Saudi Electricity Company

SEC DISTRIBUTION MATERIALS 40-SDMS-02B REV.08


SPECIFICATION DATE: September 2019

delivery for final approval. The sample should include a HHU, an


optical probe, and operational manual for software.
13.9.2. At least one Gateway, compliant with 40-SDMS-02H Rev.1
(SCHEDULE B Attachment II Gateway Unit Specifications) or the
latest version shall be delivered with the sample in order to assure the

environment for final approval.


13.9.3. A sample of the IHD shall be submitted and used for verification test
which will prove the IHD interface functionality.
13.10. Copy of original -year
continuous operation for all materials (or components) used for the meter
manufacturing as per the operation conditions of Specifications for general
requirements 01-SDMS-01 and 40-SDMS-02B (SCHEDULE B Attachment II
WC Meter Specifications).
13.11. Industrial Propriety rights of the Meter (design, patent)
13.11.1. Vendor shall warrant that any equipment, delivered and/or developed by
Vendor under this technical specification shall not infringe any valid
patent, copyright or trade secret owned or controlled by any other party.
Vendor shall defend, indemnify, and hold COMPANY harmless from
any claims, losses, expenses, or damages arising out of or incurred by
reasons of any actual or alleged infringement of any patent, copyright or
trade secret.

13.12. Schedule and plan (design, manufacturing, testing, training, technical support
plan, warranty, software upgrade, etc.).

13.12.1. Technical support organization, manpower operation, installation,


testing, operation and maintenance, recovery software program

13.12.2. Detail training contents, time/duration, training materials (all training


cost shall be included in the contract price).

13.13. If additional checking is necessary, COMPANY will request the submission of


the related documents to the Vendor, the Vendor shall submit those by the
specified date to the COMPANY.

Page 60 / 77
Saudi Electricity Company

SEC DISTRIBUTION MATERIALS 40-SDMS-02B REV.08


SPECIFICATION DATE: September 2019

14. TESTING
14.1. A sample meter of a particular type from a Vendor shall be declared acceptable
by COMPANY, only if the meter satisfies this specification and the following
tests in all respects. This acceptance will be notified by issuing a written approval
letter to the Vendor. In case of any conflict (either not clear parts in IEC
standards, this specification, or different opinions), the decision of COMPANY
shall be final.

14.2. If it is necessary to complement (or correct) the Meter


found during the Tests, the Vendor shall notify it to the COMPANY and get

Meter. In this case, the Vendor shall submit the certified test report for the
complemented item(s) by the specified date to the COMPANY.

14.3. The Vendor shall conduct interoperability test with AMR/AMM server, Gateway
(DCU) M
designated place. If there is any problem found, the Vendor shall solve its Meter
problem by the specified date to the COMPANY.

14.4. If the interoperability problem is found among the Meter, Gateway (DCU), and

14.5. Type Test


14.5.1. Type Test of the meter shall include but not limited to the following test
items in Table No.10 and related clauses.
14.5.2. DLMS CTT tests DLMS functionality tests shall
be included as part of test items. The test method and testing
organization for the COMPANY s DLMS functionality tests shall be
determined through mutual agreement between COMPANY and
Vendor during the design or development phase.
14.5.3. The Type Test shall include the interoperability test with the Gateway
that is made as per technical specification.
14.5.4. It is Vendor s responsibility to arrange for the Type Test and receive
the Type Test certificate which shall be submitted to COMPANY.
14.5.5. Test Quantity (if needed, the Vendor shall provide sufficient meter
quantity for the Type Test)
14.5.5.1. Insulation, accuracy, electrical, mechanical, marking: 3 EA
14.5.5.2. Effect of the climatic: 3 EA

