This document provides specifications for asphaltic concrete road construction. It outlines the scope of work, related codes and standards, general requirements, materials, placement limitations, equipment, and construction methods for applying a prime coat, tack coat, and asphalt surface course. The work will be performed in accordance with the specified sequence and national codes and standards referenced in the document.

Uploaded by

ana orta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views17 pages

Manual de Construction Specification For Asphaltic Concrete Roads PDF

This document provides specifications for asphaltic concrete road construction. It outlines the scope of work, related codes and standards, general requirements, materials, placement limitations, equipment, and construction methods for applying a prime coat, tack coat, and asphalt surface course. The work will be performed in accordance with the specified sequence and national codes and standards referenced in the document.

Uploaded by

ana orta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

CONSTRUCTION SPECIFICATION

FOR
ASPHALTIC CONCRETE ROADS

A
A APPROVED FOR CONSTRUCTION^^^^^^J • y
JSS
11-MAY-S3 ISSUED FOR APPROVAL GFH MJS KWH KJSS

A
CCW

22-MAR-S3 I S S U E D F O R REVIEW GFH MJS KWH


REV. DES. PROJ.
DATE STATUS BY CHKD ENCR. ftPPR.
NO. SUPV. ENCR.

MARAVEN
C O N T R A C T NO.
M A R A V E N REFINERY EXPANSION PROJECT
MRE-B-001-1 MARAVEN, S.A.
BECHTEL
JOB NO.
CONSTRUCTION SPECIFICATION
FOR
21810
ASPHALTIC CONCRETE ROADS
JANTESA CAT.ID, C.10 UNIT. 33.000 FACILITYI SIZE.' A
JOB NO.
CAO FILE NAMEi SC AL Ei

7327 DRAVING NO.:

RCN- 2 1 7 6 3 8 SHEET, 1 OF 18 REV: 0


TABLE OF CQNTENTS
PAGE

1.0 SCOPE 3

2.0 RELATED CODES, STANDARDS, AND SPECTFICATIONS 4

3.0 GENERAL 7

4. 0 MATERIALS 7

5.0 PLACEMENT LIMITATIONS 10

6.0 EQUIPMENT 11

7.0 CONSTRUCTION METHODS - PRIME COAT 11

8.0 CONSTRUCTION METHODS - TACK COAT 12

9.0 CONSTRUCTION^ METHODS - ASPHALT SURFACE COURSE 13

10.0 TESTING 16

S P E C I F I C A T I O N NO. RCN-217638 REV 0 2 OF 18


1.0 SCOPE
í-y. --\
1.1 The w o r k covered by t h i s specification consists of
furnishing a l l labor, equipment and m a t e r i a l s and
performing a l l operations required f o r t h e construction
of asphalt concrete paving.

1.2 Definitions

1.2.1 The t e r m ' s h a l l ' used i n t h i s s p e c i f i c a t i o n


s h a l l be u n d e r s t o o d as m a n d a t o r y a n d t h e t e r m
• s h o u l d ' u s e d i n t h i s s p e c i f i c a t i o n s h a l l be
u n d e r s t o o d a s s t r o n g l y recommended.

1.2.2 The t e r m 'PRINCIPAL• u s e d i n t h i s s p e c i f i c a t i o n


s h a l l be u n d e r s t o o d as b e i n g t h e p a r t y w h i c h
i n i t i a t e s t h e p r o j e c t and u l t i m a t e l y pays f o r
i t s d e s i g n a n d c o n s t r u c t i o n . The PRINCIPAL w i l l
generally specify t h e technical requirements.
The PRINCIPAL may a l s o i n c l u d e a n a g e n t o r
consultant, authorized to act f o r the
PRINCIPAL.

1.2.3 * The term • CONTRACTOR * used i n this


s p e c i f i c a t i o n s h a l l be u n d e r s t o o d a s b e i n g t h e
party which c a r r i e s o u t a l l o r p a r t o f t h e
design, engineering, procurement, c o n s t r u c t i o n
and c o m m i s s i o n i n g f o r t h i s p r o j e c t , a n d i s t h e
issuing party of this specification.

1.2.4 The term 'SUBCONTRACTOR» used in this


s p e c i f i c a t i o n s h a l l be u n d e r s t o o d as b e i n g t h e
p a r t y ( i e s ) w h i c h p e r f o r m s t h e work scope o f
this specification.

1.3 Construction Sequence

The work described i n this specification shall be


p e r f o r m e d as f o l l o w s :

• The f i r s t s t e p s h a l l c o n s i s t o f t h e p r e p a r a t i o n o f
the subgrade, i n c l u d i n g t h e compaction o f e x i s t i n g
i n - s i t u s o i l and t h e placement and c o m p a c t i o n o f
fill m a t e r i a l , i n a c c o r d a n c e w i t h Spec. No. RCN-
217636

• A p r i m e c o a t s h a l l be a p p l i e d .

• A h o t - l a i d asphaltic concrete base c o u r s e shall be


p l a c e d and c o m p a c t e d .

