Compendium of Logistics Policies 2019 - Volume 2 PDF
Compendium of Logistics Policies 2019 - Volume 2 PDF
COMPENDIUM
OF
LOGISTICS POLICIES
VOLUME II
Approved from
July 2017 – June 2019
Republic of the Philippines
DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT
DILG-NAPOLCOM Center, EDSA corner Quezon Avenue, West Triangle, Quezon City
http://www.dilg.gov.ph
MESSAGE
It is with delight that I commend the Philippine National Police (PNP) for the successful
publication of your Compendium of Logistics Policies Volume II.
At a time when the administration is strengthening its banner programs for lasting
peace and crime-free communities, the responsibility of making sure President
Rodrigo Roa Duterte’s campaign promises comes to fruition rests heavily on the PNP.
Thus, it becomes critical for the watchmen of public order, safety and security to
immediately take action in addressing the demands pressing on the organization
without sacrificing transparency in the process.
I take pride in saying that the PNP has not been remiss in providing its personnel with
the necessary tools and competencies to take on President Rodrigo Duterte’s
challenge to rid the country of illegal drugs, criminality, insurgency, violent extremism,
and even rogue cops in its own ranks.
We at DILG remain committed supporting the projects and programs of the PNP and
will continue to provide the necessary guidance and assistance for our police officers.
EDUARDO M. AÑO
Secretary
i
Republic of the Philippines
NATIONAL POLICE COMMISSION
NATIONAL HEADQUARTERS, PHILIPPINE NATIONAL POLICE
OFFICE OF THE CHIEF, PNP
Camp BGen Rafael T. Crame, Quezon City
MESSAGE
This Logistics Compendium (Volume II) will serve as light on the path of all
logistics personnel in the organization in order to be more efficient and effective in the
procurement of various equipment, in the construction of standard police stations and
facilities, and in other logistics programs to support different police operations
nationwide.
I therefore congratulate the Directorate for Logistics for ‘going the extra mile’ on
this endeavor. Continue to pursue excellence and competence in advancing various
logistics services for the betterment of the organization.
OSCAR D ALBAYALDE
Police General
Chief, PNP
ii
Republic of the Philippines
NATIONAL POLICE COMMISSION
NATIONAL HEADQUARTERS, PHILIPPINE NATIONAL POLICE
DIRECT OR AT E FOR LOGIST ICS
Camp BGen Rafael T Crame, Quezon City
FOREWORD
For easy referencing, the policies incorporated in this volume are being arranged and
divided corresponding to the major functions of the Directorate where such policies
belonged, namely: General Administration; Procurement Management; Supply
Management; Real Estate Management; and Infrastructure and Facilities
Management.
With this, I enjoin all PNP logisticians to be guided with this Compendium. Let us work
our best to carry out our functions excellently and professionally.
EDWIN C ROQUE
Police Major General
The Director for Logistics
iii
Republic of the Philippines
NATIONAL POLICE COMMISSION
NATIONAL HEADQUARTERS, PHILIPPINE NATIONAL POLICE
DIRECT OR AT E FOR LOGIST ICS
Camp BGen Rafael T Crame, Quezon City
ACKNOWLEDGEMENT
The Directorate for Logistics acknowledges the collective efforts of DL
personnel who diligently labored for the successful publication of the Compendium of
Logistics Policies Volume II.
EDWIN C ROQUE
Police Major General
The Director for Logistics
iv
Compendium of Logistics Policies (July 2017 to June 2019)
TABLE OF CONTENTS
Page
MESSAGE OF THE SILG i
FOREWORD iii
ACKNOWLEDGEMENT iv
GENERAL ADMINISTRATION 1
vi
GENERAL ADMINISTRATION
1. REFERENCES:
2. RATIONALE:
This PNP Memorandum Circular (PNP MC) provides the guidelines and
policies on the qualification for selection and designation or placement of PNP
personnel in the logistics family including the procedures and manner in granting
logistics eligibility to PNP personnel.
3. SITUATION:
The PNP logistics management system adheres to the principle of placing the
right person to the right job. Personnel assigned within the logistics family must be
aware of the procedures and processes in managing the logistics cycle to better
plan, utilize, and preserve PNP properties. Hence, the establishment and
maintenance of the PNP Logistics Eligibility List (PNPLEL) is vital. Assignment of
personnel in the PNP logistics offices/units shall be governed by an efficient
placement policy.
4. PURPOSE:
5. DEFINITION OF TERMS:
e. Eligible – refers to those who are in the PNP Logistics Eligibility List (LEL)
and is qualified to be designated in any position in a logistics office/unit as
provided in this MC.
g. Logistics Officer - refers to the Chief, RLRDD; Chief, Logistics Division and
Chief, Logistics Section/Logistics Management Section of NSUs and other
heads of logistics offices/units of the PNP.
COMPREHENSIVE LOGISTICS ELIGIBILITY AND PLACEMENT POLICY Page 3
h. Logistics Evaluation and Screening Board (LESB) - refers to the body
which confers the logistics eligibility to PNP personnel in Categories Il to VI
and vested with the primary responsibility to evaluate the competency of
applicants occupying entry position for PSSUPT with regard to logistics
management.
o. Plans and Programs Section (PPS) – refers to the Section under the
Logistics Plans and Programs Division (LPPD) of the Directorate for
Logistics (DL) whose functions include planning, supervision and
monitoring of logistics training and education in coordination with DHRDD
and the PNP Training Service.
6. GUIDELINES:
a. Procedures:
a.1) Composition:
Director, DL - Chairman
Director, LSS - Vice Chairman
Director, ES - Member
Director, HSS - Member
a.2) Function:
b.1) Composition:
Deputy Director, DL - Chairman
Executive Officer, DL - Vice Chairman
Deputy Director, LSS - Member
Deputy Director, ES - Member
DDA, HSS - Member
C, SMD - Member
C, LPPD - Member
b.2) Functions:
c.1) Composition:
c.2) Functions:
For PROs, the Board for the selection and placement of their
respective Deputy Chief, RLRDD; Deputy Chief, RHSG; RSAO;
PSAO; CSAO; and Logistics Officers of PPOs and CPOs shall be
composed of the following:
DRDA - Chairman
RCDS - Vice Chairman
All Regional Division Chiefs - Members
RSAO - Member
(for PSAO/CSAO positions only)
C, RLD - Head Secretariat
b) Reserve Category:
a.2.1) Vacancy for NSU SAO shall be open for NUP with
plantilla position as Supply Officer 1-3/Administrative
Officer 1,2, 3 or 5 (SG 10-18 or based on the PNP
Staffing Pattern duly approved by DBM);
a.2.2) Applicants shall submit their application folder to the
NSU Logistics Evaluation and Screening Board (NSU
LESB) Secretariat for evaluation (See Annex “G” -
Requirements);
a.2.3) Upon evaluation, the Secretariat shall include the
qualified applicants in the list for deliberation while
those who do not meet the requirements will be
informed accordingly;
a.2.4) The Secretariat schedules the LESB deliberation of
applicants;
a.2.5) The NSU LESB conducts the deliberation of the
applicants to determine their fitness, merit and
qualifications;
a.2.6) Once the Board has chosen the most qualified
applicant, the Secretariat shall prepare the LESB
Resolution to be signed by the Board and for
concurrence of the Director;
a.2.7) The NSU LESB Secretariat shall then endorse the
Resolution to the NHQ LESB for approval of TDL;
a.2.8) TDL shall endorse to TDPRM the application folder of
the successful applicant for the issuance of appropriate
orders; and
a.2.9) The successful applicant shall then undergo a 2-
weeks Orientation with SAO, LSS and SAO PNP Wide
to ensure his/her readiness for his/her designation.
b.1) The following shall be the valid reasons for the nullification of
the designation or removal of a SAO:
7. TRANSITORY PROVISIONS:
a. Any PCO, PNCO or NUP presently assigned with the Logistics office who
lacks the required eligibility training (PNP Logistics Management Course
and/or Basic Logistics Course or its equivalent) shall be given two years to
b. PCOs and PNCOs who are retiring within 12 months and are currently
designated as DL Division Chiefs, C, RLRDD, C, Logistics Division,
RSPNCO of D-Staffs, NSUs, PROs, PPOs/CPOs and City/Municipal
Police Station; may serve the remaining period of service in such position
until retirement; and
8. ADMINISTRATIVE SANCTION:
Any personnel who shall violate the prescribed guidelines and procedures of
this MC shall be held administratively liable and shall be meted with appropriate
sanctions in accordance with NAPOLCOM Memorandum Circular 2016-002 or
Revised Rules on Administrative Cases in the Civil Service, as the case may be.
9. REPEALING CLAUSE:
Provisions of existing PNP issuances which are inconsistent with this MC, in
whole or in part, are deemed repealed, set aside, amended or modified accordingly.
10. EFFECTIVITY:
This MC shall take effect after 15 days from filing a copy thereof at the UP
Law Center in consonance with Section 3, Chapter 2, Book Vll of Executive Order
No. 292, otherwise known as the “Revised Administrative Code of 1987,” as
amended.
Original Signed
OSCAR D ALBAYALDE
Police Director General
Chief, PNP
Distribution:
Command Group
D-Staff
P-Staff
D, NSUs
RD, PROs
November 8, 2017
1. REFERENCES:
2. RATIONALE:
3. SITUATION:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 29
controlled/dangerous substances, conduct of searches to locate suspects or missing
persons, and assist in the apprehension of suspect and in other police operations.
4. PURPOSE:
5. DEFINITION OF TERMS:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 30
i. Euthanasia – refers to the ethical process of inducing humane and
painless death of canine suffering from chronic and communicable
diseases whose life or performance is greatly diminished.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 31
6. GENERAL GUIDELINES:
A PNP K9 team shall be composed of one trained handler and one trained
K9 duly certified by K9 evaluators from the PNP EOD/K9 Group. PNP K9s shall only
be trained and utilized according to their distinct specialization and not for other
purposes.
1) Recruitment/Selection:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 32
e) A Police Officer with remaining 10 years or more in the police
service can opt to become K9 handler;
a.3) Functions:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 33
b.3) Functions:
c.3) Functions:
d) Chief of Staff:
d.3) Functions:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 34
d.3.2) Perform other duties as directed by the Director of
the PNP EOD/K9 Group.
e.3) Functions:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 35
e.3.7) Perform other tasks as directed by the Director of
PNP EOD/K9 Group.
f.3) Functions:
g) Chief, K9 Unit
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 36
g.3) Functions:
h.3) Functions:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 37
i) Chief, Kennel Management and Veterinary Unit:
i.3) Functions:
j) Veterinary Officer:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 38
j.9) Identify/designate in writing a local veterinarian in all K9
units for emergency case/use including its name, address,
contact number; and
k.3) Functions:
l) Kennel Supervisor/Manager:
l.3) Functions:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 39
l.3.1) Exercises direct supervision of all activities and
operations of the K9 kennel facility and enforce
security regulations within the facility;
m.3) Functions:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 40
n.3) Functions:
o) K9 Handlers:
o.3) Functions:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 41
o.3.7) All PNP trained K9 Handlers are presumed to
assume responsibility of their designated K9 until
termination of such orders; and
p) Kennel Assistant/Attendant:
p.3) Functions:
p.3.1) Assist in taking care and in feeding all the PNP K9s
and assist in maintaining the PNP kennel facilities
and equipment;
q.3) Functions:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 42
q.3.4) Ensure that the kennel facility shall be checked at
least every four hours. Report any emergency
condition/situation of K9, such as if sick, if injured
etc., to the kennel supervisor as necessary;
3) Dogs aged one to two years which passed the evaluation process
for a potential police service dog shall be accepted through
donation and shall immediately be recorded in the property and
accounting books.
5) Canine Procurement:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 43
procedures in the conduct of physical inspection, health, medical
records and functional test for procurement of Explosives
Detection Dogs and Narcotics Detection Dogs are to be
followed. (Annex "B"- PNP MC No. 2015-030 dated October 17,
2015, Parameters, Test and Evaluation Procedures in the
Conduct of Physical Inspection, Health, Medical Records and
Functional Test for Explosive Detection Dogs (EDDs));
d.5) Puppies that lack ball/food drive and with physical defects
shall be categorized as Excess Puppies and shall undergo
the prescribed COA disposal proceedings.
Canines for donation to PNP EOD/K9 Group should meet and pass
the same basic requirements and standards applied for canine
procurement before receipt/acceptance. Dogs for donation must
possess potential traits/qualities for training and/or breeding stock.
a) Source of donation;
b) Memorandum of Agreement/ Deed of Donation;
c) Official Receipt/Sales Invoice/Appraisal;
d) Certified Pedigree and Registration Certificate; and
e) Certificate of Training completed (if trained dog).
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 44
7) Selection/Registration/Micro chipping:
8) Inventory/Assessment:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 45
the kennel suited for the maintenance and care of the service
dogs shall be considered in developing the kennel facility
design;
b.2) Maintain leash control of all K9s when moving from one
place to another within the kennel area;
b.5) Handlers shall not hit, kick or strike a canine with any object
with the intent to harm;
a) The surface of the training area must be free of items that are
harmful to the handlers/K9s, i.e. sharp rocks, broken glass, and
burrs, holes, etc. The surface should be graded to prevent
standing water;
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 46
3) PNP K9 Equipment - Biosafety and security is foremost
consideration in the maintenance of K9 equipment. An inspection of
all equipment should be conducted periodically. Any equipment
which is found to be unserviceable must be repaired/replaced
immediately. The following basic items must be issued to the
handler as needed: (Annex “G” – NAPOLCOM Res No. 2009-716.)
ITEMS QUANTITY
Dog blanket 1 per dog
Dog grooming brush/ comb 2 per dog
Grooming Kit (Toothbrush/tooth paste, soap,
1 set per dog
shampoo and nail clipper)
Dog Collar, nylon/leather type 1 per dog
Dog Collar Choke steel Chain, 24 inches 1 per dog
Dog Leash w/ swivel and snap, leather type 1 per dog
Dog Leash w/ swivel and snap, nylon type 1 per dog
Dog Muzzle, Plastic or Leather type 1 per dog
Dog Feeding Pan, Stainless, 3 quart capacity 2 per dog
Water bucket 1 per dog
Reward ball/ Kong 2 per dog
Transport Cage 1 per dog
Dog food pouch/container 2 per dog
K9 First Aid Kit 1 set per dog
Dog supplement/Medical supplies 1 set per dog
Some modifications are necessary so that the K9s can be seen and
can provide a visual deterrence during law and order or force
protection and counter-terrorism missions. These modifications will
maximize the mission effectiveness of the dog while providing the
dog with a comfortable, supportive, and protective area inside the
vehicle. This type of modification is normally a transport cage
secured in the rear of the vehicle; the cage should have a non-
slippery surface.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 47
d. Veterinary Care, Feeding, Maintenance, and Disposition - It is very
important to keep all K9s in good health and mentally fit, both on and
off duty hours. It is necessary to have an optimal physical and mental
condition to optimize the potentials of the PNP K9s.The K9s shall
receive physical examination: at least twice a year; before and after
shipment to ensure that the dog being shipped is healthy with
vaccination certificate issued by the attending veterinarian; and as
soon as possible upon arrival from local destination and post
deployment.
a.1) Rabies;
a.2) Canine Distemper (CDV);
a.3) Canine Adenovirus (type 2/CAV-2) (Canine Hepatitis);
a,4) Parvovirus (CPV); and
a.5) Leptospirosis.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 48
c.6) The kennel area and dog house should be checked for
hazards and invaders on a routine basis; and
d.2) If at any point the K9s weight is at a level (high or low) that
affects the health and ability to work, the K9 will be
temporarily removed from service until the situation is
corrected;
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 49
f.4) Any reimbursement for veterinary fees, medicines or dog
food incurred by the handler shall only be processed when
approved or with accompanied appropriate receipts.
