Madhya Pradesh Road Development Corporation: Last 11 Yrs. Completed Road Length (In KM)

The document provides a summary of road construction projects in Madhya Pradesh for August 2020. It shows that a total of 18,371 km of roads have been constructed to date, with 35 km added in the past month. A chart displays the target and achievement levels for various road types over the past 11 years, with MDR roads achieving 134.92 km against a target of 488.62 km. The remainder of the document outlines progress updates on ongoing projects categorized by road type, including length, cost, physical and financial targets and achievements to date.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views

Madhya Pradesh Road Development Corporation: Last 11 Yrs. Completed Road Length (In KM)

The document provides a summary of road construction projects in Madhya Pradesh for August 2020. It shows that a total of 18,371 km of roads have been constructed to date, with 35 km added in the past month. A chart displays the target and achievement levels for various road types over the past 11 years, with MDR roads achieving 134.92 km against a target of 488.62 km. The remainder of the document outlines progress updates on ongoing projects categorized by road type, including length, cost, physical and financial targets and achievements to date.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

August-2020, Page-1

Madhya Pradesh Road Development Corporation


(Govt. of M.P. Undertaking)
45-A, Arera Hills, Bhopal-462011, Madhya Pradesh, India
Phone: 0755-2797205, 2597254, 2597201 (PBX), Fax: 0755-2572643
Website: www.mprdc.gov.in Email: [email protected]

Total road length constructed to date : 18371 Km


Total road constructed this Month : 35 Km

Last 11 Yrs. Completed Road Length (in km)


600
MDR NH SH
500

2000
400

1500
300

1000 200
134.925
500 100
26.69
4.68
0 0
MDR NH SH
Target 2020-21 488.62 134.268 36.14
Achievement 134.925 26.69 4.68

Monthly Status Report Ver 1.1 August-2020

MIS, MPRDC 14/09/2020 14:41


August-2020, Page-2
Summary - In Progress Projects (Catagory-wise)

Length
Physical Financial Expenditure
Project PA Up to FA Up to Q1_PA Q2_PA 2020- Q2_FA 2020- covered
Category Model Sub Model Length Cost Target 2020- Target 2020- Q1_FA 2020-21 during Year CPP CFP
Count March-2020 March-2020 2020-21 21 21 during Year
21 21 2020-21
2020-21
RC RC 11 105 213 17.54 86.09 58.17 76.45 0.16 3.92 4.05 9.12 4.08 13.17 62 90
SH
SHF SHF 12 141 72 18.6 33.75 98.93 26.33 0.6 0 0.75 6.14 0.6 6.89 100 33

BOT NHDP-IV 1 103 954 33.013 333.89 72.68 614.44 0 0 0 0 0 0 73 614

NH EPC 2 137 902 46.275 258.61 90.71 327.47 2.13 3.86 16.2 27.91 5.99 44.11 97 372
EPC NHDP III 4 227 3273 54.98 619.11 169.97 1391.3 9.43 11.27 73.54 57.39 20.7 130.93 191 1522
EPC 6 135 209 18.31 42.19 116.72 132.84 0 0 0 1.92 0 1.92 117 135

MDR NDB NDB 62 1551 3098 250.02 600.11 986.69 2053.17 35.89 44.71 57.82 91.82 80.71 149.64 1067 2203

ADB ADB-V 56 1457 2658 220.29 716.32 1051.86 2151.59 28.085 26.07 96.21 52.55 54.215 148.77 1106 2300

Building Build. Build. 1 0 356 0 24.78 0 331.17 0 0 5.21 0 0 5.21 0 336


Grand Total 155 3854 11735 659.028 2714.85 2645.73 7104.76 76.295 89.83 253.78 246.85 166.295 500.64 2812 7605

CATEGORY No. Of Projects Length Cost


OMT 15 983 50

Category No. Of Projects Cost PA March-2020 FA March-2020 Fin Target 2020-21 Total FA 2020-21
Border Check Post 1 1094 85% 931 5.00 0.00

Length in KM Cost in
Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt. Contribution.
August-2020, Page-3
Summary - In Progress Projects (Model-wise)

Total
Total Physical Expendt.
Project Financial PA Up to FA Up to Q2_PA 2020- Length during
Length Cost Target 2020- Q1_PA 2020-21 Q1_FA 2020-21 Q2_FA 2020-21 during Year CPP CFP
Count Target 2020- March-2020 March-2020 21 Year 2020-21
21 2020-21
Model Category Sub Model 21

BOT NHDP-IV 1 103 954 33 334 73 614 0.00 0 0.00 0 0 0 73 614

NH EPC 2 137 902 46 259 91 327 2.13 3.86 16.20 27.91 6 44 97 372
EPC NHDP III 4 227 3273 55 619 170 1391 9.43 11.27 73.54 57.39 21 131 191 1522
EPC 6 135 209 18 42 117 133 0.00 0 0.00 1.92 0 2 117 135
NDB MDR NDB 62 1551 3098 250 600 987 2053 35.89 44.71 57.82 91.82 81 150 1067 2203

ADB ADB-V 56 1457 2658 220 716 1052 2152 28.09 26.07 96.21 52.55 54 149 1106 2300

RC RC 11 105 213 18 86 58 76 0.16 3.92 4.05 9.12 4 13 62 90


SH
SHF SHF 12 141 72 19 34 99 26 0.60 0 0.75 6.14 1 7 100 33
Build. Building Build. 1 0 356 0 25 0 331 0.00 0 5.21 0 0 5 0 336
Grand Total 155 3854 11735 659.028 2714.85 2645.73 7104.76 76.295 89.83 253.78 246.85 166.295 500.64 2812 7605

CATEGORY No. Of Projects Length Cost


OMT 15 983 50

Category No. Of Projects Cost PA March-2019 FA March-2019 Fin Target 2019-20 Total FA 2019-20
Border Check Post 1 1094 85% 931 5.00 0.00

Length in KM Cost in Cr.,


PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt. Contribution.
Regular Contract Projects (In Progress) Page-4

Physical Financial PA Upto FA Upto Length Expen.


