0% found this document useful (0 votes)
290 views

04 - SC-Exercise-ANSI PDF

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
290 views

04 - SC-Exercise-ANSI PDF

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Short-Circuit ANSI Example 1

U1
ID = Cable2 2000 MVAsc etap
115 kV

CB3
Bus1 115 kV

CB4 CB7
Gen1
Gen3 T1
20 MW
25 MW 30/20/10 MVA
7.5/7.5/14.5 %Z T2 20 MVA
6.5 %Z

CB8
CB5 CB6
CB24 Bus4 13.8 kV
Bus3 CB11
Bus2
13.8 kV 13.8 kV
CB9 CB10 SPFdr1

LUMP3 Line1
LUMP1 AL 4 mile
18 MVA 8 MVA
Pansy #1

Bus9
7.967 kV

2 MVA
LUMP4

ETAP Workshop Notes ©1996-2010 Operation Technology, Inc. Page 1 of 7


Short-Circuit ANSI Example 1

Bus3
Bus4

T3 5 MVA T4
5 MVA
6.5 %Z 7 %Z

CB15 CB12
Bus5
4.16 kV Bus6 4.16 kV
CB16 CB19
CB1 CB14 CB13

NO
3-1/C 750

CU
Cable1 T5 2 MVA
Syn1 7 %Z
1500 ft Mtr5
2x2000 HP Bus7
CB23
2000 HP
0.48 kV

4.16 kV
Bus8

CB17 CB18
Cmtr1

Load1

Mtr1 2 MVA
4x500 HP

ETAP Workshop Notes ©1996-2010 Operation Technology, Inc. Page 2 of 7


Short-Circuit ANSI Example 1

Data Entry for SC


1. Open the ETAP file – SCExample1/SC-ANSI-Example-1
2. Enter the following data to the components for SC calculations

Element Parameters
U1 3-phase: MVAsc = 2000, X/R = 55; 1-Phase: MVAsc=1750, X/R = 48
Gen1 & Gen3 Subtransient Model, Round-rotor, Use Typical Data. Xd” tolerance = 5%
(this option is in “Imp/Model” page)
Syn1 Xd” = X2 = X0 = 15.38%, all X/R = 30.8
All Ind Mtr Use “Std MF” Option for ANSI SC Z (this option is in “Model” page)
Lump Loads LRC = 650%, “High”; X/R = 15; Use “Std MF” Option
XFMR T1: Tol% = 10; T2: Tol% = 7.5
Cable For all branch/ equipment cables: Tmin = 25, Tmax = 90
(these value are in “Impedance” page)

3. Create two configurations

Configuration Setup
Normal Open tie-CB CB1 and close all other CBs.
T3 Down Close CB1 and open CBs on both sides of T3
T4 Down Close CB1 and open CBs on both sides of T4

ETAP Workshop Notes ©1996-2010 Operation Technology, Inc. Page 3 of 7


Short-Circuit ANSI Example 1

Running SC Calculations
ETAP File – SCExample1/SC-ANSI-Example-1
1. Set up three study cases

Study Case: FaultBus4


Page Parameter Setting
Info Adjust Base kV for XFMR Tap
Do not consider Cable/OL heater for Motor.
Motor contribution based on Motor Status.
Fault only bus 4. Contribution Level =3
Standard Prefault Voltage = 100% of bus nominal kV
Use Variable Machine X/R.
HV CB interrupting rating adjusted based on Nominal kV.
Device duty based on total bus fault current.
Calculation according to C37.010-1999
LV MCCB & ICCB – Use “Higher MF” option.
Adjustment Individual XFMR Z tolerance, global cable R temperature at 25 C.
Alert Marginal limit = 95

Study Case: FaultAll-A


Page Parameter Setting
Info Adjust Base kV for XFMR Tap.
Do not consider Cable/OL heater for Motor.
Motor contribution based on Motor Status.
Fault all buses. Contribution Level =3
Standard Prefault Voltage = 102% of bus nominal kV
Use Fixed Machine X/R.
HV CB interrupting rating adjusted based on Nominal kV & Vf.
Device duty based on total bus fault current.
Calculation according to C37.010-1999
LV MCCB & ICCB – Use “Higher MF” option.
Adjustment Individual XFMR Z tolerance, global cable R temperature at 25 C.
Alert Marginal limit = 95

