0% found this document useful (0 votes)
185 views

General Abstract PDF

The document is a notice inviting tenders from contractors and firms for various development schemes in District Council Sukkur. It lists 22 schemes for providing and installing solar powered RO plants and construction of paver blocks and surface drains in villages across different union councils. Contractors must be registered with relevant authorities and have necessary equipment, experience with similar projects, financial capacity and not be blacklisted. Bids will be received until specified dates and will be opened and evaluated accordingly, with the procuring agency reserving the right to reject any bids.

Uploaded by

alibuxjatoi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
185 views

General Abstract PDF

The document is a notice inviting tenders from contractors and firms for various development schemes in District Council Sukkur. It lists 22 schemes for providing and installing solar powered RO plants and construction of paver blocks and surface drains in villages across different union councils. Contractors must be registered with relevant authorities and have necessary equipment, experience with similar projects, financial capacity and not be blacklisted. Bids will be received until specified dates and will be opened and evaluated accordingly, with the procuring agency reserving the right to reject any bids.

Uploaded by

alibuxjatoi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

OFFICE OF DISTRICT COUNCIL SUKKUR

Phone No: 071- 9310112 No.DCS/EB/Sukkur/ / of 2020


Fex No: 071- 9310112 Dated: / / 2020

NOTICE INVITING TEDNER

In persuance of Government letter No. SOII/(LG)/8-16/2017/SUK/T540U, dated 16th October


2018, regarding the approval Development Schemes/NITs & with permission of House Resolation No. 18/2020
dated 25-02-2020, the District Council Sukkur (from it's own sources), invites sealed tenders on Composite
Schedule of Rates (CSR)/ Item Rate basis or on both from interested contractors / firms. (List of works attached).

2 Eligibility: Valid Registration with tax authorities & Pakistan Engineering Council in relevant category and
discipline (mention the category and discipline) except for works costing upro Rs. 4.00 (M)
3 Method of Procurement. (National Competitive Bidding - Single Stage one Envelope.
4 Bidding / Tender Documents:
(i) Issuance: Documents will be issued from date of publication upto (01-06-2020), on payment of
tender fee (Non refundable-mentioned against each item in the list).
(ii) Submission: Last date will be 02-06-2020 till 12:00 p.m.
(iii) Opening: will be opened on 02-06-2020 till 01:00 p.m.
(iii) Place: of issuance, submission, inquiries and opening will be District Council Sukkur.
5 Un-Responded Tenders: In case of non-response the tenders will be re-issued from 02-06-2020 upto
18-06-2020 till 11:00 a.m and will be received on 18-06-2020 upto 02:30 p.m and opened at 03:30 p.m on
the same day.
6 Terms & Conditions.
(a) Under following conditions bid will be rejected:-
(i) Conditional and telegraphic bids / tenders;
(ii) Bids not accompanied by bid security of required amount and form;
(iii) Bids received after specified date and time.
(iv) Black listed firms.
(b) Bid validity Period: 90 days.
(c) Procuring Agency reserves the right to reject all or any bids subject to the relevant provisions of
Sindh Public Procurement Rules 2010.
(d) Responsive Bidder is required to submit following documents with bid:
(i) List of similar assignments with similar cost under-taken over the past three years;
(ii) Details of equipments, machineries & transport owned by firm/contractor;
(iii) Turn Over of at least last three years.
(iv) Financial Statement (summary) & income tax return for the last three years,
(v) Registration with Sindh Revenue Board
(iv) Affidavit that firm has never been black listed;