Anticipated Completion
SN Project Name SH Lane Concessionaire Agree't Date Length Cost Target Target March- March- during Yr during Year CPP CFP
Date
2020-21 2020-21 2020 2020 2020-21 2020-21
Dabra Bhitarwara-Harshi Road M/s Chambal Developers, 13-06-17 &
1 NA NA 14/10/2016 3.05 9.72 2.29 7.00 0.00 0.29 0.00 0.33 0.00 0.62
Construction of Harshi Bypass Gwalior 31-05-2019
M/s Rajlaxmi Devbuildcon 27-03-19 &
2 Datia bypass road Construction - 28/06/2018 7.82 28.07 0.39 16.90 7.43 11.17 0.19 1.10 7.62 12.27
Bhopal 31-03-20
Indore Airport Road to Pithampur 26-07-18 &
3 NA M/s H.R. Construction Noida 27/01/2017 16.70 39.74 0.17 21.19 16.53 18.55 0.03 1.48 16.56 20.03
Construction 4L 15-02-19
Persona Majan Nighi turn Section M/s Shiv Shakti Construction 19-06-19 &
4 - 20/06/2018 9.93 34.20 0.64 3.83 7.31 23.53 0.16 7.60 7.47 31.13
from Km 17.40 to 27.38 Four lanning Satna 18-12-19

Raisen Rahatgarh road Construction 05-07-17 &


5 NA NA M/s Mukesh K. Verma Sehore 06/07/2016 4.61 6.70 2.30 2.61 0.00 0.74 0.00 0.00 0.00 0.74
of major bridge at Koula-Nala. 31-05-19

Uchehra Nagod section & Uchehra


16-10-17 &
6 Bypass road (4.7 Km) on Uchehra 56 IL M/s SR. Construction Delhi 17/10/2016 33.16 46.81 0.00 15.56 26.90 21.88 3.70 2.34 30.60 24.22
31-03-19
road Reconstruction & upgradation

Up Gradation of Chapada-
7 Hatpipaliya-Newari Road SH-64 (in - 21.00 19.72 8.40 7.88 0.00 0.00 0.00 0.00 0.00 0.00
Principal NH) length 21.00 Km.

Widening of Chhindwara-Tamia-
-
8 Matkuli road (SH-19) in Chhindwara - 8.10 26.90 3.24 10.76 0.00 0.00 0.00 0.00 0.00 0.00
city portion from km. 1 to 9/2.
Balance work of Construction of RCC - - -
9 drain in Bhoma Village on Seoni- - 0.00 0.25 0.00 0.25 0.00 0.00 0.00 0.00 0.00 0.00
Chiraidongari Road
Balance work of Construction of RCC
M/s Rana Construction
10 drain on Rahatgarh- Khurai- - 0.00 1.08 0.00 0.00 0.00 0.29 0.00 0.32 0.00 0.61
company Silori
Khimlasa Road (SH-42)
Balance work of Construction of
11 - - 0.15 0.15 0.11 0.11 0.00 0.00 0.00 0.00 0.00 0.00
service road from Mahamrityunjay
Grand Total 104.52 213.34 17.54 86.09 58.17 76.45 4.08 13.17 62.25 89.62

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.
Contribution.
State Highway Fund Projects (In Progress) Page-5

Physical Financial PA Upto FA Upto Length


Anticipated Completion Expenditure
SN Project Name Lane Concessionaire Agree't Date Length Cost Target Target March- March- during Yr CPP CFP
Date Year 20-21
2020-21 2020-21 2020 2020 2020-21
Raisen-Rahatgarh Road Construction of
21-05-18 &
1 Four Lane Road in km 123 to 125 in M/s Kapcon 22/08/2017 3.47 18.37 1.87 10.90 1.60 7.47 0.60 2.07 2.20 9.54
31-03-19
Begamganj Town.
4L Projects Ltd.
Silwani-Gairatganj Road Construction
Chandigarh 10-06-19 &
2 of Four lane road in km 30 and 31 SH- 11/09/2018 2.16 15.79 1.62 10.47 0.00 1.37 0.00 0.63 0.00 2.00
22-05-20
44