• A tack c o a t s h a l l be a p p l i e d .

SPECIFICATION NO. RCN-217638 REV 0 3 OF 18


A h o t - l a i d asphaltic concrete s u r f a c e course shall
be p l a c e d and c o m p a c t e d .

2.0 RELATED COPES. STANDARDS, AND SPECIFICATIONS

I n a d d i t i o n t o t h e requirements designated elsewhere i n t h i s


s p e c i f i c a t i o n , t h e design, materials, f a b r i c a t i o n , testing,
and i n s t a l l a t i o n o f t h e e q u i p m e n t , m a t e r i a l s , and s e r v i c e s
s p e c i f i e d h e r e i n s h a l l be i n a c c o r d a n c e w i t h t h e f o l l o w i n g
codes and s t a n d a r d s :

2.1 N a t i o n a l Codes and S p e c i f i c a t i o n s

2.1.1 ASTM - American Society f o r Testing and


Materials:

C 29-90 T e s t Method f o r U n i t Weight and V o i d s


i n Aggregate

C 88-90 Test Method f o r Soundness of


A g g r e g a t e s b y Use o f Sodium S u l f a t e
o r Magnesium S u l f a t e

C «117-90 T e s t M e t h o d f o r M a t e r i a l F i n e r Than
75 - microns (No. 200) S i e v e i n
M i n e r a l Aggregates by Washing

C 131-89 Test Methods f o r Resistance to


Degradation of Small-Size Coarse
A g g r e g a t e s b y Abrasión o r I m p a c t i n
t h e Los Angeles Machine

C 136A-84 M e t h o d f o r S i e v e A n a l y s i s o f F i n e and
Coarse A g g r e g a t e s

D 75-87 P r a c t i c e f o r Sampling Aggregates

D 140-88 Methods for Sampling Bituminous


Materials

D 242-85 Specification f o r Mineral F i l l e r for


Bituminous Paving M i x t u r e s

D 546-88 Method f o r Sieve A n a l y s i s o f M i n e r a l


F i l l e r f o r Road a n d P a v i n g M a t e r i a l s

D 977-91 Specification f o r Emulsified Asphalt

D 979-89 Methods f o r Sampling Bituminous


Paving M i x t u r e s

D 1188-89 T e s t Method f o r B u l k S p e c i f i c G r a v i t y
and D e n s i t y o f Compacted B i t u m i n o u s

S P E C I F I C A T I O N NO. RCN-217638 REV 0 4 OF 18


Mixtures Using Paraffin-Coated
Specimens

D 1559-89 T e s t M e t h o d f o r R e s i s t a n c e t o Plástic
Flow o f B i t u m i n o u s Mixtures Using
Marshall Apparatus

D 2026-79 S p e c i f i c a t i o n Cut-Back A s p h a l t (Slow-


C u r i n g Type)

D 2027-86 Specification f o r Cut-Back Asphalt


( M e d i u m - C u r i n g Type)

D 2028-86 Specification f o r Cut-Back Asphalt


( R a p i d - C u r i n g Type)

D 2172-88 Test Method for Quantitative


E x t r a c t i o n o f Bitumen from Bituminous
Paving Mixtures

D 2397-91 Specification f o r Cationic Emulsified


Asphalt

D 2419-91 T e s t M e t h o d f o r Sand E q u i v a l e n t Valué


* o f S o i l s and F i n e A g g r e g a t e

D 2489-84 T e s t Method f o r Degree o f P a r t i c l e


Coating of Bituminous-Aggregate
Mixtures

D 2726-90 Test Method f o r B u l k S p e c i f i c G r a v i t y


of Compacted Bituminous Mixtures
U s i n g S a t u r a t e d S u r f a c e - D r y Specimens

2.1.2 AASHTO - A m e r i c a n A s s o c i a t i o n o f S t a t e Highway


and T r a n s p o r t a t i o n O f f i c i a l s

M 81-90 Specification f o r Cut-Back Asphalt


( R a p i d C u r i n g Type)

M 82-75 Specification for Cut-Back Asphalt

(Médium C u r i n g Type)

M 140-88 Specification f o r Emulsified Asphalt

M 208-87 Specification f o r Cationic Emulsified


Asphalt
M 226-80 Specification f o r Viscosity Graded
A s p h a l t Cement

T 2-91 Methods o f Sampling Stone, Slag,


G r a v e l , Sand, and S t o n e B l o c k f o r Use
as H i g h w a y M a t e r i a l s

S P E C I F I C A T I O N NO. RCN-217 638 REV 0 OF 18


T 11-91 M e t h o d o f T e s t f o r Amount o f M a t e r i a l
Finer Than 0.075 mm sieve in
Aggregate

T 19-91 Method o f T e s t f o r U n i t Weight and


Voids i n Aggregate

T 27-91 Method o f T e s t f o r S i e v e A n a l y s i s o f
F i n e and C o a r s e A g g r e g a t e s

T 30-87 Method of Test for Mechanical


Analysis of Extracted Aggregate

T 37-91 Method o f T e s t f o r S i e v e A n a l y s i s o f
Mineral F i l l e r