CHAIRMAN
DISTRICT COUNCIL SUKKUR
OFFICE OF THE DISTRICT COUNCIL SUKKUR
INVITING TENDER NOTICE
S# Name of Schemes Estimated Bid
Tender Time for
Cost (In Security
Fee Completion
Million) 5%
1 Detailed Working Estimate Providing & Installing & 8.847 0.442 3,000 12 Months
Testing Solarized R.O Plant at Village Faqir Sawan, Haji
Amiruddin Khoso, Tangai Khan Jaffari, Achar Mangerio
Union Council Sangrar of District Council Sukkur.
2 Detailed Working Estimate Providing & Installing & 8.847 0.442 3,000 12 Months
Testing Solarized R.O Plant at Village Murred Hussain
Mangerio, Gatan Wari, Waris Mangerio, Ali Hassan Pitafi
Union Council Sangrar of District Council Sukkur.
3 Detailed Working Estimate Providing & Installing & 8.847 0.442 3,000 12 Months
Testing Solarized R.O Plant at Village Ambh, Lashkar Ali
Shaikh, Union Council Roshanabad Village Rasoolpur, Pir
Haji Ismail, Union Council Wah Burira of District Council
Sukkur.
4 Detailed Working Estimate Providing & Installing & 8.847 0.442 3,000 12 Months
Testing Solarized R.O Plant at Village Tagyal Nariwal,
Sadique Palh, Faqir Muhammad Palh, Kandri, Union
Council Trimoh of District Council Sukkur.
5 Detailed Working Estimate Providing & Installing & 8.847 0.442 3,000 12 Months
Testing Solarized R.O Plant at Village Humarloi, Pir Koko
Union Council Akberpur Village Ghulam Ali Khaskhali,
Darawahan Union Council Trimoh of District Council
Sukkur.
6 Detailed Working Estimate Providing & Installing & 8.847 0.442 3,000 12 Months
Testing Solarized R.O Plant at Village Rato Mari,
Muhammad Ayoub Awan, Bhano Malik, Nadir Ali shah
Serahi, Union Council Dhandi of District Council Sukkur.
7 Detailed Working Estimate Providing & Installing & 6.635 0.332 3,000 12 Months
Testing Solarized R.O Plant at Village Adeul Bhanbhro,
Hazar Khan Shanbani, Khoro Union Council Dhandi of
District Council Sukkur.
8 Detailed Working Estimate Providing & Installing & 6.635 0.332 3,000 12 Months
Testing Solarized R.O Plant at Village Wali Muhammad
Malik Union Council Panhwar Village Patni, Ali Hassan
Mangi Union Council Patni of District Council Sukkur.
9 Detailed Working Estimate Providing & Installing & 6.635 0.332 3,000 12 Months
Testing Solarized R.O Plant at Village Sahib Khan Jiskani
Union Council Ali Wahan Village Pathan Goth, Sadlo
Union Council Loung Bhatti of District Council Sukkur.
10 Detailed Working Estimate Providing & Installing & 8.847 0.442 3,000 12 Months
Testing Solarized R.O Plant at Village Talib Hussain,
Baise Waro Union Council Pir Ikhlas Shah Village Makoro
Chigan, Jindo Bharo Union Council Junas of District
Council Sukkur.
11 Detailed Working Estimate Providing & Installing & 6.635 0.332 3,000 12 Months
Testing Solarized R.O Plant at Village Waryam Jatoi, Ali
Raza Shah Union Council Panhwari Village Abdul
Raheem Jatoi Azad Union Council Hingoro of District
Council Sukkur.
12 Detailed Working Estimate Providing & Installing & 6.635 0.332 3,000 12 Months
Testing Solarized R.O Plant at Village Suran Waro,
Gagnao, Yousaf Samoo Union Council Roophar of
District Council Sukkur.
13 Detailed Working Estimate Providing & Installing & 8.847 0.442 3,000 12 Months
Testing Solarized R.O Plant at Village Banazir Colony,