Study Case: FaultAll-B


Page Parameter Setting
Info Adjust Base kV for XFMR Tap.
Do not consider Cable/OL heater for Motor.
Motor contribution based on Motor Status and loading category
(Design).
Fault all buses. Contribution Level =3
Standard Prefault Voltage = Vmag * Nominal kV
Use Fixed Machine X/R.
HV CB interrupting rating adjusted based on Nominal kV & Vf.
Device duty based on total bus fault current.
Calculation according to C37.010-1999
LV MCCB & ICCB – Use “Higher MF” option.
Adjustment Individual XFMR Z tolerance, global cable R temperature at 25 C.
Alert Marginal limit = 95

ETAP Workshop Notes ©1996-2010 Operation Technology, Inc. Page 4 of 7


Short-Circuit ANSI Example 1

2. Run Device Duty calculation


• Study Case – FaultBus4
• Configuration – Normal, T3 Down, T4 Down
• Run Device Duty Calculation
• Check OLV display (Where and how can you set OLV display?)
• Check report

3. Run Device Duty calculation


• Study Case – FaultAll-A
• Configuration – Normal, T3 Down, T4 Down
• Run Device Duty Calculation
• Check OLV display – Compare OLV display against the one in 2.
• Check report

4. Run Device Duty calculation


• Study Case – FaultAll-B
• Configuration – Normal, T3 Down, T4 Down
• Run Device Duty Calculation
• Check OLV display
• Check report

5. Questions:
• Which study case results in the worst SC current?
• Which configuration results in the worst SC current?

ETAP Workshop Notes ©1996-2010 Operation Technology, Inc. Page 5 of 7


Short-Circuit ANSI Example 1

Verify and Size Equipment Rating


System File – SCExample1/SC-ANSI-Example-1
1. Factors to be considered
• System Configuration – PD status and Load configurations
• Data Revision
• Study Case – Vf, X/R, rating Adjustment, etc

2. Verify devices with existing settings


• Bus – Bus1 and Bus 7
• PD – CB5, CB8, CB10, CB11, and CB23
• Are there any problems with the existing settings? If yes, fix them.
• Run SC with the configuration and study case that give the worst case.

3. Select rating/size for some devices


• Bus –Bus 5 and Bus 6
• PD – CBs connected to Bus5 and Bus6 (CB1, CB12, CB13, CB14, CB15, CB16)
• Run SC with the configuration and study case that give the worst case.

Suggested Ratings for Some Components


Element Parameters
Bus 5 & 6 Switchgear: 800? 58 kA, 97.88 kA

CB1,12,13,14, GE, VB-4.16-250, 4.76 kV, 1200 Amp,?, 29 kA


15, 16, 19

4. Select rating/size for some devices


• Bus –Bus 3, and Bus8
• PD – CBs connected to Bus1, and Bus7
• Steps for device sizing:
• Identify the worst SC case – combination of revision, configuration & study case.
• Run SC calculation for the case and determine fault current.
• Select a device size based on the fault currents.
• Run SC calculation again to verify device rating.

Suggested Ratings for Some Components


Element Parameters
Bus 3 Switchgear: 600 Amp? 37 kA, 62.44 kA
Bus 8 MCC: 600 Amp? 39 kA, 65.81 kA

CB3, 4, 7 ABB, 121PM20, 121 kV, 1200 Amp, 20 KA


CB 20 Power-CB, ABB, K-800M, 0.48 kV, 800 Amp, 42 kA
CB 21 Molded Case, GE, TEML, 0.48kV, 150 Amp, 65 kA
CB 22 Power-CB, ABB, K-800M, 0.48 kV, 800 Amp, 42 kA
Fuse Gould Shawmut, A4BQ, 0.6 kV, 700 A, 200 kA

ETAP Workshop Notes ©1996-2010 Operation Technology, Inc. Page 6 of 7


Short-Circuit ANSI Example 1

Unbalanced SC Calculation
System File – SCExample1/SC-ANSI-Example-1
1. Set up Ground Connection
• Set up layered protection – XFMR Delta on HV side and Y grounded on LV side.
• 13.8 kV – 100 Amp Resistance grounding
• 4.16 kV – 10 Amp Resistance grounding
• 0.48 kV – Delta/Y solid-grounded
• Utility – Solid grounded
• All loads – ungrounded

2. Run unbalanced calculations using existing configuration and study cases


• What are the differences between ½. 1.5-4, and 30 cycles?

3. Check Result
• Check result on OLV – change display option to show different fault calculation results.
• Check result on crystal report.
• Check effect of grounding connection type and value on zero sequence current.

ETAP Workshop Notes ©1996-2010 Operation Technology, Inc. Page 7 of 7