3 Construction of Chanderi Town Portion - 1.50 3.46 1.50 3.46 0.23 0.00 0.00 0.38 0.23 0.38

Balance work of Construction of RCC


4 drain on Rahatgarh-Khurai-Khimlasa - 0.00 1.08 0.00 0.79 0.00 0.29 0.00 0.00 0.00 0.29
Road (SH-42)
Realignment/Curve Improvement Black
Spot/S Curve Ramgarh Junction in
5 - 0.90 1.63 0.45 0.81 0.00 0.00 0.00 0.00 0.00 0.00
Ujjain-Jaora road from Km 4+500 to
5+400.
Realignment/Curve Improvement at -
6 Sodang Junction in Ujjain Jaora road - 0.74 1.83 0.37 0.91 0.00 0.00 0.00 0.00 0.00 0.00
from km.8+150 to 8+889
Widening of Two lane to four lane of
Chhindwara Matkuli Road (SH-62) in - -
7 - 1.10 4.37 0.55 2.18 0.00 0.00 0.00 0.00 0.00 0.00
Km 30/6 to 31/6 Newton Chikhli Town
Portion.
Construction of shoulder & drain on
8 Jabalpur-Narsinghpur-Pipariya road at - 0.48 0.66 0.24 0.33 0.00 0.00 0.00 0.00 0.00 0.00
Sahpura town in km. 31+200 to 31+680
B.T. Renewal work on Agar Jawara
9 - 49.10 9.37 0.00 1.78 49.10 7.59 0.00 1.69 49.10 9.28
Road (Part-1) M/s KG Gupta
B.T. Renewal work on Agar Jawara Infrastructure
10 - 60.00 11.73 12.00 2.12 48.00 9.61 0.00 2.12 48.00 11.73
Road (Part-2)
B.T. Renewal work of Thandla-
11 - 12.47 1.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kushalgarh
-
12 B.T. Renewal work of Badgaon Salaiya - 8.60 1.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Grand Total 140.52 71.54 18.60 33.75 98.93 26.33 0.60 6.89 99.53 33.22

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC:
Govt. Contribution.
National Highway Projects NHDP-IV (In Progress) Page-6

Physical Financial PA Upto FA Upto Length


Consultant Appoi't Anticipated Completion Expen. during
SN Project Name SH Lane GC Concessionaire Agree't Date Length Cost Target Target March- March- during Yr CPP CFP
(I.E) Date Date Yr 2020-21
2020-21 2020-21 2020 2020 2020-21
18.09.2015
&
Project terminated on
Sidhi to Singrauli M/s Sidhi- Singrauli
M/s MCC 13.08.2020, EPC
1 (NH-75E) 4L+PS 75E 4L+PS 339.69 road project Pvt. Ltd. 14/05/2012 19/09/2013 102.60 954.43 33.01 333.89 72.68 614.44 0.00 0.00 72.68 614.44
Engg Proposal submitted to
NHDP IV New Delhi
CE- RO MoRTH for
approval on
28.08.2020
Grand Total 102.60 954.43 33.01 333.89 72.68 614.44 0.00 0.00 72.68 614.44

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.
Contribution.
National Highway Projects NHDP-III (In Progress) Page-7

Physical Financial PA Upto FA Upto Length Expend


Consultant
SN Project Name SH Lane Concessionaire Agree't Date Appoi't Date Anticipated Completion Date Length Cost Target Target March- March- during Yr during Yr CPP CFP
(I.E)
2020-21 2020-21 2020 2020 2020-21 2020-21

Jabalpur to Hiran river (Km M/s Wagad Infra Projects Ltd.


M/s ICT Ltd.
1 10.400 to Km 66.00)(NH-12) & M/s Sorathia Velji Ratna 19/12/2017 23/01/2018 14-09-2020 & 31-03-2021 55.60 628.45 13.85 100.66 41.01 301.42 6.30 31.20 47.31 332.62
New Delhi
Four lane with PS - EPC Co. (JV)
Sindoor river to start of M/s GVR Infra Projects Pvt.
Bareli bypass(Km130.00 to Ltd. (Sub - Contractor M/s
2 12 24/03/2016 05/07/2016 18-09-20 & 31-03-2021 63.00 809.16 24.12 233.82 38.88 262.12 6.37 21.64 45.25 283.76
193.450)(NH-12) Four lane Bansal Construction works
with PS - EPC pvt. Ltd.)
Bareli Bypass to Goharganj 4L+PS M/s Ramkey Infrastructure
3 (Km193.450 to 255.300)(NH- Ltd.-M/s Brijgopal M/s Theme 20/04/2016 10/06/2017 15-07-2020 & 31-03-2021 59.75 877.79 6.94 145.97 51.44 419.87 2.57 30.61 54.01 450.48
12) Four lane with PS - EPC Construction Co. Ltd. (JV) Engineering
Ltd. Jaipur
Goharganj to Bhopal
including link road from
12 & M/s Centrodorstory India Pvt.
4 Obedullaganj to NH-69 07/12/2017 07/02/2018 03-08-2020 & 31-03-2021 48.71 957.54 10.07 138.66 38.64 407.89 5.46 47.48 44.10 455.37
69 Ltd. New Delhi.
(Km255.300 to 301.800)(NH-
12) Four lane with PS - EPC
Grand Total 227.06 3,272.94 54.98 619.11 169.97 1,391.30 20.70 130.93 190.67 1,522.23

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.
Contribution.
National Highway Projects on EPC (In Progress) Page-8

Physical Financial PA Upto FA Upto Length Expend.


