Tupi BV: Cosco (Dalian)
Tupi BV: Cosco (Dalian)
FITTINGS
3 HALF COUP.; A105; B16.11; SWE; CL3000 4X1 ML-02 1 0.5
4 90 ELBOW LR; A234 WPB; B16.9; BWE; 4 CRL-01 3 12.3
S-40
5 45 ELBOW LR; A234 WPB; B16.9; BWE; 4 CRL-02 2 4.1
S-40
FLANGES
6 FWN; A105; B16.5; CL150; FF S-40 4 FLG-04B 8 14.2
7 FWN; A105; B16.5; CL150; FF S-80 1 FLG-04B 1 0.5
SUPPORTS
8 GR_01 U-BOLT FOR CARBON STEEL PIPES 4 1 0.5
9 SL_03 WEAR PAD FOR METALLIC PIPES 4 2 0.7
10 PS_04 4 1 0.8
11 PS_13 4 1 0.3
ERECTION MATERIALS
9
22
EL +40059 2 ASME B1.1. - 101.6 mm Length
1 16 PAE; A193 B7, ZN-NI; B18.2.1; NUTS 1/2 PAE-01 8 -
9 3 <5
22 > 1 A194 2H, ZN-NI; B18.2.2. UNC-2A;
1 ASME B1.1. - 76.2 mm Length
17 4"
262 ND
20 VALV-51334007 F6
0
F6 G12 B15 VALVES / IN-LINE ITEMS
14
4
F6 G12 B14 17 VR; WAFER; ORG.COATED; BODY A105; TRIM 4 VR-148 1 7.3
D20-4"-SW-B14-005-S3 29
4"ND 316; API 594; FF; CL150.
D20-4"-SW-B14-005-S1 F6 18 VE; BODY A105; AISI 410; ISO 17292; 1 VE-44 1 5.5
D20-4"-SW-B14-005-S4
FF; CL150.
<1 2 19 FBLD; A105; B16.5; FF; CL150. 1 FLG-05B 1 0.5
21 > F6 19 5
1
1 COI:
> TOTAL WEIGHT THE MOUNTING 13.3
SW-005 FL 2
15 30 <4
41 F6 G12 B15 97 TOTAL WEIGHT OF THE LINE 107.8
5 3 28
22 4X1"ND INDICATION SPOOL
E 182490
D20-4"-SW-B14-005-S1 D20-4"-SW-B14-005-S2 D20-4"-SW-B14-005-S3 D20-4"-SW-B14-005-S4
23
14
0
S11 31 CUT PIPE LENGTH
SP-M07-2026
1 24 PIECE LENGTH N.S. REMARKS END END ITEM
NO (MM) (IN) ONE TWO CODE
129
<2
26
>
8
2
<5> 238 4 BEVEL BEVEL T-02A
F6 G12 B15
<3>
25
F6 26
6
64
S9 2
32
1 SP-M07-2026 127
35 F7 G13 B16
22
27
2 2
9
18
ORIENTATION WEST
ORIENT HANDLE DOWN G13 B16
19
S9
4 VALV-12524683
EL +39707 SP-M07-2026
S8
SP-M07-2026
TUPI BV ENG-E&P/IEUEP-II/IEREPL-I
CLIENT:
E&P
PROJECT:
PRESALT FPSOs
UNIT: PETROBRAS 03C
MATERIAL INSULATION CONDITION TEMP. o C PRESSUREKPag INSPECTION REFERENCE DRAWING TITLE:
TYPE CODE DESIGN CLASS P&ID: PIPING ISOMETRIC
56 1351 Cls II
THICK(mm) 0 OPERATION 26 1139.00 P No
I-DE-3010.97-1252-944-KIU-
005;I-DE-3010.97-5133-944-
4"-SW-B14-005-
API-5L-B-PSL1 PAINTING KIU-001 M07
TREATMENT TEST
LEGENDS REVISION 2027 CODE 2 DESIGN: KIU EXEC: CZT CHECKED:ZSQ APROVED: LZQ
FIT
WELD
FIELD
WELD
TACK
WELD
INSULATED
LINE
INTERNAL
LINING C 2020-01-16 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ TREATMENT STRESS ANALYSIS COLOR 0080 PLANT: SCALE: NO SCALE DRAWING - SHEET: 1 of 5
B 2019-03-15 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ AREA(m² ) 19.202 CORPORATE IEREPL REV.
