0% found this document useful (0 votes)
28 views2 pages

Packing List: Bundle No Item Code Description Cut Length Pcs. Weight

The document is a packing list that contains details of various items being shipped including the bundle number, item code, description, cut length, number of pieces, and total weight. It lists over 100 items with codes for different profiles like DP, SP, handles, and tracks. The total weight of all items in the shipment is 5237.210 kg.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views2 pages

Packing List: Bundle No Item Code Description Cut Length Pcs. Weight

The document is a packing list that contains details of various items being shipped including the bundle number, item code, description, cut length, number of pieces, and total weight. It lists over 100 items with codes for different profiles like DP, SP, handles, and tracks. The total weight of all items in the shipment is 5237.210 kg.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Packing List

Bundle no Item Code Description Cut Length Pcs. Weight


2031 DP2515 DP 2.5 x 1.5 15 16 45.940
2030 DP2515 DP 2.5 x 1.5 15 20 57.450
2029 DP2515 DP 2.5 x 1.5 15 16 46.240
2028 DP2515 DP 2.5 x 1.5 15 16 46.140
2027 DP2515 DP 2.5 x 1.5 15 20 57.690
2073 SP2515 SP 2.5 x 1.5 15 20 44.090
2068 SP2515 SP 2.5 x 1.5 15 20 44.090
2064 SP2515 SP 2.5 x 1.5 15 12 26.910
2063 SP2515 SP 2.5 x 1.5 15 15 33.620
1647 SP2515 SP 2.5 x 1.5 16 20 51.580
1649 SP2515 SP 2.5 x 1.5 16 20 51.400
1650 SP2515 SP 2.5 x 1.5 16 23 61.100
1637 SP2515 SP 2.5 x 1.5 16 20 52.440
2046 H34 Handle 3 x 4 15 45 51.090
2045 H34 Handle 3 x 4 15 45 50.930
2044 H34 Handle 3 x 4 15 45 51.240
2043 H34 Handle 3 x 4 15 45 51.540
2047 H34 Handle 3 x 4 15 45 51.050
1344 H34 Handle 3 x 4 15 35 49.800
1345 H34 Handle 3 x 4 15 35 49.550
1206 H34 Handle 3 x 4 15 30 42.880
1204 H34 Handle 3 x 4 15 30 42.790
1559 MT34 MT 3 X 4 15 35 54.590
1560 MT34 MT 3 X 4 15 30 47.080
1624 MT34 MT 3 X 4 16 30 49.630
1636 MT34 MT 3 X 4 15 45 69.440
1558 MT34 MT 3 X 4 15 30 45.840
2026 TB34 Top Bottom 3 x 4 15 30 36.990
2022 TB34 Top Bottom 3 x 4 15 30 37.300
2011 TB34 Top Bottom 3 x 4 15 35 43.250
2007 TB34 Top Bottom 3 x 4 15 30 40.080
2008 TB2 2 Track Bottom 15 24 46.380
2020 L151 L Pipe 1.5 x 1 15 40 51.490
2018 L151 L Pipe 1.5 x 1 15 40 51.680
2005 H6018 Handle 60 x 18 15 9 22.920
2016 H6018 Handle 60 x 18 15 21 52.800
2003 H6018 Handle 60 x 18 15 21 53.100
2001 H6018 Handle 60 x 18 15 21 53.390
1999 H6018 Handle 60 x 18 15 21 53.120
1996 H6018 Handle 60 x 18 15 21 52.960
1998 H6018 Handle 60 x 18 15 21 53.270
2015 IL34 IL (Interlock) 3 x 4 15 30 46.280
2009 TB34 Top Bottom 3 x 4 15 30 39.890
2010 TB2 2 Track Bottom 15 24 46.380
