100% found this document useful (1 vote)
438 views

Precision Storage Vessels PVT LTD: Pressure Test Report

The document summarizes the results of a hydrostatic pressure test of a 10-inch tangential air separator without a strainer. The test was conducted on July 16, 2020 at Precision Storage Vessels Pvt Ltd. The separator passed a 1-hour hydrotest at 15 bar (15 kg/cm2) using water as the test fluid and with the metal temperature observed at 29°C.

Uploaded by

Senthil Kumaran
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
438 views

Precision Storage Vessels PVT LTD: Pressure Test Report

The document summarizes the results of a hydrostatic pressure test of a 10-inch tangential air separator without a strainer. The test was conducted on July 16, 2020 at Precision Storage Vessels Pvt Ltd. The separator passed a 1-hour hydrotest at 15 bar (15 kg/cm2) using water as the test fluid and with the metal temperature observed at 29°C.

Uploaded by

Senthil Kumaran
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

PRECISION STORAGE VESSELS PVT LTD

CLIENT : M/s HOTLINE TRADING LLC REPORT No. : PSV-HYDRO-J642-01


JOB/TAG NO: : J 642 DATE : '16-07-2020
DRG. No. : PSV-FG-515 Rev-0 MFR.SL.NO: : E031
MODEL : -- ITP INSP. POINT :W
ITP Clause No. : 12.2 INSP. BY. : CLIENT
PRESSURE TEST REPORT
DESCRIPTION TANGENTIAL AIR SEPERATOR - 10'' WITHOUT STRAINER
DATE OF TEST 16-07-2020

HYDROTEST PRESSURE. Kg/Cm2 / Bar (g) 15Bar

TEST FLUID WATER

HOLDING TIME,MINUTES 1 HOUR (60Minutes)

PRESSURE GAUGE RATING Kg/Cm2 / Bar (g) 0-40 Bar

CALIBRATION LABEL No. PSV-PG-005

CALIBRATION VALID UPTO. / CALIBRATION CERTIFICATE No. 15-09-2020 / MNP 3837-01/19-20

OBSERVED METAL TEMPERATURE IN OC 29˚C

TEST POSITION / PROCEDURE REF. Vertical / PSVPL/HYDRO/001 REV NO :4


REMARKS :

FOR QCI FOR QCE FOR PSVPL

NAME : NAME : NAME :

SIGNATURE : SIGNATURE : SIGNATURE :


WITNESSED BY EXAMINED BY WITNESSED & INSPECTED BY
Format: PSVPL/HYDRO/001/F01 Rev.0