Consultant Anticipated
SN Project Name SH Lane Concessionaire Agree't Date Appoi't Date Length Cost Target Target 2020- March- March- during Yr during Yr CPP CFP
(I.E) Completion Date
2020-21 21 2020 2020 2020-21 20-21
Barella - Mandla
M/s Gammon 09-06-2017 &
Section KM 22/8
1 12A Dunkerley 10/08/2015 17/12/2015 30-07-2020 & 30-06- 63.55 390.51 18.65 99.20 45.24 152.44 4.50 18.56 49.74 171.00
to KM 89/6 of NH
2021
12A
2L + PS -
Umariya- Shahdol M/s GVR infra
2 section Km 68/4 78 projects Ltd. 09/04/2015 01/08/2015 30/06/2021 73.10 511.83 27.63 159.41 45.47 175.03 1.49 25.55 46.96 200.58
to 142/2 (Pkg II) Chennai
Grand Total 136.65 902.34 46.28 258.61 90.71 327.47 5.99 44.11 96.70 371.58

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial
Progress, GC: Govt. Contribution.
MDR Projects on EPC (In Progress) Page-9

Physical Financial PA Upto FA Upto Expend. Length


Anticipated
SN Project Name Lane Concessionaire Consultant (I.E) Agree't Date Appoi't Date Length Cost Target Target March- March- during Year during Yr CPP CFP
Completion Date
2020-21 2020-21 2020 2020 2020-21 2020-21
1 Ambha Pinhat 14-10-15 31/05/2018 23.12 65.22 0.00 0.00 23.06 42.78 1.92 0.00 23.06 44.70
Jawasa- 24/09/2015
2 14/10/2015 31/05/2018 22.63 53.58 0.00 0.00 22.63 24.68 0.00 0.00 22.63 24.68
Sunarpura Road
Nadigaon -
3 28/10/2015 04/11/2015 30/04/2018 22.14 46.90 0.00 6.73 22.14 65.38 0.00 0.00 22.14 65.38
Seondha M/s Lion
M/S CMM infra
Pawai - Engineering
project ltd.- M/S
4 Prithvipura IL /SQC M/s 24/09/2015 14/10/2015 31/05/2018 22.34 0.00 15.36 24.13 6.98 0.00 0.00 0.00 6.98 0.00
Keti construction
Road Vaidya
ltd. Indore (J.V.)
Satanbada- Organization
5 28/10/2015 04/11/2015 30/04/2018 25.54 43.22 1.85 0.00 23.69 0.00 0.00 0.00 23.69 0.00
Narwar
Tekna-Manpur-
6 Rameshwar 24/09/2015 14/10/2015 31/05/2018 19.41 0.00 1.10 11.33 18.22 0.00 0.00 0.00 18.22 0.00
Road
Grand Total 135.18 208.92 18.31 42.19 116.72 132.84 1.92 0.00 116.72 134.76

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC:
Govt. Contribution.
NDB Projects (In Progress) Page-10

Physical Financial PA Upto FA Upto Length Expend.


