6 (2020) 137-147
*Corresponding Author
DOI: https://doi.org/10.30880/ijie.2020.12.06.016
Received 8 April 2020; Accepted 30 June 2020; Available online 2 July 2020
Abstract: Photovoltaic hybrid power generation is an alternative solution for supplying electricity to rural areas,
especially in Sarawak, Malaysia, where grid connection is almost impossible due to the cost and geographic
location. Diesel generator systems are still used by local communities in these remote areas, and the
implementation of photovoltaic diesel hybrid systems can reduce dependency on diesel generator units. The work
presented in this paper explores the possibility of integrating solar energy resource with diesel generator to meet
the load demand of rural communities in Sarawak. In further detail, the configuration and size of the PV-diesel
system are analyzed in based on the lowest net present cost (NPC) and the cost of electricity (COE). The analysis is
based on mathematical modeling and simulation using Hybrid Optimization Model for Electric Renewables
(HOMER) software. Eight different configurations of two energy resources-photovoltaic panels and diesel
generators-are studied and compared. The option with the highest optimization values is considered to be the most
feasible electrification solution for the particular rural area. The outcomes of the analysis show that the PV-diesel
hybrid configuration proves to be more cost-effective compared to an existing generator-based system in that it
reduces fuel dependency and has the lowest NPC and COE among all configurations studied.
1. Keywords:
Introduction
Keyword 1, keyword 2, number of keywords is usually 3-7, but more is allowed if deemed necessary
The majority of the population in West Malaysia has access to the electricity grid. However, some of the
population in rural areas in the east region do not yet have access to sustained electricity and traditionally rely on diesel
generators as well as small-scale renewable energy electrification. Although the electricity access rate in Malaysia is
100% nationally, there still remain pockets of rural areas, especially in the states of Sabah and Sarawak, without access
to modern energy infrastructure [1].
The rural community usually uses diesel generators for the electrification of the areas, but such solution has
disadvantages such as high fuel and maintenance costs [2]. The limited hours of generator operation limit any
significant activity for socio-economic improvement due to the price of diesel and maintenance issue. Electricity will
bring light to these communities which results in improvements in education, health and communication; and it surely
*Corresponding author: [email protected] 137
2000 UTHM Publisher. All right reserved.
penerbit.uthm.edu.my/ojs/index.php/ijie
M. Harmen et al., International Journal of Integrated Engineering Vol. 12 No. 6 (2020) p. 137-147
enhanced the income level of the household. In addition, the maintenance and operational costs for this type of
configuration are seen as an extra burden, as well as the costs to buy and to deliver diesel fuel over long distances either
by river or disrupted road access.
Solar energy is considered a practical approach to overcome the electrification issue due to the abundance of solar
irradiation in this region. The weather conditions are favorable for the development of photovoltaic (PV) systems, as
Sarawak lies directly on the equatorial zone and receives sunshine throughout the year. This makes the area highly
suitable for the implementation of PV systems as an alternative energy source. The annual average daily solar
irradiation for Malaysia was recorded as being between 4.21 kWh/m2 to 5.56 kWh/m2. The highest irradiation was
recorded at 6.8 kWh/m2, which occurred in August and November, while the irradiation lowest value of 0.61 kWh/m2
occurred in December [3], [4].
However, the solar energy fluctuates and is intermittent, and typically supplies only a few hours of power after
nightfall. The dependence on solar element needs to be solved by hybridizing this energy source with several other
energy components such as diesel generators and battery systems to generate electricity with lower implementation
costs and provide a stable electricity supply to the Sarawak region, particularly in rural areas [5].
2. System Modeling
The economic system modelling was formulated from power generation models and cost criteria models. The cost
criteria model was leveraged upon the annualized costs of system components, which included initial set-up, operation
and maintenance, part replacements, and the fuel cost of the generators. The cost objective function for the optimization
problem was to reduce the NPC and COE by simulating and comparing various system configurations. The theoretical
concept for optimization in this analysis was based on mathematical modeling that included the model of power
generation, the system components, the costs, and energy optimization. The theorical aspects are given below and are
based on the works of authors in [6], [7], and [8].