FIELD SOCKET THREADED STEAM 0 2018-09-28 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ SUBSYSTEM NR13
WELD WELD TRACING
DATE: No.
REV DATE DESCRIPTION EXEC. VERIF. APPROV. 5133.51 FLUID CLASS SUBJECT TO NR13 2020-01-16 I-IS-3010.97-1252-200-KIU-266 C
N FABRICATION MATERIALS
FITTINGS
2 90 ELBOW LR; A234 WPB; B16.9; BWE; 4 CRL-01 6 24.5
S-40
FLANGES
3 FWN; A105; B16.5; CL150; FF S-40 4 FLG-04B 18 31.9
SUPPORTS
4 GT_01 TRANSVERSE GUIDE FOR CARBON 4 2 2.0
STEEL PIPES
5 SV_03 VARIABLE WEAR PAD FOR METALLIC 4 2 -
PIPES
6 PS-03 4 1 4.2
2 7 GL_06 GUIDE FOR CARBON STEEL PIPES 4 2 4.6
EL +41200 8 SL_03 WEAR PAD FOR METALLIC PIPES 4 1 0.4
2 WEIGHT TOTAL MANUFACTURING 158.9
2 12 ERECTION MATERIALS
EL +42127 ORIENTATION NORTH
229
ORIENT HANDLE UP PT MATERIAL DESCRIPTION D.N. CLI-CODE QTD WGT(KG)
F3 G9
1
GASKETS
VALV-51334029 F3 G9 B11
2
9 GASKET; PLAIN; FULL FACE; COMPRESS 4 JPH-09(150) 11 -
1
F3 SHEET NON ASBESTOS; B16.21; FF;
F3 G9 B10
9 9
1,6mm; CL150.
22 2 22 F3
229
2
D20-4"-SW-B14-005-S10 BOLTS
4"ND 3
10 PAE; A193 B7, ZN-NI; B18.2.1; NUTS 5/8 PAE-01 56 -
1 S5 53 A194 2H, ZN-NI; B18.2.2. UNC-2A;
1
SP-M07-0402 1
1 ASME B1.1. - 101.6 mm Length
F3 1
ESP-5133011(REMOVABLE SPOOL) 15 11 PAE; A193 B7, ZN-NI; B18.2.1; NUTS 5/8 PAE-01 16 -
F3 2 8 62 A194 2H, ZN-NI; B18.2.2. UNC-2A;
COI: ASME B1.1. - 152.4 mm Length
3 1
SW-005 FL 3
F3 G9 B10
1 VALVES / IN-LINE ITEMS
F3 G9 B10 >
<9 S7 12 VB WAFER; VITON / NYLON 11 COATED; 4 VB-18 2 11.6
696
SP-M07-0402 BODY-DISC A536 65-45-12; CL250; FF.
1
07E-4"-SW-B14-005-S1 0 0
10
<10>
S4 TOTAL WEIGHT THE MOUNTING 11.6
1001
1
D20-4"-SW-B14-005-S12 1
SP-M07-0402
TOTAL WEIGHT OF THE LINE 170.5
<8>
D20-4"-SW-B14-005-S9
F3 G9 B11 D20-4"-SW-B14-005-S8
F3 G9 INDICATION SPOOL
2 9
1 22 07E-4"-SW-B14-005-S1 D20-4"-SW-B14-005-S10 D20-4"-SW-B14-005-S11 D20-4"-SW-B14-005-S12
D20-4"-SW-B14-005-S7 D20-4"-SW-B14-005-S5 D20-4"-SW-B14-005-S6 D20-4"-SW-B14-005-S7 D20-4"-SW-B14-005-S8
1 2
15 D20-4"-SW-B14-005-S9
2 44 F3 G9 B10
2 8
F3 2 ESP-5133011(REMOVABLE SPOOL)
2 52 1
CUT PIPE LENGTH
12 9 <7
22 2 >
ORIENTATION NORTH 1 1 PIECE LENGTH N.S. REMARKS END END ITEM
ORIENT HANDLE UP 2 3
1 NO (MM) (IN) ONE TWO CODE
S8 > F3 G9 B10 22
VALV-51334006 <6 1 9
SP-M07-0403 <6> 3398 4 BEVEL BEVEL T-02A
D20-4"-SW-B14-005-S11 <7> 218 4 BEVEL BEVEL T-02A
2
1 <8> 771 4 BEVEL BEVEL T-02A
<9> 848 4 BEVEL BEVEL T-02A
F3 <10> 466 4 BEVEL BEVEL T-02A
ESP-5133011(REMOVABLE SPOOL)
D20-4"-SW-B14-005-S6
F3
77 S7 F3 G9 B10
27
SP-M07-0403
2
29
36
37
40
S6
COD:
SW-005 FL 1 S5 SP-M07-0404
F3 G9 B10
SP-M07-0404
7 S4
35
SP-M07-0404
3
4"
ND
