cable wakeboarding and just 4 of them have tried
the mentioned sport. However, all of them agreed to visit the cable wakeboarding facility
if there is one in the City. Artificial lake water surrounded by land was favored by most of
the respondents whereas the metropolitan is bounded by many oceans. Not everyone
wakeboards, the visitors selected three amenities such as restaurants, accommodations and
souvenir shop for anyone and everyone. The adventurous and high-adrenalin nature of the
Cable Wakeboarding Park sits comfortably alongside, and complements, the prevailing
13 | P a g e
CHAPTER V
PRODUCT SPECIFICATIONS
The Cable Wake Park is an ultimate complex for sportive activities as well as for
leisure, fun and entertainment. The park offers a range of features including a full size main
cable, with high quality obstacles and reverse winch cable for the beginners. Ambient
swimming pool for adult and kids, restaurant, open air bar in the roof top terrace with
spectacular view on the lake cater to different interests, comfortable hotel apartments, and
professional training equipment, pro shop and hire shop enable the visitors enjoying
meters width on artificial lake. The total height of the cable above the ground in 6.75
meters. The basic structure of the water ski cableway can be obtained in the schematic
diagram in figure 9. The running cable consisting of one single cable runs via 2
horizontally arranged deflection pulleys. The two deflection pulleys are connected to the
mast by side arms. The running cable is driven by an electric motor. The cable speed can
be adjusted infinitely from the frequency inverter located in the control unit. The usual
14 | P a g e
Figure 9. (basic structure of two-tower cableway)
The full-size cable system is designed in circular artificial lake with the length of
333.8 meters and a total of length 721 meters, it has a total of five (5) cableways that allows
riders to ride simultaneously. The distance between the riders between 70 to 90-meter
range. The basic structure of the full-size cable system can be seen in Figure 10. Different
obstacles are also placed like the kickers, fun box, rooftop, high rail, etc. These obstacles
are produced through plastic welding process. They are rounded edges and screw-free
constructions characterize complete obstacle line, UV-resistant, white and shattered PE-
15 | P a g e
Figure 11. (basic structure of full size cable ways)
16 | P a g e
Other Facilities
• Office is a 16.5 square meter room where organization users do administrative work. And
the purpose of the office environment is to support its occupants in performing their job.
• Front desk is a 14 square meter room, where employees are responsible for making sure
guests have a pleasant experience at the park. Duties typically involve checking guests in
and out, taking reservations, registrations and answering questions the guests may have.
There is also a lounge that will serve as a waiting area for guests.
• Souvenir shop or Pro shop is a 38 square meter store selling souvenirs relating to
wakeboarding such as t-shirts, key chains, collections and other items. All equipment for
professional wakeboard are also available for rent and buys in the pro shop.
• Kitchen is a part where used for cooking and food preparation. Counter or simply a cashier
is a person who handles the cash register that the customer wishes to purchase food. Tables
and chairs are placed on the front where foods and drinks are served.
• Restroom is a 44 square meter bathroom with 5 stalls for urinals and a shower room for
• Bar Area is a 96 square meter onsite café on the rooftop overlooking the lakes where
• Cable Wakeboarding Lake is a surface where riders are pulled around the lake by ropes
attached to the carriers. Starting Dock is a floating square that is level with the water to
17 | P a g e
Other Amenities:
• Accommodations are lodge facilities consisting of common rooms where guests can stay
overnight.
• Swimming Pool is a 10 x 10-meter pool for adults, with a depth of 6 feet and a
4 x 3-meter kiddie pool, with a depth of 3 feet for toddlers, which enable swimming for
the guests.
• Parking Area is a cleared area that is intended for parking vehicles reserved for the
customers.
18 | P a g e
CHAPTER VI
PRODUCT ARCHITECTURE
SITE
The proposed project is located at 4 Rizal Highway Corner Aim High Ave.,
19 | P a g e
Site Location Plan
20 | P a g e
Top Views
21 | P a g e
Figure 15. (Top View of Swimming Pool and kiddie pool)
22 | P a g e
Figure 16. (Top View of Accommodation)
23 | P a g e
Figure 17. (Top view of main building and warehouse)
24 | P a g e
Figure 19. (Full-size Cableways)
25 | P a g e
Isometric Views
26 | P a g e
Figure 22. (Isometric View of Swimming Pool and kiddie pool)
27 | P a g e
Figure 24. (Isometric View of Full-Size Cable ways)
28 | P a g e
CHAPTER VII
SUMMARY
2 Wakeboard System
SUB-TOTAL ₱43,121,298.00
3 Administration Building
Restaurant ₱3,000,000.00
Souvenir Store ₱1,753,487.00
SUB-TOTAL ₱4,753,487.00
4 Amenities
Accomodations ₱27,570,613.02
Swimming Pool ₱553,100.00
SUB-TOTAL ₱28,123,713.02
5 Pre-Operating Expenses
Overhead ₱14,945,220.39
Electricity ₱131,753.66
SUB-TOTAL ₱15,076,974.05
29 | P a g e
Subject: LAND
30 | P a g e
ADMINISTRATION BUILDING
Subject: RESTAURANT
31 | P a g e
AMENITIES
Accommodations
BUILDING DETAILS
Area Unit
Ground Floor
1 Bathroom 4 SM
2 Bedroom 18 SM
3 Dining Room 5 SM
4 Living Room 15 SM
Total Area 42 SM
BID FORM-BUILDING
CODE DESCRIPTION QTY. UNIT MATERIAL LABOR MATERIALS LABOR TOTAL
UNIT UNIT AMOUNT AMOUNT
COST COST
GENERAL
A
REQUIREMENTS
Mobilization and
1 lot 10,000.00 - 10,000.00 - 10,000.00
Demobilization
Site office,
Warehouse,
1 lot 5,000.00 - 5,000.00 - 5,000.00
Fabrication Area,
Workers Barracks
Electric & Water
1 lot 5,000.00 - 5,000.00 - 5,000.00
Consumption
Demolition of
1 lot 10,000.00 - 10,000.00 - 10,000.00
existing structures
Others; Boring,
1 lot 20,000.00 - 20,000.00 - 20,000.00
Soil Test, Bldg.
