Prominence Properties Inc.: Inspection Checklist and House Construction Record

Uploaded by

Rhobbie Nollora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views

Prominence Properties Inc.: Inspection Checklist and House Construction Record

Uploaded by

Rhobbie Nollora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

PROMINENCE PROPERTIES INC.

Inspection Checklist and House Construction Record

Project/Subdivision :_____________________________________ Form Control No. _______________


Block and Lot :_____________________________________ Page __________ of ___________
House Model :_____________________________________
Date Started :_____________________________________ Date Completed _______________
Engr.-in-charge :_____________________________________ Contractor ____________________

Description of Work Inspection


Module No. SPECS FINDINGS REMARKS
Date

I FOUNDATION WORKS
Layout, Batterboards & Excavation
Site cleared from unsuitable materials and disposed of legally __________ _______________________________ _________
Boundary monuments set by Surveyor __________ _______________________________ _________
Finish elevation set __________ _______________________________ _________
Batterboard set correct to alignment and squareness __________ _______________________________ _________
Excavation dimensions checked __________ _______________________________ _________
Reinforced Concrete Wall Footings
Aggregates used __________ _______________________________ _________
Soil poisoning used, if any __________ _______________________________ _________
Rebar diameter used __________ _______________________________ _________
Rebars and spacings installed and secured __________ _______________________________ _________
Concrete design mix used __________ _______________________________ _________
Reinforced Concrete Zocalo Wall
Zocalo elevation and levelling
Rebar diameter used __________ _______________________________ _________
Rebars and spacings installed and secured __________ _______________________________ _________
Forms installed and secured __________ _______________________________ _________
Concrete design mix used __________ _______________________________ _________
Septic Vault
Excavation dimensions checked __________ _______________________________ _________
Depth of secptic tank __________ _______________________________ _________
Plastered/Waterproofed Interior of Septic Tank __________ _______________________________ _________
VA ROOF FRAMING AND TINSMITHRY
Roof Framing
Purlins protected from rust by paint (primer) __________ _______________________________ _________
Elevation set, slope correct __________ _______________________________ _________
Full welded connections __________ _______________________________ _________
Undersheeting and Roofing
Roofing materials laid correctly __________ _______________________________ _________
Roofing materials fastened mechanically __________ _______________________________ _________
Gutters secured to the building __________ _______________________________ _________
Gutters are free of debris __________ _______________________________ _________
VB MISCELLANEOUS CONCRETE
Concrete Stair Case
Rebar diameter used __________ _______________________________ _________
Rebars and spacings installed and secured __________ _______________________________ _________
Forms installed and secured __________ _______________________________ _________
Concrete design mix used __________ _______________________________ _________
Railings protected from rust by paint (primer) __________ _______________________________ _________
Railings installed plumb and level, accurately fitted and free from distortion or defects __________ _______________________________ _________
Anchors required for connecting railings to structure provided __________ _______________________________ _________
Welds grinded smooth __________ _______________________________ _________
Masonry Walls, 100mm
Rebar diameter used __________ _______________________________ _________
Rebars and spacings installed and secured __________ _______________________________ _________
Cleaned surface on which the first course is to be laid __________ _______________________________ _________
Vertical and horizontal alignment checked, any discrepancy corrected __________ _______________________________ _________
Masonry placed in horizontal courses __________ _______________________________ _________
Bed joints thickness __________ _______________________________ _________
Hollow units filled completely __________ _______________________________ _________
Drypacking
Mortar mixture used __________ _______________________________ _________
Joints filled completely __________ _______________________________ _________

file:///conversion/tmp/scratch/496511298.xls 496511298.xls 10/26/2020 09:05:00


PROMINENCE PROPERTIES INC.
Inspection Checklist and House Construction Record

Project/Subdivision :_____________________________________ Form Control No. _______________


Block and Lot :_____________________________________ Page __________ of ___________
House Model :_____________________________________
Date Started :_____________________________________ Date Completed _______________
Engr.-in-charge :_____________________________________ Contractor ____________________