2006 TB2 2 Track Bottom 15 18 34.850
2004 TB2 2 Track Bottom 15 20 39.000
2000 TT3 3 Track Top 15 18 46.180
1997 TT3 3 Track Top 15 18 45.790
995 H TT2 2 Track Top 16 10 41.690
1993 TT3 3 Track Top 15 18 45.280
1992 TT2 2 Track Top 15 25 45.000
1991 TT2 2 Track Top 15 24 42.530
1990 TT3 3 Track Top 15 16 39.680
1989 TT2 2 Track Top 15 24 42.230
1988 TT3 3 Track Top 15 12 29.290
2014 L151 L Pipe 1.5 x 1 15 32 41.630
2013 L151 L Pipe 1.5 x 1 15 32 41.450
1986 H TT2 2 Track Top 15 21 36.920
1971 TT2 2 Track Top 15 24 41.980
1969 IL34 IL (Interlock) 3 x 4 15 40 60.100
1968 IL34 IL (Interlock) 3 x 4 15 40 59.540
1967 IL34 IL (Interlock) 3 x 4 15 30 44.490
2024 TT2 2 Track Top 15 24 42.890
2021 H TB3 3 Track Bottom 15 10 50.230
2019 TB3 3 Track Bottom 15 10 50.130
Packing List
Bundle no Item Code Description Cut Length Pcs. Weight
1984 H TT2 2 Track Top 15 15 58.570
1982 H TT2 2 Track Top 15 16 62.900
1983 H TT2 2 Track Top 15 15 58.680
1974 H TT3 3 Track Top 15 10 50.100
1973 H TT3 3 Track Top 15 10 50.300
1972 H TT3 3 Track Top 15 12 60.310
1721 IL34 IL (Interlock) 3 x 4 15 30 44.290
1602 IL34 IL (Interlock) 3 x 4 15 18 26.640
1985 H TT2 2 Track Top 12 22 69.100
1987 H TT2 2 Track Top 12 18 56.480
1980 H TT3 3 Track Top 12 12 48.490
1979 H TT3 3 Track Top 12 16 64.440
1978 H TT3 3 Track Top 12 12 47.990
2083 IL21 InterLock 2 x 1 15 18 44.840
2084 TT3-1 3 Track Top 1" 15 12 56.700
2085 BB-1 Bearing Bottom 60 x 25 15 15 43.400
2086 TB21 Top Bottom 2 X 1 15 12 60.950
2034 SP2515 SP 2.5 x 1.5 12 20 36.290
2036 SP2515 SP 2.5 x 1.5 12 20 35.790
2035 SP2515 SP 2.5 x 1.5 12 20 35.680
2072 SP2515 SP 2.5 x 1.5 12 20 35.500
2074 SP2515 SP 2.5 x 1.5 12 20 35.500
2075 SP2515 SP 2.5 x 1.5 12 20 35.510
1966 IL34 IL (Interlock) 3 x 4 12 40 47.930
1970 IL34 IL (Interlock) 3 x 4 12 40 48.130
2033 DP2515 DP 2.5 x 1.5 12 12 28.050
2012 IL34 IL (Interlock) 3 x 4 12 37 45.630
1962 RT21 RT 2 x 1 12 50 49.720
1957 RT21 RT 2 x 1 12 50 48.700
1956 RT21 RT 2 x 1 12 50 48.570
1961 RT21 RT 2 x 1 12 50 50.960
1960 RT21 RT 2 x 1 12 50 49.670
1435 TB2 2 Track Bottom 16 18 36.440
1436 TB2 2 Track Bottom 16 18 36.210
1932 TB34 Top Bottom 3 x 4 12 45 44.630
1930 TB34 Top Bottom 3 x 4 12 45 44.630
1929 TB34 Top Bottom 3 x 4 12 45 44.280
2067 H34 Handle 3 x 4 12 45 41.840
2055 H34 Handle 3 x 4 12 35 32.170
2052 H34 Handle 3 x 4 12 45 41.950
2050 H34 Handle 3 x 4 12 45 42.180
2049 H34 Handle 3 x 4 12 45 42.210
2048 H34 Handle 3 x 4 12 45 41.510
2053 IL34 IL (Interlock) 3 x 4 12 20 23.810
878 TB2 2 Track Bottom 12 10 30.600
129 TB2 2 Track Bottom 12 10 31.200
2042 TT3 3 Track Top 12 20 40.200
2041 TT3 3 Track Top 12 20 39.920
2038 TT3 3 Track Top 12 16 31.390
2037 TT3 3 Track Top 12 14 27.930
Total 5237.210

You might also like