OPCRF-Target 2020-2021
OPCRF-Target 2020-2021
Name of Employee
Position
Division
District
RATEE
SCHOOL HEAD
PART I: OFFICE PERFORMANCE COMMITMENT AND REVIEW FORM
4. Conducted one action/ applied research by 5% 5-Completed the five required 5-Completed the research within 5-Accomplished the research
EOSY 2020-2021 following the required research processes the approved Work Plan within the approved timeline
processes 4-Completed four of the required 4-Completed the research utilizing 4-Accomplished the research one
a. Submission of proposal research processes additional 10% supplementary fund week after the approved timeline
b. Acceptance of proposal
of the approved Work Plan
c. Implementation
d. Evaluation 3-Completed three of the required 3-Completed the research utilizing 3-Accomplished the research two
e. Dissemination of Research research processes additional 20% supplementary fund weeks after the approved timeline
of the approved Work Plan
2-Completed two of the required 2-Completed the research utilizing 2-Accomplished the research three
research processes additional 30% supplementary fund weeks after the approved timeline
of the approved Work Plan
1-Completed one of the required 1-Completed the research utilizing 1-Accomplished the research four
research processes additional 40% and above weeks or more after the approved
supplementary fund of the approved timeline
Work Plan
2. LEARNING ENVIRONMENT 10%
1. Ensured provision of safe and child-friendly 10% 5-Implemented 10 and above 5-10 and above programs and
learning environment by implementing the programs and projects projects were functional and
following: properly utilized
1. Institutionalized child protection mechanism 4-Implemented 8 to 9 programs and
2. Provided functional ICT laboratory projects 4-8 to 9 programs and projects
4. Maintained clean and sufficient comfort were functional and properly utilized
rooms
5. Maintained clean, well-lighted and well 3-Implemented 6 to 7 programs and
ventilated classrooms equipped with safety projects 3-6 to 7 programs and projects
signage and blackboards in classrooms were functional and properly utilized
6. Implemented effective solid waste 2-Implemented 4 to 5 programs and
management program. projects 2-4 to 5 programs and projects
7. Constructed/Maintained perimeter fence to were functional and properly utilized
ensure safety of students while in campus.
8. Instituted clear DRRM Mobilization Plan 1-Implemented 1-3 programs and 1-1-3 programs and projects were
mobilization plan projects functional and properly utilized
9. Enhanced School Feeding Program
10. Instituted Effective AlternativeDelivery
Mode (ADM)
11. Maintained functional School Clinic
12. Provided specialized programs
13. Maintained a functional guidance office.
14. Maintained and updated a functional
library.
15. Provided utility workers for the
maintenance of school facilities and
cleanliness of the school the school
surrounding
1. Conducted 10 or more SLAC sessions with 10% 5-Conducted 10 and above SLAC
5-Accomplished 10 and above
100% attendance by EO SY 2020-2021 sessions 5-97% to 100% attendance of
SLAC sessions as scheduled
teachers in the SLAC sessions.