D20-4"-SW-B14-005-S5
22 2
9
2
2
TUPI BV ENG-E&P/IEUEP-II/IEREPL-I
CLIENT:
E&P
PROJECT:
PRESALT FPSOs
UNIT: PETROBRAS 03C
MATERIAL INSULATION CONDITION TEMP. o C PRESSUREKPag INSPECTION REFERENCE DRAWING TITLE:
TYPE CODE DESIGN CLASS P&ID: PIPING ISOMETRIC
56 1351 Cls II
THICK(mm) 0 OPERATION 26 1139.00 P No
I-DE-3010.97-1252-944-KIU-
005;I-DE-3010.97-5133-944-
4"-SW-B14-005-
API-5L-B-PSL1 PAINTING KIU-001 M07
TREATMENT TEST
LEGENDS REVISION 2027 CODE 2 DESIGN: KIU EXEC: CZT CHECKED:ZSQ APROVED: LZQ
FIT
WELD
FIELD
WELD
TACK
WELD
INSULATED
LINE
INTERNAL
LINING C 2020-01-16 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ TREATMENT STRESS ANALYSIS COLOR 0080 PLANT: SCALE: NO SCALE DRAWING - SHEET: 2 of 5
B 2019-03-15 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ AREA(m² ) 19.202 CORPORATE IEREPL REV.
FIELD SOCKET THREADED STEAM 0 2018-09-28 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ SUBSYSTEM NR13
WELD WELD TRACING
DATE: No.
REV DATE DESCRIPTION EXEC. VERIF. APPROV. 5133.51 FLUID CLASS SUBJECT TO NR13 2020-01-16 I-IS-3010.97-1252-200-KIU-266 C
N FABRICATION MATERIALS
FITTINGS
FLANGES
2 2
EL +48439 4 FWN; A105; B16.5; CL150; FF S-40 4 FLG-04B 12 21.3
9
ND
262
22
F4 4"
SUPPORTS
1
5 FS_08 PIPE EXTENSION IN ELBOW FOR 4 1 8.1
CARBON STEEL PIPES
229
6 GL-06 4 1 2.3
1 7 GR_01 U-BOLT FOR CARBON STEEL PIPES 4 1 0.5
0
8 SL_03 WEAR PAD FOR METALLIC PIPES 4 2 0.7
14
D40-4"-SW-B14-005-S3 F4 G10 B11 9 PS-02 4 1 3.9
F4
ERECTION MATERIALS
2
3
EL +48178 PT MATERIAL DESCRIPTION D.N. CLI-CODE QTD WGT(KG)
514
D40-4"-SW-B14-005-S2 GASKETS
10 GASKET; PLAIN; FULL FACE; COMPRESS 4 JPH-09(150) 6 -
1
SHEET NON ASBESTOS; B16.21; FF;
<17>
1,6mm; CL150.
F4 G10 B11
1
BOLTS
11 PAE; A193 B7, ZN-NI; B18.2.1; NUTS 5/8 PAE-01 48 -
5 16
A194 2H, ZN-NI; B18.2.2. UNC-2A;
1
ASME B1.1. - 101.6 mm Length
F4
4
INDICATION SPOOL
516
07E-4"-SW-B14-005-S2 07E-4"-SW-B14-005-S3 07E-4"-SW-B14-005-S4 D30-4"-SW-B14-005-S1
D40-4"-SW-B14-005-S2 D40-4"-SW-B14-005-S3
73
0
<1
6>
CUT PIPE LENGTH
3 3
1
EL +47523 PIECE LENGTH N.S. REMARKS END END ITEM
NO (MM) (IN) ONE TWO CODE
3292
S7
SP-M07-0400
S9
SP-M07-0400
S8 S8
SP-M07-0400 2
SP-M07-0400 EL +43484
1
D30-4"-SW-B14-005-S1 9
22
1336
F4 G10 B11 3
2 1
F4 G10 B11 55 2
F4
1
4>
229
F4 <1
07E-4"-SW-B14-005-S4
1
<13>
2
1128
2 07E-4"-SW-B14-005-S3
56
3
2 1 F4 G10 B11
2 1
<1
2> 1> THIS DOCUMENT IS THE PROPERTY OF PETROBRAS AND IT IS PROTECTED IN ACCORDANCE
<1 WITH PREVALING LAW, IT SHALL ONLY BE USED FOR THE PURPOSE IT IS DELIVERED
1 3
ND
4" CONTRACT:
53 3900.0000043.15.2
4
COSCO(DALIAN) CREA Nr. TECH.RESP.