Anticipated Completion
SN PKG Project Name Concessionaire Agree't Date Length Cost Target Target March- March- during Year during Year CPP CFP
Date
2020-21 2020-21 2020 2020 2020-21 2020-21
1 Badagaon-Baldeogarh Road 13/06/2019 31.0 0.0 0.0 0.0 119.3 240.5 0.0 0.4 119.3 240.9
2 Majna -Palera Road M/s Gawar Construction Ltd. 13/06/2019 55.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P-01 25-04-17
3 Badagaon-Kakarwaha Road Gurgone 13/06/2019 13.7 214.9 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0
4 Digoda Mohangarh Road 13/06/2019 19.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5 Lodi -Mahoba Road M/s IL & FS Transportation 14/03/2019 15.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6 Baxwaha -Dalpatpur Road Networks Ltd. & M/s Il & FS 14/03/2019 23.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7 P-02 Ganj -Rajnagar Road 16-06-17 14/03/2019 17.5 175.5 22.0 72.9 4.5 30.8 0.0 0.0 4.5 30.8
Engineering and construction
8 Nawgong-ShrinagarRoad comp. Ltd. (JV) Mumbai 14/03/2019 33.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9 Tetra Vijaypur Iklodh road 02/01/2020 6.0 105.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10 Goras aawada ajapura road M/s Tomar Builders & 02/01/2020 34.2 0.0 25.0 68.0 0.0 12.7 14.9 24.3 14.9 37.0
P-03 26-09-18
Iklod Tiraha to Gandhi Chouk-City Portion Contractors Pvt. Ltd., Gwalior.
11 02/01/2020 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Vijayour
12 Karera Bhitarvaar Road 17/05/2019 31.5 262.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
13 Singhnivaas Khurai Raod M/s Ganon Dunkerley & Co. Ltd. 17/05/2019 36.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P-04 19-04-17
14 Padora Gora Pichhore Road Mumbai 17/05/2019 65.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
15 Pichhore Basayi Road 17/05/2019 8.0 0.0 2.0 12.0 0.0 18.6 0.0 0.0 0.0 18.6
16 Singhpur - Gijorra Road M/s B. Patel Infrastructure Pvt. 25/09/2019 6.3 0.0 11.9 25.2 12.2 20.0 2.8 2.4 15.0 22.4
P-05 27-09-18
17 Rangava – Deogarh Road Ltd. JV 25/09/2019 16.5 38.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
18 Aron - Ashoknagar Road 25/09/2019 11.7 90.3 0.0 5.0 47.9 72.4 0.0 0.0 47.9 72.4
19 P-06 Bharoli - Ajleshwar Road 27-02-18 25/09/2019 19.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
20 Hapakhedi – Panwadi hat Road M/s Gawar Construction Ltd. 25/09/2019 16.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
21 Anooppur Chechai Amlai Road Gurgone 22/06/2019 22.0 152.5 11.9 33.5 65.3 110.4 5.0 7.9 70.3 118.4
22 P-07 Anooppur darri kherwa road 09-10-17 22/06/2019 10.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
23 Nonghati damedi devri leelatola road 22/06/2019 44.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
24 Panagar Belkhadu Road M/s Gaur Road Tar Coat 14/06/2019 14.1 58.7 0.0 4.0 31.6 60.2 0.0 3.0 31.6 63.2
P-08 02-02-18
25 Sihora Majauli Katav Road Jabalpur 14/06/2019 17.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
26 Dhooma Gotegaon Road 27/12/2018 28.4 0.0 0.0 0.2 47.6 103.1 0.0 0.0 47.6 103.1
M/s Ganon Dunkerley & Co. Ltd.
27 P-09 Ganeshganj Sunwara Kewlari Pindrai Road 24-06-17 27/12/2018 9.7 97.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Mumbai
28 Kewlari Bheemgarh Chhapara Road 27/12/2018 9.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
29 Damoh-Jamuniya-Balakot Road M/s Prakash Asphalting & Toll 05/11/2019 17.4 125.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P-10 29-06-18
30 Abhana-Tendukheda Highways (India) Ltd. 05/11/2019 35.2 0.0 22.5 47.3 12.9 22.7 5.2 16.1 18.1 38.8
31 Pali-Peerghat-Khimlasa -Kanjiya Road 27/12/2018 36.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
M/s KCC Buildcon Pvt. Ltd.
32 P-11 Bhapel -Jaisinagar Road 24-05-17 27/12/2018 24.8 171.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Gurgaon
33 Devri-Sehejpur Road 27/12/2018 21.3 0.0 1.6 11.7 81.3 169.9 1.6 12.7 82.9 182.6
34 Shahgarh Baraytha Road M/s Diamond Construction 02/01/2020 25.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P-12 Company – M/s Gawar 20-09-18
35 Banda Shahpur Parsoriya Road Construction Limited 02/01/2020 32.4 108.0 0.0 4.0 57.4 115.7 0.0 0.0 57.4 115.7
36 Bhainsdehi nanda bhimpur road M/s KCC Buildcon Pvt. Ltd. 27/01/2019 46.8 0.0 13.2 37.4 65.7 132.8 5.5 14.4 71.2 147.2
P-13 28-06-17
37 Bhoura Phophalya road Gurgaon 27/01/2019 32.1 168.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-
Cumlative Financial Progress, GC: Govt. Contribution.
NDB Projects (In Progress) Page-11

Physical Financial PA Upto FA Upto Length Expend.


Anticipated Completion
SN PKG Project Name Concessionaire Agree't Date Length Cost Target Target March- March- during Year during Year CPP CFP
Date
2020-21 2020-21 2020 2020 2020-21 2020-21
M/s Bansal construction Works
Pvt. Ltd. & Prakash Asphalting &
38 P-14 Basoda Sironj Road 19-05-17 23/09/2018 42.0 79.4 0.0 0.2 42.0 76.8 0.0 0.0 42.0 76.8
Toll Highways (India) Ltd (JV)
Bhopal.
39 Chhindgaon temagaon Road M/s Gawar Construction Ltd. 17/05/2019 11.6 59.9 0.0 0.1 28.7 62.4 0.0 0.0 28.7 62.4
P-15 22-01-18
40 Sinrali charua road Gurgone 17/05/2019 17.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
41 Berasia Narsinghgarh Road 15/01/2019 10.2 0.0 0.0 0.3 56.5 120.6 0.0 0.0 56.5 120.6
42 Narsingarh Berasia Road 15/01/2019 7.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
M/s Madhav Infra Projects
43 P-16 Doraha - Ahmadpur 24-06-17 15/01/2019 16.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Limited, M/s Eagle Infra JV
44 Bhojapura Ahmedpura Road Part - I 15/01/2019 11.1 108.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
45 Bhojapura Ahmedpura Road Part - II 15/01/2019 11.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
46 Rangwasa - Agra - Girota Road 26/10/2019 52.4 188.2 25.5 61.5 32.0 82.4 15.1 8.8 47.1 91.2
M/s Ganon Dunkerley & Co. Ltd.
47 P-17 Depalpur - Kaisur Road 26-09-17 26/10/2019 17.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Mumbai
48 Sanwer - Ajnor - Depalpur Road 26/10/2019 34.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
M/s Madhav Infra Projects
49 P-18 Khandwa to Dedatalayi Road Limited, M/s M.S. Khurana 24/04/2017 21/09/2018 41.5 86.3 0.0 4.0 41.5 87.2 0.0 0.0 41.5 87.2
Engineering Ltd. (JV), Vadodara
50 Maalpoor Varchar Mandur Road M/s Madhav Infra Projects 31/12/2019 12.5 70.0 24.0 41.5 20.6 36.9 10.4 15.5 31.0 52.4
P-19 22-09-18
51 Sonda Sakdi Umraeth Bakhatgarh Road Limited, Vadodara 31/12/2019 30.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Balsamundh Ochar nangalwadi Bistaan
52 M/s Sorathia Velji Ratna & Co. & 31/12/2019 13.2 0.0 20.5 38.0 2.0 10.1 1.4 11.9 3.4 22.0
P-20 Road 26-09-18
Ketan Construction
53 Pati Bokarta Khetiya Road 31/12/2019 31.5 128.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
54 Katargaon-Karhi-Pandlya 20/02/2019 30.3 0.0 30.5 54.2 60.3 123.2 8.4 12.1 68.7 135.3
Sanawad-Dhalgaon- Hirapur-Bheekangaon
55 22/02/2019 41.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P-21 Road M/s GHV (India) Pvt Ltd Mumbai 12-05-17
Bheekangaon-Kendwa-Shankargaon-
56 22/02/2019 18.8 182.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Khudgaon-Angad Road
57 Avalda Bag Jobat Borjhar Road 10/04/2019 38.5 0.0 0.0 3.8 61.3 155.4 0.5 4.4 61.8 159.8
P-22 M/s Shriji-Ketan JV 30-06-17
58 Dhrampur Tarapur Mandav Road 10/04/2019 23.4 126.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
59 Shahpur Nachankheda Road 03/10/2018 10.8 0.0 11.4 26.1 37.8 70.9 3.1 5.9 40.9 76.9
P-23 Burhanpur Bori Borsal Ratangarh saikheda M/s Kiledar-Barbric JV 22-07-17
60 03/10/2018 38.6 101.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Nepanagar Road
61 Goi kavri Dhulkot Road 26/03/2019 76.4 0.0 28.1 48.8 58.4 117.5 6.8 9.9 65.2 127.4
P-24 M/s GHV (India) Pvt Ltd Mumbai 23-06-17
62 Rajpur Vipri Khajuri Badsalay road 26/03/2019 18.2 198.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Grand Total 1550.9 3098.0 250.0 600.1 986.7 2053.2 80.7 149.6 1067.4 2202.8