100% attendance by EO SY 2020-2021
1. Convened 5 or more PTA 5% 5-Conducted 5 or more PTA 5-All meetings with 75% and above 5-Conducted the meetings as
assemblies/meetings with more than 50% assemblies/meeting attendance of parents scheduled
attendance of parents
4-Conducted 4 PTA 4-Four meetings with 75% and 4-Conducted the meeting one day
assemblies/meeting above attendance of parents after the scheduled date
3-Conducted 3 PTA 3-Three meetings with 75% and 3-Conducted the meeting two days
assemblies/meeting above attendance of parents after the scheduled date
2-Conducted 2 PTA 2-Two meetings with 75% and 2-Conducted the meeting three
assemblies/meeting above attendance of parents days after the scheduled date
1-Conducted 1 PTA 1-Conducted the meeting four or
assemblies/meeting 1-One or no meeting with 75% and more days after the scheduled
above attendance of parents date
2. Spearheaded the generation and utilization 7% 5-Generated 97% and above of the 5-Utilized 100% of the generated 5-Conducted the activity within the
of resources from stakeholders: target amount resources specified period
Elementary 4-Generated 86% to 96% of the 4-Utilized 95-99% of the generated 4-Conducted the activity 1 day
Small 99,999 and below target amount resources after the specified period
Medium 100,000 - 299,999
3-Generated 75% to 85% of the 3-Utilized 90-94% of the generated 3-Conducted the activity 2 days
Large 300,000 - 499,999
target amount resources after the specified period
Mega 500,000 and above
Secondary 2-Generated 51% to 74% of the 2-Utilized 85-89% of the generated 2-Conducted the activity 3 days
Small 99,999 and below target amount resources after the specified period
Medium 100,000 - 1-Generated below 50% of the target 1-Utilized 80-84% of the generated 1-Conducted the activity 4 or more
299,999 Large 300,000 - amount resources days after the specified period
499,999 Mega
1,000,000 and above
Reported through School Report Card,
Transparency Board, PTA Meetings
1. Spearheaded the conduct of strategic 5% 5-Developed complete ESIP, AIP, 5-Completed the target within the 5-Conducted the strategic planning
planning LCP and SRC with 100% compliant approved working budget as scheduled
to standards of development of
education strategic and operational
plans
4-Developed complete three plans 4-Completed the target utilizing 4-Conducted the strategic planning
(ESIP,AIP,LCP) with 100% compliant additional 5% of the approved one day after the scheduled date
to standards of development of working budget
education strategic and operational
plans
3-Developed complete two plans 3-Completed the target utilizing 3-Conducted the strategic planning
(ESIP,AIP)with 100% compliant to 10% of the approved working two days after the scheduled date
standards of development of budget
education strategic and operational
plans
2-Developed complete one plan 2-Completed the target utilizing 2-Conducted the strategic planning
(ESIP) with 100% compliant to 15% of the approved working three days after the scheduled
standards of development of budget date
education strategic and operational
plans
1-Developed draft copy of ESIP and 1-Completed the target utilizing 1-Conducted the strategic planning
AIP 20% of the approved working four or more days after the
budget scheduled date
2. Monitor the implementation of the following 3% 5-Reduced by 2% in the drop out rate 5-Implemented 5 Drop out reduction 5-Monitored the implementation of
dropout reduction activities to (Target compared to last year activities dropout reduction activities as
Decrease in Drop-out Rate)% reduction from scheduled
(Previous Drop-out Rate)% Drop-out rate last 4-Reduced by 1.5% in the drop out 4-Implemented 4 Drop out reduction 4-Monitored the implementation of
School year to (current Drop-out Rate)% DO rate compared to last year activities dropout reduction activities one
rate this year SY 2018-2019 day after the scheduled date
3-Reduced by 1% in the drop out rate 3-Implemented 3 Drop out reduction 3-Monitored the implementation of
compared to last year activities dropout reduction activities two
days after the scheduled date
2-Reduced by 0.75% in the drop out 2-Implemented 2 Drop out reduction 2-Monitored the implementation of
rate compared to last year activities dropout reduction activities three
days after the scheduled date
1-Reduced by 0.50% in the drop out 1-Implemented 1 Drop out reduction 1-Monitored the implementation of
rate compared to last year activity dropout reduction activities four or
more days after the scheduled
date
3. Managed fiscal activities with 100% 5% 5-Liquidated 100% of downloaded 5-Complied all indicators in 5-Liquidated funds five days before
liquidation of funds MOOE and SBFP funds managing fiscal activities the scheduled date
a. Completed monthly MOOE
downloading and liquidation; 4-Liquidated 86% to 99% of 4-Complied all indicators in 4-Liquidated funds three to four
b. Implemented clear fiscal downloaded MOOE and SBFP funds managing fiscal activities days before the scheduled date
management system for the school thru
reports, logs, transparency board and bank
books; c. Allocated funds 3-Liquidated 75% to 85% of 3-Complied all indicators in 3-Liquidated funds one day before
for school program, projects or activities with downloaded MOOE and SBFP funds managing fiscal activities the scheduled date
proper reporting and liquidation
d. Reported 2-Liquidated 51% to 74% of 2-Complied all indicators in 2-Liquidated funds one day after
sources and uses of funds other than MOOE downloaded MOOE and SBFP funds managing fiscal activities the scheduled date
on semi-annual basis
e. Initiated and facilitated resource 1-Liquidated 50% of downloaded 1-Complied all indicators in 1-Liquidated funds one or more
mobilization from stakeholders with proper MOOE and SBFP funds managing fiscal activities days after the scheduled date
reporting.