T 40-78 Method of Sampling Bituminous


Materials

T 96-91 Method o f Test f o r Resistance t o


Abrasión of Small Size Coarse
A g g r e g a t e by Use o f t h e Los A n g e l e s
Machine

Tfl04-91 Method of Test f o r Soundness of


A g g r e g a t e by Use o f Sodium S u l f a t e o r
Magnesium S u l f a t e

T 164-91 Method of Test for Quantitative


E x t r a c t i o n o f Bitumen from Bituminous
Paving M i x t u r e s

T 168-91 Methods o f S a m p l i n g Bituminous Paving


Mixtures

T 176-86 M e t h o d o f T e s t f o r Plástic F i n e s i n
Graded A g g r e g a t e s and S o i l s by Use o f
t h e Sand E q u i v a l e n t T e s t

T 195-67 Method o f T e s t f o r D e t e r m i n i n g Degree


o f Partióle C o a t i n g o f B i t u m i n o u s -
Aggregate M i x t u r e s

2.2 Project Specifications

RCN-217636 Specification for Site Preparation


and E a r t h w o r k

2.3 M a r a v e n Cardón E n g i n e e r i n g P r a c t i c e s

34.11.00.11 S i t e P r e p a r a t i o n and Earthwork

34.13.20.31 Roads, Paving Surfacing, Slope


P r o t e c t i o n and F e n c i n g

SPECIFICATION NO. RCN-217638 REV 0 6 OF 18


3.1 Areas o f t h e permanent work r e q u i r i n g compacted a s p h a l t
concrete paving are indicated on t h e d r a w i n g s . The
asphalt paving shall consist o f an a s p h a l t concrete
s u r f a c e c o u r s e o v e r an a s p h a l t i c c o n c r e t e b a s e c o u r s e and
a prepared subgrade. The s u b g r a d e , including fill
m a t e r i a l and compaction, s h a l l comply w i t h S p e c i f i c a t i o n
No. RCN-217 63 6. The s u r f a c e o f t h e p r e p a r e d subgrade
s h a l l be p r i m e d as s p e c i f i e d b e l o w p r i o r t o c o n s t r u c t i n g
the asphaltic c o n c r e t e base c o u r s e . Asphalt b a s e and
s u r f a c e c o u r s e f o r s u c h áreas s h a l l c o n s i s t o f a m i x t u r e
o f coarse and f i n e aggregate w i t h o r w i t h o u t m i n e r a l
f i l l e r , u n i f o r m l y mixed w i t h a s p h a l t cement, t h e n p l a c e d
and compacted i n accordance w i t h t h i s specification.
A s p h a l t s u r f a c e c o u r s e s h a l l be c o n s t r u c t e d i n one l a y e r
t o conform t o t h e l i n e s , grades, t h i c k n e s s e s , and t y p i c a l
c r o s s s e c t i o n s shown o n t h e d r a w i n g s .

3.2 The s u r f a c e t y p e t o be u s e d i n c o n s t r u c t i n g t h e a s p h a l t
c o u r s e s h a l l be a s s p e c i f i e d on t h e d r a w i n g s a n d s h a l l
c o n f o r m t o t h e r e q u i r e m e n t s o f t h i s s p e c i f i c a t i o n . When
t h e s u r f a c e t y p e i s n o t s p e c i f i e d , any o f t h e a s p h a l t
surface types listed under Section 4.0 of this
s p e c i f i c a t i o n may be u s e d i n c o n s t r u c t i n g t h e surface
course.

3.3 A testing laboratory approved by t h e C o n t r a c t o r s h a l l


determine a job-mix formula f o rt h e s p e c i f i e d surface
c o u r s e t y p e and s h a l l p e r f o r m t e s t i n g s p e c i f i e d below.
The job-mix formula f o r t h e s p e c i f i e d surface course
t y p e , w h i c h s h a l l comply w i t h t h e r e q u i r e m e n t s s t i p u l a t e d
below f o r that surface type, s h a l l be s u b j e c t f o r
a p p r o v a l by t h e C o n t r a c t o r .

4.0 MATERIALS

4.1 Asphalt Primer

The g r a d e s o f l i q u i d a s p h a l t , c o n t r o l l i n g s p e c i f i c a t i o n s ,
and a p p l i c a t i o n t e m p e r a t u r e s f o rt h e asphalt primer are
g i v e n below. The g r a d e u s e d s h a l l b e s u b j e c t t o t h e
approval o f t h e Contractor

Application
Grade Specif i c a t i o n Temperatures

MC-70 ASTM D 2027, AASHTO M 82 50° - 100°C


SC-70 ASTM D 2026 50° - 100°C
MC-30 ASTM D 2027, AASHTO M 82 30° - 100°C

S P E C I F I C A T I O N NO. RCN-217638 REV 0 7 OF 18


4.2 Sand

Sand c o v e r s h a l l be c l e a n , g r a n u l a r m i n e r a l material
m e e t i n g t h e f o l l o w i n g g r a d i n g r e q u i r e m e n t s . When t e s t e d
w i t h l a b o r a t o r y s i e v e s , 100 p e r c e n t s h a l l p a s s t h e No. 4
s i e v e a n d f r o m 0 p e r c e n t t o 2 p e r c e n t s h a l l p a s s t h e No.
200 s i e v e .

