75% found this document useful (4 votes)
2K views127 pages

ETP48400-C3B1 and ETP48400-C3B2 Embedded Power User Manual

Uploaded by

FURIVAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
75% found this document useful (4 votes)
2K views127 pages

ETP48400-C3B1 and ETP48400-C3B2 Embedded Power User Manual

Uploaded by

FURIVAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 127

ETP48400-C3B1 and ETP48400-C3B2 Embedded

Power

User Manual

Issue 05

Date 2020-03-25

HUAWEI TECHNOLOGIES CO., LTD.


Copyright © Huawei Technologies Co., Ltd. 2020. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees or
representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China

Website: https://e.huawei.com

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. i


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual Preface

Preface

Purpose
This document describes DC power systems in terms of product overview, components,
installation, commissioning, maintenance, and operations for the site monitoring module
(SMU) and rectifiers.
Figures provided in this document are for reference only.

Intended Audience
This document is intended for:
 Sales engineers
 Technical support engineers
 Maintenance engineers

Symbol Conventions
The symbols that may be found in this document are defined as follows.

Symbol Description
Indicates a hazard with a high level of risk which, if not avoided, will
result in death or serious injury.
Indicates a hazard with a medium level of risk which, if not avoided,
could result in death or serious injury.
Indicates a hazard with a low level of risk which, if not avoided, could
result in minor or moderate injury.
Indicates a potentially hazardous situation which, if not avoided, could
result in equipment damage, data loss, performance deterioration, or
unanticipated results.
NOTICE is used to address practices not related to personal injury.
Supplements the important information in the main text.
NOTE is used to address information not related to personal injury,
equipment damage, and environment deterioration.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. ii


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual Preface

Change History
Changes between document issues are cumulative. The latest document issue contains all the
changes made in earlier issues.

Issue 05 (2020-03-25)
Modified 6.8 Setting DCDB Parameters.

Issue 04 (2019-12-17)
Optimized the content of the document.

Issue 03 (2019-11-18)
Optimized the content of the document.

Issue 02 (2019-10-25)
The DCDB parameter is added.
Deleted contents about the app.

Issue 01 (2019-05-30)
This is the first official release.
The SMU software version is SMU V500R003C00.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. iii


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual Contents

Contents

Preface.......................................................................................................................................... ii
1 Safety Precautions .................................................................................................................... 1
1.1 General Safety ....................................................................................................................................................... 1
1.2 Personnel Requirements ........................................................................................................................................ 5
1.3 Electrical Safety .................................................................................................................................................... 5
1.4 Installation Environment Requirements .................................................................................................................. 7
1.5 Mechanical Safety ................................................................................................................................................. 8
1.6 Battery Safety....................................................................................................................................................... 11

2 Product Overview................................................................................................................... 15
2.1 Product Overview .................................................................................................................................................15
2.2 Product Introduction .............................................................................................................................................15

3 Components ............................................................................................................................ 22
3.1 SMU02C ..............................................................................................................................................................22
3.2 User Interface Module UIM05B1 ..........................................................................................................................26
3.3 (Optional) Communications Expansion Module NIM01C3 ....................................................................................27
3.4 Communications Expansion Module CIM02C ......................................................................................................30
3.5 Rectifier ...............................................................................................................................................................32
3.6 Digital Temperature and Humidity Sensor .............................................................................................................33

4 System Installation ................................................................................................................ 36


4.1 Preparing for the Installation .................................................................................................................................36
4.1.1 Preparing Cables................................................................................................................................................36
4.1.2 Tools .................................................................................................................................................................37
4.1.3 Installation Dimensions .....................................................................................................................................39
4.2 Installing Devices .................................................................................................................................................40
4.3 Installing Ground Cables ......................................................................................................................................41
4.4 Installing a Rectifier .............................................................................................................................................43
4.5 Installing a Circuit Breaker ...................................................................................................................................44
4.6 Installing a Digital Temperature and Humidity Sensor ...........................................................................................44
4.7 Installing a Communications Expansion Module NIM01C3 ..................................................................................46
4.8 Installing a Communications Expansion Module CIM02C.....................................................................................48
4.9 (Optional) Installing Dry Contact Signal Cables ....................................................................................................48

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. iv


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual Contents

4.10 (Optional) Installing Communications Cables .....................................................................................................49


4.10.1 WebUI Management ........................................................................................................................................49
4.10.2 Using the U2000-SPM for Management ...........................................................................................................50
4.10.3 NetEco Management........................................................................................................................................51
4.10.4 Third-Party NMS Management (over SNMP) ...................................................................................................53
4.11 Installing Sensor Cables ......................................................................................................................................54
4.11.1 Installing Door Status Sensor Cables ................................................................................................................54
4.11.2 Installing Battery Temperature Sensor Cables ...................................................................................................55
4.11.3 Installing Smoke Sensor Cables........................................................................................................................55
4.11.4 Installing a Water Sensor Cable ........................................................................................................................56
4.12 Installing Cables .................................................................................................................................................57
4.12.1 Installing DC Output Power Cables ..................................................................................................................57
4.12.2 Installing a 220/380 V AC Three-Phase Four-Wire Input Power Cable ..............................................................60
4.12.3 Installing 220 V AC Single-Phase Input Power Cables......................................................................................62
4.12.4 Installing 120/240 V AC Dual–Live Wire Input Power Cables ..........................................................................63
4.12.5 Installing Cables for an Intelligent Power Distribution Unit ..............................................................................64
4.12.6 Installing Cables for a Lead-Acid Battery Box ..................................................................................................68
4.12.7 Installing Lithium Batteries and Cables ............................................................................................................70

5 Verifying the Installation...................................................................................................... 75


5.1 Checking Hardware Installation ............................................................................................................................75
5.2 Checking Electrical Connections...........................................................................................................................75
5.3 Checking Cable Installation ..................................................................................................................................75

6 Commissioning....................................................................................................................... 76
6.1 Powering on Lead-Acid Batteries..........................................................................................................................76
6.2 Connecting the Lithium Battery Supply ................................................................................................................77
6.3 Setting the Display Language ...............................................................................................................................77
6.4 Setting Deployment Wizard ..................................................................................................................................77
6.5 Setting the Date and Time .....................................................................................................................................78
6.6 Setting the AC Input System .................................................................................................................................79
6.7 Setting the 57 V Constant Voltage Parameter .........................................................................................................79
6.8 Setting DCDB Parameters ....................................................................................................................................79
6.9 Setting AC Peak Clipping Parameters ...................................................................................................................80
6.10 Setting Sensor Parameters ...................................................................................................................................81
6.11 Setting the Mains Collection Channel..................................................................................................................82
6.12 Setting Communications Parameters ...................................................................................................................82
6.12.1 (Optional) Setting Parameters Before Using WebUI .........................................................................................82
6.12.2 (Optional) Setting Parameters Before Using U2000-SPM .................................................................................89
6.12.3 (Optional) Setting Parameters Before Using NetEco .........................................................................................89
6.12.4 (Optional) Setting Parameters Before Using SNMP Management .....................................................................91
6.13 Connecting the AC Power Supply .......................................................................................................................92
6.14 Subsequent Operations .......................................................................................................................................93

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. v


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual Contents

7 Maintenance............................................................................................................................ 94
7.1 Routine Maintenance ............................................................................................................................................94
7.1.1 AC and DC Power Distribution ..........................................................................................................................94
7.1.2 Rectifier ............................................................................................................................................................95
7.1.3 SMU .................................................................................................................................................................96
7.1.4 Parameters on the SMU .....................................................................................................................................96
7.1.5 Cables ...............................................................................................................................................................97
7.2 Identifying Component Faults ...............................................................................................................................98
7.2.1 Identifying SMU Faults .....................................................................................................................................98
7.2.2 Identifying Rectifier Faults ................................................................................................................................98
7.2.3 Identifying Circuit Breaker Faults ......................................................................................................................98
7.2.4 Locating AC Input Module Faults ......................................................................................................................98
7.3 Replacing Components .........................................................................................................................................99
7.3.1 Replacing an SMU02C ......................................................................................................................................99
7.3.2 Replacing a UIM05B1 ..................................................................................................................................... 100
7.3.3 Replacing a NIM01C3 ..................................................................................................................................... 101
7.3.4 Replacing a CIM02C ....................................................................................................................................... 102
7.3.5 Replacing a DMU02C1.................................................................................................................................... 104
7.3.6 Replacing a Rectifier ....................................................................................................................................... 105
7.3.7 Replacing a Circuit Breaker ............................................................................................................................. 106
7.3.8 Replacing an AC Input Module ........................................................................................................................ 107
7.3.9 Replacing a Digital Temperature and Humidity Sensor ..................................................................................... 108

A How Do I Install a Hall Effect Sensor? ............................................................................ 110


B Technical Specifications ..................................................................................................... 111
C Electrical Conceptual Diagrams ........................................................................................ 114
D Associations Between UIM Dry Contacts and Alarms .................................................. 115
E How Do I Change the Communications Protocol for COM4 and COM5? .................. 117
F Acronyms and Abbreviations............................................................................................. 119

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. vi


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 1 Safety Precautions

1 Safety Precautions

1.1 General Safety


Statement
Before installing, operating, and maintaining the equipment, read this document and observe
all the safety instructions on the equipment and in this document.
The "NOTICE", "CAUTION", "WARNING", and "DANGER" statements in this document
do not cover all the safety instructions. They are only supplements to the safety instructions.
Huawei will not be liable for any consequence caused by the violation of general safety
requirements or design, production, and usage safety standards.
Ensure that the equipment is used in environments that meet its design specifications.
Otherwise, the equipment may become faulty, and the resulting equipment malfunction,
component damage, personal injuries, or property damage are not covered under the warranty.
Follow local laws and regulations when installing, operating, or maintaining the equipment.
The safety instructions in this document are only supplements to local laws and regulations.
Huawei will not be liable for any consequences of the following circumstances:
 Operation beyond the conditions specified in this document
 Installation or use in environments which are not specified in relevant international or
national standards
 Unauthorized modifications to the product or software code or removal of the product
 Failure to follow the operation instructions and safety precautions on the product and in
this document
 Equipment damage due to force majeure, such as earthquakes, fire, and storms
 Damage caused during transportation by the customer
 Storage conditions that do not meet the requirements specified in this document

General Requirements
 Before installing, operating, or maintaining the equipment, remove any conductive
objects such as watches or metal jewelry like bracelets, bangles, and rings to avoid
electric shock.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 1


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 1 Safety Precautions

 When installing, operating, or maintaining the equipment, wear dedicated protective


gears such as insulation gloves, goggles, and safety clothing, helmet, and shoes, as
shown in the following figure.

 Use insulated tools or tools with insulated handles, as shown in the following figure.

 Follow the specified procedures for installation, operation, and maintenance.


 Ensure that bolts are tightened with a torque wrench and marked using red or blue color.
Installation personnel mark tightened bolts in blue. Quality inspection personnel confirm
if the bolts are tightened and then mark them in red. (The marks should cross the edges
of the bolts, as shown in the following figure.)

 Before installing, operating, or maintaining a cabinet, clean up any water, ice, snow, or
other sundries on the top of the cabinet to prevent sundries from falling into the cabinet
when you open the cabinet door.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 2


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 1 Safety Precautions

 Do not install, use, or operate outdoor equipment and cables (including but not limited to
moving equipment, operating equipment and cables, inserting connectors to or removing
connectors from signal ports connected to outdoor facilities, working at heights, and
performing outdoor installation) in harsh weather conditions such as lightning, rain,
snow, and level 6 or stronger wind.
 Before handling a conductor surface or terminal, measure the contact point voltage and
ensure that there is no risk of electric shock.
 Ensure that all slots are installed with boards or filler panels. Avoid hazards caused by
hazardous voltages or energy on boards. Ensure that the air channel is normal, control
electromagnetic interference, and prevent dust and other sundries on the backplane,
baseplate, and boards.
 After installing the equipment, remove idle packing materials such as cartons, foam,
plastics, and cable ties from the equipment area.
 In the case of a fire, immediately leave the building or the equipment area, and turn on
the fire alarm bell or make an emergency call. Do not enter the building on fire in any
case.
 Do not stop using protective devices. Pay attention to the warnings, cautions, and related
precautionary measures in this document and on the equipment. Promptly replace
warning labels that have worn out.
 Keep irrelevant people away from the equipment. Only operators are allowed to access
the equipment.
 All cable holes should be sealed. Seal the used cable holes with firestop putty. Seal the
unused cable holes with the caps delivered with the cabinet. The following figure shows
the criteria for correct sealing with firestop putty.

 Do not use water, alcohol, oil, or other solvents to clean electrical components inside and
outside a cabinet.

Personal Safety
 If there is a probability of personal injury or equipment damage during operations on the
equipment, immediately stop the operations, report the case to the supervisor, and take
feasible protective measures.
 To avoid electric shock, do not connect safety extra-low voltage (SELV) circuits to
telecommunication network voltage (TNV) circuits.
 Do not power on the equipment before it is installed or confirmed by professionals.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 3


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 1 Safety Precautions

Symbol Conventions
To ensure personal and equipment safety, observe all the safety instructions marked on the
equipment when installing, operating, and maintaining the equipment.

Symbol Description
Indicates a part exposed to high voltage. This symbol warns
operators that both direct and indirect contact with the power grid
is fatal. Such areas include hazardous voltage points or protective
power supply covers that may be removed during maintenance.
Warns users of overheating. This symbol is attached to a device
surface that may overheat and cause scalding. It warns users not to
touch the surface during operations or maintenance. Users should
wear heat insulation gloves before operations to prevent scalding.
Indicates protection earthing. This symbol is attached next to a
or protection ground terminal next to grounded equipment and an
external ground system. An equipment ground cable is connected
to an external ground bar through the protection ground terminal.
Indicates equipotential bonding. This symbol is found with
equipotential terminals inside equipment.

Indicates electrostatic discharge (ESD). This symbol is used in all


electrostatic sensitive areas. Before operating equipment in these
areas, wear ESD gloves or an ESD wrist strap.
Indicates that the equipment is safe to use at altitudes below 2000
m (6561.6 ft.).

