1 District : Hassan
2 Taluk : Alur
3 Name of Tank : Hanthanamane Aralikatte
4 Date of Inspection : 9/8/2016
5 Date of Last test check by Asst. Executive : 2/7/2016
Engineer.
6 Observation : Good
7 Tank Bund:- :
a) Are there T.B.L Stones or other : No
paramanent marks to indicate the
prescribed TBL ?
b) Is the top of bund any where below the : No
prescribed level? (if so specify the length &
shortages)
c) Are the top width and slopes according to : This is an old tank which is not in par with M.I
M.I.S Tandards every where ? (If not standards
specify the lengths & extent of Difficincies)
IV) GENERAL:- :
a) Progress on works, if any already on hand : Nill
and the probable date of completionof the
same.
b) Any other special remarks of the Inapecting : 1. Under the Railway Track is to be Desilted
officer/official: and jungle has to be removed
2. Geauge pole to be errected in the tank to
watch danger level of the flood
Assistant Executive Engineer
N0.5, PRE Sub-Dvn, Alur
GUIDENCE FOR SUBMISSION OF DISTRESS REPORT OF INDIVIDUAL I.MI.TANKS.
WHICH ARE RAILWAY AFFECTING.
Performance Report:
GUIDE LINES.
E/Kps/R.A.T Report.xls
DETAILS OF RAILWAY AFFECTING TANK IN
Name of District : HASSAN Name of Division : PRE HASSAN
Name of Railway line: Hassan - Sakaleshpura
18 Authority responsible for inspecting & : AEE P.R.E.Sub -Div. Alur& G.P Alur.
Maintance of tank.
19 Kms. Of Railway bridge bund effected. : Hassan to S.K.Pur Railway line c.No. 36
20 Bridge and span. :
26 Remarks. :
1. Under the Railway Track is to be Desilted
and jungle has to be removed
2. Geauge pole to be errected in the tank to
watch danger level of the flood
E/Kps/R.A.T Report.xls Assistant Executive Engineer
N0.5, PRE Sub-Dvn, Alur
PRE/POST MANSOON INSPECTION REPORT OF M.I WORKS FOR THE YEAR 2016-17
1 District : Hassan
2 Taluk : Alur
3 Name of Tank : Kithaganamane U.M Kere
4 Date of Inspection : 9/8/2016
5 Date of Last test check by Asst. Executive : 2/7/2016
Engineer.
6 Observation : Good
7 Tank Bund:- :
a) Are there T.B.L Stones or other : NIL
paramanent marks to indicate the
prescribed TBL ?
b) Is the top of bund any where below the : NIL
prescribed level? (if so specify the length &
shortages)
c) Are the top width and slopes according to : MI Standard
M.I.S Tandards every where ? (If not
specify the lengths & extent of Difficincies)
IV) GENERAL:- :
a) Progress on works, if any already on hand :
and the probable date of completionof the
same.
b) Any other special remarks of the Inapecting :
officer/official: Bund Sluice and w/w good condition
E/Kps/R.A.T Report.xls
E/Kps/R.A.T Report.xls
DETAILS OF RAILWAY AFFECTING TANK IN
Name of District : HASSAN Name of Division : PRE HASSAN
Name of Railway line: Hassan - Sakaleshpura
26 Remarks. :
Bund Sluice and w/w good condition
E/Kps/R.A.T Report.xls
PRE/POST MANSOON INSPECTION REPORT OF M.I WORKS FOR THE YEAR 2016-17
1 District : Hassan
2 Taluk : Alur
3 Name of Tank : Yadur Maradikere
4 Date of Inspection : 9/8/2016
5 Date of Last test check by Asst. Executive : 2/7/2016
Engineer.
6 Observation : Good
7 Tank Bund:- :
a) Are there T.B.L Stones or other : No
paramanent marks to indicate the
prescribed TBL ?
b) Is the top of bund any where below the : No
prescribed level? (if so specify the length &
shortages)
c) Are the top width and slopes according to : This is an old tank which is not in par with M.I
M.I.S Tandards every where ? (If not standards
specify the lengths & extent of Difficincies)
26 Remarks. :
E/Kps/R.A.T Report.xls
Assistant Executive Engineer
N0.5, PRE Sub-Dvn, Alur
PRE/POST MANSOON INSPECTION REPORT OF M.I WORKS FOR THE YEAR 2016-17
1 District : Hassan
2 Taluk : Alur
3 Name of Tank : Kanchanahally Pura U.M Kere
4 Date of Inspection : 9/8/2016
5 Date of Last test check by Asst. Executive : 2/7/2016
Engineer.
6 Observation : Good
7 Tank Bund:- :
a) Are there T.B.L Stones or other : NIL
paramanent marks to indicate the
prescribed TBL ?
b) Is the top of bund any where below the : NIL
prescribed level? (if so specify the length &
shortages)
c) Are the top width and slopes according to : MI Standard
M.I.S Tandards every where ? (If not
specify the lengths & extent of Difficincies)
IV) GENERAL:- :
a) Progress on works, if any already on hand :
and the probable date of completionof the
same.
b) Any other special remarks of the Inapecting :
officer/official:
E/Kps/R.A.T Report.xls
18 Authority responsible for inspecting & : AEE P.R.E.Sub -Div. Alur& G.P Alur
Maintance of tank.
