Tutorial Availability
Tutorial Availability
Coal
PIT B INCOR
Effektive Availability Target Prod'ty Kebutuhan Dump
Unit Number of unit Eff Hours Plan PA Plan UoA Working Hours
Day Hours ton/hours Truck
CAT 329 (REP 23) 1 24 30 90.00% 71.94% 648.00 466.20 200.00 8
CAT 329 (REP 24) 1 24 30 90.00% 71.94% 648.00 466.20 200.00 8
unit cleaning
Cat 320 ( REP 11)
Cat 320 ( REP 75 )
233,100 1,200
233,100 800
163,170 1,100
163,170 1,200
104,561 800
104,561 800
104,561 800
1,001,661.52 1,091
654,641.28 1,000.0
307,692.00 1,150.0
290,951.68 800.0
85,632.00 800.0
1,253,284.96
93,240 19,000
93,240 19,000
93,240.00
99,860.04 19,000
99,860.04
PT RYAN EKA PRATAMA
JOB SITE SAMBOJA
MONTHLY PLAN JUL
OVER BURDEN
PIT B INKOR
Number Effektive
No Unit Eff Hours Plan PA
of unit Day
1 PC 1250 1 18 27 88.00%
2 PC 1250 1 18 27 88.00%
3 CAT 385 (REP 26) 1 18 27 88.00%
4 CAT 385 (REP 27 1 18 27 88.00%
5 CAT 345 1 18 27 88.00%
6 CAT 345 1 18 27 88.00%
7 PC 400 1 18 27 88.00%
7 88.00%
Number Effektive
No Unit Eff Hours PA
of Unit Day
1 HD 775F 12 18 27 88.00%
2 HD 465 4 18 27 88.00%
3 ADT CAT 740 8 18 27 88.00%
Average : 24 88.00%
Catatan :
unit spare
Coal
PIT B INCOR
Number Effektive
No Unit Eff Hours Plan PA
of unit Day
1 CAT 329 (REP 23) 1 18 27 87.00%
2 Cat 329 (REP 24) 1 18 27 87.00%
1 87.00%
Number Effektive
No Unit Eff Hours PA
of Unit Day
1 DT NISSAN CWB (TAILGATE) 9 18 27 88.00%
2 DT NISSAN CWB (TAILGATE) 8 18 27 88.00%
Average : 17 88.00%
unit cleaning
1 Cat 320 (rep 11)
2 Cat 320
Target : OB 1,069,000
COAL 102,000
S/R 10.48
THLY PLAN JULI 2010
Total day of Week : 31 Day 24.00
Rain & Slippery : 0.00 Hour eff hours 15.42 hrs/day
Delay & idle 80.27 Hour wh/month 462.53 hrs/month
eff days 19.27 day
Target
Availability Working Kebutuhan Production Distance
Plan UoA Prod'ty
Hours Hours Dump Truck (Bcm) (m)
bcm/hours
73.00% 491.04 427.46 500.00 5 213,731 1.0
73.00% 491.04 427.46 500.00 5 213,731 1.0
73.00% 491.04 427.46 450.00 3 192,358 1.0
73.00% 491.04 427.46 450.00 3 192,358 1.0
73.00% 491.04 427.46 200.00 3 85,493 1.0
73.00% 491.04 427.46 200.00 3 85,493 1.0
73.00% 491.04 427.46 200.00 2 85,493 1.0
73.00% 2,500.00
Target 24 1,068,657.48
Availability Working Prod'ty Target Prod'ty Production Distance
Plan UoA
Hours Hours bcm/hours/D bcm/hours (Bcm) (m)
87.05% 5,892.48 5,129.56 T 83.33 1,000.00 427,462.99 1.5
87.05% 1,964.16 1,709.85 225.00 900.00 384,716.69 1.5
87.05% 3,928.32 3,419.70 75.00 600.00 256,477.80 1.5
87.05% 2,500.00 1,068,657.48
Target
Availability Working Kebutuhan Distance
Plan UoA Prod'ty Production (Ton)
Hours Hours Dump Truck (m)
ton/hours
73.00% 485.46 422.61 120.00 9 50,713 19
73.00% 485.46 422.61 120.00 8 50,713 19
73.00% 240.00 17 101,425.31
Target
Availability Working Target Prod'ty
Plan UoA Prod'ty Production (Ton) Distance (m)
Hours Hours ton/hours
ton/hours/DT
73.00% 4,419.36 3,847.17 13.33 120.00 51,295.56 19
73.00% 3,928.32 3,419.70 15.00 120.00 51,295.56 19
73.00% 13.33 240.00 102,591.12
bcm
tonnes
hrs/month 485.7534
MOHH : Mechine On Hour
Effesiensi Hour = availa
IDLE : hambatan yang tidak bisa di kontrol
- Hujan
- Demo
- Costumer problem
- dll
AVAILABILITY
DELAY : Hambatan yang bisa di kontrol stb
- Rest time
- Change Shift
- Blasting (klo ada) IDLE
- Survey
- Fuel & Lub
- Travel
- dll
Kapasitas vessel
Jarak
Kecepatan
loading time = ((( capasitas vessel * machine availability ) / bucket capasity ) * cycle time loader ) / (60 * bucket excavating
Dumping time
Spoting time
Hauling time = ((( 2 * jarak)) / kecepatan) *60
total time = loading time + dumping time + spoting time + hauling time
effective hours = 24 x PA x UA
Working hours = eff.hours x day
Effective day = Working hours / 24
Effesiensi Hour = availabiity - breakdown CONTOH :
PA = MOHH - B/D
MOHH
MOHH
UA = AVAILABILITY - STB
AVAILABILITY
- MOHH = 24 Jam
- Availability = 20 Jam
DELAY - B/D = 4 Jam
- stb = 4
PA = 24 - 4
24
= 0.83 %
UA = 20 - 3
20
= 0.85%