SUB - TOTAL - - 50,000.00
- - -
B EARTHWORKS
Lay-out, Staking and
B.1 42 SQM 150.00 200.00 6,300.00 8,400.00 14,700.00
Site Clearing:
B.2 Excavation Works: - -
32 | P a g e
C1-F1 0.09 cu m - 1,000.00 - 90.00 90.00
STRUCTURAL
C - - -
(REBAR) WORKS
C.1 Footings - - -
F-1 20 kgs 160.00 350.00 3,200.00 7,000.00 10,200.00
F-2 20 kgs 160.00 350.00 3,200.00 7,000.00 10,200.00
G.A 16 tie wires 5 kgs 110.00 550.00 - 550.00
Columns (Footing to
C.2 - - - - -
Roof deck)
C-1 50 kgs 160.00 350.00 8,000.00 17,500.00 25,500.00
C-2 50 kgs 160.00 350.00 8,000.00 17,500.00 25,500.00
G.A 16 tie wires 25 kgs 110.00 2,750.00 - 2,750.00
C.3 Slabs - -
First Floor 75 kgs 160.00 350.00 12,000.00 26,250.00 38,250.00
Canopies 10 kgs 160.00 350.00 1,600.00 3,500.00 5,100.00
G.A 16 tie wires 20 kgs 110.00 2,200.00 - 2,200.00
C.4 Beams - -
Footing Tie Beams 70 kgs 160.00 350.00 11,200.00 24,500.00 35,700.00
Grade Tie Beams 70 kgs 160.00 350.00 11,200.00 24,500.00 35,700.00
G.I 16 tie wires 30 kgs 110.00 350.00 3,300.00 10,500.00 13,800.00
SUB - TOTAL - - 205,450.00
D. FORM WORKS: - - -
D.1 Footings
F-1 0.27 sm 900.00 150.00 243.00 40.50 283.50
F-2 0.27 sm 900.00 150.00 243.00 40.50 283.50
Columns (Footing to
D.2 - -
Roof deck)
C-1 (footing to roof
1.5 sm 900.00 150.00 1,350.00 225.00 1,575.00
beam)
33 | P a g e
C-2 (footing to roof
1.5 sm 900.00 150.00 1,350.00 225.00 1,575.00
beam)
D.3 Slabs - -
Canopies 0.3 sm 900.00 150.00 270.00 45.00 315.00
D.4 Beams - -
Footing Tie Beams 1.68 sm 900.00 150.00 1,512.00 252.00 1,764.00
Grade Tie Beams 1.68 sm 900.00 150.00 1,512.00 252.00 1,764.00
Roof Beam 1.68 sm 900.00 150.00 1,512.00 252.00 1,764.00
Scaffoldings and
D.5 - -
shoring’s
Columns and
3.27 sm 1,200.00 150.00 3,924.00 490.50 4,414.50
Footings
Others (Specify) 1 lot 1,000.00 1,000.00 - 1,000.00
SUB - TOTAL 14,738.50
E CONCRETE WORKS
E.2 Footings
F-1 0.03 cu m 3,500.00 650.00 105.00 19.50 124.50
F-2 0.03 cu m 3,500.00 640.00 105.00 19.20 124.20
Columns (Footing to
E.3 - -
Roof beam)
C-1 0.12 cu m 3,500.00 640.00 420.00 76.80 496.80
C-2 0.12 cu m 3,500.00 640.00 420.00 76.80 496.80
E.4 Slabs - - - - -
F MASONRY WORKS - - - -
Concrete Hollow
F.1
Blocks
6" CHB Exterior Walls 126 sm 350.00 300.00 44,100.00 37,800.00 81,900.00
3" CHB Interior Walls 42 sm 350.00 300.00 14,700.00 12,600.00 27,300.00
F.2 Plastering 126 sm 400.00 300.00 50,400.00 37,800.00 88,200.00
F.3 Floor Toppings 2.1 sm 400.00 300.00 840.00 630.00 1,470.00
SUB - TOTAL 198,870.00
G ROOFING
34 | P a g e
G.1 Angle Bar 2X2X3/16 1 LOT 20,000.00 20,000.00 - 20,000.00
G.2 C-Farlins 2X3X1.0 1 LOT 10,000.00 10,000.00 - 10,000.00
G.3 Color Roof long span 1 LOT 15,000.00 15,000.00 - 15,000.00
G.4 Consumables 1 LOT 5,500.00 5,500.00 - 5,500.00
OTHERS (Please
G.5 1 15,000.00 - 15,000.00 15,000.00
specify) Labor Cost
SUB - TOTAL 65,500.00
G CEILING WORKS - - -
GROUND FLOOR - - -
G.1 Hardesenipa 4X8" 1 lot 2,700.00 450.00 2,700.00 450.00 3,150.00
G.2 Metal furring 2X1X16 1 lot 1,800.00 450.00 1,800.00 450.00 2,250.00
SUB - TOTAL 5,400.00
DOORS AND
H - - -
WINDOWS
H.1 D1- 1mtr X 2mtr 1 sets 5,000.00 - 5,000.00 - 5,000.00
H.2 D2 - .8mtr X 2mtr 1 sets 4,000.00 - 4,000.00 - 4,000.00
H.3 D3 - .7 X 2mtr 1 sets 3,500.00 - 3,500.00 - 3,500.00
H.18 W1 - .9mtr X 1mtr 4 sets 3,000.00 - 12,000.00 - 12,000.00
H.19 W2 - .5mtr X .6mtr 1 sets 900.00 - 900.00 - 900.00
Labor Cost 1 5,000.00 - 5,000.00 5,000.00
SUB - TOTAL 30,400.00
ARCHITECTURAL
FINISHES
I TILES
Bathroom (Wall
I.12 6.4 sm 600.00 300.00 3,840.00 1,920.00 5,760.00
30x60 Synthetic Tiles)
Bathroom (Floor
I.13 4 sm 600.00 300.00 2,400.00 1,200.00 3,600.00
30x60 Synthetic Tiles)
Bedroom Floor 60x60
I.25 18 sm 930.00 300.00 16,740.00 5,400.00 22,140.00
Granite Tiles
Living Room 60x60
15 sm 930.00 300.00 13,950.00 4,500.00 18,450.00
Granite Tiles
Dining Room 60x60
5 sm 930.00 300.00 4,650.00 1,500.00 6,150.00
Granite Tiles
J COUNTERS
Kitchen Counter Top 0.96 sm 6,000.00 300.00 5,760.00 288.00 6,048.00
Bathroom lavatory
counter top 60x60 0.54 sm 6,000.00 346.50 3,240.00 187.11 3,427.11
black granite tiles
SUB-TOTAL 65,575.11
35 | P a g e
L.3 Kitchen cabinets 1 sm 10,000.00 378.30 10,000.00 378.30 10,378.30
OTHERS (Please
- - -
specify)
SUB-TOTAL 10,378.30
M WATERPROOFING - - -
M.1 Bathroom 4 sm 450.00 300.00 1,800.00 1,200.00 3,000.00
OTHERS (Please
- - -
specify)
SUB-TOTAL 3,000.00
O PAINTING WORKS - - -
O.1 Interior walls 126 sm 160.00 110.00 20,160.00 13,860.00 34,020.00
Exterior walls and
O.2 upper and lower 130 sm 160.00 110.00 20,800.00 14,300.00 35,100.00
canopy
Ceiling/and Open
O.4 72 sm 160.00 110.00 11,520.00 7,920.00 19,440.00
Ceiling
SUB-TOTAL 88,560.00
P ELECTRICAL WORKS
36 | P a g e
P.1.13 Switch, 2 gang 2 set 320.00 640.00 -
640.00
37 | P a g e
Power Panelboard,
PP1
Main:60AT, 225AF, P,
P.3.11 1 Units 11,760.00 11,760.00 - 11,760.00
240V
Branches:
5 x 20AT, 2P
Labor Cost 120,000.00 - 120,000.00
SUB-TOTAL 173,305.14
Q PLUMBING WORKS - - -
COLD WATER LINE -
Q.1 1 nos 10,500.00 - 10,500.00 - 10,500.00
ppr pipe
Q.2 SEWAGE SYSTEM 1 nos 5,000.00 - 5,000.00 - 5,000.00
STORM DRAINAGE