(1)
An assumption was made that temperature effects on PV cells will be ignored.
where,
G (t ) is the hourly irradiance in in kWh/ m2 ,
Apv is the surface area, in m2 ,
P is the PV penetration level factor,
The hourly energy output from diesel generator can be calculated according to the equation
= . (2)
If more than one generator attached, the energy output will be the sum of all generated power by each generator.
(3)
where,
is the efficiency of the diesel generator,
is the generator rated power,
is the total power from all generators,
is the hourly energy of each generator.
The battery state of charge (SOC) is the cumulative sum of the daily charging and discharging rate. The battery bank
serves as energy source when discharging and as a load when charging. At any time, t, the SOC is related to the previous
SOC, while for the period of t-1 to t, it is related to the energy production and consumption situation. During the
138
M. Harmen et al., International Journal of Integrated Engineering Vol. 12 No. 6 (2020) p. 137-147
charging process, when the total output of all PV exceeds the load demand, the available battery bank capacity at a time,
t, is described by [6], [7], and [8].
(4)
where,
he battery is triggered to support the energy demand. As such, the available energy in battery bank at a time t, is
expressed as [6], [7], and [8]:
(5)
where,
(6)
where,
is the total annualized economic cost model of all components,
is the number of each component.
(7)
where,
(8)
139
M. Harmen et al., International Journal of Integrated Engineering Vol. 12 No. 6 (2020) p. 137-147
(9)
where,
(10)
where,
SOC is the state of charge of the battery.
140
M. Harmen et al., International Journal of Integrated Engineering Vol. 12 No. 6 (2020) p. 137-147
HOMER Pro has two optimization algorithms called optimizer and grid search algorithm. The grid search
algorithm simulates all of the viable configurations. An optimizer algorithm is based on propriety derivative-free
algorithm that used to calculate the least costly system [9]. A derivative-free algorithm is a mathematical-based
optimization that does not use derivative information in the classical sense to find an optimal solution [13]. According
to [14], given the unconstrainted optimization problem,
where f: R^n→ R may be noisy or non-differentiable, and particularly in the case where the evaluation of f is
complex and computationally time-consuming to evaluate, the problem of finding an optimal point in this particular
situation is referred to as derivative-free optimization. More reviews and explanations on derivative-free algorithms can
be found in [14] and [15].
There are two strategies used in PV-diesel hybrid optimization, namely the load following (LF) and cycle charging
(CC) dispatch strategies. Figure 2.0 illustrates the optimization algorithm in various case of supplying loads based on
the work in [6] and [16].
In the event of unavailability of PV output, the LF strategy is used, in which the diesel generators are employed to
supply the electricity load. The PV panels are used to supply the load and charge the batteries in the event of excess
power. Meanwhile, in the CC strategy, diesel generators are used to feed the load demand and at the same time to
charge the batteries. The LF strategy was considered in this analysis as it helps to reduce excess energy. The system
operates in different modes accordingly to the climate conditions. When solar irradiation is available, the control
system priorities the PV panels to supply the loads. Meanwhile in the case of excess energy, the system will charge the
batteries. Under these conditions, any further excess energy should be either dumped or utilized for ancillary service. If
there is less energy output from the PV panels, the battery will supply the loads until the minimum SOC occurs, at
which point the system will employ the diesel generator to supply the load. The decisions of the control system to
operate any of the energy components and to charge or discharge the batteries take place on an hourly basis and based
on the energy balance computation.
141
M. Harmen et al., International Journal of Integrated Engineering Vol. 12 No. 6 (2020) p. 137-147
Meanwhile, in the CC strategy, generators are used to supply the electricity load and at the same time to charge the
batteries. The LF strategy was considered in this analysis as it helps to reduce excess energy. This system configuration
operates in different modes based on climate situations. When solar irradiation is available, the control system priorities
the PV panels to feed the loads. Else, the system will charge the battery in the case of excess energy occurred. Under
these conditions, any further excess energy should be either utilized for ancillary service or dumped. If there is less
energy output generated by PV panels, the battery banks will supply the electricity load until the minimum SOC occurs,
at which situation the system will employ the generator to supply the load. Figure 2 illustrates the optimization
algorithm in various case of supplying loads based on the work in [6] and [16].
