Master Data: To Overview The Company Codes
Master Data: To Overview The Company Codes
info/category/production-planning/
http://www.sdn.sap.com/irj/scn/advancedsearch?query=organization+structure
http://sapbrainsonline.com/TUTORIALS/FUNCTIONAL/PP_tutorial.html
online. acm.org
http://www.miraclewisdom.com/index.jsp
http://www.whypad.com/posts/sap-company-codes/76/ to overview the company codes.
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/30f4d6c1-0808-2d10-
2ea5-f9b2863cfed8?QuickLink=index&overridelayout=true
http://www.scribd.com/doc/7214469/SAP-Customizing#open_download
1. Master Data
Organizational Structures
Material Master
• How does the material type influence the material master maintenance?
• What is the difference between external and internal number assignment and how is it set up in
Customizing?
• Which other factors can influence the selection of fields in the material master?
• How can MRP profile and forecast profile be used to optimize material master maintenance?
• How can a material master be reorganized (deleted/archived)?
• Which units of measure can affect processing in the material master (base unit of measure, production
unit, order unit, etc.)?
• What is the material status used for and on which levels could it be maintained?
• Review the usage of the following settings?
- MRP group
- MRP type
- Reorder point
- Planning time fence
- MRP controller
- Lot size
- Procurement type
- Special procurement type
- Production storage location
- Backflush flag
- Stock determination group
- Bulk material
- Scheduling margin key
- Safety stock
- Strategy group
- Consumption mode and consumption period
- Availability checking group
- Alternative selection flag
- Dependent requirement flag for individual and collective requirements
- Production scheduler
- Production scheduling profile
- Underdelivery/overdelivery tolerance
- In-house production time (lot size dependent/independent)
- Valuation class
- Price control indicator
- Moving average price/standard price
Bills of Material
Work Centers
Routings
Production Resources/Tools
• Which scheduling options are available, and how do they differ from each other?
• Which time components are taken into account during scheduling?
• How are basic order dates determined?
• How are the scheduled dates determined?
• Which scheduling types are available in lead time scheduling?
• What role do reduction measures play in scheduling?
• What types of scrap can be maintained in PP basic data and how would they be considered during MRP
repectively scheduling?
• What is external processing, and what conditions must be fulfilled before external processing can take
place?
• What are co-products?
2. Production Planning
General Issues
Demand Management
• What is the purpose of MRP and how does it fit into the PP planning environment?
• How would you organize MRP runs? Discuss the different options
- MRP for a plant – online
- MRP for a plant – in background
- MRP for a material (individual planning) – online
• Which planning types are available (NEUPL, NETCH, NETPL)?
• Which planning parameters are to be set in the application itself?
• What is the function of the planning file?
• What is meant by single-level planning, multi-level planning?
• What is meant by interactive MRP?
• What are the characteristics of an MRP scenario that is performed in simulation mode?
• What is meant by low-level code and how is it considered in MRP?
• What is a net requirements calculation?
• Which buffers can be taken into account for the net requirements calculation in MRP (quantity buffer:
safety stock, time buffer: safety time)?
• What does lot-size calculation entail?
• Which lot-sizing procedures are available in the R/3 System (static, periodic and optimizing procedures)?
What are the characteristics of these lot-sizing procedures?
• How does the procurement type defined in the material master affect MRP?
• What is backward scheduling? What are the characteristics of backward scheduling?
• What is the difference between basic scheduling and lead time scheduling?
• How are the order due dates determined in basic scheduling?
• How are the order due dates determined in lead time scheduling?
• How does the in-house production time defined in the material master affect scheduling?
• How does the scheduling margin key affect scheduling?
• How are BOMs selected in MRP? Which criteria are taken into account during BOM selection?
• What is a ‘BOM selection ID’?
• How are alternative BOMs selected?
• What is a production version?
• How are routings selected in MRP? Which criteria are taken into account during routing selection?
• What is an MRP list? What is a stock/requirements list? How are these lists structured? What are the
differences between these lists?
• What is the function of exception messages?
• What are planned orders?
• What is meant by the individual/collective conversion of planned orders?
• What is meant by “days’ supply” and “receipt days’ supply”?
• How can component discontinuation be managed in MRP?
Order Release
Printing
Goods Issue
• Which control indicators influence the behavior of the components in the production order (bulk material,
backflush, phantom assembly, etc.)?
• What is meant by picking?
• What is meant by stock determination? Which settings have to be made for stock determination during
production order processing?
• What is a goods issue posting?
• How can goods issues be entered (reference to order, reference to reservation, unplanned, etc.)?
• What is the purpose of movement types?
• What are the effects of a goods issue posting from an integrational point of view (MM, FI, CO)?
• What is meant by the backflushing of components and how can this be achieved?
Confirmation
Automation Options
Collective Orders
General Issues
5. Repetitive Manufacturing
General Issues
• What are the differences between discrete manufacturing and repetitive manufacturing?
• What are the characteristics of make-to-stock repetitive manufacturing and make-to-order repetitive
manufacturing?
• What master data are necessary in repetitive manufacturing (material master, bill of material, production
line, routing)?
• Describe the the following material master data:
- Repetitive manufacturing indicator?
- Repetitive manufacturing profile?
- Production versions?
• Which object is used to collect the material costs and production activities?
• What are the various options available for establishing a link between the cost collector and the production
version of a material? What role doe the repetitive manufacturing profile play here?
• What is the planning table in repetitive manufacturing? What functions can be executed from here?
Material Provision
• Describe the usage of pull list and stock determination as one of its function.
• Which other ways are available to make sure that sufficient components are provided to the shop floor?
Backflush
Evaluations
Data Warehouse
Standard Analyses
Flexible Analyses
• What are flexible analyses? What is the difference between flexible analyses and standard analyses?
• What are evaluation structures? What are evaluations?
If you like this post, you may as well like these too:
1. Questions on Production Planning Here are more than 100 questions (well… just questions) on
Production Planning. Go through it and see as to how many you can answer. Master Data Organizational
Structures What are...
2. Transactions: Production Planning (PP) Important transactions related to Production Planning C001
Create Production Order C005N Collective Release C011N Time Ticket C012 Confirmation – Collective C013
Confirmation – Cancel C00IS Production order information system C0GI...
3. MRP and Production Planning Understand about: Understand the principles of Demand Management
(DM) Define the Materials Requirements Planning (MRP) process Describe how to valuate MRP planning runs
Perform DM and MRP transactions Download the...
4. MRP and Production Planning Learn about Understand the principles of Demand Management (DM)
Define the Materials Requirements Planning (MRP) process Describe how to valuate MRP planning runs
Perform DM and MRP transactions Download the...
5. Administering The Production and Planning Module Administering SAP R/3: The Production and
Planning Module Chapter 1: Using PP Within an R3 Environment Chapter 2: Introducing the Concepts and
Components of PP Download the PDF File Here....
If you select the deletion indicator, the BOM is archived in the next
reorganization run, and can be deleted if required. In the BOM header, you set
the indicator that controls physical deletion after the archiving run. You can
still process the BOM within its validity period.This also applies if the deletion
indicator is entered with reference to a change number with a valid-from date
that is after the date of the next reorganization run
You can use the below mentioned tcodes:
CS25/CS28 Archiving for BOMs
CS26 BOM deletion
CS27 Retrieval of BOMs