Q.3 1 nos 4,500.00 - 4,500.00 - 4,500.00
SYSTEM
Q.4 SEPTIC TANK 1 nos 30,000.00 - 30,000.00 - 30,000.00
Q.5 WATER CLOSET 1 nos 15,000.00 - 15,000.00 - 15,000.00
URINALS (Mini
Q.6 Washbrook); FLUSH 1 nos 10,000.00 - 10,000.00 - 10,000.00
VALVE
LAVATORIES: UNDER
Q.7 1 nos 6,000.00 - 6,000.00 - 6,000.00
THE COUNTER
Q.8 Bath tub 1 set 85,000.00 85,000.00
KITCHEN SINKS:
Q.9 STAINLESS STEEL 1 nos 6,500.00 - 6,500.00 - 6,500.00
double sink
Q.10 LAV. FAUCETS: 1 set 1,125.00 - 1,125.00 - 1,125.00
Q.11 SINK FAUCETS: 1 set 500.00 - 500.00 - 500.00
FLOOR DRAINS:
Q.12 1 nos 1,000.00 - 1,000.00 - 1,000.00
STAINLESS STEEL
SHOWER VALVES
Q.13 WITH SHOWER 1 set 3,500.00 - 3,500.00 - 3,500.00
HEAD: Shower mix
Q.14 Labor Cost 1 lot 25,000.00 - 25,000.00 25,000.00
OTHERS (Please
Q.15
specify)
SUB - TOTAL 118,625.00
MECHANICAL
R
WORKS
Air conditioning
R.1
System
1.5 HP WINDOW
1 SET 23,500.00 1,500.00 23,500.00 1,500.00 25,000.00
TYPE
2TR SPLIT TYPE 1 SET 55,000.00 1,500.00 55,000.00 1,500.00 56,500.00
38 | P a g e
SUB-TOTAL 81,500.00
GRAND
1,237,709.35
TOTAL
X8 9,901,674.78
GENERAL
A
REQUIREMENTS
Mobilization and
1 lot 10,000.00 - 10,000.00 - 10,000.00
Demobilization
Site office, Warehouse,
Fabrication Area, 1 lot 5,000.00 - 5,000.00 - 5,000.00
Workers Barracks
Electric & Water
1 lot 5,000.00 - 5,000.00 - 5,000.00
Consumption
Demolition of existing
1 lot 10,000.00 - 10,000.00 - 10,000.00
structures
Others; Boring, Soil
Test, Bldg. Permit and 1 lot 20,000.00 - 20,000.00 - 20,000.00
other Permits
SUB - TOTAL - - 50,000.00
B EARTHWORKS - - -
Lay-out, Staking and
B.1 63 SQM 150.00 400.00 9,450.00 25,200.00 34,650.00
Site Clearing:
B.2 Excavation Works: - -
39 | P a g e
C1-F1 3.24 cu m - 1,000.00 - 3,240.00 3,240.00
C2-F2 1.14 cu m - 1,000.00 - 1,140.00 1,140.00
Tie Beams 1.92 cu m - 1,000.00 - 1,920.00 1,920.00
B.3 Wall Footings 1.92 cu m - 1,000.00 - 1,920.00 1,920.00
Backfill and
B.4 6.3 cu m - 600.00 - 3,780.00 3,780.00
Compaction
B.6 Gravel Bedding 2 cu m 1,600.00 - 3,200.00 3,200.00
B.7 Soil Poisoning 63 SQM 1,500.00 50.00 94,500.00 3,150.00 97,650.00
Others (Please specify) - - -
SUB - TOTA - - 147,500.00
STRUCTURAL (REBAR)
C - - -
WORKS
C.1 Footings - - -
F-1 25 kgs 160.00 350.00 4,000.00 8,750.00 12,750.00
F-2 25 kgs 160.00 350.00 4,000.00 8,750.00 12,750.00
G.A 16 tie wires 10 kgs 110.00 1,100.00 - 1,100.00
Columns (Footing to
C.2 - - - - -
Roof deck)
C-1 55 kgs 160.00 350.00 8,800.00 19,250.00 28,050.00
C-2 55 kgs 160.00 350.00 8,800.00 19,250.00 28,050.00
G.A 16 tie wires 30 kgs 110.00 3,300.00 - 3,300.00
C.3 Slabs - -
First Floor 86 kgs 160.00 350.00 13,760.00 30,100.00 43,860.00
Canopies 18 kgs 160.00 350.00 2,880.00 6,300.00 9,180.00
G.A 16 tie wires 40 kgs 110.00 4,400.00 - 4,400.00
C.4 Beams - -
Footing Tie Beams 75 kgs 160.00 350.00 12,000.00 26,250.00 38,250.00
Grade Tie Beams 75 kgs 160.00 350.00 12,000.00 26,250.00 38,250.00
G.I 16 tie wires 50 kgs 110.00 350.00 5,500.00 17,500.00 23,000.00
SUB - TOTAL - - 242,940.00
D. FORM WORKS: - - -
D.1 Footings
F-1 2.16 sm 900.00 150.00 1,944.00 324.00 2,268.00
F-2 0.75 sm 900.00 150.00 675.00 112.50 787.50
Columns (Footing to
D.2 - -
Roof deck)
C-1 (footing to roof
1.8 sm 900.00 150.00 1,620.00 270.00 1,890.00
beam)
C-2 (footing to roof 1.8 sm 900.00 150.00 1,620.00 270.00 1,890.00
D.3 Slabs - -
40 | P a g e
Canopies 5.6 sm 900.00 150.00 5,040.00 840.00 5,880.00
D.4 Beams - -
Footing Tie Beams 2 sm 900.00 150.00 1,800.00 300.00 2,100.00
Grade Tie Beams 2 sm 900.00 150.00 1,800.00 300.00 2,100.00
Roof Beam 2 sm 900.00 150.00 1,800.00 300.00 2,100.00
Scaffoldings and
D.5 - -
shorings
Columns and Footings 5 sm 1,200.00 150.00 6,000.00 750.00 6,750.00
Others (Specify) 1 lot 5,000.00 5,000.00 - 5,000.00
SUB - TOTAL 30,765.50
E CONCRETE WORKS
E.2 Footings
F-1 0.65 cu m 3,500.00 650.00 2,275.00 422.50 2,697.50
F-2 0.23 cu m 3,500.00 640.00 805.00 147.20 952.20
Columns (Footing to
E.3 - -
Roof beam)
C-1 2.16 cu m 3,500.00 640.00 7,560.00 1,382.40 8,942.40
C-2 1.08 cu m 3,500.00 640.00 3,780.00 691.20 4,471.20
E.4 Slabs - - - - -
Ground Floor 6.3 cu m 3,500.00 800.00 22,050.00 5,040.00 27,090.00
Canopies 0.36 cu m 3,500.00 800.00 1,260.00 288.00 1,548.00
E.5 Beams - - - - -
Footing Tie Beams 2.1 cu m 3,500.00 640.00 7,350.00 1,344.00 8,694.00
Grade Tie Beams 2.1 cu m 3,500.00 640.00 7,350.00 1,344.00 8,694.00
Roof Beam 2.1 cu m 3,500.00 800.00 7,350.00 1,680.00 9,030.00
SUB - TOTAL 72,119.30
F MASONRY WORKS - - - -
Concrete Hollow
F.1
Blocks
6" CHB Exterior Walls 200.5 sm 350.00 300.00 70,175.00 60,150.00 130,325.00
3" CHB Interior Walls 35 sm 350.00 300.00 12,250.00 10,500.00 22,750.00
F.2 Plastering 200.5 sm 400.00 300.00 80,200.00 60,150.00 140,350.00
F.3 Floor Toppings 3 sm 400.00 300.00 1,200.00 900.00 2,100.00
OTHERS ( Please
F.4 0 sm - - - - -
specify )
SUB - TOTAL 295,525.00
G ROOFING
G.1 Angle Bar 2X2X3/16 1 LOT 35,000.00 35,000.00 - 35,000.00
G.2 C-Farlins 2X3X1.0 1 LOT 15,000.00 15,000.00 - 15,000.00
G.3 Color Roof long span 1 LOT 22,000.00 22,000.00 - 22,000.00
41 | P a g e
G.4 Consumables 1 LOT 7,000.00 7,000.00 - 7,000.00
OTHERS (Please