Indicates that the equipment is not safe to use in tropical climates.

Indicates a fan assembly or moving part. This symbol is


silkscreened on or attached to the panel of a fan assembly,
or warning operators to keep away. Do not touch the blades when the
fan is rotating.

Indicates that users should refer to the instruction. This symbol is


used when the usage of a device port cannot be clearly described.
or For example, this symbol can be used in but not limited to the
following scenarios:
1. For a multi-power device, use it near the power supply to
replace the multi-power supply identifier. The symbol indicates
that the device has multiple power inputs. Therefore, when
powering off the device, you must disconnect all power inputs.
2. If there are multiple output ports, use the symbol near the
or
output ports. Connect cables according to the rated power
output and configuration parameter information in the
instruction.
3. If there are multiple slots, use the symbol near the slot

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 4


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 1 Safety Precautions

Symbol Description
information. For details, see the description of slot information,
restrictions on boards, and usage conditions in the instruction.

1.2 Personnel Requirements


 Personnel who plan to install or maintain Huawei equipment must receive thorough
training, understand all necessary safety precautions, and be able to correctly perform all
operations.
 Only qualified professionals or trained personnel are allowed to install, operate, and
maintain the equipment.
 Only qualified professionals are allowed to remove safety facilities and inspect the
equipment.
 Personnel who will operate the equipment, including operators, trained personnel, and
professionals, should possess the local national required qualifications in special
operations such as high-voltage operations, working at heights, and operations of special
equipment.

 Professionals: personnel who are trained or experienced in equipment operations and are clear of the
sources and degree of various potential hazards in equipment installation, operation, and
maintenance
 Trained personnel: personnel who are technically trained, have required experience, are aware of
possible hazards on themselves in certain operations, and are able to take protective measures to
minimize the hazards on themselves and other people
 Operators: operation personnel who may come in contact with the equipment, except trained
personnel and professionals

1.3 Electrical Safety


Grounding
 The protective ground of the equipment should be reliably connected to the ground
screw on the metal enclosure (grounding resistance ≤ 0.1 ohm).
 For the equipment that needs to be grounded, install the ground cable first when
installing the equipment and remove the ground cable last when removing the
equipment.
 Do not damage the ground conductor.
 Do not operate the equipment in the absence of a properly installed ground conductor.
 For the equipment that uses a three-pin socket, ensure that the ground terminal in the
socket is connected to the protection ground.

AC and DC Power

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 5


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 1 Safety Precautions

 The power system is energized by power sources with hazardous voltage. Direct or
indirect contact (through damp objects) with the power sources may result in electric
shock.
 Non-standard and improper operations may result in fire or electric shock.
 Do not connect or disconnect power cables with power on. Transient contact between the
core of the power cable and the conductor will generate electric arcs or sparks, which may
cause fire or personal injury.
 If the power supply to the equipment is permanently connected, install an easily
accessible disconnector at the exterior of the device.
 Before making electrical connections, switch off the disconnector on the upstream device
to cut off the power supply if people may contact energized components.
 If a "high electricity leakage" tag is attached on the equipment, ground the protective
ground terminal on the equipment enclosure before connecting the AC power supply;
otherwise, electric shock as a result of electricity leakage may occur.
 Before installing or removing a power cable, turn off the power switch.
 Before connecting a power cable, check that the label on the power cable is correct.
 Before connecting the power supply, ensure that cable connections are correct.
 If the equipment has multiple inputs, disconnect all the inputs before operating the
equipment.

Cabling
 When routing cables, ensure that a distance of at least 30 mm exists between the cables
and heat-generating components or areas. This prevents damage to the insulation layer of
the cables.
 Do not route cables behind the air intake and exhaust vents of the equipment.
 Ensure that cables meet the VW-1 flame spread rating requirements.
 Bind cables of the same type together. When routing cables of different types, ensure that
they are at least 30 mm away from each other.
 Ensure that all cables are securely bound. Route and bind cables so that they appear neat
and tidy and their cable sheaths are intact.
 If an AC input power cable is connected to the cabinet from the top, bend the cable in a
U shape outside the cabinet and then route it into the cabinet.
 Ensure that the bending radius of each cable is at least five times the diameter of the
cable.
 When routing power cables, ensure that there is no coiling or twisting. Do not join or
weld power cables. If necessary, use a longer cable.

ESD
 When installing, operating, and maintaining the equipment, comply with the ESD
protection regulations and wear the ESD clothing, gloves, and wrist strap.
 When holding a board, hold its edge without touching any components. Do not touch the
components with your bare hands.
 Package boards with ESD packaging materials before storing or transporting them.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 6


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 1 Safety Precautions

1.4 Installation Environment Requirements


 To prevent fire due to high temperature, ensure that the ventilation vents or heat
dissipation system are not blocked when the equipment is running.
 Ensure that there are no acid, alkaline, or other corrosive gases in the installation place.
 Do not place the equipment near heat sources or exposed fire sources, such as electric
heaters, microwave ovens, roasters, water heaters, furnace fire, candles, or other places
where high temperature may occur. Otherwise, the enclosure will melt or the equipment
will heat up, which can cause a fire.
 Install the equipment in an area far away from liquids. Do not install it under areas prone
to condensation, such as under water pipes and air exhaust vents, or areas prone to water
leakage, such as air conditioner vents, ventilation vents, or feeder windows of the
equipment room. Ensure that no liquid enters the equipment to prevent faults or short
circuits.
 Before installing the equipment into a cabinet, ensure that the cabinet is secured and will
not tilt or fall down due to loss of balance, which can cause personal injury or equipment
damage.
 Do not expose the equipment to flammable or explosive gas or smoke. Do not perform
any operation on the equipment in such environments.

Installation at Heights
Working at heights refers to operations that are performed at least 2 meters above the ground.
Do not at heights in any of the following situations:
 Rainwater remains on steel pipes or other risky conditions exist. After the preceding
conditions no longer exist, the safety director and relevant technical personnel need to
check the involved equipment. Operators can begin working only after obtaining
consent.
 When working at heights, comply with local relevant laws and regulations.
 Only trained and qualified personnel are allowed to work at heights.
 Before working at heights, check the climbing tools and safety gears such as safety
helmets, safety belts, ladders, springboards, scaffolding, and lifting equipment. If they do
not meet the requirements, take corrective measures or disallow working at heights.
 Wear personal protective equipment such as the safety helmet and safety belt or waist
rope and fasten it to a solid structure. Do not mount it on an insecure moveable object or
metal object with sharp edges. Make sure that the hooks will not slide off.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 7


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 1 Safety Precautions

 Set a restricted area and eye-catching signs for working at heights to warn away irrelevant
personnel.
 Carry the operation machinery and tools properly to prevent them from falling off and
causing injuries.
 Personnel involving working at heights are not allowed to throw objects from the height to
the ground, or vice versa. Objects should be transported by tough slings, hanging baskets,
highline trolleys, or cranes.
 Do not perform operations on the upper and lower layers at the same time. If unavoidable,
install a dedicated protective shelter between the upper and lower layers or take other
protective measures. Do not pile up tools or materials on the upper layer.
 Ensure that guard rails and warning signs are set at the edges and openings of the area
involving working at heights to prevent falls.
 Do not pile up scaffolding, springboards, or other sundries on the ground under the area
involving working at heights. Do not allow people to stay or pass under the area involving
working at heights.
 Inspect the scaffolding, springboards, and workbenches used for working at heights in
advance to ensure that their structures are solid and not overloaded.
 Dismantle the scaffolding from top down after finishing the job. Do not dismantle the
upper and lower layers at the same time. When removing a part, ensure that other parts
will not collapse.
 Do not loiter when working at heights. Do not sleep at heights.
 Any violations must be promptly pointed out by the site manager or safety supervisor
and the involved personnel should be prompted for correction. Personnel who fail to stop
violations will be forbidden from working.
 Operators who violate the safety regulations are responsible for accidents caused. The
supervisor has to bear the responsibility accordingly.

1.5 Mechanical Safety


Hoisting Devices

Do not walk under hoisted objects.


 Only trained and qualified personnel should perform hoisting operations.
 Check that hoisting tools are available and in good condition.
 Before hoisting objects, ensure that hoisting tools are firmly secured onto a load-bearing
object or wall.
 Ensure that the angle formed by two hoisting cables is no more than 90 degrees, as
shown in the following figure.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 8


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 1 Safety Precautions

 Do not drag steel ropes and hoisting tools or bump hoisted objects against hard objects
during hoisting.

Using Ladders
 Use wooden or fiberglass ladders when you need to perform live working at heights.
 When a step ladder is used, ensure that the pull ropes are secured and the ladder is held
firm.
 Before using a ladder, check that it is intact and confirm its load bearing capacity. Do not
overload it.
 Ensure that the wider end of the ladder is at the bottom, or protective measures have
been taken at the bottom to prevent the ladder from sliding.
 Ensure that the ladder is securely positioned. The recommended angle for a ladder
against the floor is 75 degrees, as shown in the following figure. An angle rule can be
used to measure the angle.

When climbing a ladder, take the following precautions to reduce risks and ensure safety:

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 9


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 1 Safety Precautions

 Keep your body steady.


 Do not climb higher than the fourth rung of the ladder from the top.
 To climb onto a roof, ensure that the ladder top is at least one meter higher than the roof
line, as shown in the following figure.

 Ensure that your body's center of gravity does not shift outside the legs of the ladder.

Drilling Holes
When drilling holes into a wall or floor, observe the following safety precautions:

Do not drill holes into the equipment. Doing so may affect the electromagnetic shielding of
the equipment and damage components or cables inside. Metal shavings from drilling may
short-circuit boards inside the equipment.
 Wear goggles and protective gloves when drilling holes.
 When drilling holes, protect the equipment from shavings. After drilling, clean up any
shavings that have accumulated inside or outside the equipment.

Moving Heavy Objects


 Be cautious to avoid injury when moving heavy objects.

 When moving the equipment by hand, wear protective gloves to prevent injuries.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 10


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 1 Safety Precautions

 Move or lift the equipment by holding its handles or lower edges. Do not hold the
handles of modules (such as power supply units, fans, and boards) that are installed in
the equipment because they cannot support the weight of the equipment.

1.6 Battery Safety


If no battery is involved, skip this section.
Before installing, operating, or maintaining batteries, read the battery manufacturer's
instructions. The safety precautions specified in this document are highly important
precautions that require special attention. For additional safety precautions, see the
instructions provided by the battery manufacturer.

Basic Requirements
Before operating batteries, carefully read the safety precautions for battery handling and
master the correct battery connection methods.

 Do not expose batteries at high temperatures or around heat-generating devices, such as


sunlight, fire sources, transformers, and heaters. Excessive heat exposure may cause the
batteries to explode.
 Do not burn batteries. Otherwise, the batteries may explode.
 To avoid leakage, overheating, fire, or explosions, do not disassemble, alter, or damage
batteries, for example, insert sundries into batteries or immerse batteries in water or other
liquids.
 When replacing a battery, use a battery of the same model or type. Improper replacement
may cause the battery to explode.
 Do not connect a metal conductor to the battery poles or touch the battery terminals.
Otherwise, the battery may be short-circuited and heat up, which can cause injuries such as
burning.

To ensure safety during battery installation, operation, and maintenance, pay attention to the
following:
 Do not wear conductive articles such as watches, bracelets, bangles, and rings.
 Wear goggles, rubber gloves, and protective clothing to prevent skin contact with
electrolyte in the case of electrolyte overflow. If a battery leaks, protect the skin or eyes
from the leaking liquid. If the skin or eyes come in contact with the leaking liquid, wash
it immediately with clean water and go to the hospital for medical treatment.
 Use dedicated insulated tools.
 Move batteries in the required direction. Do not place a battery upside down or tilt it.
 Keep the battery loop disconnected during installation and maintenance.
 Do not drop, squeeze, or puncture a battery. Protect batteries from external high pressure
to prevent internal short circuits and overheating.
 Dispose of waste batteries in accordance with local laws and regulations. Do not dispose
of batteries as household waste. If a battery is disposed of improperly, it may explode.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 11


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 1 Safety Precautions

 Do not use a damaged battery.


 To prevent injuries or explosion, do not allow children or pets to swallow or bite a
battery.
 If batteries experience discoloration, deformation, abnormal heating, or other
abnormalities during working, charging, or storage, stop using the batteries and replace
them with new ones.
 Batteries can work properly with the allowed charge and discharge parameters when the
temperature is within the specified range. If the temperature is outside the specified
range, the battery charge and discharge performance and safety are affected.

Battery Installation
Before installing batteries, observe the following safety precautions:
 Install batteries in a dry and cool environment with good ventilation, which is away from
high temperature and flammable materials, and take precautions against fire.
 Place and secure batteries horizontally.
 Note the polarities when installing batteries. Do not short-circuit the positive and
negative poles of the same battery or battery string. Otherwise, the battery may be
short-circuited.
 When installing a battery string, retain at least one breakpoint to prevent a loop being
formed. After checking that the installation is correct, close the breakpoints to finish the
installation.
 During the installation, insulate the terminals of cables connecting batteries. Ensure that
the terminals do not come into contact with metal components such as the cabinet.
 Secure battery cables or copper bars by tightening bolts to the required torque. Loose
connections will result in excessive voltage drop or cause batteries to burn out in the case
of excessive current.
 Check battery connections periodically, ensuring that all bolts are securely tightened.

Battery Short Circuit

Battery short circuits can generate high instantaneous current and release a great amount of
energy, which may cause equipment damage or personal injury.
 If permitted, disconnect the batteries in use before performing any other operations.
 To avoid battery short-circuit, do not maintain batteries with power on.

Flammable Gas

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 12


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 1 Safety Precautions

 Do not use unsealed lead-acid batteries.


 To prevent fire or corrosion, ensure that flammable gas (such as hydrogen) is properly
exhausted for lead-acid batteries.

Lead-acid batteries emit flammable gas when used. Ensure that batteries are kept in a
well-ventilated area and take preventive measures against fire.

Battery Leakage

Battery overheating causes deformation, damage, and electrolyte spillage.