17 1 RJ‐1974101868 Jose Roberto Machado Barreto
12
FILE NR: COSCO DOC Nr:
2
S5
SP-M07-0401
TUPI BV ENG-E&P/IEUEP-II/IEREPL-I
CLIENT:
S6 E&P
SP-M07-0401
PROJECT:
PRESALT FPSOs
UNIT: PETROBRAS 03C
MATERIAL INSULATION CONDITION TEMP. o C PRESSUREKPag INSPECTION REFERENCE DRAWING TITLE:
TYPE CODE DESIGN CLASS P&ID: PIPING ISOMETRIC
56 1351 Cls II
THICK(mm) 0 OPERATION 26 1139.00 P No
I-DE-3010.97-1252-944-KIU-
005;I-DE-3010.97-5133-944-
4"-SW-B14-005-
API-5L-B-PSL1 PAINTING KIU-001 M07
TREATMENT TEST
LEGENDS REVISION 2027 CODE 2 DESIGN: KIU EXEC: CZT CHECKED:ZSQ APROVED: LZQ
FIT
WELD
FIELD
WELD
TACK
WELD
INSULATED
LINE
INTERNAL
LINING C 2020-01-16 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ TREATMENT STRESS ANALYSIS COLOR 0080 PLANT: SCALE: NO SCALE DRAWING - SHEET: 3 of 5
B 2019-03-15 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ AREA(m² ) 19.202 CORPORATE IEREPL REV.
FIELD SOCKET THREADED STEAM 0 2018-09-28 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ SUBSYSTEM NR13
WELD WELD TRACING
DATE: No.
REV DATE DESCRIPTION EXEC. VERIF. APPROV. 5133.51 FLUID CLASS SUBJECT TO NR13 2020-01-16 I-IS-3010.97-1252-200-KIU-266 C
N FABRICATION MATERIALS
FITTINGS
3 TE; A234 WPB; B16.9; BWE. S-40 4X4 TE-02 2 12.0
4 WOL; A105; MSS-SP-97; BWE; S-40 x S-80 4X1 WOL-01 1 0.4
5 90 ELBOW LR; A234 WPB; B16.9; BWE; 4 CRL-01 1 4.1
S-40
FLANGES
2
6 FWN; A105; B16.5; CL150; FF S-40 4 FLG-04B 12 21.3
127
14 7 FSW; A105; B16.5; FF; CL150. S-80 1 FLG-05F 1 1.0
2
G9 B11
WEIGHT TOTAL MANUFACTURING 284.6
8
13 ERECTION MATERIALS
ORIENTATION WEST
2
ORIENT HANDLE UP
PT MATERIAL DESCRIPTION D.N. CLI-CODE QTD WGT(KG)
<34>
VALV-12524643 GASKETS
F7 G9 B11 8 GASKET; PLAIN; FULL FACE; COMPRESS 4 JPH-09(150) 7 -
SHEET NON ASBESTOS; B16.21; FF;
176
1,6mm; CL150.
9 GASKET; PLAIN; FULL FACE; COMPRESS 1 JPH-09(150) 2 -
SHEET NON ASBESTOS; B16.21; FF;
4 1,6mm; CL150.
4X1"ND
BOLTS
1
10 PAE; A193 B7, ZN-NI; B18.2.1; NUTS 5/8 PAE-01 56 -
A194 2H, ZN-NI; B18.2.2. UNC-2A;
12 ASME B1.1. - 101.6 mm Length
N 20850
11 PAE; A193 B7, ZN-NI; B18.2.1; NUTS 1/2 PAE-01 8 -
<3
1 5> 3 A194 2H, ZN-NI; B18.2.2. UNC-2A;
22 1 ASME B1.1. - 76.2 mm Length
4
2 4
3 VALVES / IN-LINE ITEMS
F6 G8 B10 D40-4"-SW-B14-005-S5
4X4"ND 12 FBLD; A105; B16.5; FF; CL150. 4 FLG-05B 2 5.6
EL +49018
13 VE; BODY A105; AISI 410; ISO 17292; 1 VE-44 1 5.5
FF; CL150.