3) PNP K9s health and physical standards for deployment -K9s health
and physical condition will assist planners in assuring that only
medically/physically capable K9s will be assigned to fill demanding
missions where medical support is less than optimal.
Deployment Categories:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 50
a.4) No existing recurring medical problems that limit
performance or will worsen by stress or increased
demands. Note: medical problems may exist or be under
treatment but do not limit performance.
d) Category 4 – Non-deployable
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 51
5) Disposition and Retirement of PNP K9s:
e) All fallen PNP K9s shall be given burial rites and a K9 memorial
wall and site shall be designated by every assigned K9 unit.
f) Methods of Disposal:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 52
DC for dropping or delisting from property and
accounting books;
a) Basic Training:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 53
a.5) Qualified instructors/trainers, veterinarian and senior
handlers from the PNP EOD/K9 Group form part of the pool
of instructors. Training includes working environment
exposures such as but not limited to train depot, buses,
thickly populated areas, warehouses, weather and terrain
condition familiarity, and introduction of obstacles,
distracters, and relative simulated exercises; and
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 54
The PNP EOD/K9 Group is responsible in scheduling
recertification and in maintaining documents on all certification
activity:
a.1) Protect the handler, other officers, and citizens from injury
or death;
a.2) Search for suspects in buildings and open areas;
a.3) Search for evidence or articles;
a.4) Detect narcotics;
a.5) Detect Explosives;
a.6) Locate missing persons and cadavers;
a.7) Locate enemies during combat operations;
a.8) Assist SWAT team during tactical deployment; and
a.9) Provide deterrence during public safety demonstrations.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 55
c.3) Exigent circumstance searches; and
c.4) Search incidental to lawful arrest.
d.1) marijuana;
d.2) cocaine;
d.3) heroin;
d.4) methamphetamine (speed); and
d.5) derivatives of the above-listed items.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 56
f). CTD shall be used in the following situations:
b.1) The handler shall have the sole responsibility over the
Police Service Dogs. In the conduct of paneling operation,
the area shall be free from persons and or stray animals
that might distract or agitate the dogs;
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 57
b.2) During the conduct of searches in open area, the area shall
be cordoned if possible and the dog shall be on leash;
b.4) In case the dog is in the staging area after the paneling, the
dog shall be placed in the cage and warn people not to play
or go near the dogs;
c) Canine Bites:
c.1) All K9 bites, on and off duty, shall be reported to the Kennel
Supervisor/Veterinary Officer who shall make the
appropriate notifications to the Chief K9 Operations
Division;
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 58
c.6) If the victim refuses treatment, the reason for the refusal
and any witnesses’ names (with their information) shall be
documented in the Canine Incident Report;
c.7) The bite and other injuries caused by the canine shall be
photographed after being cleaned at the hospital or by the
paramedics;
c.8) The handler shall contact the nearest Animal Bite Center
and provide them with the required information;
c.9) Prior to the end of the handler’s shift, the original report
shall be sent to K9 Operations Division, and a copy of the
Canine Incident Report and any other supplemental reports
shall be forwarded to appropriate supervisory staff; and
d) Record Keeping:
d.2) The K9 handler and other staff shall identify the types of
records that should be kept regarding the use of police
service dogs, including training records, incident reports,
and health reports; and
1) Cost of Dog;
2) Kenneling of Dog;
3) Training of Dog and Handler;
4) Training Equipment;
5) Canine Care and Grooming;
6) Utility Vehicle;
7) Transport Kennel Van;
8) Maintenance of Vehicle;
9) In-service Training;
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 59
10) Certification;
11) Conferences and External Training; and
12) Travel and conferences should also be included.
a) The police officer/handler shall be familiar with the legal issues and
concerns involving the use of a police service dog, in particular, the use
of a police service dog as a force option as well as issues dealing with
policy and procedure and the need for clear policy regarding the use of
a police service dog;
8. PENAL CLAUSE:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 60
Service of the Philippine National Police" for uniformed personnel and the Revised
Rules on Administrative Cases in the Civil Service for NUP shall apply.
9. REPEALING CLAUSE:
11. EFFECTIVITY:
This MC shall take effect after 15 days from the filing of a copy hereof at
the University of the Philippine Law Center in consonance with Sections 3 and 4 of
Chapter 2, Book VII of Executive Order No. 292 otherwise known as the “Revised
Administrative Code of 1987,” as amended.
Original Signed
RONALD M DELA ROSA
Police Director General
Chief, PNP
Distribution:
Command Group
D-Staff
P-Staff
Dirs, NSUs
RD, PROs
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 61
ANNEX A
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 62
ANNEX B
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 63
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 64
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 65
ANNEX C
Many breeds will work effectively for detection such as Belgian Malinois
Labradors,Golden Retrievers, German Shepherds, Beagle and Jack Russel Terriers.
These dogs are used for their intelligence, their willingness to please, their physical
agility, and their hard work.
Mix breeds and Aspins (Asong Pinoy/Native Dog) may also be used on
combat tracking purposes due to their different personalities and instinctive hunting
capabilities because of their native traits or lineages after a thorough selection and
evaluation.
Sexual maturity (puberty) occurs between the ages of 6 to 12 months for both
males and females but breeding is not recommended prior to the second estrous
cycle or until 2 years of age specially for some large breeds. The breeding K9s shall
undergo health monitoring by the veterinarian before, during and after mating; then
close supervision during pregnancy until the parturition time.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 66
Internal and External Parasites Control Medicines
Dewormingof puppies
2-4 weeks of age Liquid dewormer
6 weeks of age Liquid dewormer
8 weeks of age All wormer tab
10 weeks of age All wormer tab
Regular Deworming
Every 6 months If indoor dog
Every 3 months If outdoor dog
Heartworm Prevention
6 months old then annually Pro-heart (vaccine)
6 months old then monthly Heartgard
2 months old then monthly Advocate
Tick/Flea Prevention
8 weeks of age Frontline spot on
Monthly maintenance Frontline spot on
Vaccination/Immunization Program
6 weeks of age 5-in-1 (1st shot)
8 weeks of age 5-in-1 (2nd shot)
10 weeks of age 5-in-1(3rd shot)
12 weeks of age 5-in-1 (4th shot) *optional
Rabies
Kennel Cough
Annual 5-in-1
Rabies
Kennel Cough
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 67
ANNEX D
DEED OF DONATION TO PNP (SAMPLE FORMAT)
I fully understand that by DONATING the said DOG, PNP EOD/K9 Group will
have the exclusive rights to use them in any way that PNP EOD/K9 Group may wish
to as to improve their Breeding/Material stock of Working Dogs other than re-donating
without my consent and/or selling the said DOG.
I also fully understand that the DOG maybe deployed to different PNP K9
Units around the country and that I will not influence their choices of assignment for any
cause especially for the sake of visiting them.
I also fully understand the risks involved in training (i.e. mechanical trauma,
trauma brought by explosives ordnance and the like), tour of duty and, breeding of
the DOG and that I have confidence in PNP EOD/K9 Group to look after its welfare as
they look after their own dogs.
=AND=
PNP EOD/K9 Group will always look after the welfare of the said DOG as we
always care/for our own dogs. However, the PNP EOD/K9 Group cannot assure
complete protection from health conditions arising from uncontrollable factors such as
natural calamities, disease outbreaks and, inclement weather conditions.
Moreover, the DONOR understands the risks involved during the Dog’s training,
tour of duty and breeding and, PNP EOD/K9 Group may not guarantee for the health
conditions arising from incidents (i.e. mechanical trauma, trauma brought by explosives
and ordnance and the like). But rest be assured that reduction of such risks shall be taken
into great consideration.
ACKNOWLEDGEMENT
BEFORE ME a Notary Public for and in the City of ________, Philippines, personally
appeared the following persons with their respective Community Tax Certificates, to
wit:
Known to me to be the same persons who executed the foregoing instrument, and
they acknowledged to me that the same is their free act and voluntary deed. This
memorandum of Agreement, consisting of ______ (_) pages including this page, is
signed by the parties on each page hereof.
Doc. No. _______
Page No. _______
Book No. _______
Series of 20__
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 69
ANNEX D
DEED OF DONATION FROM PNP TO DONEE (SAMPLE FORMAT)
I fully understand that by DONATING the said DOG, PNP EOD/K9 Group will
have the exclusive rights to use them in any way that PNP EOD/K9 Group may wish
to as to improve their Breeding/Material stock of Working Dogs other than re-donating
without my consent and/or selling the said DOG.
I also fully understand that the DOG maybe deployed to different PNP K9
Units around the country and that I will not influence their choices of assignment for any
cause especially for the sake of visiting them.
I also fully understand the risks involved in training (i.e. mechanical trauma,
trauma brought by explosives ordnance and the like), tour of duty and, breeding of
the DOG and that I have confidence in PNP EOD/K9 Group to look after its welfare as
they look after their own dogs.
=AND=
PNP EOD/K9 Group will always look after the welfare of the said DOG as we
always care/ for our own dogs. However, the PNP EOD/K9 Group cannot assure
complete protection from health conditions arising from uncontrollable factors such as
natural calamities, disease outbreaks and, inclement weather conditions.
Moreover, the DONOR understands the risks involved during the Dog’s training,
tour of duty and breeding and, PNP EOD/K9 Group may not guarantee for the health
conditions arising from incidents (i.e. mechanical trauma, trauma brought by explosives
and ordnance and the like). But rest be assured that reduction of such risks shall be taken
into great consideration.
ACKNOWLEDGEMENT
BEFORE ME a Notary Public for and in the City of ________, Philippines, personally
appeared the following persons with their respective Community Tax Certificates, to
wit:
Known to me to be the same persons who executed the foregoing instrument, and
they acknowledged to me that the same is their free act and voluntary deed. This
memorandum of Agreement, consisting of ______ (_) pages including this page, is
signed by the parties on each page hereof.
Doc. No. _______
Page No. _______
Book No. _______
Series of 20__
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 71
ANNEX E
Monthly K9 Inspection Checklist
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 72
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 73
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 74
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 75
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 76
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 77
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 78
ANNEX F
Building plans, designs and detailed cost estimates will be subject for
approval of the NHQ Command Group with consultation from Veterinarians and Civil
Engineers. Location of kennel facilities must be carefully considered. Areas of concern
are: shade, temperature control, ventilation, drainage, ease of cleaning, separation of
K9s and safety. Adequate security lighting is a must. The objective is to build a kennel,
meeting essential requirements at the least cost. The following considerations will be
observed in selecting a suitable location:
a. Odors/ Noise - Do not locate kennel facility in the area which may be
harmful to the K9s senses. Avoid areas near aircraft runways/taxiways,
engine test cells, small arms ranges, or other areas where the average
sound level for any 24-hour period exceeds 75 decibels. In addition, K9s
that are continually disturbed by pedestrian/ vehicular traffic, industrial
activity, and other distractions cannot be expected to function properly.
Where feasible, the kennel should be located so that natural barriers such
as hills, trees and large shrubs separate these areas from the kennel
facility;
b. Water Supply – Large quantities of potable water are needed for cleaning
and drinking. Impurities in the water can be a source of diseases for both
handlers and K9s;
c. Fire Protection – Water type fire extinguishers are generally used in the
kennel. At least one fire extinguisher must be provided for each 2, 500
square feet in the kennel support building;
2. Kennel Criteria:
b. All openings leading to areas within the building are to be protected with
insect screening;
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 79
e. Provide sufficient water capacity to manage required wash down and
clean-up;
f. The minimum size of each kennel, including the circulation space, shall
not exceed 75 square feet per dog. Kennel run dimensions will be
constructed using the following guidelines:
h. A deep sink will be provided in the support space for food preparation
and sanitary functions;
The training areas must be kept clean and vegetation closely trimmed.
Fecal matter must be removed immediately. Dogs should not be allowed to urinate/
defecate in the training area.
b. The surface of the training area must be free of items that are harmful
to the handlers/ K9s, i.e. sharp rocks, broken glass, and burrs, holes,
etc. The surface should be graded to prevent standing water;
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 80
ANNEX G
NAPOLCOM RES No. 2009-716
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 81
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 82
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 83
ANNEX H
The PNP K9 Units shall adhere to the guidelines and procedures in Section 4.1
of the “Revised Implementing Rules and Regulations of Republic Act No. 8485.” Cruelty
in transportation shall include but is not limited to the following:
However, due to the changing climate condition and deployment program of EOD
and K9 team, a modification of EOD and Kennel Transport Van is necessary to meet the
needs in the deployment of EOD and K9 Team. Specification of kennel van described
below:
VEHICLE SPECIFICATION:
K9 CAGE SPECIFICATION:
1. Two fixed custom fit dog cages (tail-end side of the vehicle):
Length: 38 inches
Width: 74 inches
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 84
Height: 34 inches
K9 COMPARTMENT SPECIFICATION:
Length: 38 inches
Width: 74 inches
Height: 20 inches
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 85
ANNEX I
Feeding Guide and Maintenance Requirements for Adult Dogs and Puppies
1. Feeding Guide for Adult Dog
Feeding Amount Dog Food Consumption
Breed Standard
Per Ration Per Day Per Day (kg) Per Month
Weight (kg)
(cups) (cups) (kg)
Labrador 24.0 – 28.0 2.0-2 ½ 5.0 - 10.0 0.5 – 1.0 15.0 – 30.0
Retriever
Golden Retriever 24.0 – 30.0 3 ½ -4.0 7.0 – 10.0 0.7 – 1.0 24.0 – 30.0
German/Dutch 25.0 – 30.0 3 ½ -4.0 7.0 – 10.0 0.7 – 1.0 24.0 – 30.0
Shepherd
Belgian Malinois 25.0 – 30.0 3 ½ -4.0 7.0 – 10.0 0.7 – 1.0 24.0 – 30.0
Jack Russel 4.0 – 6.0 1.0- 1½ 2.0 – 5.0 0.2 – 0.5 6.0 – 10.0
Note: 1.0 cup commercial dog food weighs approximately 100 g = 0.1 kg
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 86
ANNEX J
SUBJECT: Audit Guidelines on the Divestment or Disposal of Property and Other Assets of
National Government Agencies and Instrumentalities, Local Government Units
and Government-Owned or Controlled Corporations and their Subsidiaries.
I. PURPOSE:
To achieve uniformity and consistency in the observance of audit procedures and to ensure
facility in audit with respect to the divestment or disposal of property and other assets of all
national government agencies/instrumentalities, local government units and government-owned
and/or controlled corporations and their subsidiaries, this Circular prescribes audit guidelines on
the matter.