If the battery temperature exceeds 60°C, check for and promptly handle any leakage.
Electrolyte overflow may damage the equipment. It will corrode metal parts and boards, and
ultimately damage the boards.

When the electrolyte overflows, absorb and neutralize the electrolyte immediately. When
moving or handling a battery whose electrolyte leaks, note that the leaking electrolyte may
hurt human bodies.

If the electrolyte overflows, follow the instructions of the battery manufacturer or neutralize
the electrolyte by using sodium bicarbonate (NaHCO3) or sodium carbonate (Na2CO3).

Lithium Battery
The safety precautions for lithium batteries are similar to those for lead-acid batteries except
that you also need to note the precautions described in this section.

There is a risk of explosion if a battery is replaced with an incorrect model.


 A battery can be replaced only with a battery of the same or similar model recommended
by the manufacturer.
 When handling a lithium battery, do not place it upside down, tilt it, or bump it with
other objects.
 Keep the lithium battery loop disconnected during installation and maintenance.
 When the ambient temperature is lower than the lower limit of the operating temperature
(charge is forbidden at 0°C), do not charge the battery. Otherwise, a short circuit would
occur inside the battery.
 Do not throw a lithium battery in fire.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 13


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 1 Safety Precautions

 When maintenance is complete, return the waste lithium battery to the maintenance
office.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 14


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 2 Product Overview

2 Product Overview

2.1 Product Overview


The ETP48400-C3B1 and ETP48400-C3B2 are embedded power systems that convert AC
power into DC power. They supply –48 V or –57 V constant voltage to telecommunications
equipment. The maximum capacity of the ETP48400-C3B1 is 24 kW, and the maximum
capacity of the ETP48400-C3B2 is 18 kW. They apply to 5G sites as well as capacity
expansion and reconstruction of existing sites. The intelligent power distribution unit
DCDB48-200-16B/DCDB48-200-16B-XXX and lead-acid battery box DCDB48-400-4C are
optional components.

2.2 Product Introduction


ETP48400-C3B1/ETP48400-C3B2

Figure 2-1 ETP48400-C3B1 appearance

(1) Ground screw (2) AC input module (3) LLVD power


distribution
(4) SMU02C (5) BLVD power (6) Battery wiring ports
distribution
(7) Reserved slot for (8) UIM05B1 (9) Space for rectifiers
CIM02C/NIM01C3

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 15


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 2 Product Overview

Figure 2-2 ETP48400-C3B2 appearance

(1) Ground screw (2) AC input module (3) LLVD power


distribution
(4) SMU02C (5) BLVD power (6) Battery wiring ports
distribution
(7) Reserved slot for (8) UIM05B1 (9) Space for rectifiers
CIM02C/NIM01C3

Table 2-1 System specifications

Item ETP48400-C3B1 ETP48400-C3B2


AC input system 220/380 V AC three-phase four-wire, 120/240 V AC dual–live wire
compatible with 220 V AC single-phase
DC power distribution  LLVD: two 125 A and three 63 A circuit breakers
 BLVD: two 63 A, two 32 A, and two 16 A circuit breakers
Surge protection  AC surge protection: nominal surge discharge current: 30 kA (8/20 µs), five
times respectively in the positive and negative directions
 DC surge protection: 10 kA (8/20 µs) in differential mode, 20 kA (8/20 µs)
in common mode

(Optional) Intelligent Power Distribution Unit

Figure 2-3 DCDB48-200-16B appearance

(1) Ground screw (2) LLVD power distribution (3) BLVD power distribution
(4) DMU02C1 (5) DC input ports

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 16


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 2 Product Overview

Figure 2-4 DCDB48-200-16B-XXX appearance

(1) Ground screw (2) LLVD power distribution (3) BLVD power distribution
(4) DMU02C1 (5) DC input ports

Figure 2-5 DMU02C1 panel

(1) Run indicator (2) Alarm indicator (3) RS485 communications ports

Table 2-2 Indicator description

Name Color Status Description


Run indicator Green Off The DMU is faulty or has no DC input.
Blinking The communications is normal.
slowly (0.5 Hz)
Blinking fast (4 The communications fails.
Hz)

Alarm Red Off No alarm is generated.


indicator
Steady on An alarm is generated.

Table 2-3 Communication port description

Communications Port Communications Communications Protocol


Parameter
COM1/COM2 Baud rate: 9600 bit/s Modbus protocol

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 17


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 2 Product Overview

Communications Port Communications Communications Protocol


Parameter

NOTE
All these ports are protected by a security mechanism.

Figure 2-6 Communication port pins

Table 2-4 Pin definitions for the RS485 port

Pin Signal Description


1 TX+ Transmits data over RS485
2 TX-
4 RX+ Receives data over RS485
5 RX-
3, 6, 7, 8 NA –

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 18


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 2 Product Overview

Figure 2-7 DIP switch

 When multiple DCDB48-200-16Bs are cascaded, you need to set the address DIP switch for the
DMU02C1.
 If one DCDB48-200-16B is installed, you do not need to set the address DIP switch for the
DMU02C1.

Table 2-5 DIP switch description

Address of Intelligent Pin 1 Pin 2


Power Distribution Unit
1 OFF OFF
2 OFF ON
3 ON OFF
4 ON ON

NOTE
 If one contactor and one shunt are installed, for example, in a DCDB48-200-16B-4731, set pin3 to
OFF and pin4 to OFF.
 If two contactors and one shunt are installed, for example, in a DCDB48-200-16B-4731-008, set
pin3 to OFF and pin4 to ON.

Table 2-6 DCDB specifications

Item DCDB48-200-16B DCDB48-200-16B-XXX


Input voltage 40–60 V DC
Total input Maximum: 200 A
current

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 19


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 2 Product Overview

Item DCDB48-200-16B DCDB48-200-16B-XXX


DC power  BLVD power Supports a maximum of 16 circuit breakers.
distribution distribution: two 1-pole  BLVD configuration: A maximum of six 16 A, 20 A,
16 A, two 1-pole 20 A, 32 A, 40 A, or 63 A circuit breakers can be installed.
and two 1-pole 32 A
 LLVD configuration 1: A maximum of ten 16 A, 20 A,
circuit breakers
32 A, 40 A, or 63 A circuit breakers can be installed.
 LLVD power distribution:
 LLVD configuration 2: A maximum of seven 16 A, 20
four 1-pole 32 A and six
1-pole 63 A circuit A, 32 A, 40 A, or 63 A circuit breakers and two 80 A,
breakers 100 A, or 125 A circuit breakers can be installed.

Dimensions (H x 43.6 mm x 482.6 mm x 255 mm


W x D)
Weight ≤ 10 kg
Installation mode Installed in a 19-inch rack
Cabling mode Routed in and out from the front
Maintenance Maintained from the front
mode

(Optional) DCDB48-400-4C

Figure 2-8 DCDB48-400-4C appearance

(1) Ground screw (2) Battery circuit breaker (3) Battery power
status detection ports distribution
(4) Space reserved for battery (5) DC input ports
power distribution

Table 2-7 DCDB48-400-4C specifications

Item Specifications
Input voltage 40–60 V DC
Total input current Maximum: 400 A
DC power distribution Four 1-pole 125 A circuit breakers
Dimensions (H x W x D) 43.6 mm x 482.6 mm x 180 mm

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 20


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 2 Product Overview

Item Specifications
Weight ≤ 4 kg
Installation mode Installed in a 19-inch rack
Cabling mode Routed in and out from the front
Maintenance mode Maintained from the front

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 21


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 3 Components

3 Components

3.1 SMU02C
Figure 3-1 SMU02C appearance

(1) SD card slot (2) Run indicator (3) Minor alarm indicator
(4) Major alarm (5) Buttons (6) USB ports (protected by a security
indicator mechanism)
(7) RS485/RS232 port (8) Fast Ethernet (FE) (9) CAN communications port
port
(10) LCD

Indicators

Table 3-1 Indicator description

Name Color Status Description


Run indicator Green Off The SMU is faulty or has no DC input.
Blinking The SMU is running properly and

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 22


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 3 Components

Name Color Status Description


slowly (0.5 Hz) communicating with the host properly.
Blinking fast (4 The SMU is running properly but fails to
Hz) communicate with the host properly.
Minor alarm Yellow Off No minor or warning alarm is generated.
indicator
Steady on A minor or warning alarm is generated.
Major alarm Red Off No critical or major alarm is generated.
indicator
Steady on A critical or major alarm is generated.

Buttons

Table 3-2 Button description

Button Name Description


Up
Press and to scroll through the menus or to change
the value of a parameter.
Down

Cancel Returns to the previous menu without saving the settings.

Enter  Enters the main menu from the standby screen.


 Enters a submenu from the main menu.
 Saves menu settings on a submenu.

NOTE
 The LCD screen becomes dark if no button is pressed within 30 seconds.

 You need to log in again if no button is pressed within 1 minute.

 To increase or decrease a parameter value quickly, hold down or during parameter


setting.

 To restart the SMU, hold down and for 10 seconds.

 To increase (or decrease) the LCD backlight, hold down and (or ) for 2
seconds.

SD Card Slot
SD card is used for storing the camera capture images, maximum support 32 G capacity.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 23


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 3 Components

USB Ports
You can quickly deploy a site, import and export configuration files, export running logs, and
upgrade software by inserting the USB flash drive that is specially used for site deployment
into the USB port.
After installing the specific WiFi module using the USB port, you can access the WebUI
locally, which facilitates operations.

Using WiFi modules provided by another vendor may cause data loss or function exception.
Consequences arising from this will not be borne by Huawei.

Communications Ports

Table 3-3 Communications port description

Communications Communications Parameter Communications Protocol


Port
FE 10/100M autonegotiation HTTPS, NetEco protocol,
SNMP, and TCP-Modbus
protocol
RS485/RS232 Baud rate: 1200 bit/s, 2400 bit/s, Master/slave protocol, YDN
4800 bit/s, 9600 bit/s, 14400 protocol, and Modbus protocol
bit/s, 19200 bit/s, 115200 bit/s
CAN Baud rate: 125 kbit/s CAN protocol

NOTE
All these ports are protected by a security mechanism.

Figure 3-2 Communication port pins

Table 3-4 Pin definitions for the FE port

Pin Signal Description

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 24


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 3 Components

Pin Signal Description


1 TX+ Transmits data over FE
2 TX-
3 RX+ Receives data over FE
6 RX-
4/5/7/8 NA -

Table 3-5 Pin definitions for the RS485/RS232 port

Pin Signal Description


1 TX+ Transmits data over RS485
2 TX-
4 RX+ Receives data over RS485
5 RX-
3 RX232 Receives data over RS232
7 TX232 Transmits data over RS232
6 PGND Connects to the ground
8 NA –

Table 3-6 Description for the CAN port pins

Pin Signal Description


1 RX+ Receives data over RS485
2 RX-
3 NA -
4 TX+ Sends data over RS485
5 TX-
6 NA -
7 CANH CAN high level signal
8 CANL CAN low level signal

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 25


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 3 Components

3.2 User Interface Module UIM05B1


Figure 3-3 Panel

(1) Dry contact and sensor (2) COM communications (3) Battery temperature sensor
ports port port
(4) Door status sensor port (5) Battery switch port (6) Cable hole for fan cables
(7) Handle

The battery switch is used only when the mains supply is unavailable.

Figure 3-4 Dry contacts

Figure 3-5 COM port pin definitions

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 26


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 3 Components

Table 3-7 COM port pin definitions

Pin Signal Description


1 RS485_RX+ RS485 data, positive
2 RS485_RX- RS485 data, negative
3 12 V Power supply
4 RS485_TX+ RS485 data, positive
5 RS485_TX- RS485 data, negative
6 GND Ground
7 Reserved –
8 GND Ground

3.3 (Optional) Communications Expansion Module


NIM01C3
It is mainly used for 4G communication. It can also extend the RS485/CAN port of the main
control board or extend the southbound communication equipment.

Figure 3-6 Panel

(1) SIM card slots (2 PCS) (2) 4G indicator (3) Alarm indicator
(4) Run indicator (5) ANT antenna port (6) COM1 port
(7) COM2 port (8) COM3/CAN port (9) COM4 port
(10) Handle

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 27


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 3 Components

Indicators

Table 3-8 Indicator description

Item Color Status Description


4G Green Steady on The dial-up connection is in the data
indicator service state.
Blinking for a period A network has been registered.
of 2s (on for 0.1s and
then off for 1.9s)
Blinking for a period Network search is in progress, or no
of 2s (on for 0.1s, off available network is connected.
for 0.1s, on for 0.1s,
and then off for 1.7s)
Alarm Red Off No alarm is generated.
indicator
Steady on An alarm is generated.
Run Green Off The NIM01C3 is not running because it
indicator is faulty or has no DC input.
Blinking slowly (0.5 The NIM01C3 is running and
Hz) communicating with the host properly.
Blinking fast (4 Hz) The NIM01C3 is running properly, but
fails to communicate with the host.

Communications Ports

Table 3-9 Communications port description

Communications Communications Description


Port Parameter
COM1 port Baud rate: 9600 Supports master/slave protocols and
bits/s, 19200 bits/s, Modbus.
or 115200 bit/s Supplies 12 V power.
COM2 port Baud rate: 9600 Supports master/slave protocols and
bits/s, 19200 bits/s, Modbus.
or 115200 bit/s Supplies 12 V power.
COM3/CAN port Baud rate: 9600 bit/s COM3: Supports master/slave protocols and
Modbus.
CAN: Supports the CAN protocol.
COM4 port Baud rate: 9600 Supports Modbus.
bits/s, 19200 bits/s,
or 115200 bit/s

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 28


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 3 Components

Figure 3-7 Pins in the COM1, COM2, and COM3 ports

Table 3-10 Pin definitions for the COM1 and COM2 ports

Pin Signal Description


1 RS485_RX+ Receives data over RS485.
2 RS485_RX-
3 12 V Power supply
4 RS485_TX+ Transmits data over RS485.
5 RS485_TX-
6 Reserved -
7 Reserved -
8 GND Ground

Table 3-11 Pin definitions for the COM3/CAN port

Pin Signal Description


1 RS485_RX+ Receives data over RS485.
2 RS485_RX-
3 Reserved -
4 RS485_TX+ Transmits data over RS485.
5 RS485_TX-
6 GND Ground
7 CANH CAN bus high level
8 CANL CAN bus low level

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 29


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 3 Components

Table 3-12 Pin definitions for the COM4 port

Silk Screen Signal Description


R+ RS485+ RS485 data+
R- RS485- RS485 data–

3.4 Communications Expansion Module CIM02C


It is used to extend the RS485/CAN port of the main control board and provides 12 V power
supply for the southbound equipment.