Description of Work Inspection


Module No. SPECS FINDINGS REMARKS
Date

VC SLAB ON FILL AND FLOOR TOPPINGS


Slab-on-Fill
Topsoil removed __________ _______________________________ _________
Slab on grade well compacted __________ _______________________________ _________
Gravel bed thickness __________ _______________________________ _________
Size of gravel used __________ _______________________________ _________
Elevation and depression of T&B area set __________ _______________________________ _________
Concrete design mix used __________ _______________________________ _________
Plumbing rough-ins installed and completed __________ _______________________________ _________
Supply piping and drainage piping are plumbed __________ _______________________________ _________
Electrical rough-ins installed and completed __________ _______________________________ _________
Wiring installation meets general code requirements __________ _______________________________ _________
Wiring devices approved for their intended use __________ _______________________________ _________
All wire splices are within junction boxes __________ _______________________________ _________
Catch Basins
Alignment and squareness checked __________ _______________________________ _________
Interior of catchbasins plastered __________ _______________________________ _________
Bottom slab concreted __________ _______________________________ _________
Floor Topping & Finishes
Thickness of floor topping __________ _______________________________ _________
Topping leveled evenly __________ _______________________________ _________
VD SCW AND MASONRY FINISHES
Steel Windows
Steel windows protected from rust by paint (primer) __________ _______________________________ _________
Alignment and plumbness checked __________ _______________________________ _________
Masonry Wall & Concrete Ceiling Finishes
Surface cleaned of all mortar splashes and stains __________ _______________________________ _________
Skimcoat used (Standard or Superfine) __________ _______________________________ _________
Exterior Panel Doors & Jambs and Hardwares
Jambs level and plumbed __________ _______________________________ _________
Doors fit well within their frame __________ _______________________________ _________
Hardware installed to manufacturer's instruction __________ _______________________________ _________
Mounting heights above finished floor complied __________ _______________________________ _________
PVC Downspouts & Drain Piping
Downspouts secured to the building __________ _______________________________ _________
Downspout termination has diverter and extension to direct away from the structure __________ _______________________________ _________
VI CARPENTRY
Ceilings, Eaves & Vents
Surfaces, framing and furring systems to receive boards are inspected __________ _______________________________ _________
Ensured that all rough-ins are properly located and installed prior to installation of board __________ _______________________________ _________
Boards fastened with self-drilling screws __________ _______________________________ _________
Boards installed plumbed, leveled and planed __________ _______________________________ _________
Boards installed with V-cut __________ _______________________________ _________
RC Kitchen Counter
Rebar diameter used __________ _______________________________ _________
Rebars and spacings installed and secured __________ _______________________________ _________
Vertical and horizontal alignment checked, any discrepancy corrected __________ _______________________________ _________
Cabinet Doors, 450mm x 600mm
Cabinet frames and doors set in place, scribed plumb, square and level and secured in __________ _______________________________ _________
Concrete Pads, 100x300x1000mm
Alignment and squareness checked __________ _______________________________ _________

file:///conversion/tmp/scratch/496511298.xls 496511298.xls 10/26/2020 09:05:00


PROMINENCE PROPERTIES INC.
Inspection Checklist and House Construction Record

Project/Subdivision :_____________________________________ Form Control No. _______________


Block and Lot :_____________________________________ Page __________ of ___________
House Model :_____________________________________
Date Started :_____________________________________ Date Completed _______________
Engr.-in-charge :_____________________________________ Contractor ____________________

Description of Work Inspection


Module No. SPECS FINDINGS REMARKS
Date

Interior PVC Doors & Jambs


Jambs level and plumbed __________ _______________________________ _________
Doors fit well within their frame __________ _______________________________ _________
Hardware installed to manufacturer's instruction __________ _______________________________ _________
Mounting heights above finished floor complied __________ _______________________________ _________
Wires & Conduits
Wiring installation meets general code requirements __________ _______________________________ _________
Wiring devices approved for their intended use __________ _______________________________ _________
Continuity Test/Megger Test
All wire splices are within junction boxes __________ _______________________________ _________
Decorative Grillwok
Grilleworks protected from rust by paint (primer) __________ _______________________________ _________
Welds grinded smooth __________ _______________________________ _________
VIIA FINISHING WORKS
Tileworks
Backing surfaces are dry, firm, plumb and level and of proper thickness and grade __________ _______________________________ _________
Plumbing works and other items concealed behind or to mounted on or through tile __________ _______________________________ _________
are set up in place or provided for __________ _______________________________ _________
Waterproofing done in accord to manufacturer's directions __________ _______________________________ _________
Tiles set with joints uniform, continuous and aligned in both directions __________ _______________________________ _________
Aligned joints in wall and floor __________ _______________________________ _________
Finished tile floor and wall surfaces level and plumb __________ _______________________________ _________
Tile installation thoroughly dry before grouting __________ _______________________________ _________
Joints grout full __________ _______________________________ _________
Clean tile and adjacent surfaces free of setting materials and grout as work progresses __________ _______________________________ _________
Glassworks
Thickness of glass __________ _______________________________ _________
Glass putty __________ _______________________________ _________
Wires & Conduits
Wiring installation meetsgeneral code requirements __________ _______________________________ _________
Wiring devices approved for their intended use __________ _______________________________ _________
All wire splices are within junction boxes __________ _______________________________ _________
Painting Preparation and First Coat Painting
Hardwares and accessories protected prior to surface preparation and painting __________ _______________________________ _________
Surfaces cleaned from dirt and other foreign substances before applying paint __________ _______________________________ _________
Paint applied in accordance to manufacturer's instruction __________ _______________________________ _________
Apply first coat to surfaces prepared for paint as soon as practicable after preparation __________ _______________________________ _________
VIIB MOVE-IN WORKS
Plumbing Fixtures
Fixtures are installed to manufacturer's instructions __________ _______________________________ _________
Fixtures are aligned/plumbed __________ _______________________________ _________
Electrical Fixtures
All wirings and outlets test "normal" __________ _______________________________ _________
Mounting heights above finished floor complied __________ _______________________________ _________
Final Coat Painting
Additional coats applied when stains or blemishes show through final coat __________ _______________________________ _________
Ensured dry film thickness at corners and crevices is equivalent to that of flat surfaces __________ _______________________________ _________
Sand lightly between each succeding coats __________ _______________________________ _________
Provide even texture __________ _______________________________ _________
Leave no laps, skid marks or other surface imperfections __________ _______________________________ _________
Clean-up & Turnover
Cleaned glass and paint spattered surfaces by proper methods __________ _______________________________ _________

Prepared by: Acknowledged by: Noted by:


__________________ _______________

Works Engineer Contractor PMO Head