13.12. Schedule and plan (design, manufacturing, testing, training, technical support
plan, warranty, software upgrade, etc.).
Page 60 / 77
Saudi Electricity Company
14. TESTING
14.1. A sample meter of a particular type from a Vendor shall be declared acceptable
by COMPANY, only if the meter satisfies this specification and the following
tests in all respects. This acceptance will be notified by issuing a written approval
letter to the Vendor. In case of any conflict (either not clear parts in IEC
standards, this specification, or different opinions), the decision of COMPANY
shall be final.
Meter. In this case, the Vendor shall submit the certified test report for the
complemented item(s) by the specified date to the COMPANY.
14.3. The Vendor shall conduct interoperability test with AMR/AMM server, Gateway
(DCU) M
designated place. If there is any problem found, the Vendor shall solve its Meter
problem by the specified date to the COMPANY.
14.4. If the interoperability problem is found among the Meter, Gateway (DCU), and
Page 61 / 77
Saudi Electricity Company
Page 62 / 77
Saudi Electricity Company
tested is ten (10) units. The number of meters in a delivery batch and
sample ratio may be changed according to the sampling method defined
in IEC 62058-11 as per
choose serial numbers of the sample meters and give the list of serial
numbers to the Vendor. Then the Vendor shall deliver the sample
meters to COMPANY-designated place according to the list.
14.7.4. The Routine Test includes the interoperability test with the Gateway
and AMR Server having the COMPANY specification (including field
operation test).
14.7.5. If any single meter of the tested meters in a certain delivery batch fails
to pass the Routine Test, all the meters in the delivery batch shall be
rejected.
14.7.6. Interim (or Special) Test
14.7.6.1. Interim Test may be performed by COMPANY to ensure
the manufactured meters performance with sample
meters of the delivered batch
compared with the certified qualification level, is decreased
considerably.
14.7.6.2. COMPANY will select three (3) sample meters from the
delivered batch randomly and test the meters at least once a
year. This Interim Test may be commissioned to third party
(an international test organization).
Type Routine
Test Item Related clauses
Test Test
Tests of insulation properties
Impulse voltage tests O 7.3 of IEC 62052-11
7.4 of IEC 62053-21 and
AC voltage tests O
7.4 of IEC 62053-23
Tests of accuracy requirements
Test of meter constant O O 8.4 of IEC 62053-21
Test of starting condition O O 8.3.3 of IEC 62053-21
Test of no-load condition O O 8.3.2 of IEC 62053-21
Test of error due to influence
O 8.2 of IEC 62053-21
quantities
Page 63 / 77
Saudi Electricity Company
Type Routine
Test Item Related clauses
Test Test
Test of error due to variation of the
O O 8.1 of IEC 62053-21
current
Accuracy tests at reference O
8.1 of EN50470-3
conditions
Repeatability O 8.2 of EN50470-3
Maximum permissible error O 8.4 of EN50470-3
Tests of electrical requirements
Test of power consumption O 7.1 of IEC 62053-21
Test of influence of supply voltage O 7.1 of IEC 62052-11
Test of influence of short-time
O 7.2 of IEC 62053-21
over-currents
Test of influence of self-heating O 7.3 of IEC 62053-21
Test of influence of heating O 7.2 of IEC 62052-11
Test of immunity to earth fault O 7.4 of IEC 62052-11
Anti-tampering/Anti-fraud O 9.10
O 9.11
Tests for electromagnetic compatibility (EMC)
Test of immunity to
O 7.5.3 of IEC 62052-11
electromagnetic RF fields
Test of immunity to conducted