Figure 3-8 Panel

(1) COM1 port (2) COM2 port (3) COM3/COM4 port


(4) 12 V power port (5) COM5 port (6) Handle

Table 3-13 Communications port description

Communications Description Communications


Port Parameter
COM1 port Supports RS485. Baud rate:
Supplies 12 V power. Default value: 9600
Connects to a smart device, such as a digital bit/s
temperature and humidity sensor or an Options: 9600 bit/s,
electricity meter. 1200 bit/s, 2400
bit/s, 4800 bit/s,
COM2 port Supports RS485. 14400 bit/s, 19200
Supplies 12 V power. bit/s, 115200 bit/s
Connects to a smart device.
COM3/COM4 port COM3 supports RS485.
COM4 supports RS232 and CAN. RS232 is
used by default, which can be changed to
CAN by using a jumper. For the operation
method, see appendix.
Connects to the power system.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 30


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 3 Components

Communications Description Communications


Port Parameter
COM5 port Supports RS232 and RS485. RS485 is used
by default, which can be changed to RS232
by using a jumper. For the operation
method, see appendix.
Connects to an air conditioner.

Figure 3-9 Pins in the COM1/COM2/COM3/COM4 ports

Table 3-14 Pin definitions for the COM1 and COM2 ports

Pin Signal Description


1 RS485_RX+ Receives data over RS485.
2 RS485_RX-
3 12 V Power supply
4 RS485_TX+ Transmits data over RS485.
5 RS485_TX-
6 Reserved -
7 Reserved -
8 GND Ground

Table 3-15 Pin definitions for the COM3/4 port

Pin Signal Description


1 RS485_RX+ Receives data over RS485.
2 RS485_RX-
3 RS232_RXD Receives data over RS232.
4 RS485_TX+ Transmits data over RS485.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 31


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 3 Components

Pin Signal Description


5 RS485_TX-
6 GND Ground
7 CANH/RS232_ CAN data +/Transmits data over RS232.
TXD
8 CANL CAN data –

Table 3-16 Pin definitions for the COM5 port

Silk Screen Signal Description


R+/TX RS485+/RS232 RS485 data + or transmits data over RS232.
_TXD
R-/RX RS485-/RS232_ RS485 data – or receives data over RS232.
RXD
GND GND Ground

3.5 Rectifier
A rectifier converts AC input power into stable DC power.

Figure 3-10 Appearance

(1) Power indicator (2) Alarm indicator (3) Fault indicator

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 32


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 3 Components

(4) Locking latch (5) Handle

Table 3-17 Indicator description

Indicator Color Status Description


Power indicator Green Steady The rectifier has an AC input.
on
Off The rectifier has no AC input.
The rectifier is faulty.
Blinking The rectifier is being queried.
at 0.5 Hz
Blinking The rectifier is loading an application
at 4 Hz program.
Alarm indicator Yellow Off No alarm is generated.
Steady  A warning is generated due to ambient
on overtemperature.
 The rectifier has generated a protection
shutdown alarm due to ambient
overtemperature or undertemperature.
AC input overvoltage or undervoltage
protection has been triggered.
The rectifier is in hibernation state.
Blinking The communication between the rectifier and
at 0.5 Hz the external device is interrupted.
Fault indicator Red Off The rectifier is normal.
Steady The rectifier locks out due to output
on overvoltage.

The rectifier has no output due to an internal


fault.

3.6 Digital Temperature and Humidity Sensor


A digital temperature and humidity sensor detects the indoor ambient temperature and
humidity in real time.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 33


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 3 Components

Figure 3-11 Appearance 1

Figure 3-12 Appearance 2

DIP Switch
The following figure shows the DIP switch on a digital T/H sensor. The following table
describes the DIP switch settings.

Figure 3-13 DIP switch 1

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 34


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 3 Components

Figure 3-14 DIP switch 2

Table 3-18 DIP switch settings

Toggle Toggle Toggle Toggle Toggle Toggle T/H


Switch 1 Switch 2 Switch 3 Switch 4 Switch 5 Switch 6 Sensor
Address
ON ON OFF OFF ON ON 51
OFF OFF ON OFF ON ON 52

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 35


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

4 System Installation

4.1 Preparing for the Installation


4.1.1 Preparing Cables
The cross-sectional area of a power cable depends on the current that will flow through the
cable and the voltage drop allowed for the cable.
The cable cross-sectional areas listed are for reference only.

Table 4-1 Preparing cables for the ETP48400-C3B1 and ETP48400-C3B2

Cable Type Maximum Minimum Maximum


Current (A) Cross-Sectional Area Cross-Sectional Area
(mm2) (mm2)
AIU03B Live wire 63 10 (cord end terminal 16 (bare wire)
(three-phase with the with an insertion depth of
neutral wire 18 mm)
connected)
Neutral 63 16 (M6 OT terminal) 25 (bare wire)
wire
PE wire 63 16 (M6 OT terminal) 35 (bare wire)
AIU03C Live wire 63 10 (cord end terminal 16 (bare wire)
(three-phase with the L1 with an insertion depth of
neutral wire 18 mm)
connected or
disconnected) Live wire 63 10 (cord end terminal 16 (bare wire)
L2 with an insertion depth of
18 mm)
Live wire 63 10 (cord end terminal 16 (bare wire)
L3 with an insertion depth of
18 mm)
Neutral 63 10 (cord end terminal 16 (bare wire)
wire with an insertion depth of
18 mm)
PE wire 63 16 (M6 OT terminal) 35 (M6 OT terminal)

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 36


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Cable Type Maximum Minimum Maximum


Current (A) Cross-Sectional Area Cross-Sectional Area
(mm2) (mm2)
AIU02 Live wire 144 25 (M6 OT terminal) 35 (M6 OT terminal)
(single-phase)
Neutral 144 25 (M6 OT terminal) 35 (M6 OT terminal)
wire
PE wire 90 16 (M6 OT terminal) 35 (M6 OT terminal)
AIU02 (dual-live Live wire 125 25 (cord end terminal 35 (cord end terminal
wire) L1 with an insertion depth of with an insertion depth of
18 mm) 18 mm)
Live wire 125 25 (cord end terminal 35 (cord end terminal
L2 with an insertion depth of with an insertion depth of
18 mm) 18 mm)

PE wire 90 16 (M6 OT terminal) 35 (M6 OT terminal)


DC output power - 16 1.5 16 (bare wire)
cable
- 32 4 16 (bare wire)
- 63 10 16 (bare wire)
- 80 10 35
- 100 16 35
- 125 25 35
Battery cable 350 35 (M6 OT terminal); 2 50 (M6 terminal with a
PCS width less than 16 mm); 2
PCS

NOTE
 The size data in the table is applicable when the ambient temperature is 30°C (in air) and only cables in a single loop are
involved.
 When the ambient temperature is not 30°C or cables in multiple loops are routed together, use cables with larger
cross-sectional areas if the cabling distance is long.
 Battery cables should be able to withstand a temperature of at least 90°C.

4.1.2 Tools

Use tools with insulated handles. The following table is for reference only.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 37


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Table 4-2 Installation tools and instruments

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 38


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

4.1.3 Installation Dimensions


Figure 4-1 Installation dimensions for the ETP48400-C3B1 and ETP48400-C3B2

48.3 mm indicates that the distance between a power subrack mounting ear and the front of the subrack
is about 48.3 mm.

Figure 4-2 Installation dimensions for an intelligent power distribution unit

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 39


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-3 Installation dimensions for a lead-acid battery box

4.2 Installing Devices


Procedure
Step 1 Install a subrack in a 19-inch rack.

Figure 4-4 Installing the ETP48400-C3B1 or ETP48400-C3B2 subrack

Step 2 Install an intelligent power distribution unit in the 19-inch rack.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 40


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-5 Installing an intelligent power distribution unit

Step 3 Install a lead-acid battery box in the 19-inch rack.

Figure 4-6 Installing a lead-acid battery box

----End

4.3 Installing Ground Cables

Ensure that the ground cables are installed securely. Inappropriate grounding may cause
device damage and personal injury.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 41


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-7 Installing a ground cable for the ETP48400-C3B1 or ETP48400-C3B2

(1) Ground bar

Figure 4-8 Installing a ground cable for the DCDB48-200-16B

(1) Ground bar

Figure 4-9 Installing a ground cable for the DCDB48-200-16B-XXX

(1) Ground bar

Figure 4-10 Installing a ground cable for the lead-acid battery box

(1) Ground bar

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 42


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

4.4 Installing a Rectifier


Prerequisites
 The rectifier is intact after being unpacked.
 The filler panel has been removed from the rectifier slot.

 If the rectifier is damaged, contact your local Huawei office.


 The rectifier slot presents a risk of electric shock. Do not touch the slot with your hands.
 High temperature is generated around the air exhaust vent when the rectifier is running.
Do not touch the vent with your hands or cover the vent with cables or other objects.
 In an indoor scenario, you are advised to power on the rectifier within seven days after
unpacking. If the rectifier cannot be powered on in time, place it in an indoor environment
that is dry and without corrosive gas.
 In an outdoor scenario, you are advised to power on the rectifier within 24 hours after
unpacking. If the rectifier cannot be powered on in time, place it in an indoor environment
that is dry and without corrosive gas.

Procedure
Step 1 Push the locking latch towards the left.
Step 2 Draw the handle downwards.
Step 3 Gently push the rectifier into its slot along the guide rails.
Step 4 Push the handle upwards.
Step 5 Push the locking latch towards the right to secure the handle.

Figure 4-11 Installing a rectifier

----End

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 43


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

4.5 Installing a Circuit Breaker


Prerequisites
If a circuit breaker is required, perform the following steps to install it.

Procedure
Step 1 Install a circuit breaker in the corresponding slot.
Step 2 Push the circuit breaker so that it is aligned with the subrack.

Figure 4-12 Installing a circuit breaker

----End

4.6 Installing a Digital Temperature and Humidity Sensor


Prerequisites
If a digital temperature and humidity sensor is required, perform the following steps to install
it.

Procedure
Step 1 Attach the digital temperature and humidity sensor to the side panel of the cabinet.

There is a magnet at the bottom of the digital temperature and humidity sensor, which can be directly
attached to the side panel of the cabinet.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 44


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-13 Installing a digital temperature and humidity sensor

Step 2 Connect the communications cable for the digital temperature and humidity sensor to the
COM port on the communications expansion module or UIM.

The communications cables in the figures are connected to communications expansion modules.

Figure 4-14 Installing a communications cable for a digital temperature and humidity sensor

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 45


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-15 Installing communications cables for cascaded digital temperature and humidity
sensors

Step 3 Set the DIP address.

Table 4-3 DIP switch settings

Toggle Toggle Toggle Toggle Toggle Toggle Address of


Switch Switch Switch 3 Switch 4 Switch Switch Digital
1 2 5 6 Temperature and
Humidity Sensor
ON ON OFF OFF ON ON 51
OFF OFF ON OFF ON ON 52

----End

4.7 Installing a Communications Expansion Module


NIM01C3
Context
The NIM01C3 can be installed only in the upper slot of the communications expansion
module.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 46


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Procedure
Step 1 Remove the filler panel from the slot for installing the communications expansion module.
Step 2 Install a SIM card in the communications expansion module.

The SIM card inserted into the communications expansion module (NIM01C3) should
support GSM, WCDMA, TD-SCDMA, TDD, and FDD standards, and have the SMS and data
service functions enabled.

Figure 4-16 Installing a SIM Card

(1) SIM card

Step 3 Draw the handle rightwards.


Step 4 Gently insert the communications expansion module into its slot along the guide rails.

The NIM01C3 can be installed only in the upper slot.

Step 5 Push the handle leftwards and tighten the screws.

Figure 4-17 Installing a Communications Expansion Module NIM01C3

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 47


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

----End

4.8 Installing a Communications Expansion Module


CIM02C
Context
The CIM02C can be installed in both the upper slot and the lower slot of the communications
expansion module.

Procedure
Step 1 Remove the filler panel from the slot for installing the communications expansion module.
Step 2 Draw the handle rightwards.
Step 3 Gently insert the communications expansion module into its slot along the guide rails.
Step 4 Push the handle leftwards and tighten the screws.

Figure 4-18 Installing a Communications Expansion Module CIM02C

----End

4.9 (Optional) Installing Dry Contact Signal Cables


Procedure
Step 1 Press the contact plate using a flat-head screwdriver to flip the metal spring inside each dry
contact.
Step 2 Connect the signal cables to the corresponding dry contacts.
Step 3 Remove the flat-head screwdriver and check that the signal cables are connected securely.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 48


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-19 Installing a dry contact signal cable

----End

4.10 (Optional) Installing Communications Cables


4.10.1 WebUI Management
Procedure
Step 1 Connect the FE port on the SMU by using a network cable.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 49


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-20 Connecting a communications cable (for WebUI management)

(1) WebUI terminal (2) FE port on the SMU

----End

4.10.2 Using the U2000-SPM for Management


Step 1 Connect one end of a network cable to the RS485/RS232 port on the SMU.
Step 2 Connect the other end of the cable to the MON0 or MON1 port on Huawei BBU.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 50


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-21 Connecting a communications cable

(1) RS485/RS232 port on the SMU (2) MON1 port on Huawei BBU

----End

4.10.3 NetEco Management


Networking Mode 1: FE Port
Step 1 Connect the FE port on the SMU by using a network cable.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 51


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-22 Connecting a communications cable (over the FE port)

(1) NetEco terminal (2) FE port on the SMU

----End

Networking Mode 2: RS485 Port


Step 1 Connect one end of a network cable to the RS485/RS232 port on the SMU.
Step 2 Connect the other end of the cable to the MON0 or MON1 port on Huawei BBU.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 52


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-23 Connecting a communications cable (over the RS485 port)

(1) RS485/RS232 port on the SMU (2) MON1 port on Huawei BBU

----End

4.10.4 Third-Party NMS Management (over SNMP)


Procedure
Step 1 Connect the FE port on the SMU by using a network cable.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 53


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-24 Connecting a communications cable (for third-party NMS management)

(1) SNMP-based NMS terminal (2) FE port on the SMU

----End

4.11 Installing Sensor Cables


4.11.1 Installing Door Status Sensor Cables
Procedure
Step 1 Connect door status sensor cables to the GATE ports on the UIM.