Page 61 / 77
Saudi Electricity Company

SEC DISTRIBUTION MATERIALS 40-SDMS-02B REV.08


SPECIFICATION DATE: September 2019

14.5.5.3. Electromagnetic compatibility: 3 EA


14.5.5.4. Input / Output: 3 EA (including contactor test)
14.5.5.5. Functional: 4 EA [local & remote communication, remote
configuration, interoperability, PLC communication]
14.5.5.6. Field Test: 4 EA (Actual load, 1 month, all log files)
14.5.5.7. Durability Testing: 1 EA
14.5.5.8. Security Access and Data Transport Security Testing: 2 EA
14.5.6. The performance testing or checking of specific components or
materials is impossible or difficult in an assembled state, the testing will
be replaced with quality assurance (or verifiable documents) of the
Vendor. Details shall be discussed with COMPANY, the decision of
COMPANY shall be final and be accepted by the Vendor.
14.6. Factory Test
14.6.1. Certified and complete Factory Test reports for each meter shall be
submitted for COMPANY review / approval before COMPANY start
the Routine Test.
14.6.2. The
has been properly tested and is conformed to this specification and
related IEC specifications.
14.7. Routine Test
14.7.1. Routine Test shall be performed to verify if the manufactured meters
conform to this specification prior to (or after) the delivery to
COMPANY-designated place. The Routine Test may be done in the
/ laboratory
upon Company s request. In case the test is performed in the
manufa / laboratory, the Vendor shall provide
COMPANY personnel with necessary assistance while the test is
performed.
14.7.2. The contracted quantity of meters shall be delivered on delivery batch
basis. Whenever the meters in a delivery batch are ready to be shipped,
the Vendor shall submit a list of meter serial numbers in the delivery
batch.
14.7.3. Some test items of the Routine Test may be performed on sample basis

sample test is allowed by COMPANY, the test quantity shall be at least


5% of delivered quantity, and the minimum quantity of meters to be

Page 62 / 77
Saudi Electricity Company

SEC DISTRIBUTION MATERIALS 40-SDMS-02B REV.08


SPECIFICATION DATE: September 2019

tested is ten (10) units. The number of meters in a delivery batch and
sample ratio may be changed according to the sampling method defined
in IEC 62058-11 as per
choose serial numbers of the sample meters and give the list of serial
numbers to the Vendor. Then the Vendor shall deliver the sample
meters to COMPANY-designated place according to the list.
14.7.4. The Routine Test includes the interoperability test with the Gateway
and AMR Server having the COMPANY specification (including field
operation test).
14.7.5. If any single meter of the tested meters in a certain delivery batch fails
to pass the Routine Test, all the meters in the delivery batch shall be
rejected.
14.7.6. Interim (or Special) Test
14.7.6.1. Interim Test may be performed by COMPANY to ensure
the manufactured meters performance with sample
meters of the delivered batch
compared with the certified qualification level, is decreased
considerably.
14.7.6.2. COMPANY will select three (3) sample meters from the
delivered batch randomly and test the meters at least once a
year. This Interim Test may be commissioned to third party
(an international test organization).

Type Routine
Test Item Related clauses
Test Test
Tests of insulation properties
Impulse voltage tests O 7.3 of IEC 62052-11
7.4 of IEC 62053-21 and
AC voltage tests O
7.4 of IEC 62053-23
Tests of accuracy requirements
Test of meter constant O O 8.4 of IEC 62053-21
Test of starting condition O O 8.3.3 of IEC 62053-21
Test of no-load condition O O 8.3.2 of IEC 62053-21
Test of error due to influence
O 8.2 of IEC 62053-21
quantities

Page 63 / 77
Saudi Electricity Company

SEC DISTRIBUTION MATERIALS 40-SDMS-02B REV.08


SPECIFICATION DATE: September 2019

Type Routine
Test Item Related clauses
Test Test
Test of error due to variation of the
O O 8.1 of IEC 62053-21
current
Accuracy tests at reference O
8.1 of EN50470-3
conditions
Repeatability O 8.2 of EN50470-3
Maximum permissible error O 8.4 of EN50470-3
Tests of electrical requirements
Test of power consumption O 7.1 of IEC 62053-21
Test of influence of supply voltage O 7.1 of IEC 62052-11
Test of influence of short-time
O 7.2 of IEC 62053-21
over-currents
Test of influence of self-heating O 7.3 of IEC 62053-21
Test of influence of heating O 7.2 of IEC 62052-11
Test of immunity to earth fault O 7.4 of IEC 62052-11
Anti-tampering/Anti-fraud O 9.10
O 9.11
Tests for electromagnetic compatibility (EMC)

Fast transient burst test O 7.5.4 of IEC 62052-11

Test of immunity to
O 7.5.3 of IEC 62052-11
electromagnetic RF fields
Test of immunity to conducted
disturbances, induced by radio- O 7.5.5 of IEC 62052-11
frequency fields
Test of immunity to electrostatic
O 7.5.2 of IEC 62052-11
discharges
Surge immunity test O 7.5.6 of IEC 62052-11
Prevention of PLC Signal
O 7.11.10
Attenuation and Distortion
Tests of the effect of the climatic environments
Dry heat test O 6.3.1 of IEC 62052-11