Abdul Khalique Mahar, Karma Soomro, Qadir Bux Bhatti
Union Council Mubarakpur of District Council Sukkur.
14 Detailed Working Estimate Providing & Installing & 8.847 0.442 3,000 12 Months
Testing Solarized R.O Plant at Village Imam Bargah,
Ibrahim Mahatam Union Council Mubarakpur Dargah
Naimat Faqirani Union Council Wass Village Yar
Muhammad Union Council Tarai of District Council
Sukkur.
15 Detailed Working Estimate Providing & Installing & 8.847 0.442 3,000 12 Months
Testing Solarized R.O Plant at Village Allah Jurio
Bhanbhro Union Council Khabri Bhitt Village Muhammad
Shahban Bhanbhro, Misri Shah, Muhammad Hayat Union
Council Lal Jurio Khan Shanbani of District Council
Sukkur.
16 Detailed Working Estimate for Construction of Paver 2.000 0.100 2,000 12 Months
Blocks & Surface Drains at Village Ghumra from Masjid
Kaif to Masjid Muhammadi Union Council Ghumra Taluka
New Sukkur of District Council Sukkur.
17 Detailed Working Estimate for Construction of Paver 8.000 0.400 3,000 12 Months
Blocks & Surface Drains at Village Bhuralpur, Kalwar
Mohalla, Memon Mohalla, Mirani Mohalla, from Mirani to
Shahbaz Memon, Qazi Mohalla, Syed Mohalla Union
Council Naseerabad & Tamachani Taluka New Sukkur of
District Council Sukkur.
18 Detailed Working Estimate for Construction of Paver 6.000 0.300 3,000 12 Months
Blocks & Surface Drains at Village Shaikha Mohalla, from
Ghulam Hyder Mahar to Muhammad Alam Mahar, from
Syed Mobin Shah House to Boys Primary School, from
Bismallah Masjid to Darsgah School Union Council Sangi
Taluka Pano Akil of District Council Sukkur.
19 Detailed Working Estimate for Construction of Paver 6.000 0.300 3,000 12 Months
Blocks & Surface Drains at Village Mir Hassan Jatoi, Allah
Rakhiyo, Ali Gul Kalhoro, Khan Jatoi, Kotho, Haji Abdul
Raheem Jatoi, Khuram Jatoi, Sain Dad Jatoi Near H/o
Shahmir Jatoi Union Council Hingoro Taluka Pano Akil of
District Council Sukkur.
20 Detailed Working Estimate for Construction of Paver 7.000 0.350 3,000 12 Months
Blocks & Surface Drains at Village Mohalla Najeeb Shah,
Dildar Samajo, Qadir Bux Mahar, Hazoor Bux Samajo
Union Council Nouraja, & Village Soomra Panhwari,
Kashmir jatoi, Waryam Jatoi Union Council
PanhwariTaluka Pano Akil of District Council Sukkur.
21 Detailed Working Estimate for Construction of Paver 9.000 0.450 3,000 12 Months
Blocks & Surface Drains at Village Achar Indhar,
Azizullah, Main Road to Despainsary, H/o Naveed to H/o
Rahib, Ali Village Salini, Shahoo Indhar, Union Council
Pano Gham Ali, Dr. Abdul Gahffar Simair to Masjid, H/o
Mumtaz Samair to Chuttal Shah, Village Allah Wadhayo
junajo Union Council Sultanpur H/o Abdul Ghani to
Wagho Village Chudio Wagho, Union Council Junas,
Village Umar Buriro Union Council Nirch Taluka Pano Akil
of District Council Sukkur.
22 Detailed Working Estimate for Construction of Paver 6.500 0.325 3,000 12 Months
Blocks & Surface Drains at Village Meval Khan Dharajo,
Main Road to Water Course at Village Talli, Iran Samajo,
Ilyas Indhar, Rustan Indhar, Raban Samajo Union Council
Drib Taluka Pano Akil of District Council Sukkur.
23 Detailed Working Estimate for Construction of Paver 9.500 0.475 3,000 12 Months