II. RATIONALE:
As a matter of national policy in support of its economic recovery program, the Government
has devised a scheme of reducing the number of government entities or instrumentalities and
government-owned or controlled corporations and their subsidiaries which have proliferated to
unmanageable proportions. To achieve this goal, it has resorted either to privatization of a good
number of these corporations and their subsidiaries or the divestment or disposal of their
property and other assets as well as that of national government agencies and local government
units. In aid of this endeavor, this Commission has deemed it fit to prescribe audit guidelines for
the use and observance of the management of these government entities/instrumentalities and of
the auditors concerned.
These audit guidelines shall be observed and adhered to in the divestment or disposal of
property and other assets of all government entities/instrumentalities, whether national, local or
corporate, including the subsidiaries thereof but shall not apply to the disposal of merchandise or
inventory held for sale in the regular course of business nor to the disposal by government
financial institutions of foreclosed assets or collaterals acquired in the regular course of business
and not transferred to the National Government under Proclamation No. 50. They shall not also
cover dation in payment as contemplated under Article 1245 of the New Civil Code.
As envisioned in this Circular, divestment shall refer to the manner or scheme of taking
away, depriving, and withdrawing of an authority, power or title. As opposed to investment which
signifies the delivery of possession of anything to another, divestment connotes taking away
and/or withdrawal of such possession and title (Black's Law Dictionary, Rev. 4th edition;
Webster's New School/Office Dictionary).
Pursuant to existing laws on the matter, the full and sole authority and responsibility for the
divestment or disposal of property and other assets owned by national government agencies or
instrumentalities, local government units, and government-owned and/or
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 87
controlled corporations and their subsidiaries shall be lodged in the heads of the
departments, bureaus, and offices of the national government, the local government units,
and the governing bodies or managing heads of government-owned or controlled
corporations and their subsidiaries conformably to their respective corporate charters or
articles of incorporation, who shall constitute the appropriate committee or body to undertake
the same.
V. MODE OF DISPOSAL/DIVESTMENT:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 88
d. It is understood that the price agreed upon at the negotiation shall not be lower
than the floor price as fixed by the government or the highest offer submitted at
the failed public auction whichever is higher.
3. Barter, which is the direct exchanged of commodities without the use of money and
without reference to price or the exchange of goods of one character for goods of
another, may be made with other government agencies or government-owned
and/or controlled corporations. This shall be resorted to where there is an offer that
would redound to the interest of and is advantageous to the government.
5. Destruction or Condemnation:
This mode shall be resorted to only when the unserviceable property has no
commercial value, or is beyond economic repair, or there is no willing receiver,
and/or the appraised value is less than the administrative cost of sale, subject to
prior inspection by the Auditor concerned. Valueless property shall be condemned
either by burning, pounding, throwing beyond recovery, and the like. The head of
the department, agency and corporation and the local chief executive shall approve
the disposition.
b) Inventory Report showing the itemized list and complete description of the
assets;
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 89
2. Upon receipt of these documents, the Auditor shall perform the following
functions:
a. Secure and gather the following information regarding the asset:
3) Any other information relative to the asset which will assist in arriving at the
reasonableness of the appraisal or valuation shall likewise be gathered.
b. Review the corporation's procedures for the sale of assets to determine their
propriety and conformity with existing laws and regulations.
c. In the event that the appraisal/valuation is equal to or higher than either the net
book value, the principal loan, or total government exposure as mentioned in
each of the cases in Nos. 1.a and 1.b above, the Auditor need not forward the
appraisal/valuation report to the COA Central Office, but shall file it in his office
together with the information gathered in No. 1 above as supporting documents
for the review done, which shall be available for review by the COA Central
Office.
d. In the disposal/divestment of assets, the Auditor shall also review the actual
sales or disposal value of the asset as against the appraisal/valuation report. If
the bid/sales value is less than the appraised value, the Auditor shall require
justification thereon from management. On the basis of such justification, the
Auditor shall make his own evaluation and submit his
comment/recommendation to the COA Technical Service Office (TSO).
The TSO, employing its own organic personnel or engaging the services
of a private consultant/specialist, shall review the appraisal/valuation report of
the corporation for reasonableness, thereafter transmitting its comments/action
thereon to the Auditor concerned, thru the COA Corporate Audit Office.
2. When property of a local government unit has become inserviceable for any cause,
or is no longer needed, it shall, upon application of the officer accountable therefor,
be inspected and appraised by the provincial or city auditor or his duly authorized
representative or that of this Commission.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 90
inspection and appraisal of the property. The Technical Property Inspector thus
assigned shall:
c. Prepare an Inspection Report which shall indicate the following, among others:
This Inspection Report shall be submitted to the Auditor who shall transmit
the same to the proper Disposal Committee and shall be used as basis for its
decisions.
All Circulars, Memoranda, rules, regulations and other issuances inconsistent herewith
are hereby repealed, amended or modified accordingly.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 91
ANNEX K
1. REFERENCES:
2. PURPOSE:
3. OBJECTIVE:
In this program the participants will cover aspects of the learning outcomes,
through coaching, training, and by self directed distance learning enabling students to
demonstrate:
4. CONDUCT OF TRAINING:
5. COURSE DESCRIPTION:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 93
Prior acceptance of canine unit to the K9 program must meet the following:
2. Canine age acceptance - minimum age of 8 months and not older than 1
year 6 months, a male or female (spayed);
3. The canine will be current on all preventive and routine vaccines;
4. The canine will not have any chronic disorder/disease;
5. The canine will not exhibit any behavior problems, to include aggression
towards other canines, animals or people that would be considered
unacceptable, or present a liability to any law enforcement agency or
department;
6. Medical screening and evaluation procedures shall consist of the following
(laboratory tests shall be performed by K9 Veterinarian and fees will be
shouldered by sending unit of participants):
Hip X-ray
Canine Heartworm Test
Canine Ehrlichia Canis Test
Complete Blood Count
Blood Chemistry
Faecal Examination
Urinalysis
Skin Scraping (with skin irritation/allergies)
Black Powder
Composition B
Smokeless Powder
Dynamite/Slurries
TNT
PETN/Detonating Cord
Emulsion/Fireworks/Pyrotechnic powders
Composition C4
Silver Nitrate
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 94
Flash powder
Ammunitions
Booster
Data sheet
TATP
HMTD
Explosive typical combination and etc.
Elective Explosives Improvised Explosives
MODE OF
NR OF
SUBJECTS SCOPE OF INSTRUCTIONS INSTRUCTIO
HOURS
N
Participants will be briefed about
the course modules, rules and
Overview of K9
regulations, objective, concept of Briefing/ QA 8 hrs
Training
the training and tuning up
camaraderie.
Lectures the handlers’ method
K9 Training
used in conditioning (food/toy Lecture/demo 8 hrs
Methodology
reward).
Handler/dog To know the specific techniques for
Lecture/demo 8 hrs
Communication giving commands to the canine.
Veterinarians will lecture the routine
K9 Wellness and veterinary care, grooming and
Lecture/demo 8 hrs
Vet Briefing sanitation, nutrition and diseases
affecting canines.
Canine First Aid To know the basic assessment, first
and Emergency aid and emergency procedures Lecture/demo 8 hrs
Care during injury/illness of a canine.
Introduction to Describes the basic effects and Lecture/demo/
16 hrs
Explosives & functioning of explosive. Able to PE
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 95
IED trends recognize and identify explosive
materials and components of IEDs.
Able to use safety procedures to
protect canine team; to apply
Basic Handling
proper leash control techniques; Lecture/demo 8 hrs
Skills
know when to praise and reward
the canine appropriately.
In this module, the dog should be
able to detect the odours; the
handler should be able to
Odour
accurately interpret the dog’s Demo/PE 180 hrs
Recognition
change in behaviour and able to
articulate/communicate when the
dog made a final response.
Cans, boxes,
blocks, walls, Able to present “hot items” on Lecture/Demo
180 hrs
pallets, wheel, different aids. /PE
luggage/bags
Vehicle; Mass transit (bus/trains);
articles (envelopes/boxes);
Practical
buildings (interior/exterior); rooms; Demo/PE 180 hrs
Searches
venues/school; warehouse;
Open area; buried aids.
Practical To determine the result/outcome of
PE 180 hrs
Evaluation the previous lectures or demos.
Regular exercise and grooming not
only helps in the overall health of
Exercise/ canine but also a unique bonding
grooming/ experience. Weighing is a weekly PE 180 hrs
Weighing checks basis to monitor the
increase/decrease in weight during
and after the training period.
Routine Scenarios (day & night)
PE 160 hrs
searches
Final Evaluation Scenarios (day & night) PE 48 hrs
CLOSING Presentation of Certificates
TOTAL NUMBER OF HOURS 1088 hrs
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 96
BASIC EXPLOSIVE DETECTION CANINE MODULE REQUIREMENTS:
7. POLICIES:
a. Director, PNPTS, through the Regional Special Training Unit (RSTU) Managers,
is designated as co-Office Primarily Responsible (OPR) in the implementation of
the priority training programs for PROs and NSUs, in coordination with the RDs
and Directors thereof, while concerned D-Staff shall be the OPR in the conduct of
competency courses falling under their areas of specialization;
c. RDs, PROs shall refrain from requiring police stations to conduct seminars and
trainings contained in their training programs. Only the Regional and Provincial
level of the PNP shall implement trainings and seminars with the police stations
personnel as the recipients of the programs;
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 97
d. Director, PNPTS or his duly authorized representative shall monitor the
implementation of these programs through reports and
announced/unannounced inspections/visits;
i. RDs, PROs/Dirs, NSUs shall strictly prioritized and complete the conduct of
all their respective programmed courses/seminars;
j. Training funds intended for programmed training courses shall not be utilized
to fund un-programmed training courses; and
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 98
l. Must pass the Qualifying Examination to be administered by the EOD/K9
Group; and
m. Compassionate to animals and willingness to care of the canine.
8. TRAINING ADMINISTRATION:
a. TDPRM shall issue orders for the detail of the participants and
instructors/training staff. This will also be the basis in providing Training
Subsistence Allowance (TSA) and Instructors Duty Pay, respectively upon
submission of the necessary requirements through TDHRDD;
b. TDL shall provide available explosive and other logistical requirements
needed in the conduct of training;
c. TDC shall provide funding for the training;
d. The Director, PNPEOD/K9, and Director, PNPTS or their representative
shall supervise the conduct of the training and shall be responsible for the
administration of the participants. They will submit After Opening and
Closing Reports to The Chief, PNP through DHRDD and the Command
Group within five (5) days after the activity;
e. Appropriate diploma, declaration of graduates and authority to wear Basic
K9 Badge will be given to those who will successfully complete the course;
f. Appropriate awards and decorations will be given to the outstanding
graduates; and
g. Lateral coordination with other concerned PNP Units is encouraged.
9. COORDINATING INSTRUCTIONS:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 99
the seminar/course to sufficiently justify its duration and veracity;
and
h) DHRDD Survey Form 1 (Training Evaluation Form); DHRDD Form
2 (Instructor Evaluation Form); DHRDD Form 3 (Consolidated
Instructor Evaluation Result); DHRDD Form 3.1 (General Class
Instructor Rating); and DHRDD Form 4 (Consolidated Training
Evaluation Result).
3) For courses/seminars with ten (10) training days or less duration, the
After Training Report shall be submitted to DHRDD three days after the
culmination of the training with the following data/documents:
b. Reports that do not satisfy the requirements stated shall not be considered
and request for TSA/IDP will not be endorsed;
10. COVERAGE:
This Training Action Plan specifically covers only the programmed courses
valid for three (3) years (Calendar Year 2017-2019).
(Signed)
REMIGIO B GREGORIO
Police Senior Superintendent
Director, EOD/K9
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 100
ANNEX L
Narcotic detector dogs will be trained for basic obedience, the detection of
illegal narcotics/contraband at PNP EOD/K9 training facility and for assisting outside
law enforcement agencies.
1. At a minimum, the dog will, on command from the handler, execute the
commands of SIT, DOWN, HEEL, and STAY;
It is critical to remember that the detector dog is not a facility pet. It is equally
important for the dog to be socialized with other staff members to the fullest extent
possible. The handler is responsible for determining how much socializing the dog
needs and will accept from other staff members in accordance with the dog’s
temperament.
1. Staff members who wish to assist with the socialization of the canine
should gain permission from the handler before attempting to pet the dog;
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 101
ANNEX M
a. Leash Dog - a tracking dog that is under the control and supervision of
the handler using a 15 – 30 foot tracking lead; and
b. Pack Dog - a dog that is released with one or more dogs and is
followed on foot or by motorized vehicle. The handler maintains control
of the dogs using voice commands or by use of a whistle. No tracking
lead is used. The use of GPS tracking collars is highly recommended
while using/training pack dogs.
4. Offender orderlies may be used to lay track for the tracking dogs; however,
orderlies should be rotated frequently. This prevents the offender from gaining too
much knowledge of the dogs assigned to their facility.
5. Tracking dog handlers will maintain a separate training log that includes
the date, name of the dog(s) trained, length of the track, time the track was laid, time
the track was run, and the name of the person who laid the track.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 102
ANNEX N
1. Search and Rescue dog will be trained for basic obedience and trained to
search and recovery of human locations in wilderness, disaster, cadaver, avalanche,
and drowning.
4. Human remains detection (HRD) or cadaver dogs are used to locate the
remains of deceased victims. Depending on the nature of the search, these dogs
may work off-lead (e.g., to search a large area for buried remains) or on-lead (to
recover clues from a crime scene). Air scenting and tracking/trailing dogs are often
cross-trained as cadaver dogs, although the scent the dog detects is clearly of a
different nature than that detected for live or recently deceased subjects. Cadaver
dogs can locate entire bodies (including those buried or submerged), decomposed
bodies, body fragments (including blood, tissues, hair, and bones), or skeletal
remains; the capability of the dog is dependent upon its training.
The training areas must be kept clean and vegetation closely trimmed. Fecal
matter must be removed immediately. Dogs should not be allowed to urinate/
defecate in the training area.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 103
ANNEX O
A. SUSPICIOUS PACKAGES:
Suspicious package: Any package, which based on the totality of the circumstances,
may not belong in the environment in which it has been located. Furthermore, any action or
circumstance that makes the package suspicious; e.g., packages that are witnessed to be
purposely abandoned, backpacks or bags left in a secure area, and single items such as
packages left unattended.
Procedure:
All certified explosives detection canine teams will adhere to the following
procedures:
a. Canine teams will not search packages, items, or vehicles that have been
declared suspicious by a credible source.
b. The canine handler shall make a distinction between suspicious items and
unattended items.
1. Suspicious Items
a. There is a threat associated with the item and/or location;
b. Suspicious circumstances or persons are affiliated with the items;
c. There are outward signs of an explosive device, such as oily stains;
discoloration; protruding wires; tinfoil; strange odors; or visual
indicators;
d. There is unusual or excessive exterior packaging; and
e. Another device has already been located and identified within the
location or event.