Page 64 / 77
Saudi Electricity Company

SEC DISTRIBUTION MATERIALS 40-SDMS-02B REV.08


SPECIFICATION DATE: September 2019

Type Routine
Test Item Related clauses
Test Test
Cold test O 6.3.2 of IEC 62052-11
Damp heat, cyclic test O 6.3.3 of IEC 62052-11
Solar radiation test O 6.3.4 of IEC 62052-11
Mechanical tests
Vibration test O 5.2.2.3 of IEC 62052-11
Shock test O 5.2.2.2 of IEC 62052-11
Spring hammer test O 5.2.2.1 of IEC 62052-11
Terminals (blocks) O O 5.4 of IEC 62052-11
Tests of protection against
O 5.9 of IEC 62052-11
penetration of dust and water
Test of resistance to heat and fire O 5.8 of IEC 62052-11
Accelerated Reliability Testing
O 16.10.21

Terminal coating test O ISO 2093


Salt spary test O IEC 60068-2-52
Input Output Requirement
Display O O 8.1
Power Supply for External
O O 8.3
Communication Devices
Optical Interface O O 8.4.1
RS-485 Communication Interfaces O O 8.4.2
In-home Display (IHD) Support O O 8.4.3
Protocol O O 8.5
Latch relay / Output relay O O 8.6
Functional tests
Total Energy registers O 9.1.2
TOU registers O 9.1.3
Current/last Average Demand O 9.1.4
Maximum Demand O 9.1.5
Cumulative Maximum Demand O 9.1.6
Load Profile O 9.1.7

Page 65 / 77
Saudi Electricity Company

SEC DISTRIBUTION MATERIALS 40-SDMS-02B REV.08


SPECIFICATION DATE: September 2019

Type Routine
Test Item Related clauses
Test Test
Billing periods O 9.1.8
Special day settings O OBIS 6.7
Reset Function and Historical Data
O 9.2
Recording
9.3 (for clock accuracy test,
Real Time Clock and Calendar O
IEC 62052-21 / 62054-21)
Energy storage device O 9.4
Data Retention O 9.5
Instantaneous Measurements O 9.6
Display Function O 9.7
Security Access O 9.8
Data transport security O 9.9
Anti-tampering/Anti-fraud O 9.10
O 9.11

Abnormal status/Event/Alarm O 9.12


Auto Registration O 9.13
Global Meter Reset O 9.14
Meter Password Reset
O 9.15
Management
Total Harmonics Distortion O 9.16
Over/under current protection O 16.9.26
Latch relay / Output relay O 9.18
Default Settings O 10
Marking of Meters
Name-plate O O 12.
Terminal Cover / Meter Cover O O 6.3, 6.4, 12
Packing O O 12
Interoperability O O 14.9
Test Method O O 16

Page 66 / 77
Saudi Electricity Company

SEC DISTRIBUTION MATERIALS 40-SDMS-02B REV.08


SPECIFICATION DATE: September 2019

15. TESTING METHOD


15.1. Structure Inspection
15.1.1. The meters selected for inspection shall be visually examined in order
to verify that they belong to the same type, that their specified
markings are correct and that none of them shows signs of damage.
The meters shall be in conformity with the type approval and they shall
have the same voltage and current characteristics.
15.1.2. The inspection test for structure, shape, size, color, etc. shall be
performed for Clause 6, 8.1 and DRAWING No. SEC/KWH-S-01, 02,
03 and 04. If it is difficult to perform the inspection test with a certain
item required for material analysis or component destroy, the item can
be tested with the verifiable documents submitted by the manufacturer.
15.1.3. The display shall be checked as per clause 8.1 and DRAWING No.
SEC/KWH-S-03.
15.1.4. Energy storage device shall be checked as per clause 6.1.4, 9.3, 9.4
and with technical specification of the energy storage device
manufacturer.
15.2. Insulation Performance Test
15.2.1. Impulse voltage test: according to clause 7.3 of IEC 62052-11:voltage
8kV.
15.2.2. AC voltage test: frequency 60Hz, according to clause 7.4 of IEC
62053-21 and clause 7.4 of IEC 62053-23.
15.3. Accuracy Test
15.3.1. Test of starting and no-load condition: as per clause 8.3 of IEC 62053-
21 / IEC 62053-23.
15.3.2. Meter constant test: as per clause 8.3 of IEC 62053-21 / IEC 62053-
23.
15.3.3. Limits of error due to variation of the current: as per clause 8.1 of IEC
62053-21 / IEC 62053-23.
15.3.4. Limits of error due to influence quantities: as per clause 8.2 of IEC
62053-21 / IEC 62053-23.
Outside temperature range: -10°C to 75°C
I is 0.5, applied mean temperature coefficient is 0.1% / K.
15.3.5. Limits of error due to influence of sub-harmonics: as per clause 8.2.2