Blocks & Surface Drains at Village Hussain Kalwar & Adal
Kalwar, Bhelar, More Ja Kanda, Rahoo Sangi, Ghulam
Sarwar Sangi, Redhi Chachar, Salah Chachar, Mubarak
Ali Kalwar Union Council Nidapur, Village Shahpur
Chachar Union Council Sadhoja Taluka Pano Akil of
District Council Sukkur.
24 Detailed Working Estimate for Construction of Paver 1.000 0.050 1,500 12 Months
Blocks & Surface Drains at Village Jam IbrahimMahatam,
H/o Ali Hassan Mahatam Union Council Mubarkapur
Taluka Pano Akil of District Council Sukkur.
25 Detailed Working Estimate for Construction of Paver 9.843 0.492 3,000 12 Months
Blocks & Surface Drains at Village Shaheed DIG Abdul
Aziz Bullo, Bukhtawar Janib Bullo, Wahari Bullo,
Rehmatullah Chachar, Mooso Chachar, Abdul Ghani
Bullo, Aagro Bullo, Allah Dito Bullo, Muhamamd Fazil
Bullo Girkino Wah, Kot Bulla Road to Din Muhammad,
Javario Mirbahar Mohalla Ishaque Mirani Union Council
Bulla Taluka Pano Akil of District Council Sukkur.
26 Detailed Working Estimate for Construction of Paver 9.900 0.495 3,000 12 Months
Blocks & Surface Drains at Village Jahan Khan Korai,
Muhammad Khan Korai, Izat Khan Korai, Luqman Khan
Korai, Nadar Ali Korai, Ghongi, Rustam Azad Khan Korai
Union Council Nidpur Taluka Pano Akil of District Council
Sukkur.
27 Detailed Working Estimate for Construction of Paver 9.900 0.495 3,000 12 Months
Blocks & Surface Drains at Village Rustam Budho Khan
Korai, Bangul Khan Korai, Gaman Khan Korai, Khairo
Bullo Union Council Dadloi Taluka Pano Akil of District
Council Sukkur.
28 Detailed Working Estimate for Construction of Paver 10.000 0.500 3,000 12 Months
Blocks & Surface Drains at Village Primary School boys,
Daoud Potra Mohalla Gulzar Ahmed, Suleman Khan
Street, Girls Primary School, Abdullah Khan Daoud Potra
Mohalla, Musafir Road to Masjid, Soomra Mohalla, Jamia
Masjid to Main Road, Imam Bux Dharejo, Muhammad Ali
Dharejo, Ustad Akbar Ali Dharejo, ustad ghulam
Muhammad Abbasi to Masjid to Sardar Taki Khan
Dharejo, Qalandar Bux Korai, Ro Machine to H/o DSP
mazhar Korai H/o Ali nawaz Khan korai Union Council
Dadloi Taluka Pano Akil of District Council Sukkur.
29 Detailed Working Estimate for Construction of Paver 10.000 0.500 3,000 12 Months
Blocks & Surface Drains at Village Wali Muhammad
Shaikh, buland Dharejo, abdul Wahad Kharo, Wali Dino
Khuharo, Korho Korai Union Council Dadloi Taluka Pano
Akil of District Council Sukkur.
30 Detailed Working Estimate for Construction of Paver 10.000 0.500 3,000 12 Months
Blocks & Surface Drains at Village Bakhsho Seelro Union
Council Dadloi Taluka Pano Akil of District Council
Sukkur.
31 Detailed Working Estimate for Construction of Paver 10.000 0.500 3,000 12 Months
Blocks & Surface Drains at Village Hadi Molodi Chachar,
Pir Bux Malik, Nibhao Khan Malik, Khairo Dahyo, Israr
Khan Malik, Khuda bux Seelro Union Council Dadloi
Taluka Pano Akil of District Council Sukkur.
32 Detailed Working Estimate for Construction of Paver 5.000 0.250 3,000 12 Months
Blocks & Surface Drains at Village Hafiz Imam Bux
Mirani, Mole Dino Mirbahar, Mohalla Muhammad Hashim
Union Council Moula Ali Taluka Pano Akil of District
Council Sukkur.
33 Detailed Working Estimate for Construction of Culvert At 7.642 0.382 3,000 12 Months