disturbances, induced by radio- O 7.5.5 of IEC 62052-11
frequency fields
Test of immunity to electrostatic
O 7.5.2 of IEC 62052-11
discharges
Surge immunity test O 7.5.6 of IEC 62052-11
Prevention of PLC Signal
O 7.11.10
Attenuation and Distortion
Tests of the effect of the climatic environments
Dry heat test O 6.3.1 of IEC 62052-11
Page 64 / 77
Saudi Electricity Company
Type Routine
Test Item Related clauses
Test Test
Cold test O 6.3.2 of IEC 62052-11
Damp heat, cyclic test O 6.3.3 of IEC 62052-11
Solar radiation test O 6.3.4 of IEC 62052-11
Mechanical tests
Vibration test O 5.2.2.3 of IEC 62052-11
Shock test O 5.2.2.2 of IEC 62052-11
Spring hammer test O 5.2.2.1 of IEC 62052-11
Terminals (blocks) O O 5.4 of IEC 62052-11
Tests of protection against
O 5.9 of IEC 62052-11
penetration of dust and water
Test of resistance to heat and fire O 5.8 of IEC 62052-11
Accelerated Reliability Testing
O 16.10.21
Page 65 / 77
Saudi Electricity Company
Type Routine
Test Item Related clauses
Test Test
Billing periods O 9.1.8
Special day settings O OBIS 6.7
Reset Function and Historical Data
O 9.2
Recording
9.3 (for clock accuracy test,
Real Time Clock and Calendar O
IEC 62052-21 / 62054-21)
Energy storage device O 9.4
Data Retention O 9.5
Instantaneous Measurements O 9.6
Display Function O 9.7
Security Access O 9.8
Data transport security O 9.9
Anti-tampering/Anti-fraud O 9.10
O 9.11
Page 66 / 77
Saudi Electricity Company
Page 67 / 77
Saudi Electricity Company
of IEC 62053-21.
15.4. Electrical Requirements Test
15.4.1. Influence of supply voltage: as per clause 7.1 of IEC 62052-11.
15.4.2. Temperature rise: as per clause 4.1, 7.5 of this technical specification
and clause 7.2 of IEC 62052-11.
15.4.3. Power consumption: as per clause 7.1 of IEC 62053-21 and clause 7.1
of IEC 62053-23.
15.4.4. Influence of short-time overcurrents: as per clause 7.2 of IEC 62053-
21 and clause 7.2 of IEC 62053-23.
15.4.5. Influence of self-heating: as per clause 7.3 of IEC 62053-21 and clause
7.3 of IEC 62053-23.
15.5. Electromagnetic Compatibility (EMC) Test
15.5.1. Test of immunity to earth fault: as per clause 7.4 of IEC 62052-11
15.5.2. Test of immunity to electrostatic discharges: as per clause 7.5.2 of IEC
62052-11.
15.5.3. Test of immunity to electromagnetic RF fields: frequency range
80~2000 MHz, unmodulated test field strength 10V/m with operation
current, unmodulated test field strength 30V/m without operation
current, and as per clause 7.5.3 of IEC 62052-11.
15.5.4. Fast transient burst test: as per clause 7.5.4 of IEC 62052-11
15.5.4.1. Cable length between coupling device and tested meter:
0.5m±0.05m
15.5.4.2. Repetition rate: 0.75ms at 100kHz
15.5.5. Test of immunity to conducted disturbances, induced by radio-
frequency fields: as per clause 7.5.5 of IEC 62052-11
15.5.5.1. Voltage level: 10V
15.5.6. Surge immunity test: as per clause 7.5.6 of IEC 62052-11
15.5.6.1. Test voltage on the current and voltage circuits (mains
lines): 4 kV
15.5.6.2. Phase angle: pulses to be applied at 60° and 240° relative to
zero crossing (5 positive and 5 negative) of AC supply
15.5.6.3. Tested both in differential mode (line to line) and in
common mode (line to earth)
Page 68 / 77
Saudi Electricity Company
15.7.8. Clearance and creepage distances: as per clause 5.6 of IEC 62052-11.
15.7.9. Insulating encased meter of protective class II: as per clause 5.7 of IEC
62052-11.
15.7.10. Resistance to heat and fire: as per clause 5.8 of IEC 62052-11.
15.7.11. Protection against penetration of dust and water: as per clause 5.9 of
IEC 62052-11.