4.3 A s p h a l t Tack C o a t

A s p h a l t f o r t a c k c o a t s h a l l be e m u l s i f i e d a s p h a l t o f
g r a d e s SS-1, S S - l h , CSS-1, o r CSS-lh, d i l u t e d one p a r t
p o t a b l e w a t e r t o one p a r t e m u l s i f i e d a s p h a l t . B e f o r e
d i l u t i o n , t h e e m u l s i f i e d a s p h a l t s h a l l comply w i t h t h e
r e q u i r e m e n t s o f AASHTO M 14 0 o r M 2 08 (ASTM D 977 o r D
2397) .

4.4 A s p h a l t Cement

A s p h a l t cement f o r t h e b a s e a n d s u r f a c e c o u r s e m i x t u r e s
s h a l l be AC-10, AC-2 0, o r t h e i r e q u i v a l e n t s . The g r a d e
u s e d s h a l l b e s u b j e c t t o t h e a p p r o v a l o f t h e CONTRACTOR.
The asphalt cement m a t e r i a l shall comply with the
a p p l i c a b l e r e q u i r e m e n t s o f AASHTO M 2 2 6 .

4.5 M i n e r a l Aggregate

4.5.1 The m i n e r a l aggregate f o r the asphaltic


concrete course mixtures shall be crushed
stone, crushed g r a v e l , crushed s l a g , sharp-edge
n a t u r a l sand, m i n e r a l f i l l e r , o r a c o m b i n a t i o n
of t w o o r more o f t h e s e materials. Fifty
percent by w e i g h t o f t h e combined coarse
aggregate, other than naturally occurring
rough-textured aggregate, shall consist of
crushed pieces having one o r more faces
produced by f r a c t u r e .

4.5.2 The c o m b i n e d a g g r e g a t e a f t e r g o i n g t h r o u g h t h e
d r y e r s h a l l h a v e a s a n d e q u i v a l e n t valué o f n o t
less than 50 percent. Combinations of
aggregates t h a t have a h i s t o r y of polishing
s h a l l n o t be u s e d . C o a r s e a g g r e g a t e (material
r e t a i n e d on t h e U.S. S t a n d a r d No. 8 s i e v e )
s h a l l h a v e a p e r c e n t wear by t h e L o s A n g e l e s
abrasión m a c h i n e t e s t o f n o t more t h a n 4 0 .

4.5.3 S l a g used f o r aggregate s h a l l be a i r - c o o l e d


b l a s t f u r n a c e s l a g and s h a l l weigh n o t l e s s
than 70 l b / f t . 3

4.5.4 Mineral f i l l e r shall meet t h e r e q u i r e m e n t s o f


ASTM D 2 4 2 .

SPECIFICATION NO. RCN-217638 REV 0 8 OF 18


4.6 Asphalt-Aggreqate Mixtures

S u r f a c e C o u r s e Types and C o m p o s i t i o n a r e as follows;

4.6.1 A s p h a l t i c Concrete Base C o u r s e

a) The j o b - m i x f o r m u l a f o r t h e a s p h a l t - a g g r e g a t e
base course mixture shall be within the
following limits:

T o t a l Percent
Sieve Size P a s s i n q , By W e i q h t
1 Inch 100
3/4 I n c h 90 - 100
3/8 I n c h 60 - 80
No. 4 35 - 65
No. 40 3 - 2 0
No. 200 2 - 8

Asphalt Content: 4 - 9 Percent By W e i g h t o f


T o t a l Mix

b) The a s p h a l t - a g g r e g a t e b a s e c o u r s e m i x t u r e s h a l l
meet t h e f o l l o w i n g t e s t c r i t e r i a :

Number o f C o m p a c t i o n B l o w s ,
Each End o f Specimen 75

S t a b i l i t y (Marshall) 1500 I b Minimum

Flow ( M a r s h a l l ) 8-16

Air Voids 3 - 5 percent

Voids i n Mineral Aggregate 14 percent

4.6.2 A s p h a l t i c Concrete Surface Course

a) The job-mix formula f o r the asphalt-


a g g r e g a t e s u r f a c e c o u r s e m i x t u r e s h a l l be
within the following limits:

T o t a l Percent
Sieve Size P a s s i n q , By W e i q h t
1/2 I n c h 100
3/8 I n c h 80 - 100
No. 4 55 - 70
No. 8 40 - 55
No. 4 0 15 - 30
No. 200 2 - 9

Asphalt Content: 4 1 / 2 - 9 1/2 % by W e i g h t o f


T o t a l Mix

S P E C I F I C A T I O N NO. RCN-217638 REV 0 OF 18


b) The asphalt-aggregate surface course
mixture shall meet t h e following test
criteria:

Number o f C o m p a c t i o n B l o w s ,
Each End o f S p e c i m e n 75

Stability (Marshall) 1500 I b Minimum

Flow ( M a r s h a l l ) 8-16

A i r Voids 3-5 percent

Voids i n M i n e r a l Aggregate 15 percent

4.6.3 Tolerances

The following tolerances for the job-mix


f o r m u l a s h a l l be a l l o w e d p e r single test:

Passinq Sieve Percent

1/2 I n c h and Larger + 8

3/8 I n c h and No. 4 +7

No. 8 and No. 16 +6

No. 3 0 and No. 50 +5

No. 100 + 4

No. 200 + 3

Asphalt Content, Weight


Percent of T o t a l Mixture: + 0.5

5.0 PLACEMENT LIMITATIONS

5.1 Prime Coat

Primer shall not be placed when general weather


c o n d i t i o n s are not s u i t a b l e .

5.2 A s p h a l t i c Concrete Courses

A s p h a l t s u r f a c e c o u r s e m i x t u r e s h a l l be p l a c e d o n l y when
t h e s p e c i f i e d d e n s i t y can be o b t a i n e d . Precautions shall
be t a k e n t o c o m p a c t t h e m i x t u r e b e f o r e i t c o o l s t o o much
t o o b t a i n t h e r e q u i r e d d e n s i t y . The m i x t u r e s h a l l n o t be
p l a c e d on any w e t s u r f a c e o r when w e a t h e r c o n d i t i o n s w i l l
otherwise prevent i t s proper handling or f i n i s h i n g .

SPECIFICATION NO. RCN-217638 REV 0 10 OF 18


6.0 EQUIPMENT

6.1 Prime Coat

E q u i p m e n t u s e d s h a l l i n c l u d e a p o w e r broom, a power
blower, o r both; mechanical o r s e l f - p r o p e l l e d aggregate
s p r e a d i n g e q u i p m e n t t h a t c a n be a d j u s t e d t o u n i f o r m l y
spread t h e sand cover; a pressure d i s t r i b u t o r ; and
equipment f o r h e a t i n g t h e a s p h a l t i c m a t e r i a l .

6.2 Asphalt Surface Course

Equipment f o r c o n s t r u c t i o n o f t h e a s p h a l t s u r f a c e course
s h a l l include: asphalt mixing p l a n t ; self-powered pavers;
smooth metal-bedded haul trucks with covers when
r e q u i r e d ; pressure d i s t r i b u t o r ; steel-wheeled, pneumatic-
tired, o r v i b r a t i n g r o l l e r s capable o f a t t a i n i n g t h e
r e q u i r e d d e n s i t y a n d s m o o t h n e s s ; power broom o r power
blower.

7.0 CONSTRUCTION METHODS - PRIME COAT

7.1 Genera^

The área t o r e c e i v e a s p h a l t p r i m e r s h a l l b e s u b s t a n t i a l l y
t r u e t o l i n e and grade. I t s h a l l have a d r y , f i r m , and
properly prepared surface before priming operations
b e g i n . Loóse a n d f o r e i g n m a t e r i a l s h a l l b e r e m o v e d .

7.2 Asphalt Primer A p p l i c a t i o n

7.2.1 The a p p r o x i m a t e a p p l i c a t i o n r a t e o f a s p h a l t
p r i m e r i s 0.9 - 2.3 l i t e r s p e r s q . m e t e r ( 0 . 2 0
- 0.50 g a l l o n s p e r s q u a r e y a r d ) . The j o b
a p p l i c a t i o n r a t e o f a s p h a l t p r i m e r s h a l l be
s u c h t h a t t h e amount a p p l i e d w i l l be c o m p l e t e l y
absorbed by t h e s u r f a c e b e i n g t r e a t e d i n a
p e r i o d o f 24 h o u r s .

7.2.2 A p p l i c a t i o n o f a s p h a l t p r i m e r s h a l l be made
uniformly w i t h a pressure d i s t r i b u t o r . The
asphalt primer s h a l l be a p p l i e d w i t h i n t h e
temperature ranges specified i n this
specification. When heating i s required,
precautions shall be t a k e n t o avoid fire
hazard.

7.2.3 A p p l i c a t i o n s h a l l be made o n l y when t h e s u r f a c e


i s d r y o r s l i g h t l y damp.

S P E C I F I C A T I O N NO. RCN-217638 REV 0 11 OF 18


7.2.4 Before beginning application, building paper
s h a l l be s p r e a d o v e r t h e s u r f a c e f r o m t h e j o i n t
back f o r a s u f f i c i e n t d i s t a n c e f o r t h e spray
b a r t o b e g i n s p r a y i n g a n d be o p e r a t i n g a t f u l l
forcé when t h e surface t o be t r e a t e d i s
reached. A f t e r t h e asphalt i s applied, t h e
b u i l d i n g p a p e r s h a l l be removed a n d d e s t r o y e d .