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-
Cumlative Financial Progress, GC: Govt. Contribution.
ADB-V Projects (In Progress) Page-12

Physical Financial PA Upto FA Up to Length Expend.


Anticipated
SN PKG Project Name Concessionaire Agree't Date Length Cost Target Target March- March- during Yr during Yr CPP CFP
Completion Date
2020-21 2020-21 2020 2020 2020-21 2020-21
Khatakia to Suthaliya via NH-3, Kumbhraj,
1 P-01 Barod, Mragwas, Batawda, Chanchoda, M/s Bansal-Path(JV) 19/05/2017 15/09/2018 70.8 145.4 12.6 28.0 58.2 140.8 0.0 3.2 58.2 144.0
Binaganj, Teligaon
2 Sirsod-Pichhore road 23/08/2018 31.2 123.7 0.0 24.2 57.6 122.8 0.0 11.5 57.6 134.3
P-02 M/s KCC Buildcon Pvt. Ltd. Gurgaon 03/05/2017
3 Narwar-Chitori to Amola road 23/08/2018 26.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4 Mungawali-Malahargarh road 03/11/2019 16.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
07/04/2018
5 Piprod-Thubon road M/s Gawar construction Ltd. - 03/11/2019 7.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P-03 Atcon India Ltd. LOA issued on
6 Belai-Kareela Mata Mandir road 26.02.2018 - 03/11/2019 17.7 113.1 17.2 33.0 45.1 80.1 4.6 16.6 49.7 96.7