4. Facilitated and monitored the establishment 2% 5-Established 15 or more school 5-15 or more school organizations 5-Monitored activities of school
and activities of the school organizations organizations/teams/committees are functional organization as scheduled
/teams /committees such as but not limited to 4-Established 13-14 school 4-13-14 school organizations are 4-Monitored activities of school
the following : 1. organizations/teams/committees functional organization one day after the
Subject Area Club/s, SSG, YES-O, STEP, scheduled date
TLE,Child Protection Committee, PTCA,
Faculty/Staff Club, Research Committee, 3-Established 11-12 school 3-11-12 or more school 3-Monitored activities of school
LRMDS, SDRRM, BAC and Inspectorate, organizations/teams/committees organizations are functional organization two days after the
PMT, Grievance, SBM, Others scheduled date
LRMDS, SDRRM, BAC and Inspectorate,
PMT, Grievance, SBM, Others
2-Established 9-10 school 2-9-10 school organizations are 2-Monitored activities of school
organizations/teams/committees functional organization three days after the
scheduled date
1-Established below 8 school 1-Eight and below school 1-Monitored activities of school
organizations/teams/committees organizations are functional organization four or more days
after the scheduled date
PLUS FACTOR 1. Resource Speakership (District, 5% Accomplished 5 and above tasks with
Congressional District, Division, Regional, complete MOVs, either same or
National, International) combination thereof
2. Hosting of
Events/Meetings/Contest/Trainings and other
DepEd similar and supported activities Accomplished 4 tasks with complete
3. Authorship MOVs, either same or combination
4. Innovation(School Level and up such as thereof
CIP)
Accomplished 3 tasks with complete
5. Evaluation of Programs and learning
MOVs, either same or combination
materials (LRMDS) (CD< DIVISION< Regional
thereof
Levels)
6. Advisorship (Learning Areas for Accomplished 2 tasks with complete
Elementary) MOVs, either same or combination
7. Coordinatorship (Academics, Sports) thereof
8. Elective or Appropriate positions in DepEd Accomplished 1 with complete MOVs,
Accredited Organizations either same or combination thereof
9. Special Assignments/Designation
10. Focal Person (Special Programs like GAD,
ADM, etc.)
11. Special Citations, Awards and Recognition
(such as but not limited to Brigada Eskwela,
Sports, Festival of Talents, Press
Conference , Boy Scouts, etc.)
12. Other similar DepEd initiated or supported
activities
TOTAL
Overall Rating for Accomplishment
RATEE RATER
APPROVED
RODERICK A. MALUBAG RONILO E. HILARIO
HEAD TEACHER III ASST. SCHOOLS DIVISION SUPERINTENDENT
JESSIE D. FERRER, CESO VI
SCHOOLS DIVISION SUPERINTENDENT
DEPARTMENT OF EDUCATION
SCHOOLS DIVISION OFFICE OF NUEVA ECIJA
Brgy. Rizal, Santa Rosa, Nueva Ecija
1.INSTRUCTION
AL LEADERSHIP Shall have … 30%
TOTAL
Overall Rating for Accomplishment
Ratee Rater:
Approved:
NICOLAS T. CAPULONG, Ph.D., CESO IV
pprd01/pprd05 Schools Division Superintendent
Page 11 of 11