Figure 4-25 Installing cables for a door status sensor

----End

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 54


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

4.11.2 Installing Battery Temperature Sensor Cables


Procedure
Step 1 Connect the battery temperature sensor cables to the BTEMP port on the UIM.

Figure 4-26 Installing battery temperature sensor cables

----End

4.11.3 Installing Smoke Sensor Cables


Procedure
Step 1 ProcedureConnect smoke sensor cables to the SMOKE ports on the UIM.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 55


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-27 Installing smoke sensor cables

----End

4.11.4 Installing a Water Sensor Cable


Procedure
Step 1 Connect the water sensor cable to the WATER ports on the UIM.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 56


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-28 Installing a water sensor cable

----End

4.12 Installing Cables

 Ensure that the upstream AC input circuit breaker is in the OFF position, and attach a
warning label indicating "Do not operate."
 Switch all circuit breakers to OFF before installing cables.

 If cables are routed from the front of the power subrack, the minimum bending radius of
the cables is 80 mm.
 If cables are routed from the top of the power subrack, it is recommended that 2 U be
reserved for cabling.
 If the preceding conditions are not met, you are advised to use super flexible cables.

4.12.1 Installing DC Output Power Cables


Connecting DC Output Power Cables to 125 A Circuit Breakers
Step 1 Use cables (cross-sectional area: 10–35 mm2) and cord end terminals to prepare DC output
power cables.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 57


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Table 4-4 Preparing cables

Cross-Sectional Recommended Cord End Terminal Recommended Bare Wire


Area Specifications Specifications
10 mm2 Pre-insulated and with an insertion depth 25–35 mm2
of 18 mm NOTICE
16 mm 2
Pre-insulated and with an insertion depth Cord end terminals are recommended. When
bare wires are used, you are advised to add heat
of 18 mm shrink tubing to ensure that the wire ends are
not split.
25 mm2 Pre-insulated and with an insertion depth
of 18 mm
35 mm2 Not pre-insulated; with an insertion
depth of 18 mm

Figure 4-29 Preparing a cord end terminal

(1) Cable (2) Cord end terminal (3) Crimping tool

Step 2 Install DC output power cables.


1. Loosen the screws for the DC output circuit breakers.
2. Connect DC output power cables to the corresponding DC output circuit breakers.
3. Tighten the screws for the DC output circuit breakers.

Tighten the screws until they are flush with the thread, indicating that the screws are fastened
properly.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 58


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-30 Installing DC output power cables

(1) DC load

----End

Connecting DC Output Power Cables to 63 A Circuit Breakers


Step 1 Use cables (cross-sectional area: 1.5–16 mm2) and cord end terminals to prepare DC output
power cables.

Table 4-5 Preparing cables

Cross-Sectional Recommended Cord End Terminal Recommended Bare Wire


Area Specifications Specifications
1.5 mm2 Pre-insulated and with an insertion depth of 16 mm2
18 mm NOTICE
4 mm 2
Pre-insulated and with an insertion depth of Cord end terminals are recommended.
When bare wires are used, you are advised
18 mm to add heat shrink tubing to ensure that the
wire ends are not split.
10 mm2 Pre-insulated and with an insertion depth of
18 mm
16 mm2 Pre-insulated and with an insertion depth of
18 mm (supports bare wire installation)

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 59


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-31 Preparing a cord end terminal

(1) Cable (2) Cord end terminal (3) Crimping tool

Step 2 Install DC output power cables.


1. Insert a flat-head screwdriver (2 mm wide) into the holes for DC output circuit breakers.
2. Connect DC output power cables to the corresponding DC output circuit breakers.
3. Remove the flat-head screwdriver.

Figure 4-32 Installing DC output power cables

(1) DC load

----End

4.12.2 Installing a 220/380 V AC Three-Phase Four-Wire Input


Power Cable
Procedure
Step 1 Use cables (cross-sectional area: 10–16 mm2), cord end terminals, and OT terminals to
prepare an AC input power cable.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 60


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-33 Preparing a cord end terminal

(1) Cable (2) Cord end terminal (3) Crimping tool

Figure 4-34 Preparing an OT terminal

(1) Cable (2) OT terminal (3) Heat shrink tubing


(4) Hydraulic pliers (5) Heat gun

Step 2 Remove the protective cover from the N wiring position.


Step 3 Connect the AC input power cable to corresponding AC input circuit breakers.
Step 4 Reinstall the protective cover on the N wiring position.

Figure 4-35 Installing a 220/380 V AC three-phase four-wire input power cable

(1) Alternating current distribution box (ACDB)

----End

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 61


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

4.12.3 Installing 220 V AC Single-Phase Input Power Cables


Procedure
Step 1 Install a short-circuit copper bar and remove the protective cover from the short-circuit copper
bar.

Figure 4-36 Installing a short-circuit copper bar

Step 2 Use cables (cross-sectional area: 10–35 mm2), cord end terminals, and OT terminals to
prepare AC input power cables.

Figure 4-37 Preparing an OT terminal

(1) Cable (2) OT terminal (3) Heat shrink tubing


(4) Hydraulic pliers (5) Heat gun

Step 3 Install AC input power cables.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 62


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-38 Installing 220 V AC single-phase input power cables

(1) AC distribution box

Step 4 Reinstall the protective cover for the short-circuit copper bar.
----End

4.12.4 Installing 120/240 V AC Dual–Live Wire Input Power


Cables
Procedure
Step 1 Use cables (cross-sectional area: 10–35 mm2) and cord end terminals to prepare AC input
power cables.

Figure 4-39 Preparing a cord end terminal

(1) Cable (2) Cord end terminal (3) Crimping tool

Step 2 Install AC input power cables.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 63


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-40 Installing AC input power cables

(1) ACDB

----End

4.12.5 Installing Cables for an Intelligent Power Distribution Unit

The methods for installing cables between the intelligent power distribution unit and other power
subracks are similar. The following uses one of them as an example.

Procedure
Step 1 Install power cables for the intelligent power distribution unit.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 64


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-41 Installing power cables for the DCDB48-200-16B intelligent power distribution unit

Figure 4-42 Installing power cables for the DCDB48-200-16B-XXX intelligent power
distribution unit

Step 2 Install DC output power cables for the intelligent power distribution unit.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 65


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-43 Installing DC output power cables for the intelligent power distribution unit

(1) DC load

Step 3 (Optional) Set the DIP address.

When multiple intelligent power distribution units are cascaded, set the DIP address.
1. Remove the DMU02C1.

Figure 4-44 Removing the DMU02C1

2. Set the DIP address.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 66


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-45 DIP switch

Table 4-6 DIP switch description

Address of Intelligent Power Pin 1 Pin 2


Distribution Unit
1 OFF OFF
2 OFF ON
3 ON OFF
4 ON ON

NOTE
 If one contactor and one shunt are installed, for example, in a DCDB48-200-16B-4731, set pin3 to
OFF and pin4 to OFF.
 If two contactors and one shunt are installed, for example, in a DCDB48-200-16B-4731-008, set
pin3 to OFF and pin4 to ON.

Set the DIP switch on the new DMU02C1 based on the DIP switch settings on the old DMU02C1 to
ensure consistency.
3. Reinstall the DMU02C1.
Step 4 Install communications cables for the intelligent power distribution unit.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 67


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-46 Installing a communications cable for one intelligent power distribution unit

Figure 4-47 Installing communications cables for multiple intelligent power distribution units

----End

4.12.6 Installing Cables for a Lead-Acid Battery Box


Prerequisites

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 68


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

 Smoking and sources of ignition are prohibited near batteries.


 Switch off the battery circuit breakers before installing batteries.
 Comply with regulations and warnings issued by manufacturers.
 Use tools with insulated handles. Otherwise, batteries may burn out and cause personal
injury.
 Before handling batteries, wear goggles, rubber gloves, and protective clothes. Remove all
conductive objects, such as watches, bracelets, bangles, and rings.
 If battery acid gets in the eyes, rinse with cold water for more than 15 minutes and seek
medical advice immediately. If battery acid comes into contact with skin or clothing, wash
with soap and water immediately.
 Do not use metal or conductors to simultaneously touch two or more battery terminals or
touch battery terminals and grounded objects (for example, a battery compartment);
otherwise, transient short circuits occur, which may produce sparks or explosions.
 During battery installation, ensure that the positive and negative battery terminals are
correctly connected to prevent reverse polarity. Connect the negative battery cable and
then the positive battery cable.
 Secure battery cables with a torque specified in battery documentation. Loose connections
will result in excessive voltage drops or cause batteries to burn out when the current is
high.
 The methods for installing cables between the lead-acid battery box and other power
subracks are similar. The following uses one type of cable as an example.

Procedure
Step 1 Install power cables for the lead-acid battery box.

Figure 4-48 Installing power cables for the lead-acid battery box

Step 2 Switch off the battery circuit breakers.


Step 3 Install battery cables for the lead-acid battery box.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 69


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-49 Installing battery cables for the lead-acid battery box

(1) Battery string

Step 4 Install a fuse detection cable for the lead-acid battery box.

Figure 4-50 Installing a fuse detection cable for the lead-acid battery box

----End

4.12.7 Installing Lithium Batteries and Cables


Prerequisites

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 70


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

 Smoking and sources of ignition are prohibited near batteries.


 Switch off the battery circuit breakers before installing batteries.
 Comply with regulations and warnings issued by manufacturers.
 Use tools with insulated handles. Otherwise, batteries may burn out and cause personal
injury.
 Before handling batteries, wear goggles, rubber gloves, and protective clothes. Remove all
conductive objects, such as watches, bracelets, bangles, and rings.
 Do not use metal or conductors to simultaneously touch two or more battery terminals or
touch battery terminals and grounded objects (for example, a battery compartment);
otherwise, transient short circuits occur, which may produce sparks or explosions.
 During battery installation, ensure that the positive and negative battery terminals are
correctly connected to prevent reverse polarity. Connect the negative battery cable and
then the positive battery cable.
 Secure battery cables with a torque specified in the battery documentation. Loose
connections will result in excessive voltage drops or cause batteries to burn out when the
current is high.
 Low temperature charging may cause short circuits inside the electrochemical cell and
explosion.
 Install lithium batteries in a dry, clean, and well-ventilated environment that is free from
sources of strong infrared radiation, organic solvents, and corrosive gases. Do not expose
lithium batteries to sunlight or water and keep them far away from sources of ignition.
 Do not immerse battery cables in water. Do not place battery cables in places that can be
directly exposed to rain.
 Ambient humidity: ≤ 95% RH the IP rating of the outdoor cabinet is IPX4 or higher.

 Before installing lithium batteries, ensure that the running indicator is off. Use a
multimeter to check that the lithium battery power port has no voltage.
 Install lithium batteries at the lower layer and then the upper layer.
 At least two persons are required to move a lithium battery.
 The following uses one battery as an example.

Procedure
Step 1 Install a lithium battery in a 19-inch rack.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 71


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-51 Installing a lithium battery

Step 2 Install a ground cable for each lithium battery.

Figure 4-52 Installing a ground cable for a lithium battery

(1) Ground bar

Step 3 Install communications cables and a build-out resistor for lithium batteries.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 72


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

Figure 4-53 Installing communications cables (CAN communication) for lithium batteries

Figure 4-54 Installing communications cables (RS485 communication) for lithium batteries

Step 4 Install lithium battery power cables.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 73


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 4 System Installation

1. Use cables (cross-sectional area: 35–50 mm2) and OT terminals to prepare lithium
battery power cables.

Figure 4-55 Preparing an OT terminal

(1) Cable (2) OT terminal (3) Heat shrink tubing


(4) Hydraulic pliers (5) Heat gun

Figure 4-56 Installing lithium battery power cables

----End

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 74


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 5 Verifying the Installation

5 Verifying the Installation

5.1 Checking Hardware Installation


 Check that all screws, especially those used for electrical connections, are secured.
Check that flat washers and spring washers are installed properly.
 Check that rectifiers are completely inserted into their respective slots and properly
locked.

5.2 Checking Electrical Connections


 Check that all circuit breakers are OFF or all fuses are disconnected.
 Check that flat washers and spring washers are securely installed for all OT terminals
and that all the OT terminals are intact and properly connected.
 Check that batteries are correctly installed and that battery cables are correctly connected,
and not short circuits exist.
 Check that input and output power cables and ground cables are correctly connected, and
not short circuits exist.

5.3 Checking Cable Installation


 Check that all cables are securely connected.
 Check that all cables are arranged neatly and bound properly to their nearest cable ties,
and are not twisted or overly bent.
 Check that cable labels are properly and securely attached in the same direction.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 75


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

6 Commissioning

 Performing commissioning procedure provided in this chapter may result in power failure
or alarms. Inform the alarm center before commencing the procedure and after completing
the procedure.
 Commissioning should be performed by trained personnel according to the commissioning
instructions provided in this chapter.
 Commissioning is performed with the power on. Before you perform commissioning,
remove any conductors such as jewelry or watches, stand on dry insulating material, and
use insulated tools.
 During commissioning, do not establish contact between electrical points that have
different electric currents.
 Check that the status of a unit or component meets requirements before turning on its
switch.
 If you are maintaining or servicing equipment and do not want others to perform any
operation, attach the label "Currently being serviced. Do not switch on." to the equipment.
 During commissioning, shut down the power system immediately if any fault is detected.
Rectify the fault, start the power system, and proceed with the commissioning.