Page 67 / 77
Saudi Electricity Company

SEC DISTRIBUTION MATERIALS 40-SDMS-02B REV.08


SPECIFICATION DATE: September 2019

of IEC 62053-21.
15.4. Electrical Requirements Test
15.4.1. Influence of supply voltage: as per clause 7.1 of IEC 62052-11.
15.4.2. Temperature rise: as per clause 4.1, 7.5 of this technical specification
and clause 7.2 of IEC 62052-11.
15.4.3. Power consumption: as per clause 7.1 of IEC 62053-21 and clause 7.1
of IEC 62053-23.
15.4.4. Influence of short-time overcurrents: as per clause 7.2 of IEC 62053-
21 and clause 7.2 of IEC 62053-23.
15.4.5. Influence of self-heating: as per clause 7.3 of IEC 62053-21 and clause
7.3 of IEC 62053-23.
15.5. Electromagnetic Compatibility (EMC) Test
15.5.1. Test of immunity to earth fault: as per clause 7.4 of IEC 62052-11
15.5.2. Test of immunity to electrostatic discharges: as per clause 7.5.2 of IEC
62052-11.
15.5.3. Test of immunity to electromagnetic RF fields: frequency range
80~2000 MHz, unmodulated test field strength 10V/m with operation
current, unmodulated test field strength 30V/m without operation
current, and as per clause 7.5.3 of IEC 62052-11.
15.5.4. Fast transient burst test: as per clause 7.5.4 of IEC 62052-11
15.5.4.1. Cable length between coupling device and tested meter:
0.5m±0.05m
15.5.4.2. Repetition rate: 0.75ms at 100kHz
15.5.5. Test of immunity to conducted disturbances, induced by radio-
frequency fields: as per clause 7.5.5 of IEC 62052-11
15.5.5.1. Voltage level: 10V
15.5.6. Surge immunity test: as per clause 7.5.6 of IEC 62052-11
15.5.6.1. Test voltage on the current and voltage circuits (mains
lines): 4 kV
15.5.6.2. Phase angle: pulses to be applied at 60° and 240° relative to
zero crossing (5 positive and 5 negative) of AC supply
15.5.6.3. Tested both in differential mode (line to line) and in
common mode (line to earth)

Page 68 / 77
Saudi Electricity Company

SEC DISTRIBUTION MATERIALS 40-SDMS-02B REV.08


SPECIFICATION DATE: September 2019

15.6. Climatic conditions and tests


15.6.1. Temperature range and relative humidity: as per clause 4 of this
technical specification and clause 6.1, 6.2 of IEC 62052-11.
15.6.2. Dry heat test: as per clause 4 of this technical specification and clause
6.3.1 of IEC 62052-11.
15.6.3. Cold test: as per clause 4 of this technical specification and clause 6.3.2
of IEC 62052-11.
15.6.4. Damp heat cyclic test: as per clause 4 of this technical specification
and clause 6.3.3 of IEC 62052-11.
15.6.5. Solar radiation test: as per clause 6.3.4 of IEC 62052-11
15.7. Mechanical requirements and tests
15.7.1. General mechanical requirements: as per related clause of 01-SDMS-
01 and clause 5.1 of IEC 62052-11.
15.7.2. Case: as per as per clause 6.1 of this technical specification and clause
5.2 of IEC 62052-11.
15.7.3. Spring hammer test: as per clause 5.2.2.1 of IEC 62052-11.
15.7.4. Shock test: as per clause 5.2.2.2 of IEC 62052-11.
15.7.5. Vibration test: as per clause 5.2.2.3 of IEC 62052-11.
15.7.6. Window: as per clause 6.3, 6.4 of this technical specification and
clause 5.3 of IEC 62052-11.
15.7.7. Terminals Terminal block(s) Protective earth terminal: as per
clause 6.2 of this technical specification and clause 5.4 of IEC 62052-
11.
15.7.7.1. Certification of used material characteristics shall be