2. Unattended Items
a. There is not a specific threat associated with the item;
b. There is not a suspicious activity associated with the item;
c. The "unattended item" is consistent with the particular venue;
d. There are no external indicators typically associated with an
explosives device;
e. Once a device is found or suspected, indicated by a passive alert, the
appropriate explosive personnel will be summoned to handle the
situation;
f. EDD handler shall not attempt to disarm any device found or move
any explosive material to another location;
g. EDD handler is responsible for the withdrawal, care, and turn-over
and of training aids to the kennel logistics officer;
h. When the training aids become worn or unstable, a certified bomb unit
will be contacted and requested to take possession of the aid for
destruction;
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 104
i. EDD is trained to detect Black Powder, Time Fuse, Smokeless Powder,
Sodium Chlorate, Detonation Cord, Potassium Chlorate, C-4 Plastic,
Kine Pack, Dynamite, Data Sheet, TNT, and Water Gel. (Conduct
research on other explosive materials);
j. All explosive detection searches must be documented on official reports
and filed with the Unit; and
k. Refresher routine shall be done after negative searches in coordination
with the kennel logistics officer.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 105
8. Inquire about any recent burglaries or attempts at forced entry that
may indicate an attempt to place a device;
9. Obtain keys to elevators and mechanical rooms, or utilized security
or maintenance personnel as an escort and to open locked areas;
10. Mark searched areas to reduce the possibility of duplicating search
areas;
11. Establish the ATF "Action on a Find" procedures before beginning
the search. Establish avenues of egress during the walk-through
and clear them first; and
12. The handler will NOT declare a building/area/item safe or clear of
explosives materials/devices, etc.
C. VEHICLE SWEEPS:
a. The handler will obtain the following information and plan the search
accordingly:
1. Scope of venue
2. Threat level
3. Number of vehicles to be searched
4. Any VIP travel routes
5. Any vulnerability or choke points
c. The handler shall prioritize the search areas using the red, yellow, and
green threat system.
d. The handler should use ATF I 5400.1, ATF Vehicle Bomb Explosion
Hazard and Evaluation Distance Tables, (see page 19) to determine
minimum distances in the case of a vehicle improvised explosives
device, and should base the search areas accordingly when it is not
possible or feasible to search all vehicles.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 106
e. The handler shall have the discretion and the scene will dictate how to
conduct the vehicle sweeps; however the following shall be used as a
guideline:
1. The handler should start the search closest to the main venue and
work outward;
2. The handler should start on the downwind side of vehicles, when
possible;
3. Depending upon the parking arrangement, the handlers should
search the fronts and rears or sides of vehicles, or both, when
possible;
4. Search as much of the perimeter of each vehicle as the location will
allow, targeting productive areas;
5. When multiple teams are deployed, these activities may be
performed in concert; e.g., Team A searches fronts and rears, while
Team B searches sides;
D. VENUE SWEEPS:
Any area associated with an event, directly or indirectly, in which the ATF
canine team has been called upon to search.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 107
b. In preparation of the event, the handler will do the following:
1. Identify the mission;
2. Determine if there is a threat;
3. Determine if the mission is realistic;
4. Determine if adequate resources are available;
5. Determine if there is adequate time to accomplish the mission; and
6. Ensure that the venue will be secured and posted following all sweeps.
e. A plan of action shall be identified and shall include the following factors:
1. The venue searched shall be secured before and after sweeps;
2. All personnel will be provided credentials (when applicable);
3. Necessary sweeps will be determined and performed;
4. Sweep for show (limited areas only); and
5. Teams shall serve as a visual deterrent.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 108
4. Re-tasking;
5. Maintenance searches;
6. Routes to and from the venue;
7. Vehicle control points/choke points;
8. Adjacent buildings;
9. Surrounding areas; and
10. Contingency plans.
Open area search - Any outdoor area in which the canine team has been
requested to search.
All certified explosives detection canine teams will facilitate open area
searches utilizing the following procedures:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 109
d. Unplanned Concealment:
e. Deliberate Concealment:
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 110
3) The criminal desires easy access into the hide itself so as to
spend as little time as possible on the site retrieving
contraband.
f. Buried Explosives. Finds in the field have shown that the venting of a
buried explosive varies depending on a number of factors, such as soil
composition; terrain features; containment; and even the presence of
roots. Finds have been made of explosive caches buried several feet
deep, in a seal plastic container. The canine alert may not always be
directly above the explosive, due to the venting factors mentioned above;
therefore it may be necessary to dig several feet all around the alert
location. Also, consider ground features that could affect where odor
would find the path of least resistance as it rises to the surface.
1. The driver is instructed to turn off the engine, remove the keys from the
ignition, and exit the vehicle leaving any items in the vehicle;
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 111
2. All passengers will be secured by law enforcement personnel at a
location away from and out of sight of the vehicle, when possible;
and
3. The driver will open all doors and compartments, and the driver will
be secured by law enforcement personnel away from and out of
sight of the vehicle.
a. The canine handler will ensure that legal standing exists (consent,
warrant, arrest, etc.) to perform the search for the recovery of
evidence;
b. The handler shall take precautions to ensure that he/she and the
canine are free of any explosives contamination prior to entry into the
scene;
c. The handler will walk around the vehicle to ensure the canine's safety
and to look for obvious evidence;
d. If the vehicle is to be moved to a secure area, the secure area shall be
searched with the canine prior to the arrival of the vehicle to eliminate
the potential of moving the vehicle into a contaminated area;
e. The canine handler shall determine the type of evidence the search is
expected to yield and develop a plan accordingly; and
f. Prior to opening any compartments, the exterior of the vehicle shall be
searched with the canine, paying particular attention to seams and
productive areas. If the possibility exists of anti-disturbance devices, a
bomb squad shall remotely clear the vehicle.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 112
H. ACTION ON FIND:
b. The handler will be familiar with any event-specific operational plan for
large venues and be familiar with the means of communication should
a find occur;
1. Mark the area in some manner (hat, towel, surveyors tape) and
perform a rapid visual survey of the suspected area for recall to
render safe teams (REMEMBER TIME ON TARGET);
2. Notify those in the immediate area that you have an indication as
you begin the evacuation of yourself and others in the building;
3. DO NOT allow the canine return to the indication area or run a
second canine;
4. As you evacuate, make every effort to secure the area in question
and prop all the doors open;
5. Notify the POC or the incident commander that a canine indication
has occurred and evacuation is in progress; and
6. Report to the command post or predetermined location to provide
additional information to render safe teams.
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 113
ANNEX P
A. DETECTOR DOG PER CAPITA MAINTENANCE
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 114
26 Feeding pan/bowl (stainless)– yearly 1 pc 500 500
27 Kong/ball (Toy reward)– yearly 2 pcs 1,000 2,000
28 Dog food pouch – yearly 1 pc 200 200
29 Dog blanket – yearly 2 pcs 100 200
30 Dog muzzle – yearly 1 pc 250 250
Pet
31 Dog brush/comb – yearly 2 pcs 200 400
discount
32 Water bucket – yearly 1 pc 1,000 1,000
33 Choker chain – yearly 1 pc 150 150
34 Nail clipper – yearly 1 pc 185 185
35 Vari Kennel/Kennel Crate 1 pc 5,000 5,000.00
13,468.59
12 months
Annual Expenses SUBTOTAL =1,122.383
Monthly Expenses SUBTOTAL +7,631.00
MONTHLY PER CAPITA MAINTENANCE Php 8,753.38
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 115
B. ESTIMATED COST OF BASIC EXPLOSIVE DETECTION CANINE
HANDLERS COURSE
(for 6 Months or 180 Training Days of 20 Dogs)
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 116
C. HANDLERS AND EDD PROFICIENCY TRAINING
(15 Days)
Unit price/
Particulars Quantity Total
SRP
Training Aids
Luggage 50 pcs 500 25,000
Bags/backpacks 50 pcs 300 15,000
Boxes/Plain carton (1x1 ft) 100 pcs 50 5,000
Quarter Size Cans 100 pcs 20 2,000
Liter Size Cans 100 pcs 30 3,000
Gallon (4 Li) Size Cans 100 pcs 50 5,000
Hollow Blocks (9"x16"x18) 50 pcs 150 7,500
Ball/Kong 20 pcs 1,000 20,000
Marine Plywood (1/2") 4 pcs 1,000 4,000
Wood Pallette 4 pcs 500 2,000
Good Lumber (2"x6"x8") 4 pcs 1,000 4,000
Good Lumber (2"x4"x8") 2 pcs 800 1,600
Disposable Gloves 1 box 500 500
Wood Screw 50 pcs 30 1.500
Chemical Lights (For Night training) 7 pcs 300 2,100
Explosive Training Aids 55,000.00
Trainers Honorarium (15 days)
Course Director/Lead Instructor 1 5,000.00 5,000
K9 Instructor 2 5,000.00 10,000
Veterinarian 1 5,000.00 5,000
Guest Instructor (EOD) 2 2,000.00 4,000
K9 Asst. Instructor 4 2,000.00 8,000
Meal Allowance (15 days)
Instructors 11 300.00 x 15 49,500
Handlers 20 300.00 x 15 90,000
Administrative/ Office Supplies
Certificate 30 pcs 100 3,000.00
Computer Ink (Epson L220) 2 sets 500 1,000.00
Envelope 20 pcs 5 100.00
Communications 11 500 5,500.00
Transportation (ADF) 300 Li 35.00 10,500.00
TOTAL TRAINING EXPENSES (20 K9 Teams) 343,302.00
PER CAPITA FOR TRAINING P 17,165.08
GUIDELINES IN THE ADMINISTRATION, MANAGEMENT, UTILIZATION AND DISPOSAL OF THE PNP CANINES Page 117
SUPPLY MANAGEMENT
GUIDELINES AND PROCEDURES IN THE ISSUANCE OF AMMUNITION BASIC LOAD Page 118
Republic of the Philippines
NATIONAL POLICE COMMISSION
NATIONAL HEADQUARTERS, PHILIPPINE NATIONAL POLICE
OFFICE OF THE CHIEF, PNP
Camp BGen Rafael T Crame, Quezon City
1. REFERENCES:
a. Republic Act No. 10591 otherwise known as the "Comprehensive
Firearms and Ammunition Regulation Act" dated May 29, 2013;
b. Convention on the Prohibition of the Use, Stockpiling, Production and
Transfer of Anti-Personnel Mines and on their Destruction or simply
the Mine Ban Treaty (Ottawa Treaty); and
c. PNP Memorandum Circular No. 01 titled: “Ammunition Basic Load”
dated February 5, 1993.
2. RATIONALE:
3. SITUATION:
4. PURPOSE:
GUIDELINES AND PROCEDURES IN THE ISSUANCE OF AMMUNITION BASIC LOAD Page 119
b. Prescribe as a guide and/or requirement for concerned PNP
Offices/Units/PNP personnel with the receipt, turn-in, storage,
safekeeping, care handling and management of ammunition.
5. DEFINITION OF TERMS:
6. GUIDELINES:
a. Procedures:
SHORT FIREARM
Pistol cal .45 100 50
Pistol 9mm 100 50
Revolver cal .38 24 18
GUIDELINES AND PROCEDURES IN THE ISSUANCE OF AMMUNITION BASIC LOAD Page 120
CREW-SERVED WEAPON
LMG 7.62mm 2,000 1000
LMG 5.56mm 2,000 1000
HMG cal .50 2,000
LAUNCHERS
Grenade Launcher M79 18 12
MORTARS/RECOILLESS RIFLE
Mortar 60MM 50
Mortar 81MM 120
Rifle, Recoilless 57MM 44
Rifle, Recoiless 90MM 18
EXPLOSIVES
Rifle Grenade, 40MM 630/PHQS/BN
Fragmentary Hand Grenade 300/PHQS/BN
Flare, Surface Trip 50/PHQS/BN
GUIDELINES AND PROCEDURES IN THE ISSUANCE OF AMMUNITION BASIC LOAD Page 121
b) The request shall be supported with the following documents
duly signed by the Chiefs of PNP Offices/Units:
4) Turn-In:
GUIDELINES AND PROCEDURES IN THE ISSUANCE OF AMMUNITION BASIC LOAD Page 122
b. General Guidelines:
c. Responsibilities:
1) TDL:
GUIDELINES AND PROCEDURES IN THE ISSUANCE OF AMMUNITION BASIC LOAD Page 123
c) Perform other tasks as directed.
7. PENAL CLAUSE:
8. REPEALING CLAUSE:
9. EFFECTIVITY:
This MC shall take effect after 15 days from filing a copy thereof at the UP
Law Center in consonance with Section 3, Chapter 2, Book VII of Executive Order
No. 292, otherwise known as the “Revised Administrative Code of 1987,” as
amended.
Original Signed
OSCAR D ALBAYALDE
Police General
Chief, PNP
Distribution:
Command Group
D-Staff
P-Staff
D, NSUs
IG, IAS
RD, PROs
DDs, NCRPO
SPA to SILG
GUIDELINES AND PROCEDURES IN THE ISSUANCE OF AMMUNITION BASIC LOAD Page 124
GUIDELINES AND PROCEDURES IN THE ISSUANCE OF AMMUNITION BASIC LOAD Page 125
GUIDELINES AND PROCEDURES IN THE ISSUANCE OF AMMUNITION BASIC LOAD Page 126
Republic of the Philippines
NATIONAL POLICE COMMISSION
NATIONAL HEADQUARTERS, PHILIPPINE NATIONAL POLICE
OFFICE OF THE CHIEF, PNP
Camp BGen Rafael T Crame, Quezon City
March 5, 2019
1. REFERENCES:
a. Administrative Order N0. 10, s. 2008 entitled: “Centralizing All
Government Efforts for the Reintegration of Former Rebels and
Creating for the Purpose an Inter-Agency Task Force;”
b. Republic Act (RA) No. 10591 otherwise known as the
"Comprehensive Firearms and Ammunition Regulation Act" dated
May 29, 2013;
c. Revised Implementing Rules and Regulations 2018 of RA 10591
dated February 24, 2018;
d. RA No. 8294 entitled: “An Act Amending the Provisions of Presidential
Decree No. 1866, as Amended, entitled “Codifying the Laws on
Illegal/Unlawful Possession, Manufacture, Dealing in, Acquisition or
Disposition of Firearms, Ammunition or Explosives or Instruments
Used in the Manufacture of Firearms, Ammunition or Explosives, and
Imposing Stiffer Penalties for Certain Violations Thereof, and for
Relevant Purposes” dated June 6, 1997;
e. A Destruction Handbook: Small Arms, Light Weapons, Ammunition
and Explosives by the Department for Disarmament Affairs, United
Nations;
f. PNP Memorandum Circular (MC) No. 2018-033 entitled: “Policy
on the Permanent Issuance of Handgun” dated 22 August 2018;
g. PNP MC No. 2017-017 entitled "Revised Guidelines and Procedures
in the Disposal of PNP Property, Plant and Equipment (PPE) and
the Disposition of the Income Derived There From" dated February
21, 2017;
h. Command Memorandum Circular (CMC) No. 24-2013 with Subject:
“Guidelines and Procedure for the Demilitarization and Disposal of
Firearms, Explosives and Ammunition” dated July 23, 2013;
i. Memorandum from TDIDM dated February 11, 2011 with Subject:
“Mandatory Examination of all Firearms, Shells and Slug Recovered
during Police Operations;”
j. Letter Of Instruction (LOI) 49/09 “Bilang Boga” dated July 23, 2009;
and
k. PNP Circular No. 5 Series 2005 entitled: “Disposition of Captured,
Confiscated, Surrendered and Deposited CCSD Firearms, Explosives
and Ammunition” dated December 12, 2005.