G.5 1 18,000.00 - 18,000.00 18,000.00
specify) Labor Cost
SUB - TOTAL 97,000.00
G CEILING WORKS - - -
GROUND FLOOR - - -
G.1 Hardesenipa 4X8" 1 lot 8,000.00 2,500.00 8,000.00 2,500.00 10,500.00
G.2 metal furring 2X1X16 1 lot 2,500.00 2,500.00 2,500.00 2,500.00 5,000.00
SUB - TOTAL 15,500.00
DOORS AND
H - - -
WINDOWS
H.1 D1- 1mtr X 2mtr 1 sets 5,000.00 - 5,000.00 - 5,000.00
H.2 D2 - .8mtr X 2mtr 1 sets 4,000.00 - 4,000.00 - 4,000.00
H.3 D3 - .7 X 2mtr 2 sets 3,500.00 - 7,000.00 - 7,000.00
H.18 W1 - .9mtr X 1mtr 7 sets 3,000.00 - 21,000.00 - 21,000.00
H.19 W2 - .5mtr X .6mtr 3 sets 900.00 - 2,700.00 - 2,700.00
Labor Cost 1 10,000.00 - 10,000.00 10,000.00
SUB - TOTAL 49,700.00
ARCHITECTURAL
FINISHES
I TILES
Bathroom (Wall 30x60
I.12 12 sm 600.00 300.00 7,200.00 3,600.00 10,800.00
Synthetic Tiles)
Bathroom (Floor 30x60
I.13 6 sm 600.00 300.00 3,600.00 1,800.00 5,400.00
Synthetic Tiles)
Bedroom Floor 60x60
I.25 28 sm 930.00 300.00 26,040.00 8,400.00 34,440.00
Granite Tiles
Living Room 60x60
15 sm 930.00 300.00 13,950.00 4,500.00 18,450.00
Granite Tiles
Dining Room 60x60
12.5 sm 930.00 300.00 11,625.00 3,750.00 15,375.00
Granite Tiles
J COUNTERS
Kitchen Counter Top 0.96 sm 6,000.00 300.00 5,760.00 288.00 6,048.00
Bathroom lavatory
counter top 60x60 1.08 sm 6,000.00 346.50 6,480.00 374.22 6,854.22
black granite tiles
SUB-TOTAL 97,367.22
42 | P a g e
M WATERPROOFING - - -
M.1 Bathroom 6 sm 450.00 300.00 2,700.00 1,800.00 4,500.00
OTHERS (Please
- - -
specify)
SUB-TOTAL 4,500.00
O PAINTING WORKS - - -
O.1 Interior walls 283.5 sm 160.00 110.00 45,360.00 31,185.00 76,545.00
Exterior walls and
O.2 upper and lower 283.9 sm 160.00 110.00 45,417.60 31,224.60 76,642.20
canopy
Ceiling/and Open
O.4 63 sm 160.00 110.00 10,080.00 6,930.00 17,010.00
Ceiling
SUB-TOTAL 170,197.20
P ELECTRICAL WORKS
43 | P a g e
PVC Conduit, 15mmØ x
P.2.1 1 LOT 1,300.00 1,300.00 - 1,300.00
3m
PVC Conduit, 20mmØ x
P.2.2 1 LOT 1,000.00 1,000.00 - 1,000.00
3m
P.2.3 Junction Box, PVC 1 LOT 650.00 650.00 - 650.00
P.2.4 Utility Box 1 LOT 400.00 400.00 - 400.00
P.2.5 THW wire 10mm 1 LOT 7,000.00 7,000.00 - 7,000.00
Conduit Clamp, 1 hole,
P.2.6 1 LOT 250.00 250.00 - 250.00
15mmØ
P.2.7 Tox with screw, #8 1 LOT 250.00 250.00 - 250.00
P.2.8 Electrical Tape 1 LOT 500.00 500.00 - 500.00
Convenience Outlet,
P.2.9 8 set 199.50 1,596.00 - 1,596.00
duplex, 3 prong
P.2.10 Air Con Outlet 1 set 105.00 105.00 - 105.00
Convenience Outlet,
P.2.11 2 set 250.00 500.00 - 500.00
duplex, 1 prong
Convenience Outlet,
P.2.12 3 set 270.00 810.00 - 810.00
duplex, 2 prong
P.3 III. Panelboards - - - -
RSC Conduit, 40mmØ x
P.3.1 3 l 618.10 1,854.30 - 1,854.30
3m
RSC Conduit, 25mmØ x
P.3.2 10 l 180.00 1,800.00 - 1,800.00
3m
RSC Long Elbow,
P.3.3 4 set 250.00 1,000.00 - 1,000.00
40mmØ
RSC Long Elbow,
P.3.4 4 pcs 105.00 420.00 - 420.00
25mmØ
P.3.5 Locknut, 25mmØ 12 pcs 45.50 546.00 - 546.00
P.3.6 Locknut, 40mmØ 6 pcs 63.00 378.00 - 378.00
P.3.7 Bushing, 25mmØ 6 pcs 91.00 546.00 - 546.00
P.3.8 Bushing, 40mmØ 6 pcs 145.60 873.60 - 873.60
P.3.9 Entrance cap, 40mmØ 1 pcs 500.00 500.00 - 500.00
Power Panelboard,
LP1, LP2
P.3.10 Main:15AT, 2P, 240V 1 Units 10,500.00 10,500.00 - 10,500.00
Branches:
3 x 10AT, 2P
Power Panelboard,
PP1
Main:60AT, 225AF, P,
P.3.11 1 Units 11,760.00 11,760.00 - 11,760.00
240V
Branches:
8 x 20AT, 2P
44 | P a g e
Labor Cost 140,000.00 - 140,000.00
SUB-TOTAL 211,418.90
Q PLUMBING WORKS - - -
COLD WATER LINE -
Q.1 1 nos 10,500.00 - 10,500.00 - 10,500.00
ppr pipe
Q.2 SEWAGE SYSTEM 1 nos 5,000.00 - 5,000.00 - 5,000.00
STORM DRAINAGE
Q.3 1 nos 4,500.00 - 4,500.00 - 4,500.00
SYSTEM
Q.4 SEPTIC TANK 1 nos 30,000.00 - 30,000.00 - 30,000.00
Q.5 WATER CLOSET 2 nos 15,000.00 - 30,000.00 - 30,000.00
URINALS (Mini
Q.6 Washbrook); FLUSH 2 nos 10,000.00 - 20,000.00 - 20,000.00
VALVE
LAVATORIES: UNDER
Q.7 2 nos 6,000.00 - 12,000.00 - 12,000.00
THE COUNTER
Q.8 Bath tub 2 set 85,000.00 170,000.00
Q.9 KITCHEN SINKS: 1 nos 6,500.00 - 6,500.00 - 6,500.00
Q.10 LAV. FAUCETS: 1 set 1,125.00 - 1,125.00 - 1,125.00
Q.11 SINK FAUCETS: 1 set 500.00 - 500.00 - 500.00
FLOOR DRAINS:
Q.12 1 nos 1,000.00 - 1,000.00 - 1,000.00
STAINLESS STEEL
SHOWER VALVES WITH
Q.13 SHOWER HEAD: 2 set 3,500.00 - 7,000.00 - 7,000.00
Shower mix
Q.14 Labor Cost 1 lot 50,000.00 - 50,000.00 50,000.00
OTHERS (Please
Q.15 - -
specify)
SUB - TOTAL 178,125.00
R MECHANICAL WORKS
Air-conditioning
R.1
System
1.5 HP WINDOW TYPE 1 SET 23,500.00 1,500.00 23,500.00 1,500.00 25,000.00
2TR SPLIT TYPE 1 SET 55,000.00 1,500.00 55,000.00 1,500.00 56,500.00
SUB-TOTAL 81,500.00
GRAND
1,754,536.42
TOTAL
X4 7,018,145.68
45 | P a g e
Subject: 1-12 PERSON VILLA
Floor Area: 70 SM
BUILDING DETAILS
Area Unit
Ground floor
1 Bathroom/cr 6.00 SM
2 Function room 6.00 SM
3 Dining room 12.00 SM
4 Living room 12.00 SM
Second floor
5 Bedroom 1 12.50 SM
6 Bedroom 2 12.50 SM
7 Hallway/stairs 6.00
8 Bathroom/cr 4.00 SM
Total area 70 SM
A GENERAL REQUIREMENTS
Mobilization and
1 lot 10,000.00 - 10,000.00 - 10,000.00
Demobilization
Site office, Warehouse,
Fabrication Area, Workers 1 lot 10,000.00 - 10,000.00 - 10,000.00
Barracks
