Project Name: Delivery Drone Revision Number: 01 DATE: 6/6/2020

This document provides a project plan summary for a delivery drone project. It outlines the key milestones and activities along the critical path over a 28 week period. Activities include developing requirements and plans, designing drone changes, procuring materials, testing flight paths, and final implementation. The project aims to develop customized delivery drones and operations procedures to conclude at the end of week 28.

Uploaded by

Arvin Dalisay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views

Project Name: Delivery Drone Revision Number: 01 DATE: 6/6/2020

This document provides a project plan summary for a delivery drone project. It outlines the key milestones and activities along the critical path over a 28 week period. Activities include developing requirements and plans, designing drone changes, procuring materials, testing flight paths, and final implementation. The project aims to develop customized delivery drones and operations procedures to conclude at the end of week 28.

Uploaded by

Arvin Dalisay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT NAME: DELIVERY DRONE

REVISION NUMBER: 01
DATE: 6/6/2020

KEY # All in Weeks


Early Duration Early
Start Finish
Activity name and number
Critical Path
Late Total Late
Start Slack Finish

0 4 4
1.1.2 – Engage 6 3 9 9 2 11 11 3 14
stakeholders 1.2.1 – Schedule 1.2.6 – Risk 1.2.2 – Budget
2 2 6 Development Management Plan Estimate
13 7 16 16 7 18 18 7 21

0 0 0 0 6 6
6 0 6
1.1.1 – Develop 6 5 11 11 3 14 14 4 18
Start Milestone—
Scope and Plan 1.3.1 – Drone
0 0 0 End Initiating 1.5.1 – Flight Path 1.5.2 – Flight Path
0 0 6 Changes Design
6 0 6 Engineering Testing
6 0 11 14 3 17 17 3 21

11 3 14
0 3 3 6 3 9 14 8 22
1.3.2 – Purchase
1.1.3 – 1.2.5 – Process 1.3.3 – Custom
Design Materials
Communication Drones Structure
11 0 14
Management Plan 19 13 22 14 0 22
3 3 6

6 4 10 10 4 14
14 3.5 17.5
1.4.1 – System 1.4.2 – Specialized
Changes Design Customer Order 1.4.3 – Custom
Interface Management
11.5 5.5 15.5
Reporting Interface
# Equations 15.5 5.5 19.5
19.5 5.5 23

Total Slack = TS = LF – EF = LS – ES EF = ES + Dur LS = LF – Dur

14 4 15` 18 0 18
1.2.3 – Legal Contract Milestone – Contract
Negotiations Assigned
21 7 25 25 7 25

18 2 20 22 2 24 24 0 24
25 2 27 27 1 28
1.5.3 – Pharmacy 1.5.4 – Customization Milestone –
Manager Drone of Flight Processing 1.6.1 – Final 1.6.2 – Closing
End Flight
Implementation Out the Project
Operations Procedures 23 1 25 Operations
21 3 23 25 0 27 27 0 28
25 1 25

22 3 25 25 0 25
1.3.4 – Drone Milestone – End
Maintenance Procedures Adapted Drones 28 0 28
22 0 25 25 0 25
Finish

28 0 28
17.5 0 17.5
Milestone -- End IT
and App Interfaces
23 5.5 23