6.1 Powering on Lead-Acid Batteries


Procedure
Step 1 Measure the voltage between battery strings. The value should range from –42 V DC to –58 V
DC.
Step 2 Switch the battery circuit breaker on the lead-acid battery box to ON.
Step 3 Press the battery switch for 2s to 5s. When you hear a sound from the contactor, power-on is
complete.
Step 4 Measure the voltage between the –48 V busbar and the RTN+ busbar. The value should range
from –42 V DC to –58 V DC.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 76


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

----End

6.2 Connecting the Lithium Battery Supply


Procedure
Step 1 Switch on the lithium battery circuit breaker.
Step 2 Check whether the lithium batteries communicate properly. If the run indicator on a lithium
battery is steady on, the battery communicates properly with the monitoring device. If it
blinks fast (4 Hz), the communication between them is interrupted. If so, check whether the
communications cable is properly connected.
Step 3 Observe the lithium batteries for 15 minutes. The lithium batteries are running properly if the
alarm indicators are off.
Step 4 Set all circuit breakers to the appropriate status based on site requirements.
Step 5 Observe the power system for 15 minutes. If no alarm (except the door status alarm) is
generated on the SMU during this period, the current and voltage for batteries and loads are
normal.
----End

6.3 Setting the Display Language


After powering on the SMU, press or on the LCD to select a display language.

Then press to enter the standby screen.

 If an undesired language is selected, reinstall and restart the SMU and then select the desired
language.
 The preset password for login is 000001.

6.4 Setting Deployment Wizard


After Setup Wizard Init is displayed on the LCD, set the following parameters.

Table 6-1 Parameter settings

Item Setting Value


Setting the time Set this parameter to the local time zone.
zone.
Set the date and Set this parameter to the local date and time.
time
Battery Set the parameters based on site conditions.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 77


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

Item Setting Value


manufacturer NOTE
 If the battery model is set to ESM-A, you do not need to set battery
Battery model parameters after the SMU restarts.
 If the battery model is set to lead-acid battery, perform the following steps
to set battery parameters after the SMU restarts:

The SMU may Yes


restart.
Battery 1 Yes/No
Connected NOTE
 If battery routes 1 and 2 are respectively connected to a battery string (a
Battery 2
battery string consists of four 12 V, 150 Ah batteries in series), set Battery 1
Connected Connected and Battery 2 Connected to Yes and others to No, and set
Single-String Cap. to 150 Ah.
Battery 3
 If battery route 1 is connected to two parallel battery strings (one battery
Connected
string consists of four 12 V, 150 Ah batteries in series), set Battery 1
Battery 4 Connected to Yes and others to No, and set Single-String Cap. to 300 Ah.
Connected
Single-String Rated capacity of each battery string
Cap. NOTE
A battery string includes a set of batteries controlled by one circuit breaker or
fuse.

The SMU may Yes


restart.

6.5 Setting the Date and Time

 The LCD backlight turns off if no button is pressed within 30 seconds.


 Re-login is required if no button is pressed within 1 minute.
 The preset password for login is 000001.

Set the date and time as required. Skip the setting if they have been correctly set in the setup
wizard.

Table 6-2 Setting the date and time

Main Menu Second-Level Third-Level Default Value Settings


Menu Menu
Setting Wizard Date and Time Time Zone UTC +08:00 Set to the local time zone.
NOTE
Beijing
The date and time Date and Time - Set to the local date and
vary with time
zones. Set the time
time.
zone, date, and time
based on the local NTP Enable No Yes/No

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 78


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

Main Menu Second-Level Third-Level Default Value Settings


Menu Menu
situation. NOTE
Set the parameter to Yes if
you need to synchronize the
SMU time and the site
network server time.

6.6 Setting the AC Input System


Set the AC input system based on site requirements.

Table 6-3 Setting the AC input system

Main Menu Second-Level Third-Level Setting Value


Menu Menu
Parameters Settings Mains AC Mode Set to the local  2-Phase
power supply 2-Wire
system.  1-Phase
 3-Phase
4-Wire

6.7 Setting the 57 V Constant Voltage Parameter


Set the 57 V constant voltage parameter based on site requirements.

Table 6-4 Setting the 57 V constant voltage parameter

Main Menu Second-Level Third-Level Fourth-Level Setting Value


Menu Menu Menu
Parameters Li Battery Basic Parameters Work Mode 57V Mode  57V Mode
Settings  48V Mode

6.8 Setting DCDB Parameters


Set DCDB parameters based on site requirements.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 79


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

Table 6-5 Setting DCDB parameters

Main Menu Second-Level Third-Level Fourth-Level Menu Value


Menu Menu
Parameters DC Power DMU LLVD n Enabled Enable/ Disable
Settings
LLVD n Mode Voltage Mode/ Time
Mode
LLVD n Voltage 36.0-56.0 V
LLVD n Recon Volt 37.0-58.0 V
LLVD n Time 0–6000 min
LLVD Delay Time 5-90s

6.9 Setting AC Peak Clipping Parameters


Set peak shaving parameters based on site requirements.

Table 6-6 Setting peak shaving parameters

Main Second- Third- Fourth-Level Menu Setting Description


Menu Level Level
Menu Menu
Parameters AC Peak AC Mains Peak Shave Enb Enable or disable the peaking shaving
Settings Shaving parameters function. When the mains capacity or
circuit breaker capacity is insufficient,
you are advised to enable the peak
shaving function.
Cap for Peak Shave  If the input transformer power is
insufficient, set this parameter to the
transformer power (unit: kW).
 If the input transformer power is
sufficient, keep the default value.
Breaker Rated Curr  If the circuit breaker capacity is
insufficient, set this parameter to the
circuit breaker capacity (unit: A).
 If the circuit breaker capacity is
sufficient, keep the default value.
Derating Coef Indicates the high temperature derating
coefficient of the circuit breaker. Keep
the default value (0.8) unless otherwise
specified.

Peak Rated Phase Volt Set the parameter based on the rated
Shaving voltage of the power grid. Default value:

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 80


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

Main Second- Third- Fourth-Level Menu Setting Description


Menu Level Level
Menu Menu
Para 220 V.
Peak Shaving SOC If power failure occurs, reserve the
battery capacity for peak shaving.
Peak Shaving SOC
(Mix.)
Power-On Hysteresis By default, this parameter does not need
for LLVD in Peak to be set.
Shaving

Batt Backup Enable Indicates whether the peak shaving


battery is used as the backup battery in
the case of power failure. Default value:
No.
Allow A/C Shutdown Indicates whether the air conditioner can
in Peak Shaving be turned off during peak shaving. You
are advised to disable this function.

Allow LLVD n Indicates whether to power off the minor


Disconnection in Peak loads when the battery capacity reserved
Shaving for peak shaving is fully discharged.

6.10 Setting Sensor Parameters


Set sensor parameters based on site requirements.

Table 6-7 Setting sensor parameters

Main Menu Second-Level Third-Level Fourth-Level Settings


Menu Menu Menu
Parameters Setup Parameter Sensor Config Door Sensor Yes, No
Settings NOTE
Water Sensor
Set these parameters to Yes or
Smoke Sensor No as required.

Batt. Temp. Sensor


Temp1 Sensor

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 81


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

6.11 Setting the Mains Collection Channel


Procedure
Step 1 On the WebUI, set the mains collection channel.

Figure 6-1 Setting the mains collection channel

----End

6.12 Setting Communications Parameters


6.12.1 (Optional) Setting Parameters Before Using WebUI
Operating Environment
Supported operating system: Windows XP or later
Browser: Internet Explorer 8.0 or later, FireFox 13 or later, or Chrome 20

Internet Explorer is used as an example to illustrate all WebUI operations mentioned in this document.

Setting a LAN

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 82


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

 If the SMU is connected to a LAN and a proxy server has been selected, cancel the proxy
server settings.
 If the SMU is connected to the Internet but your computer is connected to a LAN, do not
cancel the proxy server settings. Otherwise, you cannot access the SMU.

To cancel proxy server settings, perform the following steps:


Step 1 Open Internet Explorer.
Step 2 Choose Tools > Internet Options.
Step 3 Click the Connections tab and click LAN settings.
Step 4 Clear Use a proxy server for your LAN.

Figure 6-2 Canceling proxy server settings 1

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 83


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

Figure 6-3 Canceling proxy server settings 2

Step 5 Click OK.


----End

Setting Internet Explorer Security

Set Internet Explorer security before you perform the following operations:
 Export historical logs, historical data, statistics, and battery test records.
 Upload system configuration files.
 Download system configuration files.
 Upgrade software.

To set Internet Explorer security, perform the following steps:


Step 1 Open Internet Explorer.
Step 2 Choose Tools > Internet Options.
Step 3 Click the Security tab.
Step 4 Click Internet and click Custom level. After you specify Internet security settings, click
Local intranet and click Custom level.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 84


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

Figure 6-4 Internet Explorer security

Step 5 Specify the security settings.


Enable the following:
 Initialize and script ActiveX controls not marked as safe for scripting
 Allow previously unused ActiveX controls to run without prompt
 Include local directory path when uploading files to a server
 Automatic prompting for file downloads

Figure 6-5 Internet Explorer security setting 1

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 85


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

Figure 6-6 Internet Explorer security setting 2

Figure 6-7 Internet Explorer security setting 3

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 86


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

Figure 6-8 Internet Explorer security setting 4

Step 6 Click OK.


Step 7 Click the Advanced tab, and select all of Use TLS 1.0, Use TLS 1.1, and Use TLS 1.2.

Figure 6-9 Internet Explorer security setting 5

Step 8 Click OK.


----End

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 87


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

Setting SMU Parameters


Step 1 Apply to the site or equipment room network administrator for a fixed IP address.
Step 2 Set the IP address, subnet mask, and gateway on the SMU's LCD.

Table 6-8 IP parameters

Main Second-Level Third-Level Default Settings


Menu Menu Menu Value
Setting Network IP Address 192.168.0.10 Set this parameter according to the address
Wizard Parameters provided by the network administrator.
Subnet Mask 255.255.255.0 Set this parameter according to the subnet
mask provided by the network administrator.
Default 192.168.0.1 Set this parameter according to the gateway
Gateway address provided by the network
administrator.

----End

Logging In to the WebUI


Step 1 Set the PC IP address in the same network segment as the SMU IP address.
For example, if the SMU has an IP address of 192.168.0.10, a subnet mask of 255.255.255.0,
and a default gateway of 192.168.0.1, set the IP address to 192.168.0.11, subnet mask to
255.255.255.0, and default gateway to 192.168.0.1 on the PC.
Step 2 Enter https://monitoring unit local IP address (for example, https://192.168.0.10) in the
address box of the browser, and then press Enter to access the WebUI login page.

Figure 6-10 WebUI login page

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 88


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

The preset user names include admin, engineer, and operator, and the preset password is Changeme.
The user names are intended for administrators, engineers, and operators respectively.
Change the preset password when you first log in to ensure system security.

----End

6.12.2 (Optional) Setting Parameters Before Using U2000-SPM


Context

If a Huawei BBU is deployed, set the Northbound and M/S Protocol parameters.

Procedure
Step 1 Set the port mode, communications protocol type, baud rate, and communications address on
the SMU's LCD.

Table 6-9 Communications parameters

Main Second-Level Third-Level Fourth-Level Fifth-Level Default Settings


Menu Menu Menu Menu Menu Value
Parameters Comm. Serial Port Northbound Port Mode Manual Manual
Settings Parameters
Protocol Type M/S M/S Protocol
NOTE
Protocol
Protocol
Type is
displayed
only when
Port Mode is
set to
Manual.

M/S Protocol Baud Rate - 9600 9600


Comm. - 3 3
Address

----End

6.12.3 (Optional) Setting Parameters Before Using NetEco


Networking Mode 1: FE Port
Step 1 Apply to the site or equipment room network administrator for a fixed IP address.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 89


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

Step 2 Set the IP address, subnet mask, and gateway on the SMU's LCD.

Table 6-10 IP parameters

Main Second-Level Third-Level Default Value Settings


Menu Menu Menu
Setting Network Parameters IP Address 192.168.0.10 Set this parameter according to
Wizard the IP address assigned by the
network administrator.
Subnet Mask 255.255.255.0 Set this parameter according to
the subnet mask provided by the
network administrator.
Default Gateway 192.168.0.1 Set this parameter according to
the gateway address provided
by the network administrator.

Step 3 Set the IP Addresses and Ports for the active servers of the NetEco on the SMU's LCD.

Table 6-11 NetEco parameters

Main Second-Level Third-Level Fourth-Level Default Value Settings


Menu Menu Menu Menu
Parameters Comm. Network NetEco Primary 192.168.0.10 Set an IP address
Settings Parameters Parameters IP for the active
NetEco server.

NetEco Port 31220 Set a port for the


Number NetEco.

----End

Networking Mode 2: RS485 Port


Step 1 Set Port Mode to Manual, Protocol Type to M/S Protocol, Baud Rate to 9600, and Comm.
Address to 3.

Table 6-12 Communications parameters

Main Second-Level Third-Level Fourth-Level Fifth-Level Default Settings


Menu Menu Menu Menu Menu Value
Parameters Comm. Serial Port Northbound Port Mode Automatic Manual
Settings Parameters
Protocol M/S M/S
Type Protocol Protocol
NOTE
This
parameter is

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 90


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

Main Second-Level Third-Level Fourth-Level Fifth-Level Default Settings


Menu Menu Menu Menu Menu Value
displayed
only when
Port Mode is
set to
Manual.

M/S Protocol Baud Rate - 9600 9600


Comm. Address - 3 3

----End

6.12.4 (Optional) Setting Parameters Before Using SNMP


Management
Prerequisites

You can set SNMP parameters remotely or locally on the WebUI.

Before setting SNMP parameters, obtain the information listed in Table 6-13 from the
SNMP-based NMS.