Electric & Water
1 lot 15,000.00 - 15,000.00 - 15,000.00
Consumption
Demolition of existing
1 lot 10,000.00 - 10,000.00 - 10,000.00
structures
Others; Boring, Soil Test,
Bldg. Permit and other 1 lot 25,000.00 - 25,000.00 - 25,000.00
Permits
SUB - TOTAL - - 70,000.00
B EARTHWORKS - - -
Lay-out, Staking and Site
B.1 70 SQM 150.00 400.00 10,500.00 28,000.00 38,500.00
Clearing:
B.2 Excavation Works: - -
C1-F1 4.8 cu m - 1,000.00 - 4,800.00 4,800.00
C2-F2 4.8 cu m - 1,000.00 - 4,800.00 4,800.00
Tie Beams 3.07 cu m - 1,000.00 - 3,070.00 3,070.00
B.3 Wall Footings 3.07 cu m - 1,000.00 - 3,070.00 3,070.00
46 | P a g e
B.4 Backfill and Compaction 6.3 cu m - 600.00 - 3,780.00 3,780.00
B.6 Gravel Bedding 5 cu m 1,600.00 - 8,000.00 8,000.00
B.7 Soil Poisoning 70 SQM 1,500.00 50.00 105,000.00 3,500.00 108,500.00
Others ( Please specify ) - - -
SUB - TOTAL - - 174,520.00
STRUCTURAL (REBAR)
C - - -
WORKS
C.1 Footings - - -
F-1 50 kgs 160.00 350.00 8,000.00 17,500.00 25,500.00
F-2 50 kgs 160.00 350.00 8,000.00 17,500.00 25,500.00
G.A 16 tie wires 20 kgs 110.00 2,200.00 - 2,200.00
Columns (Footing to Roof
C.2 - - - - -
deck)
C-1 110 kgs 160.00 350.00 17,600.00 38,500.00 56,100.00
C-2 110 kgs 160.00 350.00 17,600.00 38,500.00 56,100.00
C-1-A 110 kgs 160.00 350.00 17,600.00 38,500.00 56,100.00
C-2-B 110 kgs 160.00 350.00 17,600.00 38,500.00 56,100.00
G.A 16 tie wires 40 kgs 110.00 4,400.00 - 4,400.00
C.3 Slabs - -
First Floor 86 kgs 160.00 350.00 13,760.00 30,100.00 43,860.00
Canopies 18 kgs 160.00 350.00 2,880.00 6,300.00 9,180.00
G.A 16 tie wires 40 kgs 110.00 4,400.00 - 4,400.00
Second Floor 90 kgs 160.00 350.00 14,400.00 31,500.00 45,900.00
Canopies 18 kgs 160.00 350.00 2,880.00 6,300.00 9,180.00
G.A 16 tie wires 40 kgs 110.00 4,400.00 - 4,400.00
C.4 Beams - -
Footing Tie Beams 75 kgs 160.00 350.00 12,000.00 26,250.00 38,250.00
Grade Tie Beams 75 kgs 160.00 350.00 12,000.00 26,250.00 38,250.00
Second Floor Tie Beams 75 kgs 160.00 350.00 12,000.00 26,250.00 38,250.00
Second Floor Roof Beams 75 kgs 160.00 350.00 12,000.00 26,250.00 38,250.00
G.I 16 tie wires 40 kgs 110.00 350.00 4,400.00 14,000.00 18,400.00
SUB - TOTAL - - 570,320.00
D. FORM WORKS: - - -
D.1 Footings
F-1 3 sm 900.00 150.00 2,700.00 450.00 3,150.00
F-2 2 sm 900.00 150.00 1,800.00 300.00 2,100.00
Columns (Footing to Roof
D.2 - -
deck)
C-1 (footing to roof beam) 3.42 sm 900.00 150.00 3,078.00 513.00 3,591.00
C-2 (footing to roof beam) 2 sm 900.00 150.00 1,800.00 300.00 2,100.00
47 | P a g e
D.3 Slabs - -
Canopies 11.2 sm 900.00 150.00 10,080.00 1,680.00 11,760.00
D.4 Beams - -
Footing Tie Beams 4 sm 900.00 150.00 3,600.00 600.00 4,200.00
Grade Tie Beams 4 sm 900.00 150.00 3,600.00 600.00 4,200.00
2nd Floor Tie Beams 3.5 sm 900.00 150.00 3,150.00 525.00 3,675.00
Roof Beam 2 sm 900.00 150.00 1,800.00 300.00 2,100.00
D.5 Scaffoldings and shorings - -
Columns and Footings 10 sm 1,200.00 150.00 12,000.00 1,500.00 13,500.00
2nd Floor Slabs 6 sm 1,200.00 150.00 7,200.00 900.00 8,100.00
Others (Specify) 1 lot 20,000.00 20,000.00 - 20,000.00
SUB - TOTAL 78,476.00
E CONCRETE WORKS
E.2 Footings
F-1 3 cu m 3,500.00 650.00 10,500.00 1,950.00 12,450.00
F-2 1 cu m 3,500.00 640.00 3,500.00 640.00 4,140.00
Columns (Footing to Roof
E.3 - -
beam)
C-1 3.18 cu m 3,500.00 640.00 11,130.00 2,035.20 13,165.20
C-2 2.16 cu m 3,500.00 640.00 7,560.00 1,382.40 8,942.40
C-1-A 3.18 cu m 3,500.00 640.00 11,130.00 2,035.20 13,165.20
C-2-B 2.16 cu m 3,500.00 640.00 7,560.00 1,382.40 8,942.40
E.4 Slabs - - - - -
Ground Floor 3.5 cu m 3,500.00 800.00 12,250.00 2,800.00 15,050.00
2nd Floor 4.2 cu m 3,500.00 800.00 14,700.00 3,360.00 18,060.00
Canopies 0.72 cu m 3,500.00 800.00 2,520.00 576.00 3,096.00
E.5 Beams - - - - -
Footing Tie Beams 2.3 cu m 3,500.00 640.00 8,050.00 1,472.00 9,522.00
Grade Tie Beams 2.3 cu m 3,500.00 640.00 8,050.00 1,472.00 9,522.00
2nd Floor Beam 2.3 cu m 3,500.00 640.00 8,050.00 1,472.00 9,522.00
Roof Beam 2.3 cu m 3,500.00 800.00 8,050.00 1,840.00 9,890.00
SUB - TOTAL 135,467.20
F MASONRY WORKS - - - -
F.1 Concrete Hollow Blocks
6" CHB Exterior Walls 300 sm 350.00 300.00 105,000.00 90,000.00 195,000.00
3" CHB Interior Walls 50 sm 350.00 300.00 17,500.00 15,000.00 32,500.00
F.2 Plastering 350 sm 400.00 300.00 140,000.00 105,000.00 245,000.00
F.3 Floor Toppings 5 sm 400.00 300.00 2,000.00 1,500.00 3,500.00
F.4 OTHERS (Please specify) 0 sm - - - - -
48 | P a g e
SUB – TOTAL 476,000.00
G ROOFING
G.1 Angle Bar 2X2X3/16 1 LOT 30,000.00 30,000.00 - 30,000.00
G.2 C-Farlins 2X3X1.0 1 LOT 10,000.00 10,000.00 - 10,000.00
G.3 Color Roof long span 1 LOT 15,000.00 15,000.00 - 15,000.00
G.4 Consumables 1 LOT 5,000.00 5,000.00 - 5,000.00
OTHERS (Please specify)
G.5 1 25,000.00 - 25,000.00 25,000.00
Labor Cost
SUB - TOTAL 85,000.00
G CEILING WORKS - - -
GROUND FLOOR - - -
G.1 Hardesenipa 4X8" 1 lot 16,000.00 5,000.00 16,000.00 5,000.00 21,000.00
G.2 Metal furring 2X1X16 1 lot 10,000.00 5,000.00 10,000.00 5,000.00 15,000.00
SUB - TOTAL 36,000.00
ARCHITECTURAL FINISHES
I TILES
Bathroom (Wall 30x60
I.12 15 sm 600.00 300.00 9,000.00 4,500.00 13,500.00
