S.N Billable/ Non Billable: DC BC DN Dept. Code CA0 SA0 Dept. Code Bldg. Code Dwg. No

The document contains details of projects for different departments including architecture, mechanical, electrical, and HVAC. For each project, it lists information such as billable status, department code, building code, drawing number, department, and actual and planned dates. It shows a total of 41 projects with status, codes, numbers, departments, hours worked, and planned versus actual dates.

Uploaded by

haricv019
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views

S.N Billable/ Non Billable: DC BC DN Dept. Code CA0 SA0 Dept. Code Bldg. Code Dwg. No

The document contains details of projects for different departments including architecture, mechanical, electrical, and HVAC. For each project, it lists information such as billable status, department code, building code, drawing number, department, and actual and planned dates. It shows a total of 41 projects with status, codes, numbers, departments, hours worked, and planned versus actual dates.

Uploaded by

haricv019
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

S.N BILLABLE/ DC BC DN DEPT.

CODE CA0 SA0


NON BILLABLE DEPT. CODE BLDG. CODE DWG. NO.
1 BILLABLE QS DBR ARCH 21-Aug-20
2 BILLABLE QS ARCH 13-Aug-20
3 BILLABLE QS ARCH 10-Aug-20
4 BILLABLE QS ARCH 10-Aug-20
5 MECH PR 601 MECH 12-Aug-20
6 MECH PR 601 MECH 12-Aug-20
7 MECH PR 601 MECH 12-Aug-20
8 BILLABLE QS ARCH 19-Aug-20
9 BILLABLE QS ARCH 19-Aug-20
10 BILLABLE ARCH GH 17 ARCH
11 BILLABLE ARCH GH 17 ARCH
12 BILLABLE ARCH GH 17 ARCH 14-Aug-20
13 BILLABLE ELE GH DOC ELE
14 BILLABLE ELE GH DOC ELE
15 BILLABLE ELE GH 17 ELE
16 BILLABLE ARCH ADM 104 ARCH 20-Aug-20
17 MECH PR 601 MECH 5-Aug-20
18 MECH PR 601 MECH 4-Aug-20
19 MECH PR 601 MECH 7-Aug-20
20 BILLABLE HVAC PR HVAC 7-Aug-20
21 BILLABLE HVAC PR HVAC 7-Aug-20
22 BILLABLE HVAC PR HVAC 10-Aug-20
23 BILLABLE MECH PR 701 MECH 3-Aug-20
24 MECH PR 601 MECH 13-Aug-20
25 MECH PR 601 MECH 24-Aug-20
26 MECH PR 601 MECH 24-Aug-20
27 MECH PR 601 MECH 24-Aug-20
28 HVAC PR HVAC 12-Aug-20
29 HVAC PR HVAC 21-Aug-20
30 HVAC PR HVAC 21-Aug-20
31 HVAC PR HVAC 31-Aug-20
32 HVAC PR HVAC 28-Aug-20
33 HVAC PR HVAC 5-Aug-20
34 HVAC PR HVAC 6-Aug-20
35 HVAC PR HVAC 10-Aug-20
36 BILLABLE HVAC PR HVAC 14-Aug-20
37 BILLABLE HVAC PR HVAC 21-Aug-20
38 BILLABLE HVAC PR HVAC 21-Aug-20
39 BILLABLE HVAC PR HVAC 31-Aug-20
40 BILLABLE HVAC PR HVAC 28-Aug-20
41 BILLABLE HVAC PR HVAC 18-Aug-20
T0 R0 R1 R2 R3 R4 R5 R6 R7 R8 ACTUAL ACTUAL PLANNED FINISH PLANNED
MANHOURS MANHOURS
21-Aug-20 7
13-Aug-20 7
7-Aug-20 10-Aug-20 7
11-Aug-20 10-Aug-20 7
12-Aug-20 27
12-Aug-20 28
12-Aug-20 29
19-Aug-20 7
19-Aug-20 7
7
7
14-Aug-20 14-Aug-20 7
19-Aug-20 19-Aug-20 7
10-Aug-20 4 7
7
20-Aug-20 7
5-Aug-20 5-Aug-20 14
4-Aug-20 4-Aug-20 15
7-Aug-20 7-Aug-20 16
7-Aug-20 7-Aug-20 103
7-Aug-20 7-Aug-20 103
10-Aug-20 10-Aug-20 103
3-Aug-20 3-Aug-20 8
13-Aug-20 13-Aug-20 25
24-Aug-20 47
24-Aug-20 48
24-Aug-20 49
12-Aug-20 12-Aug-20 83
21-Aug-20 91
21-Aug-20 92
31-Aug-20 101
28-Aug-20 102
5-Aug-20 5-Aug-20 71
6-Aug-20 6-Aug-20 72
10-Aug-20 10-Aug-20 79
14-Aug-20 14-Aug-20 103
21-Aug-20 103
21-Aug-20 103
31-Aug-20 103
28-Aug-20 103
18-Aug-20 18-Aug-20 103
P WEEK A WEEK P Day A Day P Rev's A Rev's

34 5
33 4
33 32 1 5
33 33 1 2
33 3
33 3
33 3
34 3
34 3

33 33 5 5
34 3 1 1
33 1

34 4
32 32 3 3
32 32 2 2
32 32 5 5
32 32 5 5
32 32 5 5
33 33 1 1
32 32 1 1
33 33 4 4
35 1
35 1
35 1
33 33 3 3
34 5
34 5
36 1
35 5
32 32 3 3
32 32 4 4
33 33 1 1
33 33 5 5
34 5
34 5
36 1
35 5
34 34 2 2