Table 6-13 Information obtained from the NMS

Information Description
SNMP Version SNMP version and port number used for communication between the SMU and
NMS. The SNMP version can be SNMPv1, SNMPv2c, or SNMPv3.
SNMP Port Number
Read Community Name If you use SNMPv1 or SNMPv2c, enter the read and write community names that
comply with the NMS. Otherwise, the SMU will not connect to the NMS.
Write Community Name
The read community name must be different from the write community name.
User Name To enhance the security, you need a user name and password for authentication if
you use SNMPv3. After the authentication succeeds, the SMU can communicate
MD5/SHA Password with the NMS.
DES/AES Password
Trap Target Address IP address and port number used for reporting alarm trap packets.
Trap Port
Trap Community If you use SNMPv1 or SNMPv2c, this parameter is the community name used for
reporting alarm trap packets.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 91


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

 The standard protocols SNMPv1 and SNMPv2 have security risks. You are advised to use the secure
protocol SNMPv3.
 The standard encryption algorithms MD5 and DES have security risks. You are advised to use the
secure encryption algorithms SHA and AES.

Procedure
Step 1 Log in to the WebUI.

The preset user name is admin, and the preset password is Changeme.

Step 2 Access the System Settings page and set SNMP.


 There are two NMSs and the SNMP versions are SNMPv1 or SNMPv2c and SNMPv3:
Set SNMP Version in SNMP to ALL, set SNMP Port, Read Community Name, and
Write Community Name, then click Add in SNMPv3, set User Name, MD5/SHA
Password, and DES/AES Password, and click Confirm.
 SNMPv1 or SNMPv2c: Set SNMP Version in SNMP to SNMPv1&SNMPv2c, set
SNMP Port, Read Community Name, and Write Community Name, and click
Confirm.
 SNMPv3: Set SNMP Version in SNMP to SNMPv3, click Add in SNMPv3, set User
Name, MD5/SHA Password, and DES/AES Password, and click Confirm.
Step 3 Click Add in SNMP Trap.
 If SNMP Version is set to SNMPv1 or SNMPv2c, set Trap Target Address, Trap Port,
and Trap Community.
 If SNMP Version is set to SNMPv3, set Trap Target Address, Trap Port, and
SNMPv3 User Name.

The SNMP version here can be different from the version in Step 2.

Step 4 In Mib files, click Export to export the Mib file and then import it into the NMS.

If there is only one NMS, perform Step 4 once only.

----End

6.13 Connecting the AC Power Supply


Procedure
Step 1 Switch on the AC input circuit breaker and measure the output voltage of the AC input circuit
breaker. The value should range from 85 V AC to 300 V AC.
Step 2 Check that the RUN indicator on the rectifier is steady on.
Step 3 Set all circuit breakers to the appropriate status based on site requirements.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 92


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 6 Commissioning

Step 4 Observe the power system for 15 minutes. If no alarm (except the door status alarm) is
generated on the SMU during this period, the current and voltage for batteries and loads are
normal.
----End

6.14 Subsequent Operations


Procedure
Step 1 Reinstall the removed panels (if any).
Step 2 The subrack surface paint should be intact. If paint peels off, repair the paint to prevent
corrosion.
Step 3 Clean the site and leave there.
----End

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 93


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

7 Maintenance

7.1 Routine Maintenance


Perform routine maintenance based on site requirements. The recommended maintenance
interval is six months. If any fault occurs, rectify it in a timely manner.

Do not maintain devices on raining days, preventing water from entering and damaging
devices.

7.1.1 AC and DC Power Distribution


Table 7-1 AC and DC power distribution maintenance

No. Maintenance Item If... Then...


1 Check for AC input  AC input power cables 1. Replace AC input power
undervoltage. have a large voltage drop. cables with shorter or thicker

cables.
AC input power cables are
in poor contact. 2. Connect AC input power
cables securely.
 The mains voltage is too
3. Provide the voltage data to
low.
the power supplier.
2 Check for AC input The mains voltage is too high. Provide the voltage data to the
overvoltage. power supplier.
3 Check whether the AC input  AC input power cables are 1. Check and rectify the cables.
voltage is open-phase. in poor contact, 2. Provide the open-phase data
short-circuited, or to the power supplier.
damaged.
 The mains supply has
failed.
4 Check whether a DC output  Load overcurrent occurs. Rectify any overcurrent or short
circuit breaker is OFF and a  Load short-circuit occurs. circuit. Turn on the circuit
fuse is blown. breaker or replace the fuse.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 94


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

No. Maintenance Item If... Then...


5 Check for DC busbar A rectifier is abnormal. Replace the abnormal rectifier.
overvoltage.
6 Check for DC busbar  The AC power supply has 1. Resume the AC power
undervoltage. failed. supply.
 The system is overloaded. 2. Check the load status and
rectify faults if any.
 A rectifier is abnormal.
3. Replace the abnormal
rectifier.

7.1.2 Rectifier
Table 7-2 Rectifier maintenance

No. Maintenance Item Possible Fault Cause Suggestion


1 Check the green indicator Off: 1. Check the rectifier AC input.
status (normal: steady on).  There is no AC input. 2. Replace the rectifier.
 The rectifier is faulty.
2 Check the yellow indicator Steady on: 1. Check the ambient
status (normal: off). 
temperature status, and clean
Because the ambient
the cabinet air channel.
temperature is high, the
rectifier power is limited. 2. Rectify faults in the indoor
temperature control system.
 Because the ambient
3. Check the AC input voltage.
temperature exceeds the
upper or lower threshold, the 4. The rectifier is in
rectifier shuts down for hibernation. No action is
protection. required.
 AC input over/undervoltage
protection is triggered.
 The rectifier is in
hibernation.
Blinking: 1. Check that the rectifier

communications cable is
The rectifier communication
securely connected.
has failed
2. Replace the rectifier.
 The rectifier is faulty.
3 Check the red indicator status Steady on: 1. Check that the cabinet is not
(normal: off). 
connected to an external DC
The rectifier is latched off
power source that has a
due to output overvoltage.
voltage of greater than 58.5
 The rectifier is faulty. V DC.
2. Check that the rectifier
output voltage is within 58.5
V DC.
3. Replace the rectifier.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 95


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

7.1.3 SMU
Table 7-3 SMU maintenance

No. Maintenance Item Possible Fault Cause Suggestion


1 Check the green indicator Off: 1. Check that the DC input
status.  There is no DC input.
power cable is securely
connected.
 The SMU is faulty. 2. Check that the
communications cable is
securely connected.
3. Replace the SMU.
2 Check the red indicator status. Steady on: 1. Check related components

based on alarms.
A critical or major alarm is
generated. 2. Replace the SMU.
 The SMU is faulty.
3 Check the LCD display status.  The LCD flat cable is loose. 1. Check that the LCD flat

cable is securely connected.
The SMU is faulty.
2. Replace the SMU.
4 Check that the SMU can  The communications cable is 1. Check that the
communicate with the network loose. communications cable is
management system (NMS). 
securely connected.
Networking parameters are
not correctly set. 2. Check that networking
parameter settings are
correct.

7.1.4 Parameters on the SMU


Table 7-4 SMU parameter maintenance

No. Maintenance Item Possible Fault Cause Suggestion


1 Check whether the displayed  Parameters are set Set battery parameters again.
battery capacity and number of incorrectly.
battery strings are the same as  The number of batteries is
the actual data. changed, or batteries are
replaced.
2 Check Charge Current Limit N/A Change the value as required.
Coefficient. The value is Otherwise, retain 0.15C10.
typically 0.15C10 and
adjustable.
3 Check whether the displayed  The battery temperature 1. Replace the battery
battery temperature is the same sensor is faulty. temperature sensor.
as the actual temperature.  The SMU is faulty. 2. Replace the SMU.

4 Check whether the displayed  Battery current detection 1. Check that the current
total load current is the same as fault. monitoring cable is securely

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 96


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

No. Maintenance Item Possible Fault Cause Suggestion


the actual current measured by  The SMU is faulty. connected.
a clamp meter. 2. Replace the SMU.
5 Check whether the displayed  The current monitoring cable 1. Check that the current
battery charge current is the is loose. monitoring cable is securely
same as the actual current 
connected.
The SMU is faulty.
measured by a clamp meter. 2. Replace the SMU.
6 Check whether the difference  The cabinet busbar and 1. Check and secure the cabinet
between the displayed DC cables are loose or in poor busbar and cable
output voltage and the contact. connections.
measured DC busbar voltage is  The SMU is faulty. 2. Replace the SMU.
less than 0.5 V DC.

7.1.5 Cables
Table 7-5 Cable maintenance

No. Maintenance Item Possible Fault Cause Suggestion


1 Check whether signal cables Cables are not properly Bind signal cables and power
and power cables are separately installed. cables separately.
bound.
2 Check whether all cables are Cables are not properly Bind cables properly.
bound properly. installed.
3 Check whether the cabinet Cables are not properly Connect the cabinet ground bar
ground bar is securely installed. to the site or equipment room
connected to the site or ground point.
equipment room ground point.

4 Check whether ground cables Cables corrode after being used Replace rusty cables.
are rusty. for a long time.
5 Check whether cables have  Cables are too thin.  Replace the cables with
overheated and are  Cables are not properly cables of the required
deteriorating. routed. thickness.
 Route the cables properly.
6 Check whether the cable near  Cables are too thin.  Replace the cables.
the output port of the circuit  Cables are not properly  Reinstall the cables (strip the
breaker is overheated. installed. cables for 18 mm) and
ensure that the cables are
securely connected.
7 Check whether copper wires Cables are not properly  Use standard terminals.
are exposed at the circuit installed.  Insulate exposed copper
breaker wiring terminals. wires.
8 Check whether cables are Cables are not properly Replace the cables and adjust
misshapen by metal parts. installed. the cable routing.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 97


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

No. Maintenance Item Possible Fault Cause Suggestion


9 Check whether cables pass Cables are not properly Adjust the cable routing to
behind the air exhaust vents of installed. prevent cable overheating.
rectifiers.
10 Check whether cable insulation Cable insulation is damaged. Reinsulate the cables with
is damaged. insulation tape.

7.2 Identifying Component Faults


7.2.1 Identifying SMU Faults
The following lists the SMU faults:
 The DC output is normal but the green indicator on the SMU is off.
 The SMU breaks down or cannot be started. Its LCD has abnormal display or buttons
cannot be operated.
 With alarm reporting enabled, the SMU does not report alarms when the power system is
faulty.
 The SMU reports an alarm whereas the power system does not experience the fault.
 The SMU fails to communicate with the connected lower-level devices even though the
communications cables are correctly connected.
 Communication between the SMU and all rectifiers fails even though the rectifiers and
the communications cables are normal.
 The SMU cannot monitor AC or DC power distribution when communications cables are
intact and AC and DC power distribution is normal.
 Parameters cannot be set or running information cannot be viewed on the SMU.

7.2.2 Identifying Rectifier Faults


The following lists the rectifier faults
 The AC input and slot connector are normal, but the Fault indicator (red) is steady on or
all indicators are off.
 The slot connector and SMU are normal, but the Alarm indicator (yellow) still blinks
after the rectifier is reinstalled.
 The AC input and SMU are normal, but the SMU cannot control the rectifier.

7.2.3 Identifying Circuit Breaker Faults


If the load fuse is blown, it indicates that the circuit breaker trips. If the circuit breaker is
switched on and the downstream device is still not powered (the busbar has power), the circuit
breaker is faulty and needs to be replaced.

7.2.4 Locating AC Input Module Faults


The following lists the AC input module faults:

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 98


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

 The AC surge protector is faulty.


 Under normal AC power supply, if the rectifier has no output after the circuit breaker is
switched on (the upstream has power), the circuit breaker is faulty.

7.3 Replacing Components

 Ensure that loads are supplied with power when replacing major components. For example,
keep the switches for primary loads in the ON position, and do not turn off the battery
switch and AC input switch at the same time.
 Seek the customer's prior consent if load disconnection is required.
 Rectifiers and the SMU are hot-swappable.

7.3.1 Replacing an SMU02C


Prerequisites
 You have obtained the cabinet door key.
 The new SMU02C is intact.

Procedure
Step 1 Connect the ground cable for the ESD wrist strap, and put on the ESD wrist strap and ESD
gloves.

Record the software version of the old SMU. If the old SMU is damaged and cannot be viewed, send the
barcodes of the old SMU and the cabinet to Huawei service personnel for query.

Step 2 Remove the communications cable from the SMU02C panel and record the cable information.
Step 3 Push the locking latch leftwards.
Step 4 Pull the handle outwards and remove the SMU02C.

Figure 7-1 Removing the SMU02C

Step 5 Take off the SD card from the side of the SMU02C.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 99


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

If no SD is installed, go to Step 7.

Step 6 Insert the SD card into the new SMU02C.


Step 7 Place the new SMU02C in the slot, push the locking latch leftwards, and pull out the handle.
Step 8 Gently push the SMU02C along guide rails until it is engaged. Close the handle, and push the
locking latch rightwards.

Figure 7-2 Installing the SMU02C

Step 9 Reset SMU02C parameters.

After replacing the old SMU with a new spare part, power on the new SMU and check its software
version. If the software version of the new SMU is earlier than that of the old SMU, upgrade the new
SMU software.

Step 10 Reconnect the communications cable to the SMU02C panel based on the recorded cable
information.
Step 11 Disconnect the ground cable from the ESD wrist strap, and remove the ESD wrist strap and
ESD gloves.
----End

Follow-up Procedure
Pack the removed component and have it sent to the local Huawei warehouse.

7.3.2 Replacing a UIM05B1


Prerequisites
 The ESD wrist strap, ESD gloves, ESD box or bag, and toolbox are available.
 The new UIM05B1 is intact.

Procedure
Step 1 Connect the ESD wrist strap ground cable, and wear the ESD wrist strap and ESD gloves.
Step 2 Record the connection positions of cables on the UIM05B1 panel and remove the cables.
Step 3 Loosen the screws on the UIM05B1 panel, pull the handle until it is engaged, and take out the
UIM05B1.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 100


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

Figure 7-3 Removing the UIM05B1

Step 4 Install the new UIM05B1.


Step 5 Install the cables based on the recorded information.
Step 6 Disconnect the ground cable from the ESD wrist strap, and remove the ESD wrist strap and
ESD gloves.
----End

Follow-up Procedure
Pack the removed component and send it to the local Huawei warehouse.