Synthetic Tiles)
Bathroom (Floor 30x60
I.13 10 sm 600.00 300.00 6,000.00 3,000.00 9,000.00
Synthetic Tiles)
Bedroom Floor 60x60
I.25 12.5 sm 930.00 300.00 11,625.00 3,750.00 15,375.00
Granite Tiles
Living Room 60x60 Granite
6 sm 930.00 300.00 5,580.00 1,800.00 7,380.00
Tiles
Dining Room 60x60
12 sm 930.00 300.00 11,160.00 3,600.00 14,760.00
Granite Tiles
J COUNTERS
Kitchen Counter Top 0.96 sm 6,000.00 300.00 5,760.00 288.00 6,048.00
Bathroom lavatory counter
top 60x60 black granite 2.16 sm 6,000.00 346.50 12,960.00 748.44 13,708.44
tiles
49 | P a g e
SUB-TOTAL 79,771.44
M WATERPROOFING - - -
M.1 Bathroom 7 sm 450.00 300.00 3,150.00 2,100.00 5,250.00
OTHERS (Please specify) - - -
SUB-TOTAL 5,250.00
O PAINTING WORKS - - -
O.1 Interior walls 240 sm 160.00 110.00 38,400.00 26,400.00 64,800.00
Exterior walls and upper
O.2 220 sm 160.00 110.00 35,200.00 24,200.00 59,400.00
and lower canopy
O.4 Ceiling/and Open Ceiling 85 sm 160.00 110.00 13,600.00 9,350.00 22,950.00
SUB-TOTAL 147,150.00
P ELECTRICAL WORKS
50 | P a g e
P.2.2 PVC Conduit, 20mmØ x 3m 1 LOT 1,500.00 1,500.00 - 1,500.00
P.2.3 Junction Box, PVC 1 LOT 1,000.00 1,000.00 - 1,000.00
P.2.4 Utility Box 1 LOT 1,000.00 1,000.00 - 1,000.00
P.2.5 THW wire 10mm 1 LOT 12,000.00 12,000.00 - 12,000.00
Conduit Clamp, 1 hole,
P.2.6 1 LOT 300.00 300.00 - 300.00
15mmØ
P.2.7 Tox with screw, #8 1 LOT 250.00 250.00 - 250.00
P.2.8 Electrical Tape 1 LOT 5,000.00 5,000.00 - 5,000.00
Convenience Outlet,
P.2.9 9 set 199.50 1,795.50 - 1,795.50
duplex, 3 prong
P.2.10 Air Con Outlet 3 set 105.00 315.00 - 315.00
Convenience Outlet,
P.2.11 4 set 250.00 1,000.00 - 1,000.00
duplex, 1 prong
Convenience Outlet,
P.2.12 5 set 270.00 1,350.00 - 1,350.00
duplex, 2 prong
P.3 III. Panelboards - - - -
P.3.1 RSC Conduit, 40mmØ x 3m 5 l 618.10 3,090.50 - 3,090.50
P.3.2 RSC Conduit, 25mmØ x 3m 15 l 180.00 2,700.00 - 2,700.00
P.3.3 RSC Long Elbow, 40mmØ 6 set 250.00 1,500.00 - 1,500.00
P.3.4 RSC Long Elbow, 25mmØ 6 pcs 105.00 630.00 - 630.00
P.3.5 Locknut, 25mmØ 20 pcs 45.50 910.00 - 910.00
P.3.6 Locknut, 40mmØ 10 pcs 63.00 630.00 - 630.00
P.3.7 Bushing, 25mmØ 12 pcs 91.00 1,092.00 - 1,092.00
P.3.8 Bushing, 40mmØ 12 pcs 145.60 1,747.20 - 1,747.20
P.3.9 Entrance cap, 80mmØ 1 pcs 575.00 575.00 - 575.00
Power Panelboard, LP1,
LP2
P.3.10 Main:15AT, 2P, 240V 1 Units 10,500.00 10,500.00 - 10,500.00
Branches:
12 x 10AT, 2P
Power Panelboard, PP1
Main:100AT, 225AF, P,
P.3.11 240V 1 Units 11,760.00 11,760.00 - 11,760.00
Branches:
21 x 20AT, 2P
Labor Cost 140,000.00 - 140,000.00
SUB-TOTAL 248,515.20
Q PLUMBING WORKS - - -
COLD WATER LINE - ppr
Q.1 1 nos 15,000.00 - 15,000.00 - 15,000.00
pipe
Q.2 SEWAGE SYSTEM 1 nos 10,000.00 - 10,000.00 - 10,000.00
Q.3 STORM DRAINAGE SYSTEM 1 nos 6,000.00 - 6,000.00 - 6,000.00
51 | P a g e
Q.4 SEPTIC TANK 1 nos 45,000.00 - 45,000.00 - 45,000.00
Q.5 WATER CLOSET 4 nos 15,000.00 - 60,000.00 - 60,000.00
URINALS (Mini
Q.6 4 nos 10,000.00 - 40,000.00 - 40,000.00
Washbrook); FLUSH VALVE
LAVATORIES: UNDER THE
Q.7 4 nos 6,000.00 - 24,000.00 - 24,000.00
COUNTER
Q.8 Bath tub 2 set 85,000.00 170,000.00
KITCHEN SINKS: STAINLESS
Q.9 1 nos 6,500.00 - 6,500.00 - 6,500.00
STEEL double sink
Q.10 LAV. FAUCETS: 2 set 1,125.00 - 2,250.00 - 2,250.00
Q.11 SINK FAUCETS: 1 set 500.00 - 500.00 - 500.00
FLOOR DRAINS: STAINLESS
Q.12 4 nos 1,000.00 - 4,000.00 - 4,000.00
STEEL
SHOWER VALVES WITH
Q.13 SHOWER HEAD: Shower 2 set 3,500.00 - 7,000.00 - 7,000.00
mix
Q.14 Labor Cost 1 lot 50,000.00 - 50,000.00 50,000.00
Q.15 OTHERS (Please specify) - -
SUB - TOTAL 270,250.00
R MECHANICAL WORKS
R.1 Air conditioning System
1.5 HP WINDOW TYPE 3 SET 23,500.00 1,500.00 70,500.00 4,500.00 75,000.00
2TR SPLIT TYPE 2 SET 55,000.00 1,500.00 110,000.00 3,000.00 113,000.00
SUB-TOTAL 188,000.00
GRAND
2,662,698.14
TOTAL
X4 10,650,752.56
52 | P a g e
Subject: SWIMMING POOL
Area Cost
100 sq. meter ₱553,100.00
PRE-OPERATING EXPENSES
Subject: OVERHEAD
Subject: ELECTRICITY
53 | P a g e
Cost Reduction
wakeboard cable systems, demands a huge amount of money. Because of this, the
researchers presented ways in reducing the overall construction costs. But there are basic
topics to think about as the researchers start off the adventure before the application of the
tower system. Knowing that site is very important to the customers, the closer to the
population, the better chance of succeeding. When it comes to buy or to lease, if money is
no object, the proponents suggested to purchase the property for the reason that leasing
means payments will be forever and the park will never be yours. The cable park has
several things to offer for everyone, other amenities such as swimming pool, restaurant and
etc. that can cause in to larger project. Another common question is the size of the lake and
finding a pre-existing lake or try to dig one, and this will vary on the site and geography.
Another important advantage to cable wakeboarding is the dramatic reduction in the cost
for its participants since you won’t be needing a boat. Besides, cable wakeboarding is an
