BAT Agile Framework Sprint Retrospective Format and Objectives Version 0.1
BAT Agile Framework Sprint Retrospective Format and Objectives Version 0.1
Discussion Document
Digital Delivery Discussion Document
1 Revision History
Date of this revision: 5th June 2013
2 Distribution
Consultation distribution list:
Alex Roth
Karl Mansour
Steve Barker
Femi Hezekiah
John Cowper
Mark Vassallo
Digital Delivery Discussion Document
4 Introduction
Continuous improvement is a core value within the Agile framework and no matter how good the
team has performed we can always do better.
The Sprint Retrospective provides a dedicated period of time, usually one to two hours, to allow
the team to reflect on their individual, team and tool set performance during the sprint and
brainstorm improvement opportunities.
At the end of the session the Scrum Master will take away a list of actions that will help to
streamline the next sprint, as well as a commitment from the team members.
5 The Retrospective
5.1 Output:
A document outlining:
o Start – Things the team should start doing to improve velocity / quality.
o Stop – Things that the team know are making our lives difficult and slowing down
progress or degrading the potential quality of the end product.
o Continue – What the team is doing right and should focus efforts on continuing to
do and improve.
5.2 Preparation:
Chickens
Sprint Metrics
Stories Story Points
Stories planned for Sprint
Velocity:
Sprint Impediments
ID Impediment Who Status
1 Fixed
Issue
Parked
2 Fixed
Issue
Parked
3 Fixed
Issue
Parked
4 Fixed
Issue
Parked
5 Fixed
Issue
Parked
6 Fixed
Digital Delivery Discussion Document
Issue
Parked
7 Fixed
Issue
Parked
8 Fixed
Issue
Parked
9 Fixed
Issue
Parked
10 Fixed
Issue
Parked
11 Fixed
Issue
Parked
12 Fixed
Issue
Parked
Opportunities
ID Item Type Who
1 Now
Later
Park It
2 Now
Later
Park It
3 Now
Later
Park It
4 Now
Later
Park It
5 Now
Later
Park It
6 Now
Later
Park It
7 Now
Later
Park It
8 Now
Later
Park It
9 Now
Later
Park It
10 Now
Later
Park It
11 Now
Later
Digital Delivery Discussion Document
Park It
12 Now
Later
Park It
13 Now
Later
Park It
14 Now
Later
Park It
15 Now
Later
Park It
16 Now
Later
Park It
Next Steps:
Fix It Now:
Fix It Later:
Park It:
Retrospective Feedback
[Any points raised to improve Retrospective format]