70 14 FBLD; A105; B16.5; FF; CL150. 1 FLG-05B 1 0.5
2
6
TOTAL WEIGHT THE MOUNTING 11.5
33 TOTAL WEIGHT OF THE LINE 296.1
32
5 <2
0>
181
1
INDICATION SPOOL
F6
D40-4"-SW-B14-005-S4 D40-4"-SW-B14-005-S5 D40-4"-SW-B14-005-S6 D40-4"-SW-B14-005-S7
D40-4"-SW-B14-005-S8
1 4 F6 G8 B10
F6 G8 B10
CUT PIPE LENGTH
7 D40-4"-SW-B14-005-S8
PIECE LENGTH N.S. REMARKS END END ITEM
F6 NO (MM) (IN) ONE TWO CODE
1
53 <2
1> <35> 743 4 BEVEL BEVEL T-02A
<19>
F6 G8 B10 1 F6
1
396
COD: F6 G8 B10
SW-005 FL 3
D40-4"-SW-B14-005-S7
2
D40-4"-SW-B14-005-S4
ND
4"
1 <2
2>
1
1
1 31 F6 G8 B10
1 52
> 4 2 D40-4"-SW-B14-005-S6
18 F6
< 69
3 1
3
4X4"ND
<2 N 5560
5 2 3> 2
1
2 19
47
F6 G8 B10
18
1
12
4
181
1
F6
TUPI BV ENG-E&P/IEUEP-II/IEREPL-I
CLIENT:
E&P
PROJECT:
PRESALT FPSOs
UNIT: PETROBRAS 03C
MATERIAL INSULATION CONDITION TEMP. o C PRESSUREKPag INSPECTION REFERENCE DRAWING TITLE:
TYPE CODE DESIGN CLASS P&ID: PIPING ISOMETRIC
56 1351 Cls II
THICK(mm) 0 OPERATION 26 1139.00 P No
I-DE-3010.97-1252-944-KIU-
005;I-DE-3010.97-5133-944-
4"-SW-B14-005-
API-5L-B-PSL1 PAINTING KIU-001 M07
TREATMENT TEST
LEGENDS REVISION 2027 CODE 2 DESIGN: KIU EXEC: CZT CHECKED:ZSQ APROVED: LZQ
FIT
WELD
FIELD
WELD
TACK
WELD
INSULATED
LINE
INTERNAL
LINING C 2020-01-16 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ TREATMENT STRESS ANALYSIS COLOR 0080 PLANT: SCALE: NO SCALE DRAWING - SHEET: 4 of 5
B 2019-03-15 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ AREA(m² ) 19.202 CORPORATE IEREPL REV.
FIELD SOCKET THREADED STEAM 0 2018-09-28 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ SUBSYSTEM NR13
WELD WELD TRACING
DATE: No.
REV DATE DESCRIPTION EXEC. VERIF. APPROV. 5133.51 FLUID CLASS SUBJECT TO NR13 2020-01-16 I-IS-3010.97-1252-200-KIU-266 C
N FABRICATION MATERIALS
FITTINGS
2 90 ELBOW LR; A234 WPB; B16.9; BWE; 4 CRL-01 8 32.7
S-40
FLANGES
3 FWN; A105; B16.5; CL150; FF S-40 4 FLG-04B 16 28.4
SUPPORTS
4 FS_07 PIPE EXTENSION IN ELBOW FOR 4 1 9.8
CARBON STEEL PIPES
5 GR_01 U-BOLT FOR CARBON STEEL PIPES 4 1 0.5
6 SL_03 WEAR PAD FOR METALLIC PIPES 4 1 0.4
7 SV_03 VARIABLE WEAR PAD FOR METALLIC 4 1 -
COD:
SW-005 FL 4 PIPES
8 PS-25 4 1 46.1
2 9 GL_06 GUIDE FOR CARBON STEEL PIPES 4 1 2.3
3
WEIGHT TOTAL MANUFACTURING 278.3
10 2
S6 01
SP-M07-0268 2
1 <2 ERECTION MATERIALS
F3 G10 B11 8> 9> 1
S5 <2 1
SP-M07-0268
PT MATERIAL DESCRIPTION D.N. CLI-CODE QTD WGT(KG)
2 22
2 9 GASKETS
10 GASKET; PLAIN; FULL FACE; COMPRESS 4 JPH-09(150) 8 -
9 2 SHEET NON ASBESTOS; B16.21; FF;
22
1,6mm; CL150.