19 Kms. Of Railway bridge bund effected. : Hassan to S.K.Pur Railway line Near C.No - 58
E/Kps/R.A.T Report.xls
PRE/POST MANSOON INSPECTION REPORT OF M.I WORKS FOR THE YEAR 2016-17
1 District : Hassan
2 Taluk : Alur
3 Name of Tank : Kongavally Arasikere
4 Date of Inspection : 9/8/2016
5 Date of Last test check by Asst. Executive : 2/7/2016
Engineer.
6 Observation : Good
7 Tank Bund:- :
a) Are there T.B.L Stones or other : NIL
paramanent marks to indicate the
prescribed TBL ?
b) Is the top of bund any where below the : NIL
prescribed level? (if so specify the length &
shortages)
c) Are the top width and slopes according to : MI Standard
M.I.S Tandards every where ? (If not
specify the lengths & extent of Difficincies)
IV) GENERAL:- :
a) Progress on works, if any already on hand :
and the probable date of completionof the
same.
b) Any other special remarks of the Inapecting : jungle clearance and Repairs w/w
officer/official:
E/Kps/R.A.T Report.xls
18 Authority responsible for inspecting & : AEE A.P.E.Sub -Div. Alur& G.P
Maintance of tank.
19 Kms. Of Railway bridge bund effected. : Near Kongavally level crossing B.R No 72
20 Bridge and span. :
E/Kps/R.A.T Report.xls
Assistant Executive Engineer
N0.5, PRE Sub-Dvn, Alur
PRE/POST MANSOON INSPECTION REPORT OF M.I WORKS FOR THE YEAR 2016-17
1 District : Hassan
2 Taluk : Alur
3 Name of Tank : Kogilakatte
4 Date of Inspection : 9/8/2016
5 Date of Last test check by Asst. Executive : 2/7/2016
Engineer.
6 Observation : Good
7 Tank Bund:- :
a) Are there T.B.L Stones or other : No
paramanent marks to indicate the
prescribed TBL ?
b) Is the top of bund any where below the : No
prescribed level? (if so specify the length &
shortages)
c) Are the top width and slopes according to : This is an old tank which is not in par with M.I
M.I.S Tandards every where ? (If not standards
specify the lengths & extent of Difficincies)
d) Are there any dangerous gullies, cart track : No
ruts etc. which in your opinion, must be
repaired urgently (If so specify the
locations)
e) Action taken to rectify deficiencies notes : NA
in(a) to (d) above.
II) 1. SURPLUSING ARRANGEMENTS:- :
a) Are the surplussing arrangement at site in : Yes
order (If not indicate the variations).
IV) GENERAL:- :
a) Progress on works, if any already on hand : Nill
and the probable date on completion the
roof.
b) Any other special remarks of the Inapecting : 1. Under the Railway Track to be Desilted and
officer/official: jungle has to be removed 2.
Geauge pole to be errected in the tank to watch
danger level of the flood
E/Kps/R.A.T Report.xls
Condition of
Dist. & Tank in bund whether Adequecy of
Sl. which Railway it is capable of waste weir to
Name of Tank Remarks.
No. affecting tank holding discharge the
situated. disigned designed flood
discharge
1 2 3 4 5 6
Certified that I have inspected the tank and the appetrenant items personally on 09/08/2016 and the tank in safe.
E/Kps/R.A.T Report.xls
LIST OF RAILWAY EFFECTING TANK IN : ALUR TALUK
Condition of
Dist. & Tank in bund whether Adequecy of
Sl. which Railway it is capable of waste weir to
Name of Tank Remarks.
No. affecting tank holding discharge the
situated. disigned designed flood
discharge
1 2 3 4 5 6
Certified that I have inspected the tank and the appetrenant items personally on 09/08/2016 and the tank is safe.
Condition of
Dist. & Tank in bund whether Adequecy of
Sl. which Railway it is capable of waste weir to
Name of Tank Remarks.
No. affecting tank holding discharge the
situated. disigned designed flood
discharge
1 2 3 4 5 6
Certified that I have inspected the tank and the appetrenant items personally on 09/08/2016 and the tank is safe.
Condition of
Dist. & Tank in bund whether Adequecy of
Sl. which Railway it is capable of waste weir to
Name of Tank Remarks.
No. affecting tank holding discharge the
situated. disigned designed flood
discharge
1 2 3 4 5 6
Certified that I have inspected the tank and the appetrenant items personally on 09/08/2016 and the tank in safe.
Condition of
Dist. & Tank in bund whether Adequecy of
Sl. which Railway it is capable of waste weir to
Name of Tank Remarks.
No. affecting tank holding discharge the
situated. disigned designed flood
discharge
1 2 3 4 5 6
Certified that I have inspected the tank and the appetrenant items personally on 09/08/2016 and the tank in safe.
Condition of
Dist. & Tank in bunt whether if Adequecy of
Sl. which Railway is capable of waste weir the
Name of Tank Remarks.
No. affecting tank holdings discharge the
situated. disigned designed flood
discharge
1 2 3 4 5 6
1. Under the Railway Track to
be Desilted and jungle has to
be removed
1 Alur Koglilakatte Hassan / Alur Safe Suffcient
2. Geauge pole to be errected
in the tank to watch danger
level of the flood
Certified that I have inspected the tank and the appetrenant items personally on 09/08/2016 and the tank is safe.