7 Bhounrasa-Malhargarh road 07/04/2018 03/11/2019 20.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
M/s Dineshchandra R. Agrawal
Sanwer, Chandravatiganj, Gautampura
8 P-04 Infracon Pvt. Ltd. LOA issued on 09/04/2018 14/08/2019 33.9 96.2 2.1 20.2 31.4 107.9 1.1 13.7 32.5 121.6
road
26.02.2018
M/s Dineshchandra R. Agarwal
9 P-05 Bijawar Kataphod Satwaas Khategaon road 23/02/2017 18/04/2018 55.2 103.9 0.0 11.6 55.2 116.6 0.0 0.0 55.2 116.6
Infracon Pvt. Ltd.
10 Gadarwara-Gotetoria road 23/10/2018 13.6 0.0 20.3 49.0 49.8 95.4 3.2 4.2 53.0 99.6
11 P-06 Podar-Salichok-Babai-Sukhakhairi road M/s Gannon & Dunkerly 12/05/2017 23/10/2018 23.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12 Kareli-Singhpur-Dangidhana road 23/10/2018 32.9 137.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
13 Maharajpur Sahajpur road 25/12/2018 24.4 0.0 0.0 11.5 84.9 174.9 0.0 0.0 84.9 174.9
Samnapur-Bilehra-Nanhi-Deori-Narayanpur
14 P-07 25/12/2018 45.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
road
15 Kesali Sahapur road 25/12/2018 15.1 145.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
16 Barodiya Dhamoni road M/s KCC Buildcon Pvt. Ltd. Gurgaon 16/02/2017 25/12/2018 19.8 146.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
17 Nauniya Madanpura road 25/12/2018 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
18 P-08 Khurai Rajwans road 25/12/2018 31.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
19 Garpehera Dhamoni road 25/12/2018 35.3 0.0 0.3 15.3 87.2 155.7 1.8 0.0 89.0 155.7
20 Rajnagar Bachhon road 25/04/2019 23.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
21 Khaparia Banspahari road 25/04/2019 24.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
22 P-10 Chhatarpur-Vikrampur-Rajnagar road 25/04/2019 10.2 213.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
M/s IL&FS Transportation Networks
23 Bamitha to Dumra 25/04/2019 28.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Limited-M/s IL&FS Engineering and 02/03/2017
24 Baraiya Choki Lugasi Garhi Malhara road 25/04/2019 15.5 0.0 5.0 27.0 21.1 53.9 0.0 0.0 21.1 53.9
Construction Company Ltd. (JV)
25 Barghat Kanhiwada road 25/10/2018 21.8 0.0 5.0 24.0 14.3 29.4 0.0 0.0 14.3 29.4
26 P-11 Dharna Aata Dondiwada Dharmakua 25/10/2018 26.2 161.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
27 Waraseoni Katangi road 25/10/2018 30.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
28 Rampayali-Garra Chouki road 14/01/2019 27.6 0.0 0.0 11.8 85.3 211.8 2.7 0.0 88.0 211.8
29 Khairlanji-Agasi road 14/01/2019 29.0 173.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P-12 M/s SVR-Ketan (JV) 19/04/2017
30 Laalbarra-Samnapur road 14/01/2019 8.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
31 Sitapathar-Mahkepaar-Goreghat road 14/01/2019 23.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC:
Govt. Contribution.
ADB-V Projects (In Progress) Page-13

Physical Financial PA Upto FA Up to Length Expend.


Anticipated
SN PKG Project Name Concessionaire Agree't Date Length Cost Target Target March- March- during Yr during Yr CPP CFP
Completion Date
2020-21 2020-21 2020 2020 2020-21 2020-21
32 Chand-Bichhua-Khamarpani road 26/11/2018 59.3 125.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P-14 M/s GHV INDIA 01/05/2017
33 Chourai-Panjara-Chand road 26/11/2018 17.2 0.0 0.0 31.2 87.7 203.1 0.5 4.7 88.2 207.8
Harfari Khaira-Misirgawan via Shivpurva
34 14/01/2019 26.0 97.3 0.4 8.2 48.3 113.6 0.4 6.6 48.7 120.2
P-17 road M/s Path India Ltd., Indore 22/09/2017
35 Chitrangi-Garhwa road 14/01/2019 22.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
M/s Shreeji Infrastructure India Pvt.
36 P-19 Sohagpur Manpur road Ltd.-PRL projects & Infrastructure 27/02/2017 14/10/2018 59.4 85.8 0.0 20.6 59.4 74.7 0.0 0.0 59.4 74.7
Ltd. (SIIPL-PRL) (JV)
37 Anooppur Jaitpur road 23/03/2019 36.7 0.0 0.0 20.2 100.1 149.0 0.0 9.9 100.1 158.9
38 P-20 Gohparu Rasmohni Budhar road M/s GHV (India) Pvt Ltd 22/02/2017 23/03/2019 39.9 170.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
39 Pasgarhi Deori Janakpur road 23/03/2019 23.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
40 Govindgarh Tikar Laxmanpur Road - 24.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
M/s P.D. Agrawal, Infrastructure
41 P-21 Jigna New Ramnagar to Gorsari Road - - 17.7 120.4 33.4 70.0 30.3 45.8 19.1 27.2 49.4 73.0
Pvt. Ltd.
42 Byohari Manpur Road - 16.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
M/S Shreeji Infra Pvt. Ltd. M/s Gour
43 P-23 Kotma Jaithari Rajendragram Road 04/01/2018 03/01/2019 52.2 101.9 0.0 13.5 48.9 107.8 3.3 9.4 52.2 117.2
Road Tar Coat Pvt. (JV)
44 Teonthar-Shankargarh - 14.6 0.0 11.0 25.2 0.0 0.0 0.0 0.0 0.0 0.0
P-15A To be Retender -
45 Naigarhi-Garh road - 14.1 0.0 9.1 18.1 0.0 0.0 0.0 0.0 0.0 0.0
M/s Udit Infraworld Pvt. Ltd. LOA
46 P-15B Baheradabar-Piparahi-Jadkud road 09/04/2018 02/08/2019 19.7 47.3 0.0 8.1 19.7 45.8 0.0 8.2 19.7 54.0
issued on 26.02.2018
47 Bhatura Bhadpur Barakhurd road - 20.1 0.0 38.3 74.1 0.0 0.0 0.0 0.0 0.0 0.0
P-16A Kharamseda-Kirhai-Ramgarh-Mukundpur To be Retender -
48 - 34.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Road
M/s ABS Associaes JV Bhati
49 P-16B Jharkua-Raigaon-Karsara Associates Pvt. Ltd. LOA issued on 11/04/2018 02/08/2019 24.0 45.0 16.9 35.2 7.1 15.8 7.2 11.0 14.3 26.8
26.02.2018
Barbarik Project Ltd. LoA on
50 Parsona-Mada road 04/08/2019 12.6 63.3 0.0 12.6 32.5 60.2 0.0 0.0 32.5 60.2
12.03.18
Barbarik Project Ltd
P-18A 07/04/2018
A-24 Ashoka Millennium, Ring Road
51 Mada Ramgarh road 04/08/2019 19.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
No.1 Near Rajendra Nagar Raipur
492001(CG)
M/s Shreeji Infraspace Pvt.
52 P-18B Jhurai Sarai road Ltd.,Ahemdabad 12/04/2018 02/08/2019 31.4 50.3 3.6 22.0 27.8 37.0 3.5 8.7 31.3 45.7
LOA issued on 26.02.2018
53 Deotalab Garh Road - 14.8 97.7 22.0 51.0 0.0 4.9 3.0 5.6 3.0 10.5
P-22A
54 Latiyar Hanumana Road M/s Bansal construction Works Pvt. - 26.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
-
55 Chakghat -Sonari Road Ltd. - 27.8 92.7 23.0 51.0 0.0 4.6 3.8 8.4 3.8 13.0
P-22B
56 Sohagi-Teothar-Panwar-Daboura Road - 9.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Grand Total 1456.9 2657.9 220.3 716.3 1051.9 2151.6 54.2 148.8 1106.1 2300.4