Based on the energy consumption of the Bario community, it was decided to implement a PV-diesel hybrid
configuration combining PV panels, diesel generators, battery storage, and converter. The system configuration used in
this hybrid system is a mixed-bus system where the energy from the PV panels and the battery banks feed into the
direct current (DC) bus and the energy from diesel generators feeds into the alternating current (AC) bus as depicted in
Figure 3 [16], [17].
To find the most viable system with lowest cost criteria, the input variables were prepared and gathered through
data preparation stage. The priority cost criteria analyzed were the NPCs and COEs of the system configurations. Other
cost criteria analyzed were capital costs, operating costs, and diesel fuel costs. Eight system configurations were
proposed: PV/four generators/battery, PV/three generators/battery, PV/two generators/battery, PV/one
generator/battery, PV/battery, two generators/battery, two-generator system, and a PV/two generator system. The
component costs, load size, technical data, interest rate, and control strategy were then simulated using the HOMER
optimization software. The method used for the system’s cost analysis is represented in Figure 4.
The 2018 monthly solar radiation data for Bario, Sarawak coordinated at 3°44.7’ N, 115°27.0’ E is analyzed based
on mean global solar radiation and monthly clearness index [18]. The solar radiation reaches its highest value of 5.39
kWh/m2/day in June, and a yearly average of 5.11 kWh/m2 was recorded at the studied location [19]. The clearness
index indicates the clearness of the atmosphere at the selected site and was generated by HOMER. The average
clearness index in this remote area was recorded as 0.47 annually. The highest clearness index value of 0.534 was
recorded in June and the lowest of 0.472 was recorded in December [17], [19]. The solar radiation data was
automatically generated by HOMER once the location was selected [18].
142
M. Harmen et al., International Journal of Integrated Engineering Vol. 12 No. 6 (2020) p. 137-147
Net Present
Initial Cost
Cost (RM)
P1 440kW
P2 200kW
P3 200kW
P4 125kW
Electricity
Converter
Battery
Cost of
(RM)
(RM)
(RM)
PV
The PV and battery system (Configuration E) produced the lowest operating cost of RM309,862.50, while the
generator and battery system of Configuration F was the highest with a cost of RM723,875.90 between all
configurations. The ranking for each configuration is shown in Figure 5.
143
M. Harmen et al., International Journal of Integrated Engineering Vol. 12 No. 6 (2020) p. 137-147
Configuration E is a fully renewable energy configuration and had the lowest operating costs among all
configurations analyzed. In Configuration F, additional costs were imposed to cover the operating cost of the generator,
including its maintenance and fuel costs. Configuration F is not ideal for a sustainable hybrid system despite the fact
that the capital cost of this configuration ranked second lowest among all configurations, as shown in Figure 6.
The highest capital cost, RM9,617,149.24, was recorded for the PV and battery of Configuration E. In this weather
and solar irradiance-dependent configuration, the system needs more battery capacity for energy storage to satisfy the
electricity demand. The least capital cost of RM776,000.00was recorded for the base case, the diesel-only system of
Configuration G. Configuration F was the highest of RM9,617,149.24 between all configurations.
Configuration D had the lowest NPC among all configurations, at RM 9,396,797.00. However, as a power control
strategy and to ensure no power disruption in meeting load demand, two generators had to be involved in the
optimization to avoid system failure due to generator breakdown or scheduled maintenance. Configuration C, which
integrates a PV array, two diesel generators, and a battery, had the second lowest NPC among all configurations at
RM9,618,797.00. The 100% renewable energy penetration and lowest operating cost (RM309,862.50) is recorded using
the stand-alone PV and battery system in Configuration E, but such a system comes with the highest NPC
(RM13,622,900.00) and highest initial capital cost (RM9,617,149.24) in comparison with other hybrid systems.
However, in terms of greenhouse gas emissions, the PV and battery system is also preferable than the base case of a
diesel-only system. The base case, Configuration G, had the fourth highest NPC (RM10,131,510.00) of all systems
analyzed.