environmental-friendly kind of sports. The cable system will be operated by the use of
electricity. So, it will not produce wastes such as exhaust, oil and won’t pollute the air and
water. On the contrary, the use of the wake cable system will give 9 tons of oxygen per
The layout of the proposed project cost is with the assistance of Professional
Engineers, Architect, Dock Builder, Structural Designer, Cable Park consultant and other
engineering bodies. The researchers prefer to buy the land, to save monthly expenses. On
the other hand, digging a lake is difficult to engineer and costly to do, but it will end up
with a perfect shape and size. There are several other costs involved in building cable
54 | P a g e
system, such as concrete anchors, and the starting dock. The designed materials are guided
with the cable manufacturer that installed excellent systems and produces high-class
equipment. Including the different materials and featured components of the tower systems
to lessen the cost of producing the parts. And if the selection and prioritization of the
specific needs of the project is in the proper order, the researchers will make a good quality
55 | P a g e
CHAPTER VIII
PROTOTYPING
Top View
56 | P a g e
Isometric View
57 | P a g e
CHAPTER IX
Economic Analysis
happier and safer communities. This matter is part of sports tourism, which contributes a
lot to the social, cultural, economic and infrastructural development. Its effects are
multiplied and has long-lasting impacts to the community, recreational and government
Sport tourism brings in the people and residents take the advantage to earn from
them. This also contributes to economic growth through business investment and
employment. Of these aspects the general participation of water sport is the most important
driver for the sport goods industry because participation in water sports requires sports
goods. This also stimulates much direct and indirect economic activity such as increase of
employment rate, higher government revenue because of taxes paid by the water sports
resorts.
activities. Demand for accommodation will also allow long lasting social connections that
results visiting and expenditures from tourists and will then provide long term benefits to
58 | P a g e
The success of the sport tourism depends on the management even if it has the
potential to be a powerful tool for development progress. Proper planning and management
has to be undertaken.
Operating Hours
Selling Price
Cable Wakeboarding
59 | P a g e
Cable Membership Rates
Room Rates
60 | P a g e
Influences of the Qualitative Factors on Project Success
With all the technicalities and financial matters, there are other soft qualitative aspects
of the project that need to be thoroughly looked into. Qualitative parameters may vary
The impact of the project on the safety of employees as well as the protection of
• Availability of raw material, power and other basic amenities of the project.
Electricity and other basic facilities required to build the project must to be
considered. Even if the project is financially viable but if there are no available
The researchers need to ensure that there is enough manpower to operate the
equipment proposed to build the project. If there is not enough working force for the
project and the staff has no motivation no matter how financially capable it is, it will
never succeed.
implementation of the project. The researchers need to know the direction and
priorities of the local government while creating the project as well as the interest and
economic development.
61 | P a g e
• Environmental constrains
If the general public feels that the project will harm and damage the environment,
it would not only result in the project failure but impair the image and reputation of
the business. The researchers need to consider the “green” implication of the project
at all times.
• Capacity Management
The researchers need to ensure that the minimum performance levels specify are
exceeded by planning, sizing and controlling the building capacity of the project. This
will make sure that the project can provide goods and services at a reasonable cost and
still meet the level of quality and performance that will satisfy the customers.
62 | P a g e
CHAPTER X
PROJECT MANAGEMENT
Mission Statement
To start the first cable park in Subic Bay Freeport Zone and develop the sport of
satisfaction.
Vision Statement
wakeboarding system place where athletes will innovate the way that they do exercise. As
63 | P a g e
Cable Wakeboarding Park Logo
64 | P a g e
Organizational Chart
President
Executive
Director
Programs Administration
Facilities Division
Divisions Division
65 | P a g e
Personnel Descriptions
President
The President, as the highest ranking executive committee member, also approves
day-to-day operations of the Executive Director’s office making the decision to include the
depending on the needs of the Cable Park. Presidents are expected to provide the overall
leadership in an organization and provide direction for the actions of all other employees.