PNP MC ON CCSDAF FIREARMS AND AMMUNITION Page 127
2. RATIONALE:
3. SITUATION:
During the five-month siege of Marawi City, over 1,100 people, mostly
Islamic State-inspired terrorists were killed and over 300,000 residents of the city,
considered as the center of Islamic faith in Mindanao were displaced. Further, as
an aftermath, a total of 652 weapons were either captured, confiscated,
surrendered or recovered from the Maute terrorists. Said weapons consisting of
high powered firearms such as machine guns, squad automatic weapons, rifle
grenade launchers, sniper rifles, M16 rifles, shotguns, as well as airguns were
flattened and destroyed by a road roller vehicle and were subsequently cut into
pieces to render them unserviceable.
Based on PNP Firearms and Explosives Office (FEO) record, there are
about 25,476 firearms awaiting final disposition excluding CCSDAF firearms and
ammunition still in the possession of various PNP offices/units nationwide.
4. PURPOSE:
5. DEFINITION OF TERMS:
k. Storage Area – refers to the designated areas within PNP units where
the turned-in, inspected and inventoried firearms shall be received and
stored.
6. GUIDELINES:
a. Procedures:
d) National Headquarters:
a) Safekeeping/Storage:
a.1) The FEO/RCSU shall be the depository of all CCSDAF
firearms and ammunition; and
a.2) In case, the RCSU has no storage and the PRO has a
warehouse, the C, RCSU shall coordinate with the C,
RLRDD for the possibility of storing the CCSDAF firearms
and ammunition in the PRO storage/warehouse, however,
the CCSDAF firearms and ammunition must be separately
stored from the PNP-owned firearms and ammunition.
PNP MC ON CCSDAF FIREARMS AND AMMUNITION Page 134
b) Accounting:
b.1) For accounting purposes, the RLRDD/Supply Officer shall
have a record of all CCSDAF turned over to RCSU/FEO;
and
b.2) The RLRDD shall coordinate with RCSU/FEO to check
their records on a monthly basis.
c) Inventory:
c.1) RLRDD/Logistics Office shall conduct a quarterly inventory
and inspection of all CCSDAF firearms and ammunition
stored at the RCSU/FEO;
c.2) Authorized Inventory Report format (Annex “F”) and
Physical Inspection Checklist (Annex “G”) shall be used in
the inventory taking and reporting; and
c.3 RLRDD shall prepare and submit to DL copy furnish FEO/
LSS separate inventory reports on serviceable and
unserviceable CCSDAF firearms and ammunition attached
to the individual technical inspection report (TIR) of
firearms.
Composition Designation
Assistant Chief, FEO Chairman
Chief, FLD, FEO Vice-Chairman
Chief, EEMD, FEO Member
SLO, FEO Member
Chief, CIDS, EEMD, FEO Member
Chief, Record, FLD, FEO Member
SAO, CSG Member
Chief, Storage Sec, FLD, FEO Head Secretariat
b. General Guidelines:
c) Responsibilities:
1) TDL:
a) OPR in the implementation of this PNP MC;
b) TDL will sit as Chairman of the NHQ Disposal Committee; and
c) Perform other tasks as directed.
2) TDO:
a) Supervise the CSG in the implementation of this MC; and
b) Perform other tasks as directed.
3) TDC:
a) Provide funds for the transportation of CCSDAF firearms and
ammunition from the RCSUs to FEO;
b) Ensure proper recording of CCSDAF-TPPF and ammunition in
the book of accounts; and
c) Perform other tasks as directed.
4) Director, CSG
a) Director, CSG shall submit the consolidated report of CCSDAF
firearms and ammunition to the Chief, PNP with the
concurrence of TDL and TDO for information;
b) Ensure proper recording of all CCSDAF from the RCSUs and
updating of the database at the FEO; and
c) Perform other tasks as directed.
5) Chief, FEO:
a) Act as OPR in the conduct of forfeiture proceedings of all
CCSDAF firearms and ammunition in favor of the PNP every 6
months (June and December) of every year;
b) Responsible in the supervision of the proper storage and
security of all types of CCSDAF firearms and ammunition in
the FEO/RCSU storage area;
c) Supervise the assignment of serial number to all serviceable
CCSDAF TPPF with defaced/tampered or obliterated serial
numbers;
d) Issue corresponding permit to transport on all CCSDAF
firearms and ammunition for turn-in;
e) Submit inventory reports of CCSDAF firearms stored/stocked
in FEO storage rooms to DL (Attn: SMD) on quarterly basis as
well as the reports on gains and losses of CCSDAF firearms;
f) Supervise the turn-over of all CCSDAF TPPF to SAO, PNP
Wide; and
g) Perform other tasks as directed.
6) Director, LSS:
a) Designated as member of the NHQ Disposal Committee;
b) Act as OPR in the firearms demilitarization processes;
9) Chief, RCSU
a) Responsible in the proper storage and security of all types of
CCSDAF firearms and ammunition turn-over to the RCSU;
b) Shall coordinate with respective RLRDDs and ROPD for
CCSDAF storage area and security if there are no available
storage in the RCSU;
c) Update database of CCSDAF firearms and ammunition in
coordination with RLDDD and ROPD;
d) Submit consolidated report to FEO, CSG including the status
of all CCSDAF firearms and ammunition; and
e) Perform other tasks as directed.
10) C, EOD/K9:
a) Supervise the EOD personnel in the demilitarization of
ammunition; and
b) Perform other tasks as directed.
7) PENALTY CLAUSE:
8) REPEALING CLAUSE:
9) EFFECTIVITY:
This MC shall take effect after 15 days from filing a copy thereof at the UP
Law Center in consonance with Section 3, Chapter 2, Book VII of Executive Order
292 otherwise known as the “Revised Administrative Code of 1987”, as amended.
Original signed
OSCAR D ALBAYALDE
Police Director General
Chief, PNP
Distribution:
Command Group
D-Staff
P-Staff
D, NSUs
RDs, PROs
1. REFERENCES:
a. Republic Act (RA) No. 10951 entitled: “An Act Adjusting the Amount of
the Value of Property and Damage on Which a Penalty is Based, and
the Fines Imposed Under the Revised Penal Code, Amending for the
Purpose Act No. 3815, otherwise known as the Revised Penal Code,
as Amended” (2017);
b. RA No. 10591 Otherwise known as the “Comprehensive Firearms and
Ammunition Regulation Act” (2013);
c. Government Accounting Manual (GAM) 2016;
d. Presidential Decree Number 1445 known as the “Government Auditing
Code of the Philippines” dated June 11, 1978;
e. NAPOLCOM Memorandum Circular No. 2018-001 entitled: “The New
Rules and Regulations on the Issuance of Short Firearms to PNP
Personnel” dated April 23, 2018;
f. NAPOLCOM MC No. 2016-002 entitled: “Revised Rules of Procedure
Before the Administrative Disciplinary Authorities and the Internal
Affairs Service of the Philippine National Police” (2016);
g. NHQ-PNP General Orders Number DPL 08-15 dated October 7, 2008;
h. PNP Circular No. 5 Series 2005 entitled: “Disposition of Captured,
Confiscated, Surrendered and Deposited (CCSD) Firearms, Explosives
and Ammunition” dated December 12, 2005; and
i. Standard Operating Procedure Number 2005-02 entitled: “Permanent
Issuance of Short Firearms” dated June 3, 2005.
2. RATIONALE:
The Directorate for Logistics (DL) duly noted the above situation and
undertook the initiative to address the issues connected with the above.
4. PURPOSE:
5. DEFINITION OF TERMS:
c. Logistics Office – any PNP offices from the Directorate for Logistics
(DL), Regional Logistics, Research and Development Division
(RLRDD) and the Logistics Division or Logistics Section/Logistics
Management Section of NSUs to include other offices performing
logistics-related functions such as the Logistics Support Service (LSS),
Engineering Service (ES) and Headquarters Support Service (HSS).
6. GUIDELINES:
1) Sources of Handgun:
a) New Procurement:
c) Donation:
e) Confiscated/Captured/Surrendered/Deposited/Abandoned/
Forfeited (CCSDAF):
a) National Headquarters:
b) NSUs/PROs:
5) The following are the PNP Senior Officer and Supply Accountable
Officers who will sign on the Property Acknowledgement Receipt
(PAR) for permanent issuance of handgun (See Annex “D” – PAR
Form):
b. General Guidelines:
1) Issuance of Handgun:
4) Double Issuance:
c. Responsibilities:
2) Director, LSS
a) Assist the Directorate for Logistics in the monitoring and
implementation of this MC; and
b) Perform other tasks as directed;
3) SAO, LSS
a) Implement the transfer of handguns to NSUs, PROs, including
those intended for NHQ personnel based on the Supply Directive
from TDL;
b) Maintain the files of PARs nationwide;
c) Keep an updated record of all handguns in the Inventory and ensure
that all PARs are renewed every three years and/or every time
there is a change in accountability or custodianship of the handgun;
and
d) Perform other tasks as directed.
9) Unit Commanders
a) Ensure the proper implementation of this MC;
b) Facilitate the conduct of monthly Inspection of handguns to his/her
subordinates to account losses, if any; and
c) Perform other tasks as directed.
10) RSPNCO
a) Ensure compliance with this MC; and
b) Performs other tasks as directed.
8. REPEALING CLAUSE:
Provisions of existing PNP issuances which are inconsistent with this MC, in
whole or in part, are deemed repealed, set aside, amended or modified accordingly.
9. EFFECTIVITY:
This MC shall take effect after 15 days from filing a copy thereof at the UP
Law Center in consonance with Section 3, Chapter 2, Book VII of Executive Order
292 otherwise known as the “Revised Administrative Code of 1987,” as amended.
Original Signed
OSCAR D ALBAYALDE
Police Director General
Chief, PNP
Distribution:
Command Group
D-Staff
P-Staff
Dirs, NSUs
RDs, PROs
Purpose:
(Position/Office) (Position/Office)
(Date) (Date)
STENCIL OF PROPERTY
Note: 1) stencil can be attached at the back portion of this PTIS if this space provided for the stencil of property is limited/insufficient.
2) Indicate whether the serial number is tampered, defaced or obliterated.
I HEREBY CERTIFY THAT I have turned-in the I HEREBY CERTIFY that the
above- cited property to _____________________
SAO of __________ for the reasons/circumstances
undersigned personally conducted the
indicated above. physical inspection and accounted the
above-cited property.
(Name of the Head of PNP Office/Logistics Officer) (Name of the Supply Accountable Officer)
Date Signed: ______________________ Date Received: _________________________
1. REFERENCES:
2. RATIONALE:
3. SITUATION:
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 173
of the PNP who worked hard for the PNP but unfortunately have either fallen prey to
the pitfalls or became victims of a flawed procurement process. The present situation
calls for the crafting of the right mechanism that would guarantee the welfare of
every Committee member and its support groups.
Unless a sound, well-defined and effective procurement procedure, as well
as upright contract implementation is adopted that would work well and ensure the
safety and protection of all the parties involved in the procurement process, the
organization will always be susceptible to committing the same mistakes in the
future.
It is toward this end that sound, well-defined guidelines and procedures in
the inspection and acceptance of all delivered goods are hereby crafted and shall
henceforth be adopted and implemented in the PNP to better strengthen the duties,
responsibilities and functions of the members of the NHQCIA, PROCIA, and
NSUCIA.
4. PURPOSE:
To set forth the policy guidelines and procedures in the inspection and
acceptance of all delivered goods procured by the Bids and Awards Committee
(BAC) or those procured by a Procurement Agent pursuant to RA No. 9184 and its
Revised Implementing Rules and Regulations (IRR), starting with the reception of
the Delivery Notice from the concerned supplier/contractor until the issuance of the
resolution for Final Acceptance.
This MC shall not apply in the procurement of consulting services and
infrastructure projects.
5. DEFINITION OF TERMS:
For purposes of this MC, the following words, phrases and abbreviations
shall be understood to mean:
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 174
on the Delivery Receipt (DR), Purchase Order (PO) and Supply
Contract (SC).
g. Final Acceptance - refers to the acceptance of completely delivered
items as to quantity and the declaration as passed during the conduct
of the functional test and evaluation as specified in the test and
functional parameters.
h. Functionality Test Duration – refers to the duration required in the
conduct of functionality and laboratory test procedures, the number of
days of which varies on the kind of items being subjected to the
procedure.
i. Goods – refers to all supplies and materials which may be needed in
the transaction of public business or in the pursuit of any government
undertaking, project, or activity.
j. Head of the Procuring Entity (HOPE) – refers to the Head of the
Agency or the C, PNP/RD, PRO/D, NSU or duly authorized official
vested with authority to approve and sign contracts for the procurement
made by the respective Bids and Awards Committees (BACs).
k. Inspection – refers to the process of checking the delivered items to
ensure completeness as to the number of items to be delivered and
compliance to the standard specifications pursuant to the NAPOLCOM
Approved Resolutions.
l. National Headquarters/Regional Headquarters/National Support Units
Committee on Inspection and Acceptance (NHQCIA/PROCIA/NSUCIA)
– refers to the Committee created under this MC tasked to accept or
reject all delivered goods procured pursuant to RA No. 9184 and its
revised IRR.
m. Procurement – refers to the acquisition of goods in accordance with the
approved Annual Procurement Plan (APP) regardless of the methods
used as allowed under RA No. 9184 and its IRR and the source of
funds.
n. Procurement Agent – refers to the other Government Agencies
contracted by the Procuring Entity to undertake the procurement
process in behalf of the latter.
o. Provisional Acceptance – refers to the acceptance of delivered items
as to quantity.
p. Standard Specifications – refer to the NAPOLCOM approved Technical
Specifications of supplies, materials and equipment used by the BAC
as basis for procurement.
q. Technical Working Group (TWG) – refers to the group of Technical
personnel tasked to support the Inspection and Acceptance Committee
in the Inspection, functional Test and Evaluation of all delivered goods
prior to acceptance.
r. Test and Evaluation refers to the process of testing and evaluating the
durability, quality and specifications of delivered items pursuant to the
PNP Approved Test Parameters.
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 175
Procurement Division, Logistics Support Service (PD, LSS) for
safekeeping using the Transmittal Sheet (Annex B) enumerating the
documents attached. In the case of the PRO and NSU BACs, they
shall transmit the procurement documents to their respective
Procurement Officers;
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 176
6) The TWG through the Supervising Officer of the Technical
Inspectors, shall likewise perform the following tasks, seven (7)
calendar days before the delivery:
10) On the same day, the CIA Head Secretariat shall submit to TDL an
After Activity Report with attached action photos, a copy of the duly
accomplished accounting checklist and attendance sheet. He shall
likewise reiterate the attendance of the CIA members to the CIA
Meeting/Deliberation as previously disseminated or as appropriate;
11) On the third day, the DRD Technical Inspectors, in the presence of
the other members of the Correlated Support to the CIA, whenever
necessary shall start the conduct of the functionality test and
evaluation of the samples collected based on the approved
functionality test procedures/parameters (Refer to Annex C for the
Duration of Functionality Test and Evaluation of Various
Equipment).