Therefore, base on lowest NPC criteria, the PV-diesel integrated with battery system is preferable for the system
selection over only generator or PV and battery systems. Configurations D, C, B, A, G, F, H, and E are ranked
accordingly in order of increasing NPC as presented in Figure 7. The system with the lowest COE is the most
economically preferred. The combination of PV-diesel and batteries in Configuration C produced the lowest COE
(RM0.7033/kWh) among all configurations. The highest COE was produced by the PV and battery system of
144
M. Harmen et al., International Journal of Integrated Engineering Vol. 12 No. 6 (2020) p. 137-147
Configuration E (RM1.07/kWh). The other PV-diesel hybrids with battery configurations (D, B, and A) produced
COEs of RM 0.7182/kWh, RM0.7264/kWh, and RM0.7408/kWh respectively.
The variation of COE values depicted major differences between systems with and without a generator. In this
comparison, the system without a generator resulted in a higher COE value. As shown in Figure 8, the COE values of
Configurations D, B, A, G, and F are in increasing order, proportional to the number of generators attached. More
generators in the system result in higher COEs, and it is not preferable for a system with a higher COE to be proposed
in a rural area.
Lower consumption of diesel is considered to be favourable for all generator-based systems. Neglecting
Configuration E, which consists only of PV and battery components, Configuration A, B, and C consume 215,592 liters
diesel annually, the lowest among all generator-based configurations. Regardless of the generators used in these systems,
the fuel consumption remains the same, except for in the case of the 200 kW generator combined with the PV and the
battery in Configuration D. This configuration consumes 2.63% more fuel annually compared to Configurations A, B,
and C. As explained earlier, Configuration D was not considered in the selection of feasible hybrid system due to its
operating strategy to obtain power reliability in supplying electricity to the community.
Configuration H is considered to be a fuel-dependent system, as the PV array would not be able to generate
electricity during nightfall or in lower solar irradiance conditions. Therefore, it ranked among the highest fuel consuming
145
M. Harmen et al., International Journal of Integrated Engineering Vol. 12 No. 6 (2020) p. 137-147
systems. Configuration F and G consumed the highest volumes of fuel (316,847 liters/year) and shared the same power
production fractions. A complete comparison of fuel consumption for each configuration is demonstrated in Figure 9.
5. Conclusion
The findings from this analysis are concluded as follows.
The simulation indicated that the PV array and two diesel generators with the integration of the battery system
had the lowest NPC and COE among all configurations analyzed, based on a 2,898.32 kWh/day load
consumption, 5.11 kWh/ m2/day of solar radiation, a diesel price of RM2.18/liter, an 80% maximum renewable
energy fraction share, and the interest rate is at 6.0%.
The NPC for this optimal hybrid configuration is RM9,618,797.00, compared to RM10,131,510.00 for a
generator-only system. The COE is RM0.7033/kWh, a decrease of 5.06% from the generator-only system.
Although the initial capital cost of the hybrid system is considered high, the implementation of a PV array and
two generators with a battery system causes a reduction of 101,255 liters of diesel consumption, which can save
RM220,735.90 annually compared to the generator-only system for 25 years of operation.
Based on HOMER optimization results, it is recommended that the system integrate 255 kW PV panels, 86
units of 2,500 Ah batteries, a 115 kW power converter, and two generators with the sizes of 440 kW and 200
kW to minimize the cost criteria of the proposed system.
Finally, the findings from this current work will hopefully serve as a base case for future researchers in implementing
any configuration of PV hybrid system in other rural areas of the state and in Malaysia in general.
Acknowledgement
The authors gratefully acknowledge the contributions of the Electrical and Electronics Engineering, Faculty of
Engineering, Universiti Malaysia Sarawak for academic supports on this research.