Village Allah Wadayo Chachar Union Council Drib,
Muhammad Bux Mahasir, Near Eid Gah, Moula Ali Near
High School, Near Imam Bargah, Rojo Union Council
Moula Ali of District Council Sukkur.
34 Detailed Working Estimate for Construction of Culvert At 3.100 0.155 3,000 12 Months
Village Ali Bux Pitafi, Muhamamd Arbab Channa, Union
Council Roophar of District Council Sukkur.
35 Detailed Working Estimate for Construction of R.C.C 6.816 0.341 3,000 12 Months
SLab At Village Pano Ghulam Ali, Shahoo Indhar,
Ghulam Rasool Indhar, Salehani, Union Council Pano
Ghulam Ali, Village Tajan Indhar, Chuto Kalhoro, Adam
Gopang, Rasool Bux, Union Council Sultanpur, Village Ali
Muhammad Indhar, Bhoral Chachar, Fazil Mangi, Abdul
Hafeez Channa Bhilini, Union Council Junas, Village
Dhandi Road, Thikratho Road, Khowaja Dino Shah,
Farukhpur Union Council Dhandi, Village Mubarkpur,
Roophar, Moto Mirbahar, Mir Din Mirbahar, Jaro Mir
Bahar, Mahesar Mirbahar, Abdullah Mirbahar, Khuda Bux
Mirbahar, Ali Bux Dharejo, Gati Malik, Daho Malik Union
Council Moula Ali of District Council Sukkur.
36 Detailed Working Estimate for Construction of R.C.C Slab 4.600 0.230 3,000 12 Months
At Village Janab Wah Regular Sangi Union Council
Sangi, Village Muhamamd Bux Soomro, Abdul Rehman
Bagir, Near Pir Wah, Bhaiji, Soomer Dakhan, Shahdad
Indhar Union Council Bhaiji Village Latif Abad, Bukhsho
Seelro, Hussain Balle, Umaid Ali Mahar, Gulzar Mahar,
Mohbat Mahar, Jam Shafi Mahar, Raza Mahar, Phullo
Mahar Union Council Nouraja of District Council Sukkur.
37 Detailed Working Estimate for Construction of R.C.C Slab 1.114 0.056 3,000 12 Months
At Village Sher Khan Khaki, Lal Khan Jatoi, Lakhan Khan
Jagirani, Nabi Bux Jiskani Union Council Panwar of
District Council Sukkur.
38 Detailed Working Estimate for Construction of R.C.C Slab 6.919 0.346 3,000 12 Months
At Village Atta Muhammad Shanbani, Ghous Bux Bux
Malah, Imdad Ali Malah, Safar & Pinyal Chutyani, Khabri
Bhitt Stop RD-159 Channal, RD-186 Channel Left Side,
Ghulab Khan Shanbani, RD-202 Jindo Khan Gudkhani,
Hamzo Khan Gudkhani (02 Nos), Zawar Malik Bux, Shafi
Muhammad Sain Ghazi, Subhan Ali & Teerat Khan
Shanbani, RD-186 Channel Bahsir & Ajmal Shanbani,
Alam Khan Chutkani, Muhammad Shahban Bhranbhro,
RD-186 Shahban Nabyani, Ghulam Hyder Moochi,
Muhammad Yousaf Mahar, Ali Dost Bhanbhro, Syed
Hyder Shah Dargah, Ali Bux Mirjo Channel RD-159, Allah
Warayo Bhanbhro Union Council Khabri Bhitt, Tarai & Lal
Jurio Khan Shanbani of District Council Sukkur.
39 Detailed Working Estimate for Construction of R.C.C Slab 7.025 0.351 3,000 12 Months
At Village Nisar Ansari Kandhra Bypass, Pir Musha Water
Course to Rafique Ahmed Palh, Pir Jafar Shah, Arz
Muhammad Katohar, Chak No. 02 LR-23 Lakho Phulpoto,
Mukhtiar Ali Shah, Chak No. 03 LR-23 Abdul Ghani
Phulpoto, Iqbal Shanbani Deh Dakhano, Punhal Phulpoto
Chak No. 03, Village Kalati, Union Council Pir Ikhlas
Shah, Wah Burira, Trimoonh, Arrore & Roshanabad of
Taluka Rohri of District Council Sukkur.
40 Detailed Working Estimate for Construction of Culvert At 7.200 0.360 3,000 12 Months
Village Manghwar Muhalla, Roshanabad Rohri Road to
Kandhra, Kandhra Bypass to Mari Janullah Shah on Sim