4 F3 G10 B11
2 F3 G10 B11 29 D40-4"-SW-B14-005-S10 2 BOLTS
1
F3
423
4"ND
2831
5>
<2
1
F3
3 D40-4"-SW-B14-005-S12
1
<26>
1 INDICATION SPOOL
7>
<30>
<2 07E-4"-SW-B14-005-S5 07E-4"-SW-B14-005-S6 07E-4"-SW-B14-005-S7 D30-4"-SW-B14-005-S9
1
F3 G10 B11
D40-4"-SW-B14-005-S10 D40-4"-SW-B14-005-S11 D40-4"-SW-B14-005-S12 D40-4"-SW-B14-005-
S13
2 2
EL +48413 1 D30-4"-SW-B14-005-S9
D40-4"-SW-B14-005-S13 CUT PIPE LENGTH
71 1
F3 43 10 2
07E-4"-SW-B14-005-S7 PIECE LENGTH N.S. REMARKS END END ITEM
2 3 2 9 F3
NO (MM) (IN) ONE TWO CODE
229
32
<24> 193 4 BEVEL BEVEL T-02A
229
F3 G10 B11 3 S7
2 <25> 1090 4 BEVEL BEVEL T-02A
S4 D40-4"-SW-B14-005-S11 SP-M07-0399 <26> 454 4 BEVEL BEVEL T-02A
SP-M07-0270 <27> 2999 4 BEVEL BEVEL T-02A
<28> 1380 4 BEVEL BEVEL T-02A
2 23
3
<29> 771 4 BEVEL BEVEL T-02A
EL +44438 36
<30> 2601 4 BEVEL BEVEL T-02A
2 <31> 132 4 BEVEL BEVEL T-02A
2 <32> 135 4 BEVEL BEVEL T-02A
2 <3
<33> 110 4 BEVEL BEVEL T-02A
EL +47499 1> 2
S8 1
SP-M07-0399
22
9
2
1
S9
F3
SP-M07-0399
F3 G10 B11 1
2
1
<32>
366
07E-4"-SW-B14-005-S6
595
3
F3
F3 G10 B11
1
1
2
EL +43843
229
30 <33> 1
2 4"ND F3
TP M-170085
34 3 E 187610
0 N 3396
EL +43843
07E-4"-SW-B14-005-S5
TUPI BV ENG-E&P/IEUEP-II/IEREPL-I
CLIENT:
E&P
PROJECT:
PRESALT FPSOs
UNIT: PETROBRAS 03C
MATERIAL INSULATION CONDITION TEMP. o C PRESSUREKPag INSPECTION REFERENCE DRAWING TITLE:
TYPE CODE DESIGN CLASS P&ID: PIPING ISOMETRIC
56 1351 Cls II
THICK(mm) 0 OPERATION 26 1139.00 P No
I-DE-3010.97-1252-944-KIU-
005;I-DE-3010.97-5133-944-
4"-SW-B14-005-
API-5L-B-PSL1 PAINTING KIU-001 M07
TREATMENT TEST
LEGENDS REVISION 2027 CODE 2 DESIGN: KIU EXEC: CZT CHECKED:ZSQ APROVED: LZQ
FIT
WELD
FIELD
WELD
TACK
WELD
INSULATED
LINE
INTERNAL
LINING C 2020-01-16 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ TREATMENT STRESS ANALYSIS COLOR 0080 PLANT: SCALE: NO SCALE DRAWING - SHEET: 5 of 5
B 2019-03-15 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ AREA(m² ) 19.202 CORPORATE IEREPL REV.
FIELD SOCKET THREADED STEAM 0 2018-09-28 ISSUE FOR CONSTRUCTION CZT ZSQ LZQ SUBSYSTEM NR13
WELD WELD TRACING
DATE: No.
REV DATE DESCRIPTION EXEC. VERIF. APPROV. 5133.51 FLUID CLASS SUBJECT TO NR13 2020-01-16 I-IS-3010.97-1252-200-KIU-266 C