Nmo Critical Lift Plan Sheet
Nmo Critical Lift Plan Sheet
D. Hoist Rope
1. Rope diameter _____________ Number of parts ______________
2. Lift capacity based on parts ____________________________lbs.
E. Rigging __________________
1. Hitch type _____________________________________________ Supervisor Signature Date
2. No. of slings ____________ Size _________ Type ____________
3. Sling assembly rated capacity __________________________lbs. __________________
4. Shackle size ______________ No. of shackles _____________ Crane Operator Signature Date
5. Shackle rated capacity ________________________________lbs.
6. Shackle secured to load by: ______________________________ __________________
______________________________________________________ Lead Rigger Signature Date