Nala, Bhano Jhanjho on RD-03 Channel, Darwan to Piral
Khan, Moosa Gabol on Girkano Minor, Hayat Mangerio,
Piyaro Wah, Karim Dad Shanbani on Bumbali Minor
Union Council Pir Ikhlas Shah, Roshanaba Taluka Rohri
of District Council Sukkur.
41 Detailed Working Estimate for Construction of R.C.C Slab 6.100 0.305 3,000 12 Months
At Village Channel RD-171 Old Janooji, RD-15, RD-186,
RD-150 Water Course in Village Jaladin Bhanbhro, Eiden
Shanbani, Yar Muhammad Bhanbhro, RD-159 Allah
Wadayo Bhanbhro, Khabhar Bhanbhro, Rajib Ali
Bhanbhro, Sodho Khan Balouch, Wahid Bux Bhanhro,
Ghulam Fareed, Ghulam Khan Nibyani, Pir Bux
Shanbani, Abdul Rashid, Channel RD-151, Bachal
Bhanbhro, Abdul Rehman Bhanbhro, Mureed Mahar,
Union Council Khabri Bhitt, Tarai & Lal Jurio Khan
Shanbani of District Council Sukkur.
42 Detailed Working Estimate for Construction of Paver 4.500 0.225 3,000 12 Months
Blocks & Surface Drains at Village Shahib Khan Jiskani,
Laiq Khan Jiskani, Bhitt Noor Shah, Manghwar Mohalla,
Ghulam Hyder Khoso Union Council Ali Wahan & Arrore
Taluka Rohri of District Council Sukkur.
43 Detailed Working Estimate for Construction of Paver 7.000 0.350 3,000 12 Months
Blocks & Surface Drains at Village Allah Warayo
Bhanbhro, Ali Nawaz Bhanbhro Union Council Tarai,
Village Balach Shanbani, Sadoro Shaikh, Qalool
bhanbhro, Shahbaz Dino Khorkhani Union Council Lal
Jurio Khan Shanbani Taluka Salehpat of District Council
44 Construction of mettelled road at village Nek Muhammad 2.000 0.100 2,000 12 Months
Chajan near chohara market uc Patni Tal Rohri District
council Sukkur
45 Detailed Working Estimate Providing & Installing & 6.635 0.33 3,000 12 Months
Testing Solarized R.O Plant at Village Daro Palh Union
Council Nirch, Sakhi Ibrahim Shah Union Council
Sultanpur, Village Phull Draho Union Council Dhandhi of
District Council Sukkur.
46 Detailed Working Estimate Providing & Installing & 6.635 0.332 3,000 12 Months
Testing Solarized R.O Plant at Village Ilyas Bharo,
Mureed Mangrio, Mevo Khan Khund, Union Council Kotri
of District Council Sukkur.
47 Detailed Working Estimate for Construction of Paver 6.500 0.325 3,000 12 Months
Blocks & Surface Drains at Village Arrore, Kalati, Bhitt
Noor Shah, Gulan Buriro, Badaruddin Bhatti, Ghulam
Mehdi Shah Old Abdul Karim Lund Union Council Arrore
Taluka Rohri of District Council Sukkur.
48 Detailed Working Estimate for Construction of Paver 5.000 0.250 3,000 12 Months
Blocks & Surface Drains at Village Fazal Abad Union
Council Pir Ikhlas Shah, Shahzaib Shah Old Janooji,
Union Council Khabri Bhitt of District Council Sukkur.
49 Detailed Working Estimate Providing & Installing & 4.424 0.221 3,000 12 Months
Testing Solarized R.O Plant at Village Abdul Karim Lund,
Moula Abad Union Council Arrore Taluka Rohri of District
Council Sukkur.
50 Detailed Working Estimate for Renovation & Finishing of 1.249 0.062 1,500 12 Months
Offices & Hall of District Council Sukkur
51 Detailed Working Estimate For Repair of Main Office 9.500 0.475 3,000 12 Months
Building & Official Quarters in the Premises of District
Council Colony of District Council Sukkur.

CHAIRMAN
DISTRICT COUNCIL SUKKUR

You might also like