7.3.3 Replacing a NIM01C3


Prerequisites
 An ESD wrist strap, ESD gloves, ESD box or bag, cabinet door key, and required tools
are available.
 The new NIM01C3 is intact.

Procedure
Step 1 Connect the ground cable to the ESD wrist strap, and put on the ESD wrist strap and ESD
gloves.
Step 2 Record all cable connection positions on the communications expansion module and
disconnect the cables.
Step 3 Loosen the screws on both sides of the communications expansion module.
Step 4 Pull the handle rightwards and remove the communications expansion module.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 101


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

Figure 7-4 Removing a communications expansion module

Step 5 Remove the SIM card from the SIM card slot, and insert the new communications expansion
module. Skip this step if no SIM card is installed.
Step 6 Place the new NIM01C3 in the corresponding slot of the monitoring unit subrack, and push
the NIM01C3 until its front panel is flush with the front panel of the monitoring unit subrack.
Step 7 Push the handle inwards until it is engaged, and then tighten the screws.

Figure 7-5 Installing a communications expansion module

Step 8 Reconnect cables to the panel of the new communications expansion module based on the
recorded information.
Step 9 Disconnect the ground cable from the ESD wrist strap, and remove the ESD wrist strap and
ESD gloves.
----End

Follow-up Procedure
Pack the removed component and have it sent to the local Huawei warehouse.

7.3.4 Replacing a CIM02C


Prerequisites
 An ESD wrist strap, ESD gloves, ESD box or bag, cabinet door key, and required tools
are available.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 102


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

 The new CIM02C is intact.

Procedure
Step 1 Connect the ground cable to the ESD wrist strap, and put on the ESD wrist strap and ESD
gloves.
Step 2 Note where cables are connected to the CIM02C panel. Record these positions and disconnect
the cables.
Step 3 Loosen the screws on both sides of the CIM02C panel.
Step 4 Pull the handle rightwards and take out the CIM02C.

Figure 7-6 Removing the CIM02C

Step 5 Place the new CIM02C into the correct slot in the subrack, and push the CIM02C until its
front panel is flush with the front panel of the subrack.
Step 6 Push the handle inwards until it is engaged, and then tighten the screws.

Figure 7-7 Installing the CIM02C

Step 7 Reconnect the cables to the new CIM02C panel based on the information you recorded.
Step 8 Disconnect the ground cable from the ESD wrist strap, and remove the ESD wrist strap and
ESD gloves.
----End

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 103


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

Follow-up Procedure
Pack the removed component and have it sent to the local Huawei warehouse.

7.3.5 Replacing a DMU02C1


Prerequisites
 The protective gloves and cabinet door key are available.
 The new DMU02C1 is intact.

 Do not remove the DMU02C1 that is loaded. Otherwise, it may be damaged.


 To prevent burns, exercise caution when removing a DMU02C1 because it may be hot as a
result of continuous operation.

Procedure
Step 1 Put on the protective gloves.
Step 2 Note where cables are connected to the DMU02C1 panel. Record these positions and
disconnect the cables.
Step 3 Remove the old DMU02C1.

Figure 7-8 Removing the old DMU02C1

Step 4 Install the new DMU02C1.

Figure 7-9 Installing the new DMU02C1

Step 5 Reconnect the cables based on the information you recorded.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 104


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

Step 6 Remove the protective gloves.


----End

Follow-up Procedure
Pack the removed component and have it sent to the local Huawei warehouse.

7.3.6 Replacing a Rectifier


Prerequisites
 You have obtained a pair of protective gloves and the cabinet door key.
 The new rectifier is intact.

Protect yourself from being burnt when moving the rectifier because the rectifier has a high
temperature.

Procedure
Step 1 Put on protective gloves.
Step 2 Push the locking latch at the right side of the panel towards the left.
Step 3 Gently draw the handle outwards, and then remove the rectifier from the subrack.

Figure 7-10 Removing a rectifier

Step 4 Push the locking latch on the new rectifier towards the left, and pull out the handle.
Step 5 Place the new rectifier at the entry to the correct slot.
Step 6 Gently slide the converter into the slot along guide rails until it is engaged. Close the handle,
and push the locking latch towards the right to lock the handle.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 105


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

Figure 7-11 Installing a rectifier

Step 7 Take off protective gloves.


----End

Follow-up Procedure
Pack the removed component, and return it to Huawei local warehouse.

7.3.7 Replacing a Circuit Breaker


Prerequisites
 You have obtained the toolbox.
 The new circuit breaker is intact.

 Power off the system before replacing a circuit breaker. Do not operate with power on.
 Power-off will disconnect power supply to loads. Obtain prior consent from customers
before replacing a circuit breaker.

Procedure
Step 1 Switch off the circuit breaker to be replaced.
Step 2 Record the connection positions of cables, remove the cables, and insulate them.
Step 3 Push the faulty circuit breaker along the guide rails and pull it out horizontally.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 106


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

Figure 7-12 Removing a circuit breaker

Step 4 Put the new circuit breaker to the slot and push it along the guide rails until it is in position.
Step 5 Connect cables to the circuit breaker based on the recorded cable information.
Step 6 Switch on the circuit breaker.
----End

Follow-up Procedure
Pack the removed components and send them to the local Huawei warehouse.

7.3.8 Replacing an AC Input Module


Prerequisites
The required tools are available and the new AC input module is intact.

 Power off the AC input module before replacing it.


 Power-off will cause load devices to be shut down. Before replacing the AC input module,
obtain the customer's approval.

Procedure
Step 1 Switch off the circuit breaker on the AC input module.
Step 2 Record the installation positions of cables, remove the cables and insulate them.
Step 3 Remove the AC input module.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 107


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

Figure 7-13 Removing the AC input module

Step 4 Install the new AC input module.


Step 5 Install the AC input power cables based on the recorded information.
----End

Follow-up Procedure
Pack the removed parts and send it to the local Huawei warehouse.

7.3.9 Replacing a Digital Temperature and Humidity Sensor


Prerequisites
 Tools and the key to the cabinet door are available.
 The new digital temperature and humidity sensor is intact.

Procedure
Step 1 Record cable information and installation positions.
Step 2 Record the DIP switch settings.
Step 3 Disconnect the cable from the communications port on the sensor.
Step 4 Remove the faulty sensor.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 108


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual 7 Maintenance

Figure 7-14 Removing a sensor

Step 5 Put the new sensor at the side of the cabinet.


Step 6 Connect cables based on the recorded information.
Step 7 Set the DIP switch based on the recorded DIP switch information.
----End

Follow-up Procedure
Pack the removed component and send it to the local Huawei warehouse.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 109


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual A How Do I Install a Hall Effect Sensor?

A How Do I Install a Hall Effect Sensor?

When installing the hall effect sensor, ensure that the direction of current is the same as that of
the arrow on the hall effect sensor.

Figure A-1 Installing a Hall effect sensor 1

Figure A-2 Installing a Hall effect sensor 2

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 110


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual B Technical Specifications

B Technical Specifications

Table B-1 Technical specifications

Category Item Specifications


Environment Operating temperature –40°C to +65°C (When the ambient
conditions temperature is between –33°C and
+55°C, the power system works
properly. When the ambient
temperature is greater than 55°C and
less than or equal to 65°C, the output
power is linearly derated to 80%.
When the ambient temperature is
–40°C, the power system can start
properly after AC power is applied.)
Transportation temperature –40°C to +70°C
Storage temperature –40°C to +70°C
Operating humidity 5%–95% RH (non-condensing)
Storage humidity 5%–95% RH (non-condensing)
Altitude 0–4000 m
When the altitude ranges from 2000
m to 4000 m, the operating
temperature decreases by 1°C for
each additional 200 m.
Noise System audible noise: ≤ 60 dBA at
25°C, ≤ 72 dBA at 40°C; meets class
3.1 requirements of ETSI 300753.
Others There is no conductive dust, corrosive
gas, or explosion hazard.
Dust, corrosive substances, pests,
molds, and other indicators should be
controlled in accordance with class
3.1 requirements in ETSI EN 300
019-1-3 (V2.3.2 or a later version).

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 111


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual B Technical Specifications

Category Item Specifications


AC input Input frequency 45–66 Hz; rated frequency: 50 Hz/60
Hz
Power factor ≥ 0.99 (rated input voltage,
50%–100% load)
DC output Output voltage –53.5 V DC
Maximum output power  ETP48400-C3B1: 24 kW
 ETP48400-C3B2: 18 kW
Regulated voltage precision ≤ ±1%
Peak-to-peak noise voltage ≤ 200 mV (0–20 MHz)
Psophometrically weighted ≤ 2 mV
noise voltage
Unbalance of load sharing ≤ ±5% (50%–100% load)
AC input protection AC input overvoltage ≥ 300 V AC
protection threshold
AC input overvoltage 290–300 V AC
recovery threshold
AC input undervoltage ≤ 80 V AC
protection threshold
AC input undervoltage 80–90 V AC
recovery threshold
DC output DC output overvoltage –56 V DC to –60.5 V DC (default:
protection protection threshold 59.5 V DC)
EMC specifications Conducted emission  AC port: EN 55032, Class B
 DC port: EN 55032, Class A1
 Signal port: EN 55032, Class B
Radiated interference EN 55032, Class B
Harmonic current IEC 61000-3-12
Voltage flicker and IEC 61000-3-11
fluctuation
Electrostatic discharge IEC 61000-4-2
(ESD)

Electrical fast transient IEC 61000-4-4


(EFT)

Radiated susceptibility (RS) IEC 61000-4-3


Conducted susceptibility IEC 61000-4-6
(CS)

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 112


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual B Technical Specifications

Category Item Specifications


Surge susceptibility IEC 61000-4-5
Voltage dip IEC 61000-4-11
Others MTBF 200,000 hours (at 25°C)
Structure Dimensions (H x W x D) ETP48400-C3B1/ETP48400-C3B2:
130 mm x 482 mm x 330 mm
Weight ≤ 20 kg (excluding rectifiers)
IP rating IP20
Installation mode Installed in a 19-inch rack
Cabling mode Routed in and out from the front
Maintenance mode Maintained from the front
Heat dissipation mode Free cooling

1. This is a class A product and may cause radio interference in residential areas. Therefore, you may
need to take adequate safety measures to prevent radio interference.

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 113


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual C Electrical Conceptual Diagrams

C Electrical Conceptual Diagrams

Figure C-1 ETP48400-C3B1 electrical conceptual diagram

Figure C-2 ETP48400-C3B2 electrical conceptual diagram

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 114


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual D Associations Between UIM Dry Contacts and Alarms

D Associations Between UIM Dry


Contacts and Alarms

Table D-1 Associations between dry contacts and alarms

Port Type Silk Screen Associated Alarm


Dry contact input DIN4 Dry contact input 4
Dry contact output DIN1/ALM1 AC failure
Default setting (closed: Long-time AC failure (disabled by
alarm; open: normal). default)
The setting can be
modified. DIN2/ALM2 Busbar overvoltage
NOTE Busbar ultra overvoltage
The DIN/ALM1-3 is a Busbar undervoltage
multiplexing port.
Busbar ultra undervoltage
Lithium battery discharge
DIN3/ALM3 Single-rectifier fault – redundancy
(disabled by default)
Single-rectifier fault – non-redundancy
(disabled by default)
Multi-rectifier fault
All-rectifier communication failure
Rectifier fault
Rectifier protection
Communication failure
ALM4 AC SPD fault
DC SPD fault
ALM5 Load fuse blown
Battery fuse blown
ALM6 High battery temperature
Very high battery temperature

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 115


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual D Associations Between UIM Dry Contacts and Alarms

Port Type Silk Screen Associated Alarm


Low battery temperature
Very low battery temperature
High ambient temperature
Very high ambient temperature
Low ambient temperature
ALM7 Door status alarm
ALM8 Power cabinet temperature control:
Fan 1 fault, fan 2 fault, fan 3 fault,
high temperature of the return air vent
When an external direct ventilation
battery cabinet or a heat exchanger
cabinet is used:
Air outlet overtemperature, air outlet
undertemperature, air inlet
overtemperature, air inlet
undertemperature, return air vent
overtemperature, return air vent
undertemperature, EXTFAN1 fault,
EXTFAN2 fault, INFAN1 fault,
INFAN2 fault, INFAN3 fault,
INFAN4 fault, TEC air conditioner
fault
When an external PC300D or air
conditioner is used:
High air conditioner temperature, air
conditioner internal fan fault, air
conditioner external fan fault, air
conditioner compressor fault,
communication failure

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 116


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power E How Do I Change the Communications Protocol for
User Manual COM4 and COM5?

E How Do I Change the Communications


Protocol for COM4 and COM5?

 To use CAN for communication through the COM4 port:


Take out the CIM02C, remove the jumper caps from pins 1 and 2 in the J18 position
shown in Figure E-1, and insert the jumper caps to pins 2 and 3.
 To use RS232 for communication through the COM5 port:
Take out the CIM02C, remove the jumper caps from pins 1 and 2 in the J16 and J17
positions shown in Figure E-1, and insert the jumper caps to pins 2 and 3.

Figure E-1 COM4 and COM5 port jumper positions

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 117


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power E How Do I Change the Communications Protocol for
User Manual COM4 and COM5?

Figure E-2 Jumper connection rules for the COM4 and COM5 ports

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 118


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual F Acronyms and Abbreviations

F Acronyms and Abbreviations

E
EFT electrical fast transient
EMC electromagnetic compatibility
ESD electrostatic discharge

H
HTTPS Hypertext Transfer Protocol Secure

I
IP Internet Protocol

L
LCD liquid crystal display

M
MTBF mean time between failures

R
RS radiated susceptibility

S
SMU site monitoring unit
SNMP Simple Network Management Protocol
SPD surge protection device

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 119


ETP48400-C3B1 and ETP48400-C3B2 Embedded
Power
User Manual F Acronyms and Abbreviations

T
THD total harmonic distortion

U
UIM user interface module

Issue 05 (2020-03-25) Copyright © Huawei Technologies Co., Ltd. 120