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 177
On the same day, the sample due for laboratory testing shall be
submitted to the concerned agency;
12) After completion of the functionality test and evaluation, the TWG
shall prepare the results and submit same to the Chairman, CIA
Attention: Head Secretariat within two (2) calendar days;
13) The CIA shall deliberate on the results of the functionality test and
evaluation. The CIA shall accept the delivery only if the goods are
complete and in order, have passed the test parameters and
conformed to the NAPOLCOM approved specifications, otherwise,
it shall reject the same. For goods delivered requiring correction of
defect/s noted or replacement of UNIT or WHOLE LOT,
appropriate corrective actions shall be done before recommending
for acceptance. The CIA Secretariat shall prepare the resolution for
the final acceptance, rejection, correction of defect/s or
replacement of units or whole lot of the delivered goods for
signature of the CIA members on the same day and approval of
the HOPE;
14) The CIA Secretariat transmits to the HOPE the resolution the day
after the signing by the CIA members. The HOPE signs the
approval or disapproval of the resolution within three (3) calendar
days and directs the transmittal of the signed resolution to the CIA
Secretariat for further disposition action;
15) If accepted, the CIA Head Secretariat shall prepare a letter for
signature of the Chairman notifying the supplier of the acceptance
of its delivery. The supplier shall post a warranty security upon
receipt of the notification for acceptance pursuant to Section 62 of
the 2016 Revised IRR of RA No. 9184;
16) On the same day, SAO, PNP Wide shall receive the accepted
goods and ensure inclusion in the PNP Property Books while the
CIA Secretariat shall transmit to PD, LSS the following documents
to start the streamlined payment process:
17) In case the delivery is rejected, the CIA through its Secretariat shall
prepare a letter for signature of the Chairman informing the
supplier of the rejected delivery with a directive to withdraw the
goods delivered. The approved Resolution shall be attached to the
letter addressed to the supplier;
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 178
18) For goods needing rectification or replacement of unit or whole lot,
the CIA Secretariat shall notify the supplier of the noted defect/s
with a directive to take appropriate action;
19) The CIA Chairman shall immediately endorse to the TWG the
rectified/replaced goods for the conduct of functionality test and
evaluation; and
b. General Provisions:
d) The NHQCIA, PROCIA, and NSUCIA are hereby vested with the
power to determine whether to accept the delivery of goods
based on the report of their respective TWGs that the goods are
complete as to quantity and in conformity with the approved
NAPOLCOM specifications and functionality;
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 179
in the interpretation of any provision relative to the tasks and
responsibilities of the Committee;
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 180
subject to applicable auditing and accounting procedures. As
such, yearly programming of funds shall be undertaken by the
Comptrollers/Budget Officers of the Offices concerned; and
c. Policies:
8) The supplier shall provide upon delivery three (3) original copies
of Delivery Receipt and Invoice Receipt which shall form part of
the record. No deliveries shall be accepted without the copies of
these documents. The original copy to be attached to the
Disbursement Voucher, the duplicate copy for SAO PNP wide
(For NHQ) or SAO (NSU/RHQ), and the triplicate copy for the
CIA;
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 181
9) The date to be stamped in the delivery receipts by the
warehouse PNCO should be the date of completion of the
delivery of goods, unless delivery in tranches is provided for. In
such case, the last day of delivery (tranche) shall be the date to
be used;
a) Export Permit;
b) Bill of Lading;
c) Packing list;
d) Proof of Payment of Import duties; and
e) Release Clearance from Bureau of Customs.
13) The CIA thru its Secretariat shall determine, based on the
Notice to Proceed or submitted documents, whether the goods
were delivered on time. If the liquidated damages reach the
equivalent of ten percent (10%) or more of the unperformed
obligation, no further action shall be taken except the
submission of report by the Chairman to HOPE and
recommend the termination/rescission of the contract. It shall
also verify if all the required documents are present upon the
delivery and in case of machine copy thereof, the document
must be duly authenticated by the office or agency that issued
the same, otherwise, the supplier shall execute a certification
under oath on the authenticity of the submitted documents;
15) The CIA shall convene to deliberate and evaluate the result of
the Functionality Test and Evaluation submitted by the TWG;
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 182
17) It shall not be obligatory on the part of the CIA to be present
during the actual conduct of the functionality test and
evaluation, however, it shall be obligatory for the Committee to
convene and deliberate, whether to accept or reject the
delivery, on the merits of the report submitted by its TWG;
a) Chairman;
b) Vice Chairman;
c) Member;
d) Member;
e) Member; and
f) Provisional Member (End-User).
3) Observers/Witnesses:
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 183
a) COA Representative;
b) DILG Representative;
c) NAPOLCOM Representative;
d) SAO PNP-Wide;
e) DC Management Representative;
f) DL Representative; and
g) Other NGOs.
7. PENAL CLAUSE:
8. REPEALING CLAUSE:
All rules, regulations and other issuances made by the PNP which are
inconsistent with this MC are deemed repealed, superseded, or amended
accordingly.
9. EFFECTIVITY CLAUSE:
This MC shall take effect after 15 days from filing a copy thereof at the UP
Law Center pursuant to Section 3, Chapter 2, Book Vll of EO No. 292, otherwise
known as the “Revised Administrative Code of 1987,” as amended.
Original Signed
RONALD M DELA ROSA
Police Director General
Chief, PNP
Annexes:
A, B, C, D & E
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 184
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 185
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 186
Annex B
Page 4 of 12
TRANSMITTAL SHEET
FOR: D, LSS
(Attn: C, Procurement Division)
DATE:
PARTICULARS
Reference: NHQ BAC Resolution No. _____________
Award of Contract to____________ with contract price of
__________________________________(Php _____________)
REQUESTED ACTION:
Please prepare the necessary documents to process the Purchase Order.
INCLUSIONS (3 SETS)
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 187
o. Eligibility Requirements
o.1 DTI Business Name/Registration Certificate from SEC or CDA
o.2 Mayor’s Permit
o.3 TIN as shown in BIR Form 2303/Tax Clearance
o.4 Statement of the prospective bidder that it is not blacklisted/Letter authorizing
the BAC or its duly authorized representative to verify the documents
submitted
o.5 Statement of the prospective bidder of all ongoing and completed
projects/Statement of Single Largest Similar Contract (SLSC)
o.6 Authority of Signatory/SPA
o.7 Audited Financial Statements
o.8 PhilG-EPS Registration/Appropriate Licenses/JV Agreement
o.9 Computation of NFCC/Credit Line Commitment
p. Bidders Technical and Financial Proposal/Bidders Tender
q. Abstract of Bids
r. Bid Evaluation Report
s. Minutes of Pre-Procurement Conference, if applicable
t. Minutes of Pre-Bid Conference, if applicable
u. Minutes of Opening of Bids
v. Copy of Brochures/Manuals, if applicable
w. Notice of Post Qualification
x. Post Qualification Report of TWG
y. Copy of Bid Document Payment Receipt
z. Results of Eligibility/Check Screening
NHQ BAC Secretariat Office: RECEIVED THE ABOVE DOCUMENTS IN
GOOD ORDER AND CONDITION
___________________________
Police Colonel (Signature Over Printed Name)
Head, BAC Secretariat DATE:__________ TIME: ___________
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 188
Annex C DURATION OF FUNCTIONALITY TEST AND EVALUATION
Page 5 of 12
a. PISTOL/RIFLE 14
b. MAGAZINE 14
c. AMMUNITION 14
II. TRANPORTATION (LAND) 7
III. COMMUNICATION EQUIPMENT 7
IV. IT EQUIPMENT 5
V. CRIMINALISTICS SECTION
a. ANTI-RIOT SHIELD 34
b. PROTECTIVE VEST, LEG, ARMS, AND GLOVES 34
PROTECTION
c. ANTI-RIOT DUTY HELMET 34
d. UNDERSHIRT VEST LEVEL III-A 34
e. WAISTCOAT VEST LEVEL III-A 36
f. ENHACED COMBAT HELMET 34
g. EXPLOSIVE DETECTION DOG 10
VI. MEDICAL, DENTAL AND CRIME LABORATORY EQUIPMENT 4
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 189
FIREARM (Pistol/Rifle)
ACTIVITY DURATION
I. RANDOM SAMPLING
Selection of Samples
II. TEST AND EVALUATION
Dimensional and Adverse Condition Test 1 CD
III. LABORATORY TEST
Submission and Processing of Sample to 10 CD
MIRDC-DOST
IV. PREPARATION OF REPORT 3 CD
TOTAL number of Days 14 CD
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 190
MAGAZINE (30-Rounder)
ACTIVITY DURATION
I. RANDOM SAMPLING
Selection of Samples
II. TEST AND EVALUATION
Dimensional and Adverse Condition Test 1 CD
III. LABORATORY TEST
Submission and Processing of Sample to 10 CD
MIRDC-DOST
IV. PREPARATION OF REPORT 3 CD
TOTAL number of Days 14 CD
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 191
AMMUNITION
ACTIVITY DURATION
I. RECEIVED NOTICE
Coordination to other Units and to Gov’t Arsenal for the
Availability of Facility
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 192
TRANSPORTATION EQUIPMENT (Land)
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 193
TRANSPORTATION EQUIPMENT (Land)
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 194
COMMUNICATIONS EQUIPMENT
TOTAL NO. OF HOURS (per item for Tests I-III) 12.25 to 15.25 hours
Note: Total number of hours for the tests does not include travel time.
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 195
COMMUNICATIONS EQUIPMENT
ACTIVITY TIME ALLOTMENT
Note: Total number of hours for the tests does not include travel time.
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 196
IT EQUIPMENT
TOTAL NO. OF HOURS (per item for Tests I-III) 5 days and 6.5 hours
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 197
TEST FOR ANTI-RIOT SHIELD
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 198
TEST FOR PROTECTIVE VEST, LEGS, ARMS AND GLOVES PROTECTION
DURATION
ACTIVITY *Minimum (for 5
samples)
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 199
TEST FOR UNDERSHIRT VEST III-A
DURATION
ACTIVITY *Minimum (for 6
samples)
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 200
TEST FOR WAIST COAT VEST LEVEL III-A WITH 2 UPGRADE
PLATE LEVEL IV
DURATION
ACTIVITY *Minimum (for 6 samples)
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 201
TEST FOR ENHANCED COMBAT HELMET
DURATION
ACTIVITY *Minimum (for 6 samples)
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 202
TEST FOR EXPLOSIVE DETECTION DOG
ACTIVITY DURATION
*Minimum (for 5
samples)
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 203
TIMELINE FOR MEDICAL DENTAL AND CRIME LABORATORY
EQUIPMENT
A DURATION OF TEST FOR ALL
SUBMITTED ITEMS
ACTIVITY (machine devices/system)
MINIMUM MAXIMUM
1. Delivered and received items were issue a
receipt by the CIA
1 CD 3 CD
2. Conduct of visual and functional
evaluation on the submitted items
a. Physical inspection
3. Visual and Dimension on all parts and 2 CD
1 CD
accessories
b. Functional Test and Evaluation
4. Deliberation and Submission of report 2 CD 3 CD
containing findings to CIA
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 204
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 205
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 206
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 207
GUIDELINES AND PROCEDURES IN THE INSPECTION AND ACCEPTANCE OF DELIVERED GOODS Page 208
Republic of the Philippines
NATIONAL POLICE COMMISSION
NATIONAL HEADQUARTERS PHILIPPINE NATIONAL POLICE
OFFICE OF THE CHIEF, PNP
Camp BGen Rafael T Crame, Quezon City
1. REFERENCES:
3. SITUATION:
4. PURPOSE:
5. DEFINITION OF TERMS:
j. Storage – the holding and keeping of supplies for future use, ready for
issue at any given time.
q. Warehouse Administrator – for the purpose of this MC, the SAO, shall
also be referred to as the Warehouse Administrator.
1) General Policy:
2) Location:
b. Human Resources:
Warehouse facilities shall have physical barriers and deterrents not just
to avoid mishaps but also to guard against unauthorized access. PNP
warehouses shall incorporate the following safety and security criteria:
2) Physical Security:
3) Perimeter Fence:
4) Interior Fencing:
a) The SAO shall be responsible for making sure that all doors and
windows are locked after the last employee leaves for the day;
and
8) Lighting:
e.1) Blue (white background): for civilian guest and visitors; and
a) The packing area (the area where finished products are put into
shipping cartoons) and the loading area (the area where
shipping cartoons are loaded onto the conveyance or into a
container) shall be accessible to authorized warehouse
personnel only;
c) Both the packing and loading areas shall be closed off to all
transit activities. Access to these zones must be restricted to
prevent this type of unauthorized foot-traffic;
3) The following shall compose the RHQ Inspection Team that will
inspect the Police Regional Offices and their subordinate units:
9. REPEALING CLAUSE:
Provisions of existing PNP issuances which are inconsistent with this MC,
in whole or in part, are deemed repealed, set aside, amended or modified
accordingly.
10. EFFECTIVITY:
This PNP MC shall take effect after 15 days from filing a copy thereof at
the UP Law Center in consonance with Section 3, Chapter 2, Book VII of Executive
Order 292 otherwise known as the “Revised Administrative Code of 1987,” as
amended.
Original Signed
RONALD M DELA ROSA
Police Director General
Chief, PNP
Distribution:
Command Group
D-Staff
P-Staff
RDs, PROs
Dirs, NSUs
a. Ensure that flooring surfaces are non-slippery and free of pits and dents;
b. Report loose or damaged flooring or other tripping hazards that need repair;
c. Do not leave box cutters or other sharp tools lying around;
d. Keep cords and wires off the floor;
e. Clean all spills immediately;
f. Do not leave items in aisles, on the floor, or stacked insecurely on flat
surfaces;
g. Do not block extinguishers, sprinklers or fire exits;
h. Create designated areas to store empty pallets and limit stack height to six
feet;
i. Buy enough trash bins to avoid debris accumulation and employee walk time;
j. Make sure someone is in charge of emptying trash bins regularly;
k. Block access to exposed or open loading dock doors;
l. Permit access to above-floor racks and shelves only if portable ladders or
appropriate lifting devices are available;
m. Ensure that daily and timely cleaning procedure is observed;
n. Avail of pest control services;
o. Conduct a Safety Audit;
p. Train personnel in handling goods or items stored in the warehouse;
q. Before entering the warehouse, personnel must wear their personal protective
gear such as, but not limited to gloves, face mask, plastic helmets, goggles, or
other garments or equipment designed to protect the person’s body from
injury;
r. Installation of a Ventilation System in all PNP Warehouses to maintain a
certain temperature inside;
s. Engineering Service to come up with a standard structural design of a
warehouse and/or storage for RSAO; and
t. Observe waste segregation in the disposal of trash (RA 9003).
2. Cleanliness:
4. Readiness to Emergency:
2. Minimum Requirements:
Authorized PNP personnel who are given access to WMS are categorized as
Users and Administrators. Only those identified under these two (2) categories
are allowed to access:
a) The authorized Officers are identified as users of WMS. These PCOs are
given access for purposes of viewing the graphical user interface (GUI) for
their appreciation as a tool in their assessment and analysis for decision-
making.
The primary data inputted into the WMS by the administrators shall be the
approved or endorsed items that are purchased, donated and turned-in.