15.7.12. Terminal coating test according to ISO 2093
15.8. Metering / Measurement Conformance Tests
Page 69 / 77
Saudi Electricity Company
15.8.1. The metering / measurement values shall be tested and verified as per
clause 7.9, 8.1.8, 8.2, 8.7 and 9.1 of this technical specification.
15.8.2. The metering test shall be tested and verified with applied THD (Total
Harmonics Distortion) test conditions.
15.8.3. TOU functions shall be tested per season, week, day, time and DST.
15.9. Latch Relay Tests
15.9.1. Latch Relay Tests: as per clauses 6.9.8.4, 6.9.8.5 and 6.10.6 of IEC
62052-31
15.9.2. Utilization category: UC3
15.9.3. Number of operating cycles is 5500 (other conditions as per IEC 62052-
31)
15.9.4. Temperature test should be as per IEC 62052-31 clause 10.
15.9.5. Latch relay should operate normally during "OIML R46-1/-2 Edition
2012 (E), available at https://www.oiml.org/en/files/pdf_r/r046-p-
e12.pdf, section 6.3.13 "continuous (DC) magnetic induction of external
origin" Test with external magnetic interference of (500mT ±50mT).
15.10. Meter Function Tests
15.10.1. Reset function and Historical Data recording: as per clause 9.2 of this
technical specification.
15.10.2. Clock and calendar: 20 years calendar with leap years, six (6) days
time error rate conversed to one (1) month as per clause 9.3 of this
technical specification and clause 7.5 of IEC 62054-21.
15.10.3. Energy storage device: consumed energy storage device current,
technical specification of energy storage device, capacity operation as
per clause 9.4 of this technical specification.
15.10.4. Data retention: tested with accumulated metering data after the meter
power is off and one (1) hour of energy storage device removal. When
the meter power is recovered (on), the metering data shall be kept
normally as per clause 9.5 of this technical specification.
15.10.5. Instantaneous measurements: as per clause 9.6 of this technical
specification.
15.10.6. Self-diagnostics and Alarms: as per clause 8.1.18 of this technical
specification.
15.10.7. Display function: as per clause 8.1, 9.7 of this technical specification
and clause 5.10 of IEC 62052-11.
Page 70 / 77
Saudi Electricity Company
15.10.8. Output devices: as per clause 8.2, 8.6 of this technical specification
and clause 5.11 of IEC 62052-11.
15.10.9. Communication interfaces/devices: as per clause 8.3, 8.4, 8.5 of this
technical specification.
15.10.10. Security access: as per clause 9.8 of this technical
specification.
15.10.11. Data transport security Access: as per clause 9.9 of this
technical specification.
15.10.12. Anti-tampering/Anti-fraud: as per clause 9.10 of this technical
specification.
15.10.13. Magnetic Interference Tampering Protection: as per clause
9.11 of this technical specification.
15.10.14. Events/Alarms/Logs: as per clause 9.12 of this technical
specification.
15.10.15. Auto Registration: as per clause 9.13 of this technical
specification.
15.10.16. Global meter reset: as per clause 9.14 of this technical
specification.
15.10.17. Meter password reset management: as per clause 9.15 of this
technical specification.
15.10.18. Harmonics: as per clause 9.16 of this technical specification.
15.10.19. Other measurement and recording requirements: as per clause
9.17 of this technical specification.
15.10.20. Marking and packing of meter: as per clause 12, 13 of this
technical specification and clause 5.12 of IEC 62052-11.
15.10.21. Accelerated reliability tests according to IEC 62059-31-1: it shall be
conducted taking into account the following conditions:
T.Max = 80ºC and Moisture= 95% R.H and life time output condition
a. n (index characteristic) = 3
b. Ea (Activation Energy) = 0.9eV
c. Temperature/Moisture condition as below
Tuse: 30 °C
RHuse: 35%
Page 71 / 77
Saudi Electricity Company
Page 72 / 77
Saudi Electricity Company
16.1.2. Technical support for the quantity and inspection check, performance
test, integration test with Gateway (DCU) and AMR/AMM server and
trial operation.
Page 73 / 77