Documentation: Dismantling of Sheet Pile & Hold Back Beam
Documentation: Dismantling of Sheet Pile & Hold Back Beam
Starting Dismantle of Sheet Pile and Hold Back Beam at Kp 42:000
Starti Back Fill at KP 42:000
TIMAS HSE DOCUMENT
DOCUMENTATION
Preparation Tie – In 14’ Pipe
February, 25, 2009
POE 1217’S Bow Davit Lift 14’ PIPE Up
PULLING HEAD IN SURFACE
TIMAS HSE DOCUMENT
DOCUMENTATION
Preparation Tie – In 14’ Pipe
February, 25,26, 2009
POE 1217’S Stern Davit Lift 14’ PIPE Up
14’ PIPE at Surface and held by Both Davit of POE 1217 Spud Barge
TIMAS HSE DOCUMENT
14’ PIPE at Surface and held by Both Davit POE 1217 Spud Barge
PREPARATION CUTTING OF 14” PIPE , AND MOVING
TIMAS HSE DOCUMENT
TIMAS HSE DOCUMENT
CUTTING OF PULLING HEAD FOR TIE IN 14’ PIPE
TIMAS HSE DOCUMENT
DOCUMENTATION
Cutting , Grinding & Welding 14” Pipe and X – Ray ( Tie – In 14’ Pipe )
February ,26, 2009
Pipe to Elwow 14” ( Pit Up for Cutting and Grinding )
Install External Clamp and Welding
TIMAS HSE DOCUMENT