7.2.5 The s p r a y b a r s h a l l be s h u t o f f i n s t a n t a n e o u s l y
a t each c o n s t r u c t i o n j o i n t t o a s s u r e a s t r a i g h t
l i n e and t h e f u l l a p p l i c a t i o n o f a s p h a l t p r i m e
up to the joint. I f necessary t o prevent
d r i p p i n g , a d r i p p a n s h a l l be i n s e r t e d u n d e r
t h e n o z z l e when t h e a p p l i c a t i o n i s s t o p p e d .

7.2.6 A hand s p r a y s h a l l be u s e d t o a p p l y primer


material necessary to touch up spots
unavoidably missed by t h e d i s t r i b u t o r .

7.2.7 A f t e r application o f t h e asphalt primer a t


l e a s t 24 h o u r s s h a l l l a p s e b e f o r e a p p l y i n g t h e
* sand cover i f such cover i s r e q u i r e d .

7.3 Sand C o v e r A p p l i c a t i o n

7.3.1 I f t h e a s p h a l t p r i m e r h a s n o t been c o m p l e t e l y
absorbed by t h e t r e a t e d s u r f a c e twenty-four
h o u r s a f t e r a p p l i c a t i o n , s u f f i c i e n t sand s h a l l
be s p r e a d o v e r t h e s u r f a c e w i t h a m e c h a n i c a l
spreader t o b l o t up t h e excess a s p h a l t .

7.3.2 Before p l a c i n g an a s p h a l t s u r f a c e course o r


s u r f a c e t r e a t m e n t , loóse s a n d s h a l l be s w e p t
from t h e primed s u r f a c e .

8.0 CONSTRUCTION METHODS - TACK COAT

8.1 A f t e r t h e c o n t a c t s u r f a c e h a s been t h o r o u g h l y c l e a n e d o f
a l l d e l e t e r i o u s m a t e r i a l s , t h e base c o u r s e s u r f a c e s h a l l
r e c e i v e a t a c k c o a t o f 0.25 - 0.70 l i t e r s / m (0.05-0.15
2

gal/yd 2 ) o f d i l u t e d e m u l s i f i e d a s p h a l t o f t h e t y p e and
g r a d e d e s i g n a t e d a b o v e . The t a c k c o a t s h a l l be u n i f o r m i n
t h i c k n e s s , s h a l l c o v e r a l l t h e c o n t a c t s u r f a c e área, and
s h a l l n o t be o v e r s p r a y e d .

8.2 The t a c k c o a t s h a l l be a l l o w e d t o c u r e b e f o r e p l a c i n g t h e
a s p h a l t surface course.

S P E C I F I C A T I O N NO. RCN-217638 REV 0 12 OF 18


8.3 The t a c k c o a t s h a l l be a p p l i e d on o n l y a s much base as
can be c o v e r e d w i t h a s p h a l t s u r f a c e m i x t u r e i n t h e same
day.

9.0 CONSTRUCTION METHODS - ASPHALT CONCRETE COURSES

9.1 General

9.1.1 The área t o be p a v e d s h a l l be s u b s t a n t i a l l y


t r u e t o l i n e and grade. I t s h a l l have a d r y ,
firm, and p r o p e r l y prepared surface before
paving operations begin. Loóse and f o r e i g n
m a t e r i a l s h a l l be removed.

9.1.2 P r i o r t o t h e a s p h a l t i c c o n c r e t e base course


p l a c e m e n t , t h e p r e p a r e d s u r f a c e s h a l l be p r i m e d
i n a c c o r d a n c e w i t h S e c t i o n 7.2.

9.1.3 P r i o r t o t h e a s p h a l t i c concrete surface course


placement, t h e s u r f a c e s h a l l have a t a c k c o a t
a p p l i e d i n a c c o r d a n c e w i t h S e c t i o n 8.0.

9.2 Preparinq the Mixture

9.2.1 The a s p h a l t s h a l l be h e a t e d a t t h e p a v i n g p l a n t
t o a t e m p e r a t u r e a t w h i c h i t c a n be u n i f o r m l y
a p p l i e d t o t h e aggregate.

9.2.2 Coarse and f i n e a g g r e g a t e s s h a l l be s t o r e d


s e p a r a t e l y a t t h e p a v i n g p l a n t i n a manner t h a t
w i l l p r e v e n t i n t e r m i n g l i n g . S t o c k p i l e s s h a l l be
b u i l t i n a manner t h a t w i l l p r e v e n t s e g r e g a t i o n
of aggregate s i z e s . I ft h e aggregate tends t o
s e g r e g a t e d u r i n g h a n d l i n g i t s h a l l be s u p p l i e d
and s t o c k p i l e d i n t w o o r more s i z e s .

9.2.3 When n e c e s s a r y t o b l e n d a g g r e g a t e s f r o m one o r


more s o u r c e s t o p r o d u c e t h e c o m b i n e d g r a d a t i o n ,
each c o u r s e o r s i z e o f a g g r e g a t e s h a l l be
stockpiled individually. Aggregate from t h e
individual stockpiles shall be f e d t h r o u g h
sepárate b i n s t o t h e c o l d e l e v a t o r f e e d e r s a n d
s h a l l n o t be b l e n d e d i n t h e s t o c k p i l e .