5. Encoding of Data:
a) The designated administrator shall enter the data contained in the SDS into
the WMS;
c) In case of failure of entry, the other designated administrator will enter data
into WMS;
d) Use a device as an interface between the system and the item using either
barcode scanner or RFID;
e) The Operator shall scan or key enter the bar coded pallet ID to verify product,
quantity and condition;
f) In the entry of information, consider the stock keeping units (SKUs) that are
handled and stored, e.g., weight, dimensions, case pack, automatic ID labels
(bar codes, etc.), and inventory by location with manufacture date, lot code,
etc. SKUs may include basic materials, fabricated parts, assemblies, and
industrial and consumer finished goods, etc.; and
g. Key enter the stage, cross dock, QC movement and put away. Include entry of
warehouse storage locations, e.g., individual location number, picking
sequence, type of use (picking, reserve storage, etc.), type of storage (each,
case, pallet), location size or capacity, storage restriction (flammable,
hazardous, high value materials, outdoor, etc.), etc., Dock doors, e.g.,
individual number, etc.
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 235
Republic of the Philippines
NATIONAL POLICE COMMISSION
NATIONAL HEADQUARTERS, PHILIPPINE NATIONAL POLICE
OFFICE OF T HE CHIEF, PNP
Camp BGen Rafael T Crame, Quezon City
1. REFERENCES:
a. Section 26, Republic Act (RA) No. 6975 as amended by RA No. 8551;
b. Section 48, Chapter 12, Book I, EO 292, as amended, otherwise
known as The Administrative Code of 1987, on the subject “Official
Authorized to Convey Real Properties”;
c. Section 6 and 7 of EO No. 301, s. of 1987, entitled: “Decentralizing
Actions on Government Negotiated Contracts, Lease Contracts and
Records Disposal”;
d. PNP Memorandum Circular (MC) No. 2016-069 dated October 26,
2016, entitled: “Guidelines and Procedures on the Lease of PNP
Owned, Occupied, and Managed Lots, Buildings and Spaces”;
e. PNP MC No. 2017-038 dated June 1, 2017, entitled: “Amending
Paragraph 2 of PNP MC No. 2016-069” (Guidelines and Procedures
on the Lease of PNP Owned, Occupied, and Managed Lots, Buildings
and Spaces);
f. Memorandum of Agreement (MOA) between the PNP and the AFP
executed on July 25, 2008 on real properties in the name of the AFP
or PC/INP which are solely used and/or occupied by the PNP;
g. MOA between the PNP and the AFP executed on November 14, 2009
on real properties in the name of the AFP or PC/INP which are jointly
used by the PNP and the AFP;
h. Commission on Audit (COA) Policy Training and Technical Assistance
Facility (PTTAF) Manual on Lease of Lands, Buildings and Spaces;
i. COA Circular No. 88-282A;
j. Section 1.2.5, Chapter 1, Part 3 of Joint Circular No. 1 DBM-DENR-
DPWH Manual on Lease of Government Owned Building Space and
Lot by Private Sector;
k. Section 3 of DENR Administrative Order No. 98-20, dated May 20,
1998; and
l. Book IV, New Civil Code of the Philippines.
2. RATIONALE:
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 236
3. SITUATION:
4. PURPOSE:
a. Those lands titled in the name of the Philippine National Police and
Insular Government of the Philippine Island (IGPI), Philippine Island,
Commonwealth of the Philippines, Republic of the Philippines, and
Philippine Constabulary (PC)/Integrated National Police (INP) but
presently occupied by the PNP;
b. Those titled in the name of the Armed Forces of the Philippines (AFP)
but in the possession of the PNP and/or in joint use with the PNP
pursuant to the Memorandum of Agreement (MOA) between the AFP
and PNP dated July 25, 2008 and November 14, 2009;
5. DEFINITION OF TERMS:
n. Reserved Land - refers to public lands which were withheld back from
sale or any other kind of disposition and which shall only be utilized
for the exclusive purpose for which it was reserved by the President
through Presidential Proclamation.
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 238
6. GUIDELINES:
a. Procedures:
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 239
CONTRACT ADMINISTRATOR
Unit Office Designation
Chief, Logistics NHQ Contract
NHQ
Div, HSS Administrator
Logistics Officer, PRO Contract
PROs
RHSG Administrator
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 240
8) Upon identification of the items priority for auction, the Secretariat
Auction Committee shall prepare the Invitation to Bid (ITB). The
ITB must contain the following:
10) The Secretariat Auction Committee shall send a copy of the ITB to
prospective bidders by mail or personal service, if necessary.
14) The prospective bidders are allowed to withdraw their bids if made
on or before the deadline for the submission of bids. If made after
the deadline but before bid opening, withdrawal could be
undertaken with the approval of the Auction Committee.
15) The Auction Committee shall open the submitted bids at the time,
date and place set in the Invitation to Bid or as clarified during the
Pre-Bid Conference. Under the direction of the Auction
Committee, bidders or their authorized representatives may
witness the proceedings. To ensure transparency, the Auction
Committee shall invite any observers not known to any member of
the Committee and who have no interest in the auctioned
lots/buildings/spaces.
16) The Auction Committee shall open the first envelopes submitted
by the bidder containing eligibility and technical requirements
whether it complied with the bid requirements, such as
compliance with the prescribed bid proposal form. The Auction
Committee shall sign in the Bid Proposal Form immediately after it
was opened and announced in order to confirm compliance with
the requirements of the auction.
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 242
17) After opening all the first envelopes, the Auction Committee shall
only open the second envelopes of those bidders who passed the
minimum eligibility requirements.
19) The Auction Committee shall declare the bidder with the highest
bid as winning bidder. The winning bidder will be subjected to
background check by the Directorate for Intelligence for NHQ and
the Regional Intelligence Division for PROs. If the winning bidder
passed the background check or is cleared of any derogatory
information that would compromise the security and safety of the
Camp, a recommendation shall be endorsed to the Chief, PNP or
his duly authorized representative for Approval.
22) Within five days from the signing of contract, the D, HSS for NHQ
and RD for PROs shall submit a copy to the Director, Finance,
Collecting Officer and Unit Auditor/COA for their information and
appropriate action.
b. General Guidelines:
2) PNP lands which are not reserved nor donated with reversion
clause, regardless of source or status that were included in or
forming part of any development plan, whether national, regional or
provincial development plan, shall not also be leased to the private
sector. However, lands that were subsequently excluded from
camp development plan which were neither reserved nor donated
may be leased to private entities in accordance with this MC.
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 243
3) Before a lease of a government-owned building, space or lot may
be executed, public auction shall be conducted by the Auction
Committee.
5) All bids submitted after the deadline will not be accepted and the
Auction Committee shall record the date and time of the late
submission.
6) The prospective bidders may modify its bid provided that this is
done before the deadline for the submission and receipt of bids.
Where a bidder modifies its bid, it shall not be allowed to retrieve its
original bid but shall only be allowed to send another bid and
marked as a “modification” and shall be stamped “received” by the
Auction Committee. Any modified bid received after the deadline
shall not be considered.
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 244
(Note: In para 9a and 9b, leasehold improvement will be
determined by Engineering Service whether permanent or
temporary to avoid ambiguity on the number of years that a
contract may be granted.)
e) The contract shall take effect only upon the approval of the
Chief, PNP or his duly authorized representative.
10) Public auction shall be the only method for the award of
lease contracts pursuant to this MC.
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 245
12) Repairs or construction in the leased property may only be
undertaken upon written approval of the Chief, PNP or his duly
authorized representative.
13) The PNP reserves the right to accept or reject any or all bids, or
any part thereof or waive any defects contained thereon, not to
proceed with the bidding process or not to award any contract, or
award the contract to the bidder with the bid most advantageous to
the PNP.
7. PENALTY CLAUSE:
8. REPEALING CLAUSE:
9. EFFECTIVITY:
This MC shall take effect after 15 days from filing a copy thereof at the
University of the Philippines Law Center in consonance with Sections 3, Chapter 2,
Book VII of Executive Order No. 292, otherwise known as the “Revised
Administrative Code of 1987,” as amended.
Original Signed
OSCAR D ALBAYALDE
Police Director General
Chief, PNP
Distribution:
Command Group
P-Staff
D-Staff
Dirs, NSUs
ADIG, IAS
RDs, PROs
DDs, NCRPO
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 246
Annex A
LEASE CONTRACT
This CONTRACT OF LEASE is made and executed at the City of _____, this day of
_______________, 20__, by and between:
-AND-
(NAME OF LESSEE), Filipino and with residence and postal address at (Address),
hereinafter referred to as the LESSEE.
WITNESSETH; That
WHEREAS, the LESSOR agrees to lease-out the property to the LESSEE and the
LESSEE is willing to lease the same;
2. TERM: This term of lease is for TWO (2) YEARS from (Date) to (Date) inclusive.
Upon termination of this contract, another bidding shall be held in the renewal of the
same. The lessee, whose lease has just terminated, shall have the right to equal the
highest bid if he manifests such in writing not more than five (5) days from the
opening of the bids;
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 247
3. RENTAL RATE: The monthly rental rate for the leased premises shall be in
PESOS: AMOUNT IN WORDS (P 00,000.00), Philippine Currency and shall be
increased by _____ percent (__%) of the monthly Base Rental paid during the
preceding lease year. All rental payments shall be payable to the LESSOR.
4. DEPOSIT: That the LESSEE shall deposit to the LESSOR upon signing of this
contract and prior to move-in an amount equivalent to the rent for ________
MONTHS or the sum of_________ PESOS (P 00,000.00), Philippine Currency
wherein the two (2) months deposit shall be applied as rent for the 11th and 12th
months and the remaining one (1) month deposit shall answer partially
for damages and any other obligations, for utilities such as Water, Electricity, CATV,
Telephone, Association Dues or resulting from violation(s) of any of the provision of
this contract.
6. SUB-LEASE: The LESSEE shall not directly or indirectly sublet, allow or permit
the leased premises to be occupied in whole or in part by any person, form or
corporation, neither shall the LESSEE assign its rights hereunder to any other
person or entity and no right of interest thereto or therein shall be conferred on or
vested in anyone by the LESSEE without the LESSOR'S written approval.
7. PUBLIC UTILITIES: The LESSEE shall pay for its telephone, electric, cable TV,
water, Internet, association dues and other public services and utilities during the
duration of the lease.
9. LESSOR'S RIGHT OF ENTRY: The LESSOR or its authorized agent shall after
giving due notice to the LESSEE shall have the right to enter the premises in the
presence of the LESSEE or its representative at any reasonable hour to examine the
same or make repairs therein or for the operation and maintenance of the building or
to exhibit the leased premises to prospective LESSEE, or for any other lawful
purposes which it may deem necessary.
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 248
condition as the same is now, ordinary wear and tear expected devoid of all
occupants, movable furniture, articles and effects of any kind. Non-compliance with
the terms of this clause by the LESSEE will give the LESSOR the right, at the latter's
option, to refuse to accept the delivery of the premises and compel the LESSEE to
pay rent therefrom at the same rate plus Twenty Five (25) % thereof as penalty until
the LESSEE shall have complied with the terms hereof. The same penalty shall be
imposed in case the LESSEE fails to leave the premises after the expiration of this
Contract of Lease or termination for any reason whatsoever.
11. COMPLIANCE WITH COA CIRCULAR NO. 88-282A: The rights and
obligations of both parties as provided in paragraph 2.2 of Commission on Audit
Circular No. 88-282A shall likewise form part of the Lease Contract.
12. TERMINATION CLAUSE: The LESSEE binds himself to all the foregoing and
the following provisions of this Contract coupled with all the existing Laws, Rules and
Regulations existing within the Philippine National Police.
The need for a demand to vacate subject premises, should this Contract end
due to any cause as enumerated in this contract or law, is no longer required and the
LESSOR could summarily evict the LESSEE and subject the latter to criminal, civil or
administrative charges if liable.
13. JUDICIAL RELIEF: Should any one of the parties herein be compelled to seek
judicial relief against the other, the losing party shall pay an amount of One Hundred
(100) % of the amount claimed in the complaint as attorney's fees which shall in no
case be less than P50,000.00 pesos in addition to other cost and damages which the
said party may be entitled to under the law. The venue for any judicial relief shall be
in the proper courts of Quezon City only.
14. This CONTRACT OF LEASE shall be valid and binding between the parties,
their successors-in-interest and assigns.
IN WITNESS WHEREOF, parties herein affixed their signatures on the date and
place above written.
_____________________________ _____________________________
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 249
ACKNOWLEDGEMENT
Known to me and to me known to be the same persons who executed the foregoing
instrument and acknowledged to me that the same is their free and voluntary act and
deed.
This instrument consisting of ____ page/s, including the page on which this
acknowledgement is written, has been signed on each and every page thereof by the
concerned parties and their witnesses, and and sealed with my notarial seal.
WITNESS MY HAND AND SEAL, on the date and place first above written.
Notary Public
Doc. No.______;
Page No. ______;
Book No.______;
Series of 20___.
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 250
Annex B
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 251
Annex C
Advertisement/Posting of the
7 Calendar Days
Invitation to Bid
Pre-Bid Conference
1 Calendar Day
Approval of Resolution/Issuance of
1 Calendar
Notice Day
of Award 1 Calendar Day
PNP MC ON LEASE OF PNP-OWNED, OCCUPIED AND MANAGED LOTS, BUILDINGS AND SPACES Page 252
INFRASTRUCTURE AND FACILITIES
MANAGEMENT
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 253
\
Republic of the Philippines
NATIONAL POLICE COMMISSION
NATIONAL HEADQUARTERS, PHILIPPINE NATIONAL POLICE
OFFICE OF THE CHIEF, PNP
Camp BGen Rafael T Crame, Quezon City
1. REFERENCES:
2. RATIONALE:
3. SITUATION:
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 254
It is toward this end that a sound, well-defined, and more effective policy
containing procedures and guidelines in the inspection, evaluation and acceptance
of all newly-completed infrastructure projects is crafted for subsequent adoption and
implementation in the PNP. This also aims to protect and strengthen the duties,
responsibilities, and functions of the Inspection Committee and its support groups.
4. PURPOSE:
5. DEFINITION OF TERMS:
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 255
inspection and evaluation, stating the defects and deficiencies noted in
the preceding inspection and evaluation.
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 256
production/manufacture, or construction of the project or undertaking
as described by the specifications in the contract or order).
6. GUIDELINES:
a. Procedures:
As defined in this MC, the HOPE is also the HIO during the
implementation stage, unless the HOPE opted to designate a duly
authorized HIO.
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 257
Chief, Infrastructure Division, ES Chairperson
Asst. Chief, Infrastructure and Facilities Vice Chairperson
Management Division, DL
Asst. Chief, Infrastructure Division, ES Member/Head
Secretariat
SAO PNP-Wide Member
End-user (LOG/BFO) Member
NAPOLCOM Representative Observer
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 258
b) Procedures for the Issuance of CC:
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 259
developments, and other similar
structures.
b.2) The IC shall be required to submit corresponding report
within 10 days from the receipt of a memorandum directive
from the HIO. It shall indicate in the report the construction
defects/deficiencies/failures detected, if any, and the
corresponding measures that shall be undertaken by the
contractor to correct the same. If no defects and
deficiencies are detected, the IC shall submit an FCIR.
b.3) In case, there are noted defects/deficiencies, failures
based on the Inspection Report, the HIO shall issue an
NDDF and RCRW to the contractor, with the instruction to
commence the repair works within seven days upon receipt
of the notice and to complete the works not exceeding 30
days.
b.4) The Contractor may be granted extension if under the
circumstances an additional time is needed because of the
complexity of the needed repair works, provided that the
contractor shall submit its request for extension with valid
justification to the HIO.
b.5) Upon receipt of a written advice/notice from the contractor
that the noted defects/deficiencies/failures have already
been corrected, the HIO within the period of three days
shall direct the IC to conduct inspection and evaluation of
result/compliance of the RCRW of the project. The IC shall
submit its report within seven days from receipt of the
directive from the HIO. An FCIR shall be submitted if all the
noted defects have been satisfactorily corrected.
