Slab Schedule: Cistern Tank Cistern Tank Cover
Slab Schedule: Cistern Tank Cistern Tank Cover
3 SLAB SCHEDULE
S-CT1 SCALE: 1: NTS
CISTERN COVER
5 BEAM SCHEDULE
S-CT1 SCALE: 1: NTS
RAINWATER COVER
CISTERN TANK CISTERN TANK COVER
6 BEAM SCHEDULE
1 COVER FRAMING PLAN S-CT1 SCALE: 1: NTS 11 DEMOLITION KEY PLAN
S-CT1 SCALE: 1: 100 S-CT1 SCALE: 1: 100
LEGEND:
- PART TO BE DEMOLISHED
- PART TO BE RETAINED
9 BLOW-UP DETAIL
S-CT1 SCALE: 1: NTS
TANK AND ROAD
7 CONNECTION DETAIL
S-CT1 SCALE: 1: 20
EXISTING BEAM W/
SIDES CHIPPED OFF
& TOP BARS
EXPOSED
ADDITIONAL
NEW CONCRETE
TOP BARS
ADDITIONAL
ADDITIONAL
BOTTOM BARS
RAINWATER TANK COVER
STIRRUP
12 DEMOLITION KEY PLAN
S-CT1 SCALE: 1: 100
14 JUL 2020
S CT1
TOTAL SHEETS