This document is a point-to-point test report for the control panel of the Shwe Nagar Shopping Mall project in Mandalay, Myanmar. It details the status of main motor fans, local panels, and override modes in different areas under normal, fire, and override conditions. The report was conducted by an engineer and checked by a supervisor with a witness from the construction company.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0%(1)0% found this document useful (1 vote)
422 views
Panel Testing Form PDF
This document is a point-to-point test report for the control panel of the Shwe Nagar Shopping Mall project in Mandalay, Myanmar. It details the status of main motor fans, local panels, and override modes in different areas under normal, fire, and override conditions. The report was conducted by an engineer and checked by a supervisor with a witness from the construction company.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
PROJECT : SHWE NAGAR SHOPPING MALL @ MANDALAY
CONTROL PANEL POINT TO POINT TEST REPORT Date :
STATUS OF STATUS OF STATUS OF STATUS OF MAIN MOTOR
STATUS OF STATUS OF MAIN MV FR MAIN MV FR LOCAL PANEL MV FR PANEL FOR RUNNIN S/N AREA SERVED MV FAN NO. LOCAL PANEL AT LOCAL PANEL PANEL AT PANEL AT FIRE FOR OVERRIDE OVERRIDE ON/OFF G NORMAL MODE AT FIRE MODE NORMAL MODE MODE ON/OFF MODE MODE STATUS
Comments(if any):
Conducted By : Engineer/ Supervisor Checked By : Witness By : M&E RTO
Name Name Name
Company : Dual Star Co.,Ltd Company : Capital Development Ltd Company : Capital Construction Ltd