Project
FORM Title Item *1 Item *1 (a) Item *1 (b) Item *1(c) Item *2
1) Insert name (individual) of
proprietor / partner / director of
Contractor's Company & attach
If this item is certified copy of Company's Form 49 If Item *1 is
Insert applicable, insert to authenticate this individual applicable, strike
description LA's Approval (Contractor) 2) Insert Contractor's 1) Fill in SP's name 2) Fill in out Item *2. If item
of project Ref No. If not NRIC 3) Contractor to sign and date BEM registration no. 3) Sign *1 is not
G-1 as per BP applicable, strike 4) Attach copy of CIDB registration of and date 4) SP must be a applicable, PSP to
Earthwork approval out Item*1 Company Civil Engineer sign declaration
1) Insert name (individual) of
proprietor / partner / director of
Contractor's Company & attach
If this item is certified copy of Company's Form 49 1) Fill in PSP's If Item *1 is
Insert applicable, insert to authenticate this individual name 2) Fill in applicable, strike
description LA's Approval (Contractor) 2) Insert Contractor's 1) Fill in Licensed Land BAM/BEM out Item *2. If item
of project Ref No. If not NRIC 3) Contractor to sign and date Surveyor's name 2) Fill in registration no. *1 is not
G-2 as per BP applicable, strike 4) Attach copy of CIDB registration of Surveyor Board's registration 3) Sign and applicable, PSP to
Setting Out approval out Item*1 Company no. 3) Sign and date date sign declaration
1) Insert name (individual) of
proprietor / partner / director of
If this item is Contractor's Company & attach
applicable, insert certified copy of Company's Form 49 If Item *1 is
Insert SP's Deposited to authenticate this individual applicable, strike
description Plans Ref No. to (Contractor) 2) Insert Contractor's 1) Fill in SP's name 2) Fill in out Item *2. If item
of project LA. If not NRIC 3) Contractor to sign and date BEM registration no. 3) Sign *1 is not
G-3 as per BP applicable, strike 4) Attach copy of CIDB registration of and date 4) SP must be a applicable, PSP to
Foundation approval out Item*1 Company Civil Engineer sign declaration
If this item is
applicable, insert
Water Authority's 1) Insert name (individual) of Licensed
Approval Ref No. Plumber 2) Insert Plumber's If Item *1 is
Insert or SP's registration no. and LA / Water 1) Fill in SP's name 2) Fill in applicable, strike
G-5 description Deposited Plans Authority's name & attach copy of BAM/BEM registration no. 3) out Item *2. If item
Internal of project Ref No. If not Licence 3) Plumber to sign and date Sign and date 4) If an *1 is not
Water as per BP applicable, strike 4) Attach copy of CIDB registration of Engineer, SP must be a applicable, PSP to
Plumbing approval out Item*1 Company Mechanical or Civil Engineer sign declaration
If this item is
applicable, insert
LA's Approval 1) Insert name (individual) of Licensed If Item *1 is
Insert Ref No. or SP's Plumber 2) Insert Plumber's 1) Fill in SP's name 2) Fill in applicable, strike
G-6 description Deposited Plans registration no. and LA / Authority's BAM/BEM registration no. 3) out Item *2. If item
Internal of project Ref No. If not name & attach copy of Licence 3) Sign and date 4) If an *1 is not
Sanitary as per BP applicable, strike Plumber to sign and date 4) Attach Engineer, SP must be a applicable, PSP to
Plumbing approval out Item*1 copy of CIDB registration of Company Mechanical or Civil Engineer sign declaration
If this item is
applicable, insert 1) Insert name (individual) of
LA/JKR's Competent Person 2) Insert
Approval Ref No. Competent Person's registration no. If Item *1 is
Insert or SP's with Energy Commission & attach applicable, strike
description Deposited Plans copy of Competency Certificate 3) 1) Fill in SP's name 2) Fill in out Item *2. If item
G-18 of project Ref No. If not Competent Person to sign and date 4) BEM registration no. 3) Sign *1 is not
Steet as per BP applicable, strike Attach copy of CIDB registration of and date 4) SP must be an applicable, PSP to
Lighting approval out Item*1 Company Electrical Engineer sign declaration
1) Insert name (individual) of
proprietor / partner / director of
Contractor's Company & attach
If this item is certified copy of Company's Form 49 If Item *1 is
Insert applicable, insert to authenticate this individual applicable, strike
description LA's Approval (Contractor) 2) Insert Contractor's 1) Fill in SP's name 2) Fill in out Item *2. If item
G-19 of project Ref No. If not NRIC 3) Contractor to sign and date BEM registration no. 3) Sign *1 is not
External as per BP applicable, strike 4) Attach copy of CIDB registration of and date 4) SP must be a applicable, PSP to
Main Drain approval out Item*1 Company Civil Engineer sign declaration
Notes:
1) PSP shall notify the local authority through OSC (in writing or using prescribed form) after Forms G1-G3 are certified (i.e. after completion of
Earthwork, Setting Out and Foundations)
2) Form F/F1 and Form G-1 to G-21 shall be forwarded to the Local Authority and BAM/BEM within 14 days of the issuance of Form F/F1
3) If Contractor or Trade Contractor is the same in multiple Forms, then attach only one (1) set of the required document/s.
Legend: BP = Building Plan; LA = Local Authority; NRIC = National Registration Identity Card; SP = Submitting Person; PSP = Principal Submitting
Person; ACP = Architectural Consultancy Practice; ECP = Engineering Consultancy Practice; PMA = Perakuan Mesin Angkat