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC:
Govt. Contribution.
Infrastructure Development Project Project (In Progress) Page-14

Anticipated Financial FA Upto Expend


SN Project Name Concessionaire Completion Progress Discription Cost Target March- during Yr CFP
Date 2020-21 2020 2020-21

College Building, Hospital building, Hostel Complex, Residential Complex, Sulabh and Rain Basera work completed.
M/s Yashnand
Vidisha (V) Medical College
Engineering & 1. Auditorium, 2. Mortuary 3. Incinator 4. Gym and Guest house, 5. Engineering block. Work complete.
1 and hospital building 30/11/2019 355.95 24.78 331.17 5.21 336.38
Contractors. Ahemdabad, Following Building in Progress.
Construction
Gujrat 1. Development work.
2. Hospital Building.

Grand Total 355.95 24.78 331.17 5.21 336.38

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC:
Govt. Contribution.
Physical, Financial Targets and Achievements for 2019-20 of 24 Border Check Post Barrier's Page-15

PA FA Expen.
S. Physical Project Concession Concessi March March Financial Physical during Yr
No. Name of Road Location Progress Districts Cost Period onaire Agr Dt. App Dt. Com Dt. 2018 2018 Target Target 2019-20 CFP
LARGE- CHECK POST
136.47
1 Agra- Mumbai Road(NH-3) 137.22 Completed Badwani
2 Morena-Dholpur Road (NH-3) 63.65 64.4 Court Case Morena
3 Mhow-Neemuch Road (SH-31) 250.55 251.8 Completed Neemuch
4 Indore- Ichhapur Road (SH-27) 199.60 200.35 Completed Burhanpur
MEDIUM- CHECK POST
1 Indore-Ahemdabad Road (NH-59) 170.10 170.25 Completed Jhabua
2 Rewa-Mirzapur Road (NH-7) 141.95 142.6 Completed Rewa
3 Rewa- Allahabad Road (NH-27) 46.93 47.58 In Progress Rewa
4 Ujjain-Jhalawad-Jaipur Road ( SH-27) 188.08 188.73 Completed Shajapur
5 Seoni-Nagpur Road (NH-7) 646.50 647.15 Completed Seoni M/s MP
6 Betul-Nagpur Road (NH-69) 172.60 173.25 Completed Betul Border
SMALL- CHECK POST 2CCF &
Check
Datiya & Concession 19 check
1 Shivpuri-Jhansi Road (NH-25) 75.95 76.5 Court Case 1094.00 post
Shivpuri Period 12.5 10.11.10 05.05.11 post 85% 930.93 0.0 0% 0 930.9
Cr. Develop
104.70 Year complete
2 Bhind-Ettawah Road (NH-92) 105.25 Court Case Bhind ment
d
Company
3 Naugaon-Jhansi Road (NH-75) 95.4 95.95 Completed Chattarpur
Ltd.
4 Chhindwara-Nagpur Road (NH-12) 72.93 73.48 Completed Chhindwara
5 Jabalpur-Jaipur Road (NH-12) 486.85 487.4 Completed Rajragh
6 Sendhwa-Khetia Road (MDR) 46.03 46.58 Completed Badwani
7 Shivpuri-Kota Road (NH-76) 563.05 563.6 Completed Shivpuri
8 Warud-Multai Road 18.95 19.5 Completed Betul
9 Sagar-Kanpur Road (NH-86) 186.4 186.95 Completed Chatarpur
10 Jabalpur-Mandla Road (NH-12A) 172.375 172.925 In Progress Mandla
11 Sagar-Lalitpur Road (NH-26) 133.5 134.05 Completed Sagar
SINGLE-CHECK POST
1 Balaghat-Gondia (SH-11) 262.1 262.55 Completed Balaghat
2 Venket Nagar Road 23.5 23.95 Completed Anuppur
3 Kabir Chabutara Road 205 205.45 Completed Dindori
Total 4221.995 4477.465 1094 85% 930.93 0 0.00% 0 930.9
CCF Building
1 Indore Completed
2 Gwalior Completed

Length in KM
Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt. Contribution.