9.2.4 C o l d a g g r e g a t e s s h a l l be f e d c a r e f u l l y t o t h e
p l a n t so t h a t s u r p l u s e s and s h o r t a g e s w i l l n o t
occur and cause breaks disrupting the
continuous operation.

S P E C I F I C A T I O N NO. RCN-217638 REV 0 13 OF 18


The a g g r e g a t e s h a l l be d r i e d a n d h e a t e d t o
provide a paving mixture temperature
i m m e d i a t e l y a f t e r m i x i n g o f 100°C - 165°C, b a s e d
on t h e a s p h a l t cement u s e d .

9.2.6 H e a t e d d r i e d a g g r e g a t e s s h a l l be s c r e e n e d and
s t o r e d i n s i z e s t h a t may e a s i l y be r e c o m b i n e d
i n t o a gradation meeting t h e requirements of
the job-mix formula.

9.2.7 The h e a t e d and d r i e d aggregates shall not


c o n t a i n enough m o i s t u r e t o c a u s e t h e m i x t u r e t o
s l u m p , t h e a s p h a l t t o foam, o r t h e a g g r e g a t e t o
s e g r e g a t e d u r i n g h a u l i n g and p l a c i n g .

9.2.8 M i x i n g t i m e s h a l l be t h e s h o r t e s t t i m e that
w i l l p r o d u c e a s a t i s f a c t o r y m i x t u r e . I t w i l l be
e s t a b l i s h e d b y t h e t e s t i n g l a b o r a t o r y b a s e d on
the procedure f o r determining t h e percentage of
coated p a r t i c l e s described i n 7AASHT0 T 195
(ASTM D 2 4 8 9 ) .

The m i x i n g t i m e s f o r s u r f a c e c o u r s e m i x t u r e s
* w i l l be s e t t o a c h i e v e 95 p e r c e n t o f c o a t e d
p a r t i c l e s f o r d e n s e a g g r e g a t e a n d 90 p e r c e n t o f
c o a t e d p a r t i c l e s f o r honeycombed a g g r e g a t e .

9.2.9 For batch p l a n t s , d r y m i x i n g time i f required


s h a l l n o t e x c e e d 50 s e c o n d s .

9.2.10 For continuous mix p l a n t s , t h e m i x i n g t i m e will


be c o m p u t e d by t h e f o l l o w i n g f o r m u l a .

Pugmill dead capacity, kg


Mix. time,seconds =
Pugmill output, kg/sec

M i x i n g t i m e s h a l l n o t e x c e e d 60 s e c o n d s .

9.3 P l a c i n g t h e Mix

The a s p h a l t i c c o n c r e t e c o u r s e m i x t u r e s h a l l be p l a c e d
w i t h an a s p h a l t p a v e r t o p r o v i d e t h e c o u r s e t h i c k n e s s
s p e c i f i e d on t h e d r a w i n g s . The base a n d s u r f a c e c o u r s e s
s h a l l be l a i d i n a s i n g l e l i f t e a c h a n d c o m p a c t e d t o
r e q u i r e d u n i f o r m d e n s i t y and s m o o t h n e s s . P l a c i n g t h e
m i x t u r e s h a l l be a c o n t i n u o u s o p e r a t i o n . I r r e g u l a r i t i e s
shall be c o r r e c t e d before final compaction of the
mixture.
m
S P E C I F I C A T I O N NO. RCN-217638 REV 0 14 OF 18
9.4 Compacting t h e Mix

The m i x s h a l l be c o m p a c t e d i m m e d i a t e l y a f t e r placing.
I n i t i a l r o l l i n g w i t h a s t e e l - w h e e l tándem r o l l e r , steel
three-wheeled r o l l e r , v i b r a t o r y r o l l e r , o r a pneumatic-
tired roller shall follow t h e p a v e r a s c l o s e l y as
possible. I f needed, intermedíate rolling with a
p n e u m a t i c - t i r e d r o l l e r s h a l l be done i m m e d i a t e l y b e h i n d
t h e i n i t i a l r o l l i n g . F i n a l r o l l i n g s h a l l elimínate m a r k s
f r o m p r e v i o u s r o l l i n g . I n áreas t o o s m a l l f o r t h e r o l l e r ,
a v i b r a t i n g píate c o m p a c t o r o r a h a n d t a m p e r s h a l l be
used t o achieve t h o r o u g h compaction.

