0% found this document useful (0 votes)
126 views

Hydraulic Calculation For Bridge No.:-39 Mahesana-Taranga Gauge Conversion Project

This document contains the hydraulic calculations for Bridge No. 39 as part of the Mahesana-Taranga Gauge Conversion Project. It provides key data like the bridge dimensions, high flood level, rainfall data, and catchment area. Discharge is calculated using two methods: the RDSO report method results in 4.11 cubic meters per second, while the area-velocity method yields 5.88 cubic meters per second. Scour depth is calculated as 0.953 meters from the high flood level. The maximum scour depths for the abutment and pier are provided. The summary lists the design discharge, vertical clearance, permissible clearance, and scour depth below the bed level.

Uploaded by

Ankita
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
126 views

Hydraulic Calculation For Bridge No.:-39 Mahesana-Taranga Gauge Conversion Project

This document contains the hydraulic calculations for Bridge No. 39 as part of the Mahesana-Taranga Gauge Conversion Project. It provides key data like the bridge dimensions, high flood level, rainfall data, and catchment area. Discharge is calculated using two methods: the RDSO report method results in 4.11 cubic meters per second, while the area-velocity method yields 5.88 cubic meters per second. Scour depth is calculated as 0.953 meters from the high flood level. The maximum scour depths for the abutment and pier are provided. The summary lists the design discharge, vertical clearance, permissible clearance, and scour depth below the bed level.

Uploaded by

Ankita
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Hydraulic Calculation for Bridge No.

:-39
MAHESANA-TARANGA GAUGE CONVERSION PROJECT

A.) Hydraulic Data

1 Bridge No. 39
2 Latitude 23°49'20.79"N
Longitude 72°37'43.06"E
3 No. of span 1 No.
4 Clear span 6.000 m
5 High Flood Level (Observed at site) HFL 157.705 m
6 Low Water Level LWL 156.500 m
7 Lowest Bed Level LBL 156.500 m
8 Dist in U/S 400 m
9 Level in U/S 156.90 m
10 Dist in D/S 400 m
11 Level in D/S 156.10 m
12 bed Slope 0.00100000
13 Cross-Section area of channel Ac 7.03 m2
14 Wetted perimeter of channel P 7.882 m
15 Rugosity Co-efficient N 0.035
16 Silt Factor f 2.20
17 Bottom of super structure 159.350
18 50 year 24 Hrs. Rainfall R50(24) 28 Cm
19 Area Reduction Factor F 0.81
20 50 year 1 Hrs. Rainfall R50(1) 106.4 mm
Length of the stream from farthest point of the catchment to the
21 L 0.455 km
bridge
22 Area of the Catchment A 0.195 km2
Diff of elevation of bed at farthest point of catchment and the
23 H 0.235 met
bridge.
Hydraulic Calculation for Bridge No. :-39
MAHESANA-TARANGA GAUGE CONVERSION PROJECT

B.) Discharge Calculation by RDSO report RBF-16


0.345
[L^3/H]
Time of Concentration = tc = = 0.729 hrs

C = 0.332x (R50(24) x F)0.2 = 0.620


tc hr ratio R50(tc)/R50(24) From Graph Fig 4 = x = 0.319
1 hr ratio R50(1)/R50(24) From Graph Fig 4 = y = 0.380

x R50(tc) = k x R50(1) = 89.32 mm


Coefficient K = = 0.839
y
I50=R50(tc)/tc = 122.441 mm/hr
Q50=0.278*C*I50*A = 4.11 met3/sec

C.) Discharge Calculation by Area Velocity Method

Heighest flood Level = 157.705


2
Wetted Area = 7.03 met
Wetted Perimeter = 7.88 met
Increase Height = 0 met
Linear water way = 6.00 met

Ac 7.03
Hydraulic Mean Depth = R = = = 0.892 met
P 7.88
Mannings's Velocity = V = (1/N) x (R ) 2/3 x (S) 1/2 = 0.837 met/sec
Discharge Q = Ac x V = 7.030 x 0.837 = 5.88 met3/sec

HFL for Design Discharge = 157.705 + 0.000 = 157.705


Hydraulic Calculation for Bridge No. :-39
MAHESANA-TARANGA GAUGE CONVERSION PROJECT

D.) Calculation for Scour Depth

Discharge for Foundation = Discharge fromr RBF-16=> 4.11 Q= 4.11 met3/sec


Design Discharge for Foundation = Qd= 1.30 x Q = 5.34 met3/sec ( Sub. Str.- Cl. - 4.4 )

Total Clear Span = 1x6 5.34


Discharge per met width = Qf = = 0.891
= 6 met 6.00

Scour Depth = =0.953 met ( Sub. Str.- Cl. - 4.6.4 ) (From H.F.L.)

Maximum Scour Depth for Abutment = DA = ( 1.25 x D ) = 1.191 met ( Sub. Str.- Cl. - 4.6.6 )
Maximum Scour Depth for Pier = DP = ( 2.0 x D ) = Not Applicable ( Sub. Str.- Cl. - 4.6.6 )
Scour depth below bed level=> 1.191- (157.705-156.5) => -0.014 met Say ==> 0.00
For Abutment => Scour Depth-(HFL-Bed level)
(Return Wall,Drop wall &
Curtain Wall)
E.) Summary
3
1.) Design Discharge 5.34 met /sec
2.) Vertical Clearance 1.645 met
3.) Permissible Vertical Clearance 0.600 met
4.) Scour Depth below Bed Level 0.000 met