Bahagian A: 50 Markah
Bahagian A: 50 Markah
SECTION A : 50 MARKS
BAHAGIAN A : 50 MARKAH
INSTRUCTION:
This section consists of TWO (2) structured questions. Answer ALL questions.
ARAHAN :
Bahagian ini mengandungi DUA (2) soalan berstruktur. Jawab SEMUA soalan.
QUESTION 1
SOALAN 1
CLO1 (b) Explain TWO (2) advantages and TWO (2) disadvantages of lightweight concrete.
C2 Terangkan DUA (2) kelebihan dan DUA (2) kekurangan konkrit ringan.
[8 marks]
[8 markah]
CLO1 (c) List FOUR (4) ratios of concrete mix and its usage. Show your answer in a suitable
C3
table.
Senaraikan EMPAT (4) nisbah bancuhan konkrit dan kegunaannya. Tunjukkan
jawapan di dalam bentuk jadual.
[12 marks]
[12 markah]
QUESTION 2
SOALAN 2
[5 marks]
[5 markah]
2 SULIT
SULIT DCB1012: CONSTRUCTION AND MATERIALS
CLO1 (b) Explain THREE (3) methods of transportation for the ready to cast unit.
C2 Terangkan TIGA (3) kaedah pengangkutan unit-unit siap tuang.
i) Water Transportion
Pengangkutan Air
[2 marks]
[2 markah]
ii) Freight Train
Pengangkutan Keretapi
[3 marks]
[3 markah]
[12 marks]
[12 markah]
3 SULIT
SULIT DCB1012: CONSTRUCTION AND MATERIALS
SECTION B : 50 MARKS
BAHAGIAN B : 50 MARKAH
INSTRUCTION:
This section consists of FOUR (4) structured questions. Answer TWO (2) questions only.
ARAHAN:
Bahagian ini mengandungi EMPAT (4) soalan berstruktur. Jawab DUA (2) soalan sahaja.
QUESTION 1
SOALAN 1
QUESTION 2
SOALAN 2
i. Nail
Paku Pertukangan
ii. Screw
Skru
[5 marks]
[5 markah]
4 SULIT
SULIT DCB1012: CONSTRUCTION AND MATERIALS
ii. Wall
Dinding
CLO2 (c) [8 markah]
C3 [8 markah]
i. Sketch TWO (2) patterns of Parquet for floor finishing.
Lakarkan DUA (2) corak Parket untuk kemasan lantai.
[4 marks]
[4 markah]
ii. Illustrate a section of pitch roof and show the roof tiles finishing.
Ilustrasikan keratan bagi bumbung curam dan tunjukkan kemasan bumbung
jenis jubin.
[8 marks]
[8 markah]
QUESTION 3
SOALAN 3
CLO2 (b) Explain briefly FOUR (4) factors affecting types of joints.
C2
Jelaskan secara ringkas EMPAT (4) faktor yang mempengaruhi sambungan bagi
kimpalan.
[8 marks]
[8 markah]
5 SULIT
SULIT DCB1012: CONSTRUCTION AND MATERIALS
CLO2 (c)
Illustrate the following floor installations;
C3
Ilustrasikan kaedah pemasangan lantai berikut;
QUESTION 4
SOALAN 4
i) Suspended Floor
Lantai Tergantung
[2 marks]
[2 markah]
ii) Lower Solid Floor
Lantai Bawah Padu
[3 marks]
[3 markah]
CLO2 (b) Explain FOUR (4) categories of nails.
C2 Jelaskan EMPAT(4) kategori paku.
[8 marks]
[8 markah]
6 SULIT
SULIT DCB1012: CONSTRUCTION AND MATERIALS
CLO2 (c) Parquet finishing can be divided into 5 types. Interpret any EMPAT (4) types of
C3 parquet finishing.
Kemasan parkey boleh dibahagikan kepada 5 jenis. Tafsirkan mana-mana
EMPAT (4) jenis kemasan tersebut.
[12 marks]
[12 markah]
SOALAN TAMAT
7 SULIT