Aisc Audit Checklist For QC Manager
Aisc Audit Checklist For QC Manager
1 CALIBRATION
* Generate Report of Quarterly Welding Machine Vadim/Romani
* QC tools & Equipment Log of Calibration Arif
* Skidmore & Torque Wrench Arif Complete
* Calibration log/reports for Big Equipments Arif
* Fluke Meter Arif Complete
2 QC REPORTS
Make sure you have inspection reports on all structures
* that are in the plant, specially cambering, dimensional, Vadim/Charith
weld insp'n including painting etc…
3 DOCUMENTED TRAINING
* Fracture Critical Training Vadim
* Welder Training
* Other training mentioned on our meeting
4 MEETINGS
5 NCR
Generate NCR's & CAR's Arif
6 QUALITY GOAL
Pepi/Vadim/Arsha
* Generate Quarterly Quality Goal
d
8 PURCHASING
make sure you have certs of all materials inside the plant Ibrahim
9 SHOP CONDITION
Make sure shop is clean & with clear pathway during audit Ahsan/Jalal
10 VENDORS LIST
11 WELDING WIRES
* Make sure there's no welding wires used/unused exposed Ahsan/Jalal
12 BOLTS
NO ITEM ACTION BY REMARKS
* Need to cover all bolts so that no dirt gets into buckets. Ahsan/Jalal
* Need to put flux in dry un exposed area. Flux oven needs Ahsan/Jalal/Charit
to checked as well h
15 QC MANUAL
* Update QC Manual where required Pepi/Vadim
16 QMS CARs
* WPS, and Welder Quals did not show FC qualification Arif This is all filed in Project folder
for Rizzo.
This was corrected and is
Incorrect documentation in WPS list and Welder Contiuity
* log of D1.1 PQRs Arif available in Audit folder under
AISC Car resopnses
Welding Gas and Wire/Flux COC were not available Need to get this from
From 2017 (obtained from distributor during the audit) Ibrahim/Jalal Middlesex/Mrs. Farah
PQR and WPS were dated 2015 for both SAW and FCAW
processes. The reports indicate that they were performed
and according to AWS D1.5-2010 with no other supporting
From 2017 Arif Complete. Print Out again
documentation (MTR, COC etc.) indicating adherence to
Clause 12 of AWS D1.5. The report indicated “N/A” for
fillet weld soundness macro etch testing