CHECKLIST (Work Performed, Repaired & Replaced)

This document is a checklist for refurbishing and repainting above ground storage tanks used for petroleum products over a period of 5 years. It provides details of the work to be performed, including unit rates for tasks like UT thickness measurements, welding repairs, replacing tank plates, pressure and hydrostatic testing, supplying and installing valves, pipes, flanges and other equipment. The checklist contains 68 line items with descriptions of the tasks and quantities needed to complete the work on tanks of various sizes ranging from 2,500 to 50,000 liters. The total costs will be calculated based on the unit rates and quantities of work required for each tank.

Uploaded by

jabir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
92 views2 pages

CHECKLIST (Work Performed, Repaired & Replaced)

This document is a checklist for refurbishing and repainting above ground storage tanks used for petroleum products over a period of 5 years. It provides details of the work to be performed, including unit rates for tasks like UT thickness measurements, welding repairs, replacing tank plates, pressure and hydrostatic testing, supplying and installing valves, pipes, flanges and other equipment. The checklist contains 68 line items with descriptions of the tasks and quantities needed to complete the work on tanks of various sizes ranging from 2,500 to 50,000 liters. The total costs will be calculated based on the unit rates and quantities of work required for each tank.

Uploaded by

jabir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Project: Refurbishing Repainting of Above Ground Storage Tanks

used for Petroleum Products for a period of 5 years


(TC/DIS/159/11/14/MR#25143)

Tank Descriptions: Date : 20-Jun-20


Capacity : 10,000 Liters Chassis No. : HFT-2015-06-645 Ref. : PGCC/HT/1652
Type : Double Wall Woqod Eqpt No. :3053 Doc. No. : PGCC/CL/1652

CHECKLIST (Work Performed, Repaired & Replaced)

UNIT PERFORM/ TOTAL COST


SN CATEGORY ITEM UNIT QTY
RATE (QR) REPAIR/ (QR)
REPLACE
1 UT TEST UT thickness measurements DAY 2,200.00

2 REPAIR Welding Patch repair A36 S275JR sq ft 114.00

3 REPLACE Replace shell plate 4mm thk A36 S275JR sq m 832.00


4 Replace shell plate 5mm thk A36 S275JR sq m 1,041.00
5 Replace shell plate 6mm thk A36 S275JR sq m 1,248.00
6 Replace shell plate 8mm thk A36 S275JR sq m 1,664.00

7 HYDROSTATIC TEST Hydrostatic test for 2500 tank ea 1,455.00


8 (With Water) Hydrostatic test for 5000 tank ea 1,559.00
9 Hydrostatic test for 10000 tank ea 1,767.00
10 Hydrostatic test for 15000 tank ea 1,975.00
11 Hydrostatic test for 20000 tank ea 2,184.00
12 Hydrostatic test for 50000 tank ea 3,434.00

13 PRESSURE TEST Pressure test for 2500 tank ea 2,200.00


14 (With Air) Pressure test for 5000 tank ea 2,200.00
15 Pressure test for 10000 tank ea 2,200.00
16 Pressure test for 15000 tank ea 2,200.00
17 Pressure test for 20000 tank ea 2,200.00
18 Pressure test for 50000 tank ea 2,200.00

19 VENT VALVES (Cl or CS) Supply & install 1" vent valve 1 no. 278.00
20 Supply & install 2" vent valve 1 no. 361.00
21 DRAIN VALVE (Cl or CS) Supply & install 1" drain valve 1 no. 278.00
22 Supply & install 1.5" drain valve 1 no. 315.00
23 Supply & install 2" drain valve 1 no. 361.00
24 VALVES (Cl or CS) Supply & install 3/4" ball valve 1 no. 96.00 Cleaned 2
25 Supply & install 1" ball valve 1 no. 278.00
26 Supply & install 2" ball valve 1 no. 361.00
27 Supply & install 3/4" discharge valve 1 no. 96.00
28 Supply & install 2" discharge valve 1 no. 361.00
29 Supply & install 1" ball valve with cam lock 1 no. 467.00
30 Supply & install 3" ball valve with cam lock 1 no. 1,654.00 Cleaned 1
31 Supply & install 6" gate valve 1 no. 2,268.00 Cleaned 1
32 Supply & install 1/2" breather 1 no. 86.00
33 Supply & install 1/2" pipe LM 34.00
34 Supply & install 1" pipe LM 67.00
35 Supply & install 1.5" pipe LM 108.00
36 Supply & install 2" pipe LM 144.00
37 Supply & install 3" pipe LM 299.00
38 FLANGES Supply & install 1/2" flange 1 no. 51.00
39 Supply & install 1" flange 1 no. 61.00
40 Supply & install 1.5" flange 1 no. 71.00
41 Supply & install 2" flange 1 no. 81.00
42 Supply & install 3" flange 1 no. 126.00
43 Supply & install 4" flange 1 no. 139.00
44 BLIND FLANGES Supply & install 1/2" blind flange 1 no. 51.00
45 Supply & install 1" blind flange 1 no. 61.00
46 Supply & install 1.5" blind flange 1 no. 71.00
47 Supply & install 2" blind flange 1 no. 81.00
48 Supply & install 3" blind flange 1 no. 126.00
49 Supply & install 4" blind flange 1 no. 139.00
50 PLUGS Supply & install 1/2" drain plug 1 no. 51.00
51 Supply & install 1" drain plug 1 no. 61.00
52 Supply & install 1.5" drain plug 1 no. 71.00
53 OTHERS Supply & install 3/4" level indicator 1 no. 81.00  1 81.00
54 Supply & install PV Vent 1 no. 144.00
55 Supply & install fire extinguisher 1 no. 780.00
56 Supply & install gaskets different sizes 1 no. 65.00
57 Mobilization from and to woqod doha depot Per Trip 600.00