Otherwise, HIO shall issue a Final Notice for Correction to
the contractor which shall be complied within the period of
90 days.
b.6) In case of failure of the contractor to correct the
aforementioned defects, the HIO shall order the repair to
be undertaken by another contractor consistent with the
requirement of the existing rules on procurement. If the
contractor fails to comply with the correction notice, the
procuring entity shall forfeit its performance security,
subject the contractor’s property to attachment or
garnishment proceedings or disqualify it from participating
in future PNP procurements/biddings.
b.7) In case the IC issued an FCIR, the HIO shall, within seven
days from receipt of the FCIR, issue the CC of the project,
certifying that the project has been satisfactorily completed
as of the date indicated in the FCIR.
b.8) The one-year Defects Liability Period (DLP) shall
commence the day after the issuance of the CC by the
HIO.
b.9) If the IC has found no defects and deficiencies during the
first inspection, the committee shall duly reflect this in the
FCIR.
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 260
b.10) The standard formats for the CC, CIR, NDDF and FCIR
(NHQ/NSUs & PROs), of the OICC shall be adopted
(Annexes “C” to “I” – Forms).
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 261
90 days from receipt of the notice by the contractor, to the
satisfaction of the same IC. In case of failure or refusal to
comply with the contractor’s mandate, the Procuring Entity
(PE) shall undertake such repair works and shall be entitled
to full reimbursement of expenses incurred therein upon
demand. If the contractors still fail to comply with the
foregoing, the PE shall forfeit the performance security,
subject its property to attachment and garnishment
proceedings, and perpetually disqualify it from participating
in future PNP procurements/biddings.
b.3) Upon receipt of advice from the contractor that the defects/
deficiencies/failures in the said notice have been corrected,
the HIO shall direct the IC to conduct inspection and
evaluation of result/compliance of the RCRW and to submit
its report within seven days. If the report shows that the
defects/deficiencies/failures have been satisfactorily
corrected/rectified, the report is considered as the FAIR.
Otherwise, the provisions of Sec. 62.2.1 to Sec. 62.2.4 of
the 2016 Revised IRR of RA 9184 shall be applied.
b.4) Upon the receipt of the FAIR, the HIO shall issue the CA.
b.5) If no defects/deficiencies/failures are noted by the IC upon
the first inspection prior to the issuance of the CA, the
committee shall duly note this in the FAIR with appropriate
commendation/award to the contractor and the OICC.
b.6) The standard formats for the CA, AIR (NHQ/NSUs &
PROs), FAIR (NHQ/NSUs & PROs), FCR of OICC, and the
FAIR of the OICC shall be adopted (Annexes “J” to “R” –
Forms).
b. Responsibilities:
1) TDL
a) Act as over-all supervisor in the implementation of this MC;
b) Provide logistical support for the implementation of this MC; and
c) Perform other tasks as directed.
2) TDC
a) Provide fund support for the implementation of this MC; and
b) Perform other tasks as directed.
3) D, ES
a) Provide technical personnel in the implementation of this MC;
b) Render appropriate reports to DL on the implementation of this
MC; and
c) Perform other tasks as directed.
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 262
c) Perform other tasks as directed.
5) Inspection Committee
a) To do all acts necessary to accomplish the task of the
committee as provided for in this MC, in so far as it will be
consistent with the rules, statues, issuance, orders, and other
laws of the Philippines;
b) Conduct inspection and evaluation of the project but not limited
to scope of work, plans/design and specifications;
c) Prepares FCIR and CIR report for the HIO; and
d) Perform other tasks as directed.
6) Officer-In-Charge of Construction
a) Supervise and monitor infrastructure projects implementation in
accordance with plans and specification; and
b) Perform other tasks as directed.
7. PENALTY CLAUSE:
8. REPEALING CLAUSE:
All existing PNP Policies and Issuances inconsistent with this MC are
hereby repealed.
9. EFFECTIVITY:
This MC shall take effect after 15 days from filing a copy thereof at the UP
Law Center in consonance with Section 3, Chapter 2, Book VII of Executive Order
No. 292, otherwise known as the “Revised Administrative Code of 1987,” as
amended.
Original Signed
OSCAR D ALBAYALDE
Police Director General
Chief, PNP
Distribution:
Command Group
D- Staff
P-Staff
Dirs, NSUs
RDs, PROs
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 263
ANNEX “A”
N 1
Failure of the Contractor to comply with the
A A
correction Notice, the Procuring Entity shall
R END
forfeit its Performance Security. R
T T
1
A
R
T
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 264
ANNEX “B”
1 1
A A
R R END
T T
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 265
ANNEX “C”
LETTERHEAD
__________________
DATE
CERTIFICATE OF COMPLETION
Contractor : ___________________________________
This is to certify that the above stated project has been satisfactorily completed on
_____________________(date)______________ in accordance with the Plans and
Specifications of the Contract based on the Final Completion Inspection Report of
the Inspection Committee dated _______________________.
This certification does not relieve the Contractor of his obligations and
responsibilities in undertaking repair works on any defects/deficiencies that may
occur in any section of the project during the one-year Defects Liability Period
starting from the date of completion as herein stated. Neither is he relieved of his
obligations and responsibilities pursuant to the provisions of RA No. 9184.
__________________________
Head of the Implementing Office
Conforme:
__________________________
Contractor
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 266
ANNEX “D”
LETTERHEAD
(NHQ)
__________________
DATE
Contractor :______________________________________
Recommendation:
_________________________________________________________________________
_________________________________________________________________________
______________________________________________________________________
_____________________________ _____________________________
C, ID, ES/Chairperson Asst. Chief, IFMD, DL/Vice Chairperson
______________________________ ______________________________
Asst. Chief, ID, ES/Member/Head Secretariat SAO PNP Wide/Member
____________________________ _______________________________
End-User (LOG/BFO)/Member NAPOLCOM Representative/Observer
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 267
ANNEX “E”
LETTERHEAD
(NSUs)
__________________
DATE
Contractor :______________________________________
Recommendation:
_________________________________________________________________________
_________________________________________________________________________
______________________________________________________________________
__________________________________ ___________________________
Logistics Officer/Chairperson ES Technical PCO/Vice Chairperson/
Head Secretariat
__________________________________ ___________________________
SAO End-User/Member NAPOLCOM Representative/Observer
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 268
ANNEX “F”
LETTERHEAD
(PRO)
__________________
DATE
Contractor :______________________________________
Recommendation:
_________________________________________________________________________
_________________________________________________________________________
______________________________________________________________________
__________________________________ ___________________________
Deputy C, RLRDD/Chairperson RPMU, ES/Technical Personnel/
Vice Chairperson/Head Secretariat
__________________________________ ___________________________
Chief, Management Sec, ORCD/Member RSAO/Member
__________________________________ _____________________________
End-User Representative/Member NAPOLCOM Representative/Observer
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 269
ANNEX “G”
LETTERHEAD
(NHQ)
__________________
DATE
Contractor :______________________________________
_____________________________ _____________________________
C, ID, ES/Chairperson Asst. Chief, IFMD, DL/Vice Chairperson
__________________________________ ______________________________
Asst. Chief, ID, ES/Member/ Head Secretariat SAO PNP Wide/Member
____________________________ ____________________________
End-User (LOG/BFO)/Member NAPOLCOM Representative/Observer
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 270
ANNEX “H”
LETTERHEAD
(NSUs)
__________________
DATE
Contractor :______________________________________
__________________________________ _______________________________
Logistics Officer/Chairperson ES/Technical PCO/Vice Chairperson/
Head Secretariat
__________________________________ ______________________________
SAO End-User/Member NAPOLCOM Representative/Observer
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 271
ANNEX “I”
LETTERHEAD
(PRO)
__________________
DATE
Contractor :______________________________________
__________________________________ ___________________________
Deputy C, RLRDD/Chairperson RPMU, ES/Technical Personnel/
Vice Chairperson/Head Secretariat
__________________________________ ___________________________
Chief, Management Sec, ORCD/Member RSAO/Member
__________________________________ _____________________________
End-User Representative/Member NAPOLCOM Representative/Observer
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 272
ANNEX “J”
LETTERHEAD
__________________
DATE
CERTIFICATE OF ACCEPTANCE
Contractor :__________________________________
Based on the Final Acceptance Inspection Report of the Inspection Committee dated
______________, after the one-year Defects Liability Period, the project is free from
defects/deficiencies which are due to poor workmanship, use of poor quality
materials and non-compliance with the Plans and Specifications of the Contract.
In view hereof, we hereby certify that the project is accepted by (Name Implementing
Office) on __________.
__________________________
Head, Implementing Officer
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 273
ANNEX “K”
LETTERHEAD
(NHQ)
__________________
DATE
Contractor :______________________________________
Recommendation:
_________________________________________________________________________
_________________________________________________________________________
______________________________________________________________________
_____________________________ _____________________________
C, ID, ES/Chairperson Asst. Chief, IFMD, DL/Vice Chairperson
__________________________________ ____________________________
Asst. Chief, ID, ES/Member/Head Secretariat SAO PNP Wide/Member
____________________________ ____________________________
End-User (LOG/BFO)/Member NAPOLCOM Representative/Observer
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 274
ANNEX “L”
LETTERHEAD
(NSUs)
__________________
DATE
Contractor :______________________________________
Recommendation:
_________________________________________________________________________
_________________________________________________________________________
______________________________________________________________________
__________________________________ ___________________________
Logistics Officer/Chairperson ES/Technical PCO/Vice Chairperson/
Head Secretariat
__________________________________ ___________________________
SAO End-User/Member NAPOLCOM Representative/Observer
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 275
ANNEX “M”
LETTERHEAD
(PRO)
__________________
DATE
Contractor :______________________________________
Recommendation:
_________________________________________________________________________
_________________________________________________________________________
______________________________________________________________________
__________________________________ ___________________________
Deputy C, RLRDD/Chairperson RPMU, ES/Technical Personnel
/Vice Chairperson/Head Secretariat
__________________________________ ___________________________
Chief, Management Sec, ORCD/Member RSAO/Member
__________________________________ _____________________________
End-User Representative /Member NAPOLCOM Representative/Observer
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 276
ANNEX “N”
LETTERHEAD
(NHQ)
__________________
DATE
Contractor :______________________________________
We, the undersigned members of the Inspection Committee, conducted a final inspection on
the above stated project after the one-year Defects Liability Period, and found the project to
be free from any defects/deficiencies that are due to poor workmanship, use of poor quality
materials and non-compliance with Plans and Specification of the Contract.
_____________________________ _____________________________
C, ID, ES/ Chairperson Asst. Chief, IFMD, DL/Vice Chairperson
__________________________________ ______________________________
Asst. Chief, ID, ES/Member/Head Secretariat SAO PNP Wide/Member
____________________________ ____________________________
End-User (LOG/BFO)/Member NAPOLCOM Representative/Observer
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 277
ANNEX “O”
LETTERHEAD
(NSUs)
__________________
DATE
Contractor :______________________________________
We, the undersigned members of the Inspection Committee, conducted a final inspection on
the above stated project after the one-year Defects Liability Period, and found the project to
be free from any defects/deficiencies that are due to poor workmanship, use of poor quality
materials and non-compliance with Plans and Specification of the Contract.
__________________________________ ___________________________
Logistics Officer/Chairperson ES/Technical PCO/Vice Chairperson/
Head Secretariat
__________________________________ ___________________________
SAO End-User/Member NAPOLCOM Representative/Observer
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 278
ANNEX “P”
LETTERHEAD
(PRO)
__________________
DATE
Contractor :______________________________________
We, the undersigned members of the Inspection Committee, conducted a final inspection on
the above stated project after the one-year Defects Liability Period, and found the project to
be free from any defects/deficiencies that are due to poor workmanship, use of poor quality
materials and non-compliance with Plans and Specification of the Contract.
__________________________________ ___________________________
Deputy C, RLRDD/Chairperson RPMU, ES/Technical Personnel/
Vice Chairperson/Head Secretariat
__________________________________ ___________________________
Chief, Management Sec, ORCD/Member RSAO/Member
__________________________________ _____________________________
End-User Representative /Member NAPOLCOM Representative/Observer
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 279
ANNEX “Q”
LETTERHEAD
__________________
DATE
Contractor :______________________________________
Recommendations: ___________________
_________________________ ____________________________
Contractor/Representative OICC
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 280
ANNEX “R”
LETTERHEAD
__________________
DATE
Contractor :______________________________________
Recommendations: ____________________
_________________________ ____________________________
Contractor/Representative OICC
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 281
ANNEX “S”
(LETTER HEAD)
NOTICE OF DEFECTS/DEFICIENCIES/FAILURE
(Date of Issuance)
Based on the Inspection Report for the (Project Name and Location), you are
hereby directed to commence the repair works within seven (7) days and to
complete the works within ninety (90) days on the following defects and deficiencies.
(Name)
(Designation)
Head, Implementing Office
_______________________
Signature over Printed Name
MC ON THE ISSUANCE OF CERTIFICATE OF COMPLETION AND ACCEPTANCE FOR NEWLY CONSTRUCTED INFRA PROJECTS Page 282
Republic of the Philippines
NATIONAL POLICE COMMISSION
NATIONAL HEADQUARTERS PHILIPPINE NATIONAL POLICE
OFFICE OF THE CHIEF, PNP
Camp BGen Rafael T Crame, Quezon City
1. REFERENCES:
2. RATIONALE:
3. SITUATION:
4. PURPOSE:
This MC sets forth the policies and guidelines on the proper utilization,
conservation and reduction of water and electricity usage.
f. Water and Electricity Audit Team (WEAT) – refers to the group tasked
to implement Administrative Order No. 103 (s. 2004) and AO 110 (s.
2004).
6. GUIDELINES:
Position Designation
C, IFMD, DL Team Leader
ES Representative (Electrical Assistant Team Leader
Engineer)
12 representatives from ES, Members
DL, and HSS who are either
Electrical Engineer or with
electrical knowledge
Note:
Please see Annex “C” – DPRM Letters Orders for NHQ EMT
b. General Guidelines:
2) Water Conservation:
3) Electricity Conservation:
7. PENALTY CLAUSE:
8. REPEALING CLAUSE:
This Circular shall take effect after 15 days from the filing of a copy hereof
at the University of the Philippines Law Center in consonance with Section 4 of
Chapter 2, Book VII of Executive Order No. 292, otherwise known as “The Revised
Administrative Code of 1987,” as amended.
Original Signed
RONALD M DELA ROSA
Police Director General
Chief, PNP
Distribution:
Command Group
D-Staff
P-Staff
Dirs, NSUs
RDs, PROs
IG, IAS