9.5 Acceptance Requirements

9.5.1 Density

T a r g e t d e n s i t y w i l l be d e t e r m i n e d b y t a k i n g ,
for each l o t , t h e average d e n s i t y o f s i x
l a b o r a t o r y - p r e p a r e d specimens r e p r e s e n t i n g t w o
sub s a m p l e s ( a p p r o x i m a t e l y 10 k g e a c h ) c h o s e n
on a r a n d o m b a s i s , t a k e n f r o m t r u c k s d e l i v e r i n g
« m i x t u r e t o t h e j o b s i t e . By q u a r t e r i n g , e a c h
sub s a m p l e s h a l l be r e d u c e d t o o b t a i n t h r e e
sample units, each of sufficient weight
( a p p r o x i m a t e l y 1.2 k g ) t o p r e p a r e a s p e c i m e n
a p p r o x i m a t e l y 60 mm (2 1/2 i n c h e s ) i n h e i g h t .
The s p e c i m e n s w i l l be c o m p a c t e d i n a c c o r d a n c e
w i t h " C o m p a c t i o n o f S p e c i m e n s " i n ASTM D 1 5 5 9 ,
except t h a t t h e temperature of t h e mixture
i m m e d i a t e l y b e f o r e compacting o f t h e specimens
shall be within t h e range specified i n
Paragraph 7.2.5 o f t h i s s p e c i f i c a t i o n . The
s a m p l e o f m i x t u r e c a n be p l a c e d i n a n o v e n f o r
n o t more t h a n 3 0 m i n u t e s t o m a i n t a i n t h e h e a t ,
b u t i t s h a l l n o t be r e h e a t e d i f i t c o o l s b e f o r e
use. The c o m p a c t i n g a p p a r a t u s shall be i n
a c c o r d a n c e w i t h ASTM D 1559.

9.5.1.2 Acceptance o f t h e compacted pavement


d e n s i t y w i l l be b a s e d on t h e a v e r a g e o f
f i v e d e n s i t y d e t e r m i n a t i o n s f o r each l o t
of a s p h a l t m i x t u r e p l a c e d . Cores d r i l l e d
f r o m t h e s u r f a c e c o u r s e w i l l be u s e d t o
t e s t t h e d e n s i t y o f t h e pavement by e i t h e r
ASTM D 1188 o r ASTM D 2726, w h i c h e v e r i s
applicable. Each l o t o f t h e compacted
s u r f a c e w i l l be a c c e p t e d when t h e a v e r a g e
of the five density determinations i s
e q u a l t o o r g r e a t e r t h a n 97 p e r c e n t , and
when no i n d i v i d u a l d e t e r m i n a t i o n i s l o w e r
t h a n 95 p e r c e n t , o f t h e a v e r a g e d e n s i t y o f
the s i x l a b o r a t o r y prepared specimens.

SPECIFICATION NO. RCN~217638 REV 0 15 OF 18


Material samples will be t e s t e d for the
requirements o f Section 4 by t h e a p p l i c a b l e
methods s p e c i f i e d below.

10.2.2 Asphalt

A s p h a l t m a t e r i a l s w i l l be t e s t e d b y t h e t e s t
m e t h o d s o f AASHTO d e s i g n a t e d i n t h e a p p l i c a b l e
a s p h a l t s p e c i f i c a t i o n . I f a n AASHTO m e t h o d o f
t e s t procedure i s n o t a v a i l a b l e , t h e equivalent
ASTM m e t h o d w i l l be u s e d .

10.2.3 Sand

S i e v e a n a l y s i s o f sand c o v e r m a t e r i a l s h a l l be
i n a c c o r d a n c e w i t h AASHTO T 27 o r ASTM C 13 6.

10.2.4 M i n e r a l Aggregates

M i n e r a l a g g r e g a t e s w i l l b e t e s t e d b y one o r
more o f t h e f o l l o w i n g m e t h o d s o f t e s t o f AASHTO
o r ASTM:

Characteristic T e s t Method
AASHTO ASTM

Amount o f M a t e r i a l F i n e r
t h a n No. 200 S i e v e i n T 11 C 117
Aggregate

U n i t Weight o f Aggregate T 19 C 29

Sieve A n a l y s i s , F i n e and

Coarse Aggregates T 27 C 136

Sieve A n a l y s i s o f M i n e r a l
Filler T 37 D 546
Abrasión o f C o a r s e
Aggregate, Los Angeles
Machine T 96 C 131
Soundness o f A g g r e g a t e s T 104 C 88

Plástic F i n e s i n Graded
Aggregates and S o i l s by
use o f Sand E q u i v a l e n t T e s t T 176 D 2419

10.2.5 Asphalt-Aggregate Mixture

S P E C I F I C A T I O N NO. RCN-217638 REV 0 17 OF __18


2. 5.1 The a s p h a l t - a g g r e g a t e mixture will be
t e s t e d f o r a s p h a l t c o n t e n t b y AASHTO T 164
(ASTM D 2171) . The m i x t u r e w i l l b e t e s t e d
for compliance with aggregate grading
r e q u i r e m e n t s b y AASHTO T 3 0 .

10.2.5.2 I f t h e m i x t u r e i s produced i n a mixing


plant having automatic controls and a
p r i n t o u t system and t h e c o n t r o l s a r e i n
proper calibration, asphalt content
compliance will be determined from
recorded data. Hot B i n Analysis together
w i t h b a t c h w e i g h t r e a d o u t d a t a w i l l be
used t o d e t e r m i n e c o m p o s i t i o n compliance.

S P E C I F I C A T I O N NO. RCN-217638 REV 0 18 OF 18