Executive Director
The Executive Director of the Cable Wakeboarding Park runs the day-to-day
operations and make decisions and directions on matters pertaining to strategic plan,
Programs Division
The Programs Division provides cultural and social services and recreational
programs and services such as ports Team includes summer camps, seasonal classes, and
Administration Division
the operating budget, capital improvements plan process, and facility maintenance. Staff
66 | P a g e
Affiliated Services Team
special events and assists with community-sponsored events. The Team oversees arts
grants, and provides all information technology functions for the department, including
Facilities Division
The Facilities Division is responsible for the day-to day management, maintenance,
Aquatics
The Aquatics program operates outdoor pools and the Cable Wakeboarding park.
67 | P a g e
Project Execution
In the very beginning of the project there was merely the idea of starting a cable
wake boarding park. To get an initial idea of whether or not there would be a possibility of
starting a cable park, initial research and system research was conducted. The purpose of
the initial research was to establish the overall possibility of starting the first cable park in
Subic Bay Freeport Zone. A hands-on approach was used for this part of the project. This
involved several interviews and survey questionnaires with people from around the City.
And the interviews and surveys gave an overview of the most important things to look out
for in the area of business. To gain more out of opportunity like this in the future it is
essential to keep contact with the industry professionals. Talking to them further into the
development of the company would have given the opportunity for more sound and
constructive advice. With the help of the professionals, it would give an opportunity to
acquire an experienced business mentor that will help to improve the business.
68 | P a g e
Marketing Strategy
Promotional Activities
• Partnership
way to build business, boost awareness, and break into new markets, the researchers decide
to build a strategic partnership. They will identify products and services that are
complimentary to their wakeboarding resort and think of a product they want to relate to
the business like a restaurant and souvenir store than can satisfy the needs of the customer.
The researchers look for wakeboarding goods businesses to partner with and this
can affect the actual product and service because of its availability in the same place that
increase the convenience of clients, increasing the overall value and providing stronger
benefits to the businesses and clients. The Cable Wakeboarding Park franchised Gerry’s
Grill Restaurant that serves delicious Filipino foods made from the freshest ingredients that
will surely satisfy the stomach of the customers. The park also provided a shop that sells
have an integral part of the cable wakeboarding experience and return home with souvenirs
to preserve and commemorate such experiences. As a result, the Wakeboarding Park will
69 | P a g e
• Discounts and Promos
Wakeboarding is a water sport that in the nature is a seasonal business. The business
is usually in-demand on summer season. This means that they have lesser income in the
other seasons of the year. To address this matter the researches come up to the idea of
creating discounts sand promos. This is not only necessary aim to increase the income but
These are the discounts and promos that the business will offer;
✓ Bundled Discount
Clients will pay less is they avail multiple services or products that
✓ Group Discount
Clients will pay less if they go as group in the resort. This will result
✓ Seasonal Discounts
and they are often recurring. This includes discounts that take place during
70 | P a g e
✓ Free Gift Item
can be a great way to provide additional value to clients. It can also be used
to increase average order size and to get rid of product that isn’t moving.
• Student Discounts- The students need to present valid student ID and get
• Kids’ Day- Kids that are 16 years old and below will have half price for all
• Ladies’ Day- All girls are half price for all day tickets every Thursday.
• Market Introduction
Launching a new line of business isn’t that easy, marketing plan clearly outlines how
the business will reach ideal clients by effectively implementing. With the right mix of
activities, the business can identify and focus on the most effective marketing tactics.
✓ Advertisements
The business plans to advertise on the local radio, use stickers for
cars and PUV, and take an ad in a local newspaper and local TV station.
71 | P a g e
will help to announce new, interesting, or helpful information about the
business.
✓ Billboard
billboards that are strategically located on business areas. The business will
acquire an ad from the service provider. This is a great way to reach the
masses, to reach where they live, commute, and works and socialise.
it becomes more engrained in the memory of the public, they will remember
72 | P a g e
✓ Social media
to reach prospects and customers. This often feeds into the discovery of new
content such as new tourist spot and attractions around the globe. Nowadays
will use different social platforms like Facebook, Twitter and Instagram to
post paid advertisements. Also, they will hire social media influencers to
Project control carries out the project in terms of progress, quality, changes,
products, commitments and other critical concerns. The main purpose of this matter is to
manage the work during the implementation, preparation and actual construction of the
Cable Wakeboarding Park in every step of the way. The course of the project is to assemble
and manage an effective project team that is able to accomplish defined goals and
objectives. Describing current goals and issues and establishing effective communications
with the team will enables a project manager to accomplish tasks important to the control
process.
To confirm that the project is completed and developed in line with expectations,
it is important to have quality control. This control parameter is very relevant to the project
of the researchers. As they know that setting up a watersport like wakeboarding requires a
lot of technicalities. They need to comply within the context of a project. They have to
monitor the construction process of the project, control the financial and time resources,
and measure the progress of the project. But changes are inevitable, the goal of controlling
may change. To ensure that the scope, schedule and cost remain relevant to current
situation creating an action plan will enable the researchers to implement the project even
Generally, the researchers need to plan the task from beginning to end while
considering the time and resources. Proper allocation of budget will prevent the limiting of
manpower, supplies and capital. Time management will play a vital role in finishing the
project on the projected date. All of this can be done by proper monitoring and
74 | P a g e
CHAPTER XI
Conclusion/ Generalization
A cable wakeboarding park is a concept that has been around since the early 1960’s.
The idea is to suspend a motor driven circular cable by a system of towers and pull a
wakeboarder and tow around the lake. With its gaining popularity, over 240 cable parks
have been constructed worldwide and by these the researchers have planned to build and
design a cable wakeboarding park in Subic Bay. At this specific location, prior research
and surveys is done in order to determine the requirements in placing a cable wakeboarding
With the data collected by the researchers, the proposed cable wakeboarding park
will include swimming pool, accommodation, souvenir shops and restaurant that can cater
the customer needs. Aside from these, the cable park will have a two-tower cable system
and a full-size cable system. The two-tower cable system is designed for beginners that
simply runs back and forth from one tower to another, and the full-size cable system is
consists of 5 towers arranged in circular pattern and features many customized obstacles
Knowing the cable park specifications, identifying the costs of construction is must
be thoroughly look. The researchers found out that it would take a huge amount of
investment in building a cable park, but different ways are done in order to reduce the cost
of the construction. Economic analysis was also look into. And lastly the management of
75 | P a g e
Generally, there is a high success rate of building a cable wakeboarding park in
Subic Bay. It would be the first wakeboarding park in the city, that will surely pique the
interest of the people. Different activities at affordable prices such as, swimming pool for
kids and adults, restaurant and souvenir shop are offered in the proposed wakeboarding
park. The project will also create jobs for the people, that will increase the economic
stability of the city. The researchers made sure that the project will be an eco-friendly
business, and that it will not affect the good environment of Subic Bay. It was also designed
to promotes tourism and introduce the benefits of wakeboarding to the people of Subic Bay
as well as a stepping ground for the future wakeboarding athletes in the city.
76 | P a g e