15.7.8. Clearance and creepage distances: as per clause 5.6 of IEC 62052-11.
15.7.9. Insulating encased meter of protective class II: as per clause 5.7 of IEC
62052-11.
15.7.10. Resistance to heat and fire: as per clause 5.8 of IEC 62052-11.
15.7.11. Protection against penetration of dust and water: as per clause 5.9 of
IEC 62052-11.
15.7.12. Terminal coating test according to ISO 2093
15.8. Metering / Measurement Conformance Tests

Page 69 / 77
Saudi Electricity Company

SEC DISTRIBUTION MATERIALS 40-SDMS-02B REV.08


SPECIFICATION DATE: September 2019

15.8.1. The metering / measurement values shall be tested and verified as per
clause 7.9, 8.1.8, 8.2, 8.7 and 9.1 of this technical specification.
15.8.2. The metering test shall be tested and verified with applied THD (Total
Harmonics Distortion) test conditions.
15.8.3. TOU functions shall be tested per season, week, day, time and DST.
15.9. Latch Relay Tests
15.9.1. Latch Relay Tests: as per clauses 6.9.8.4, 6.9.8.5 and 6.10.6 of IEC
62052-31
15.9.2. Utilization category: UC3
15.9.3. Number of operating cycles is 5500 (other conditions as per IEC 62052-
31)
15.9.4. Temperature test should be as per IEC 62052-31 clause 10.
15.9.5. Latch relay should operate normally during "OIML R46-1/-2 Edition
2012 (E), available at https://www.oiml.org/en/files/pdf_r/r046-p-
e12.pdf, section 6.3.13 "continuous (DC) magnetic induction of external
origin" Test with external magnetic interference of (500mT ±50mT).
15.10. Meter Function Tests
15.10.1. Reset function and Historical Data recording: as per clause 9.2 of this
technical specification.
15.10.2. Clock and calendar: 20 years calendar with leap years, six (6) days
time error rate conversed to one (1) month as per clause 9.3 of this
technical specification and clause 7.5 of IEC 62054-21.
15.10.3. Energy storage device: consumed energy storage device current,
technical specification of energy storage device, capacity operation as
per clause 9.4 of this technical specification.
15.10.4. Data retention: tested with accumulated metering data after the meter
power is off and one (1) hour of energy storage device removal. When
the meter power is recovered (on), the metering data shall be kept
normally as per clause 9.5 of this technical specification.
15.10.5. Instantaneous measurements: as per clause 9.6 of this technical
specification.
15.10.6. Self-diagnostics and Alarms: as per clause 8.1.18 of this technical
specification.
15.10.7. Display function: as per clause 8.1, 9.7 of this technical specification
and clause 5.10 of IEC 62052-11.

Page 70 / 77
Saudi Electricity Company

SEC DISTRIBUTION MATERIALS 40-SDMS-02B REV.08


SPECIFICATION DATE: September 2019

15.10.8. Output devices: as per clause 8.2, 8.6 of this technical specification
and clause 5.11 of IEC 62052-11.
15.10.9. Communication interfaces/devices: as per clause 8.3, 8.4, 8.5 of this
technical specification.
15.10.10. Security access: as per clause 9.8 of this technical
specification.
15.10.11. Data transport security Access: as per clause 9.9 of this
technical specification.
15.10.12. Anti-tampering/Anti-fraud: as per clause 9.10 of this technical
specification.
15.10.13. Magnetic Interference Tampering Protection: as per clause
9.11 of this technical specification.
15.10.14. Events/Alarms/Logs: as per clause 9.12 of this technical
specification.
15.10.15. Auto Registration: as per clause 9.13 of this technical
specification.
15.10.16. Global meter reset: as per clause 9.14 of this technical
specification.
15.10.17. Meter password reset management: as per clause 9.15 of this
technical specification.
15.10.18. Harmonics: as per clause 9.16 of this technical specification.
15.10.19. Other measurement and recording requirements: as per clause
9.17 of this technical specification.
15.10.20. Marking and packing of meter: as per clause 12, 13 of this
technical specification and clause 5.12 of IEC 62052-11.
15.10.21. Accelerated reliability tests according to IEC 62059-31-1: it shall be
conducted taking into account the following conditions:
T.Max = 80ºC and Moisture= 95% R.H and life time output condition
a. n (index characteristic) = 3
b. Ea (Activation Energy) = 0.9eV
c. Temperature/Moisture condition as below
Tuse: 30 °C
RHuse: 35%