Submittted by: Petrol Gas Construction Company page 1/2


Project: Refurbishing Repainting of Above Ground Storage Tanks
used for Petroleum Products for a period of 5 years
(TC/DIS/159/11/14/MR#25143)

CHECKLIST (Work Performed, Repaired & Replaced)

UNIT PERFORM/ TOTAL COST


SN CATEGORY ITEM UNIT QTY
RATE (QR) REPAIR/ (QR)
REPLACE

Supply & Installation A36 S275JR (without


58 STEEL STRUCTURE 1 Kg. 11.00
grating)

BLASTING WOKS FOR


59 2,500 Litres (Dwg. No. GICS02501) Ea 675.00
INSPECTION
60 2,500 Litres (Dwg. No. PD080124/A) Ea 675.00
61 5,000 Litres (Dwg. No. GIC805000) Ea 1,116.00
62 5,000 Litres (Dwg. No. PD050706-B2/A) Ea 1,116.00
63 10,000 Litres (Dwg. No. PD060632-A2/2) Ea 1,802.00
64 15,000 Litres (Dwg. No. GI0S15001) Ea 2,287.00
65 15,000 Litres (Dwg. No. GIDS15001) Ea 2,401.00
66 20,000 Litres (Dwg. No. GICS2001) Ea 2,949.00
67 20,000 Litres (Dwg. No. PD080080-0) Ea 2,949.00
68 50,000 Litres (Dwg. No. GICS50001) Ea 5,721.00

BLASTING & APPLY FULL


69 2,500 Litres (Dwg. No. GICS02501) Ea 1,578.00
SYSTEM
70 2,500 Litres (Dwg. No. PD080124/A) Ea 1,578.00
71 5,000 Litres (Dwg. No. GIC805000) Ea 2,460.00
72 5,000 Litres (Dwg. No. PD050706-B2/A) Ea 2,460.00
73 10,000 Litres (Dwg. No. PD060632-A2/2) Ea 3,948.00
74 15,000 Litres (Dwg. No. GI0S15001) Ea 4,918.00
75 15,000 Litres (Dwg. No. GIDS15001) Ea 5,145.00
76 20,000 Litres (Dwg. No. GICS2001) Ea 6,585.00
77 20,000 Litres (Dwg. No. PD080080-0) Ea 6,585.00
78 50,000 Litres (Dwg. No. GICS50001) Ea 12,817.00

HAND ABRADE, TOUCH-UP


79 2,500 Litres (Dwg. No. GICS02501) Ea 338.00
AND APPLY TOP COAT ONLY

80 2,500 Litres (Dwg. No. PD080124/A) Ea 338.00


81 5,000 Litres (Dwg. No. GIC805000) Ea 558.00
82 5,000 Litres (Dwg. No. PD050706-B2/A) Ea 558.00
83 10,000 Litres (Dwg. No. PD060632-A2/2) Ea 901.00
84 15,000 Litres (Dwg. No. GI0S15001) Ea 1,144.00
85 15,000 Litres (Dwg. No. GIDS15001) Ea 1,201.00
86 20,000 Litres (Dwg. No. GICS2001) Ea 1,475.00
87 20,000 Litres (Dwg. No. PD080080-0) Ea 1,475.00
88 50,000 Litres (Dwg. No. GICS50001) Ea 2,861.00
Mobilization and Demobilization of Materials
89
and Manpower
OTHER WORKS Ea 600.00 1 600.00
90 Supply & Installation of Sight Guage

91

TOTAL AMOUNT (QR) 681.00

Prepared by: __________________________ Witnessed by: _______________________

Muhamed Jhabeer
PGCC Representative Woqod Representative

Date signed: _______________________

Submittted by: Petrol Gas Construction Company page 2/2