References
[1] Energy Watch: Global & Regional Energy Insights, Thought leadership, & Conversations. Exploring Rural
Electrification Challenges in ASEAN. [2019, July 4]
[2] Rahman, Mizanur & Faizal, Hasan & Saat, Aminuddin & Wahid, Mazlan & Vijeyan, & Vikkren. (2017)
Renewable resource based decentralized power system to a remote village in Malaysia: optimization and
technoeconomic evaluation. Journal of Advanced Research in Fluid Mechanics and Thermal Sciences, 37, 1-17
[3] Wafi, A., Muzaffar, K., Norain, R., Zaidi, T., Norhisyam, A. R. W., & Ainol, S. (2018). Experimental study on
efficiency of dc and ac power supply travel kit using solar panel. Journal of Telecommunication, Electronic and
Computer Engineering, 10, 105-109
[4] Hairuniza, A. K., Hazim, M. M., & Rajendran, P. (2015). Regression model to predict global solar irradiance in
Malaysia. International Journal of Photoenergy, 2015, 1-7
[5] Carvalho, D. B., Guardia, E. C., Marangon, L., & José, W. (2019). Technical-economic analysis of the insertion of
PV power into a wind-solar hybrid system. Journal of Solar Energy, 191, 530-539
[6] Lau, Kwan Yiew & Tan, Chee Wei & Yatim, Abdul Halim. (2015). Photovoltaic systems for Malaysian islands:
Effects of interest rates, diesel prices and load sizes. Energy, 83, 204-216
146
M. Harmen et al., International Journal of Integrated Engineering Vol. 12 No. 6 (2020) p. 137-147
[7] Sinha, S., & Chandel, S. S. (2015). Review of recent trends in optimization techniques for solar photovoltaic–wind
based hybrid energy systems. Renewable and Sustainable Energy Reviews, 50, 755-769
[8] Ani, V. A. (2016). Design of a reliable hybrid (pv/diesel) power system with energy storage in batteries for remote
residential home. Journal of Energy, 2016, 1-16
[9] Pavan, Y. V., & Ravikumar, B. (2015). Renewable energy based microgrid system sizing and energy management
for green buildings. Power Syst. Clean Energy, 3, 1-13
[10] Nigussie, T., Bogale, W., Bekele, F., & Dribssa, E. Feasibility study for power generation using off- grid energy
system from micro hydro-pv-diesel generator-battery for rural area of Ethiopia: the case of Melkey Hera village,
Western Ethiopia. Journal of AIMS Energy, 5, 4, 667-690
[11] Asad W., Muhammad, S. T., Jehanzeb, A., Muhammad, A., Muneeband, Y., & Fareeha, A. (2017). Multi-objective
analysis of a chp plant integrated microgrid in pakistan. Journal of Energies, 10, 10, 1625
[12] Bahramara S., Moghaddam, M., P., & Haghifam, M. R. (2016). Optimal planning of hybrid renewable energy
systems using HOMER: A review. Renewable and Sustainable Energy Reviews, 62, 609-620
[13] Gao, J., Cao, J., & Yang, Y. (2018). A derivative-free trust region algorithm with nonmonotone filter technique for
bound constrained optimization. Journal of Mathematical Problems in Engineering, 2018, 1-13
[14] Larson, J., Menickelly, M., & Wild, S. (2019). Derivative-free optimization methods. Journal of Acta Numerica,
28, 287-404
[15] Gumma, E. A. E., Montaz, M. A., & Hashim, M. H. A. (2019). A derivative-free algorithm for non-linear
optimization with linear equality constraints. Journal of Mathematical Programming and Operations Research, 69,
1361-1387
[16] Halabi, L. M., Mekhilef, S., Olatomiwa, L., & Hazelton, J. (2017). Performance analysis of hybrid
pv/diesel/battery system using HOMER: A case study Sabah, Malaysia. Journal of Energy Conversion and
Management, 144, 322-339
[17] HOMER Energy. How HOMER works. [2017, December 18]
[18] Halim, Amanda & Fudholi, Ahmad & Sopian, Kamaruzzaman & Ruslan, M. H. & Phillips, Stephen. (2018).
Feasibility study on hybrid solar photovoltaic with diesel generator and battery storage design and sizing using
homer pro. Jurnal Kejuruteraan SI, 1, 3, 69-76
[19] Aziz, P. D., Wahid, S. S. A., Yanuar, Z., & Aziz, N. (2016). Evaluation of solar energy potential in Malaysia.
International Journal of Trends in Bioinformatics, 9, 35-43
[20] Ani, V. A. (2015). Energy optimization at GSM base station sites located in rural areas. International Journal of
Energy Optimization and Engineering, 1, 3, 1-31
147