Page 71 / 77
Saudi Electricity Company

SEC DISTRIBUTION MATERIALS 40-SDMS-02B REV.08


SPECIFICATION DATE: September 2019

d. Life time evaluation condition: 15-years life time with


Reliability/Confidence level 50%.
e. Five combinations of stresses to be applied:
Temperature: 80 °C, relative humidity: 95 %
Temperature: 80 °C, relative humidity: 85 %
Temperature: 80 °C, relative humidity: 75 %
Temperature: 75 °C, relative humidity: 95%
Temperature: 70 °C, relative humidity: 95 %.

15.10.22. Remote Communication and Interoperability Test: with


different manufacturers Meters, Gateway (or DCU/PLC modem) and
AMR Software as per clause 8.4.2, 14.7 and 14.9 of this technical
specification (Alternative interoperability test methods may be
proposed by Vendor, but approved by COMPANY).
15.10.23. Contactor (Output Relay) Test: as per clause 8.6 of this
technical specification and related clause as per IEC 62052-31.
15.10.23.1. Contactor (Output Relay) test shall be substituted with 3rd
party s test report.
15.10.23.2. After testing 5500 times (reference one time: on-off-on),
the contactor shall operate normally and contactor
temperature shall be less than 27°C (at ambient temperature
23°C).
15.10.23.3. On/off operating time: within 50 ~ 100ms.
15.10.24. PLC Communication Test: as per clause 7.11.10 of this
technical specification.
15.10.24.1. The meter shall comply in the used frequency band with
IEC 50065 familiy standards in case of transmission
between 3kHz and 148.5kHz and with another similar
standard in case of use of transmission above 148.5kHz.
15.10.24.2. The PLC signal shall be injected with a level equal or lower
than the maximum level according to the selected
technology and the used frequency range. This level shall
be measured using the IEC 50065 familiy standards in case
of transmission between 3kHz and 148.5kHz and with
another similar standard in case of use of transmission

Page 72 / 77
Saudi Electricity Company

SEC DISTRIBUTION MATERIALS 40-SDMS-02B REV.08


SPECIFICATION DATE: September 2019

above 148.5kHz. If the selected technology has not


established the maximum level, the COMPANY will
establish it.
15.10.25. Modem Communication Circuit Test: as per clause 8.4.2,
8.4.4. of this technical specification.
15.10.25.1. Communication speed test: test range 300~115,200 bps.
15.10.25.2. Modem interface connector type, pin allocation
15.10.25.3. Modem install and communication LED test
15.10.25.4. Power output to modem test
15.10.25.5. RS-485 insulation test: measure the resistance between one
of 1st phases (L1, L2, L3 or N) and one of 2nd side (RS
485+ or RS485-) using Digital Multi Meter. The measured
(infinity).
15.10.26. For the internal latch relay testing, it will be tested according
IEC 60255-151, with the breaker outside the meter like an independent
device.
15.10.27. The Test Procedure for Severe Voltage Variations shall be that
of OIML R46-1/-2 Edition 2012 (E), available at
https://www.oiml.org/en/files/pdf_r/r046-p-e12.pdf, section 6.3.8.
Object of the test is to verify the error shift due to severe voltage
variations. The intrinsic error shall first be measured at Unom. It shall
then be verified that the error shift, relative to the intrinsic error at Unom
compiles with the requirements of Table-4 (as per OIML R46-1/-2
Edition 2012) when the voltage is varied from 0.8 Unom to 0.9 Unom and
from 1.1 Unom to 1.15 Unom. For poly-phase meters, the test voltage
shall be balanced. If several Unom values are stated, the test shall be
repeated for each Unom value.

16. OTHER REQUIREMENTS


16.1. Delivery Scope

16.1.1. Meter Hardware and Software, HHU, its fittings (communication


cables, screws, etc.).

16.1.2. Technical support for the quantity and inspection check, performance
test, integration test with Gateway (DCU) and AMR/AMM server and
trial operation.